20
Tuesday, April 05,2016 519 Main ST Marble city, OK Page I 0/20 WorkWrite-Up and Bid Document Rose Yahola 519 Main 8T Marble city, OK 74945- (918) 525-2660 Contractor Name Contractor Signature Bid Due Date: Trade Area Description Comments Manual Spec Quantity Enter Bid Appliances 1 KITCHEN Oryer Vent/Replace. Replace existing dryer replace dryer vent vent with new louvered dryer vent and ducting. 10.0.2.0. 1 EA 1'--- _ 2 Range Oven/30"/Free Standing. Install new replace oven 30" range/oven. 10.F 1 EAIL- _ 3 Refrigerator/12 C.F.llnstall new replace fridge refrigerator/12 C.F. 10.F 1 EAI _ 4 Vent-A-Hood/30"/Ext. Vented/Install new replace venthood kitchen vent-a-hood (ext.vent)/30" 10.0.3.0 1 EAI _ Carpentry BATHROOM #1

EAIL- EAI. 1 EAI _ Marble city, OK Page 10of 20. Tuesday, April 05,2016 519 Main ST Marble city, OK Page 110/20 Trade Area Description Comments Manual Spec Quantity Enter Bid

Embed Size (px)

Citation preview

Tuesday, April 05,2016 519 Main ST Marble city, OK Page I 0/20

WorkWrite-Up and Bid DocumentRose Yahola519 Main 8TMarble city, OK74945-(918) 525-2660

Contractor Name

Contractor Signature

Bid Due Date:

Trade Area Description Comments Manual Spec Quantity Enter Bid

Appliances

1KITCHENOryer Vent/Replace. Replace existing dryer replace dryer ventvent with new louvered dryer vent andducting.

10.0.2.0.1 EA 1'--- _

2 Range Oven/30"/Free Standing. Install new replace oven30" range/oven.

10.F 1 EAIL- _

3 Refrigerator/12 C.F.llnstall new replace fridgerefrigerator/12 C.F.

10.F 1 EAI _

4 Vent-A-Hood/30"/Ext. Vented/Install new replace venthoodkitchen vent-a-hood (ext.vent)/30"

10.0.3.0 1 EAI _

Carpentry

BATHROOM #1

Tuesday, April OS, 2016 519 Main ST Marble city, OK Page2of20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

BATHROOM #15 Closet ShelflWood. Install new closet shelf/ replace wood 6.Z. 8 LF I

1" x 12". shelves in bathroom

6 Medicine Cabinet/Steel. Replace existing replace medicine 11.2.Z 1 EA Imedicine cabinet with new medicine cabinetcabinet/steel frame w/mirror-16"x 22".

7 Paper Holder/Replace paper holder replace paper holder 10.E.2. 1 EA I

8 Passage Door/Pre-Hung/6-Panel/Replace replace entry door 8.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

9 Towel Bar/Install new towel bar/24". replace towel bars 10.E.2. 2 EA I

BATHROOM #210 Closet ShelflWood. Install new closet shelf/ replace wood selves 6.Z. 8 LF I

1" x 12".

11 Medicine Cabinet/Steel. Replace existing replace medicine 11.2.Z 1 EA Imedicine cabinet with new medicine cabinetcabinet/steel frame w/mirror-16"x 22".

Tuesday, April 05,2016 519 Main ST Marble city, OK Page 3 0/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

BATHROOM #212 Paper Holder/Replace paper holder replace paper holder 10.E.2. 1 EA I

13 Passage Door/Pre-Hung/6-Panel/Replace replace entry door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

14 Towel Bar/Install new towel bar/24". replace towel bars 10.E.2. 2 EA I

BEDROOM #115 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 14 LF

1" x 12". closet

16 Clothes Rod/Install. Install new closet replace rod in closet 6.Z. 14 LF Iclothes rod.

17 Passage Door/Pre-Hung/6-Panel/Replace replace closet door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

18 Passage Door/Pre-Hung/6-Panel/Replace replace entry door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

Tuesday, April 05,2016 519MainST Marble city, OK Page 4 0/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

BEDROOM #119 Window Stool/Replace window stool. replace window B.R 6 LF I

stool and sill

20 Window/ReplaceNinyl. Replace window replace windows B.G 2 EA Iwith new Solid Vinyl window/singlehung/Use American Craftsman Series 2160-Vinyl or written approved equal. Includeframe, sill, sash, trim, hardware, screen,repair & paint of interior and exteriorsurfaces.

BEDROOM #221 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 6 LF

1" x 12". closet

22 Clothes Rodllnstall. Install new closet replace metal rod in 6.Z. 6 LF Iclothes rod. closet

23 Passage Door/Pre-Hung/6-Panel/Replace replace closet door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

24 Passage Door/Pre-Hung/6-Panel/Replace replace entry door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

Tuesday, April 05,2016 519 Main ST Marble city, OK Page 5 0/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

BEDROOM #225 Window Stool/Replace window stool. replace sill and stool B.R 3 LF I

26 Window/ReplaceNinyl. Replace window replace window B.G 1 EA Iwith new Solid Vinyl window/singlehung/Use American Craftsman Series 2160-Vinyl or written approved equal. Includeframe, sill, sash, trim, hardware, screen,repair & paint of interior and exteriorsurfaces.

BEDROOM #327 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 8 LF

1" x 12". closet

28 Clothes Rod/Install. Install new closet replace rod in closet 6.Z. 8 LF Iclothes rod.

29 Passage Door/Pre-Hung/6-Panel/Replace replace entry door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

30 Passage Door/Pre-Hung/6-Panel/Replace replace closet door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

BEDROOM #331 Window Stool/Replace window stool. replace stool and sill 8.R 6 LF I

32 Window/ReplaceNinyl. Replace window replace windows 8.G 2 EA Iwith new Solid Vinyl window/singlehung/Use American Craftsman Series 2160-Vinyl or written approved equal. Includeframe, sill, sash, trim, hardware, screen,repair & paint of interior and exteriorsurfaces.

EXTERIOR33 Door/Exterior/6-Panel Steel/Pre- replace entry doors 8.A. 2 EA I

Hung/Replace. Replace exterior entrancedoor with new pre-hung-steel six panel. UseStanley #13757 or written approved equal.Work shall include paint-both sides.

GARAGE34 Door/Exterior/6-Panel SteeliPre- replace entry doors 8.A. 2 EA I

Hung/Replace. Replace exterior entrancedoor with new pre-hung-steel six panel. UseStanley #13757 or written approved equal.Work shall include paint-both sides.

35 Garage Vehicle Door/9' x 7'/lnstall new replace garage door 8.C 1 EA Ioverhead garage vehicle door--9' X 7'.

Tuesday, April 05,2016 519 MaillST Marble city, OK Page 60/20

Tuesday, April OS, 2016 519 Main ST Marble city, OK Page 70/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

GARAGE36 Passage Door/Pre-Hung/6-Panel/Replace replace water B.A 2 EA I

passage door & lockset with new pre-hung heater, and hvac6-Panel. Work shall include paint both sides. closet doors

HAllWAY #137 Closet ShelflWood. Install new closet shelf/ replace wood 6.Z. 4 LF I

1" x 12". shelves in hallwaycloset

38 Clothes Rod/Install. Install new closet replace clothes rod 6.Z. 4 LF Iclothes rod. in hallway closet

39 Passage Door/Pre-Hung/6-Panel/Replace replace closet door B.A 1 EA Ipassage door & lockset with new pre-hung in hallway6-Panel. Work shall include paint both sides.

INTERIOR40 Base Trim/Oak Colonial 2-1/4"/Replace. replace all trim, 6.N 450 LF I

Replace base trim, colonial, oak, 2-114". paint white.

KITCHEN41 Base Cabinets/Replace/Oak. Replace base replace base 6.0.2 11 LF I

cabinets with new cabinets, pre-finished cabinetsoak. Use Mill's Pride "York" or writtenapproved equal.

Tuesday, April 05,2016 519MainST Marble city, OK Page 8 of20

Trade Area Description Comments Manua/Spec Quantity Enter Bid

Carpentry

KITCHEN42 Closet Door/Bi-Fold/Replace door with new replace double B.A. 1 EA I

bi-fold closet door/complete with trim. Work doors on washershall include paint both sides. room

43 Closet ShelflWood. Install new closet shelf/ replace shelves in 6.Z. 12 LF1" x 12". pantry

44 Closet ShelflWood. Install new closet shelf/ install shelves in 6.Z. 12 LF1" x 12". washer room

45 Countertop/Replace. Remove existing replace countertop 6.0.4 11 LF Icountertop and replace with new countertopand backsplash.

46 Door/Exterior/6-Panel SteellPre- Replace entry door B.A. 1 EA IHung/Replace. Replace exterior entrancedoor with new pre-hung-steel six panel. UseStanley #13757 or written approved equal.Work shall include paint-both sides.

47 Passage Door/Pre-Hung/6-PaneIlReplace replace pantry door B.A 1 EA Ipassage door & lockset with new pre-hung6-Panel. Work shall include paint both sides.

Tuesday, April 05,2016 519MainST Marble city, OK Page 90/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Carpentry

KITCHEN48 Wall Hung Cabinets/Replace/Oak. Replace replace wall hung 6.0.2 18 LF I

all wall hung cabinets with new cabinets/ pre- cabinetsfinished oak/use Mill's Pride "York" orwritten approved equal.

49 Window Stool/Replace window stool. Replace window 8.R 3 LF Istool and sill

50 Window/ReplaceNinyl. Replace window Replace window 8.G 1 EA Iwith new Solid Vinyl window/singlehung/Use American Craftsman Series 2160-Vinyl or written approved equal. Includeframe, sill, sash, trim, hardware, screen,repair & paint of interior and exteriorsurfaces.

LIVING ROOM #151 Door/Exterior/6-Panel Steel/Pre- Replace entry door 8.A. 1 EA I

Hung/Replace. Replace exterior entrancedoor with new pre-hung-steel six panel. UseStanley #13757 or written approved equal.Work shall include paint-both sides.

52 Window Stool/Replace window stool. Replace window 8.R 6 LF Istool and sill

Comments Quantity Enter BidTrade Description Manual SpecArea

LIVING ROOM #1Window/ReplaceNinyl. Replace window replace windowwith new Solid Vinyl window/singlehung/Use American Craftsman Series 2160-Vinyl or written approved equal. Includeframe, sill, sash, trim, hardware, screen,repair & paint of interior and exteriorsurfaces.

Carpentry

53

CarpentrylP lumb ing

54BATHROOM #1Vanity Base Cabinet, Faucet, Top. Replaceexisting with new lavatory/vanity basecabinet (pre-finished oak), cultured marbletop (1" overlap) and faucet (Moen onehandle # P84521) or written approvedequal. Match existing size.

55BATHROOM #2Vanity Base Cabinet, Faucet, Top. Replaceexisting with new lavatorylvanity basecabinet (pre-finished oak), cultured marbletop (1" overlap) and faucet (Moen onehandle # P84521) or written approvedequal. Match existing size.

Drywall & Finish

INTERIOR

Tuesday, April 05,2016 519MainST

8.G 2 EA 1 --'

replace vanitycabinet, top sinkand faucet.Match existing size.

EAI _11.4. 1

replace vanity andtop, sink and faucet,match existing

EAI _11.4. 1

Marble city, OK Page 10 of 20

Tuesday, April 05,2016 519 Main ST Marble city, OK Page 110/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Drywall & Finish

INTERIOR56 Drywall/Wall/Replace 1/2" drywall on Remove all 9.0 1600 SF I

wall/Finish completely. Work shall include sheetrock, on wallstape, bed, texture and paint to match and replace allexisting surfaces. sheetrock on

interior walls.

Electrical

BATHROOM #157 Light Fixture & SwitchlWet Area/Replace. replace light above 13.0. 1 EA I

Replace existing light fixture and switch with sinknew wet-area approved light fixture andswitch.

58 Light Fixture/Heat-Vent-Lightllnstall new replace heat vent 13.0.16 1 EA Ibathroom light (100 watt), heater (1450 lightwatt), vent fan (70 CFM) and switch. UseBroan model 655 or written approved equal.

BATHROOM #259 Light Fixture & SwitchlWet Area/Replace. replace light above 13.0. 1 EA I

Replace existing light fixture and switch with sinknew wet-area approved light fixture andswitch.

Trade Area Description Comments Manual Spec Quantity Enter Bid

Electrical

BATHROOM #260 Light Fixture/Heat-Vent-Lightllnstall new repair heat vent light 13.D.16 1 EA I

bathroom light (100 watt), heater (1450watt), vent fan (70 CFM) and switch. UseBroan model 655 or written approved equal.

BEDROOM #161 Ceiling Fan & Light Kitl52"/lnstall ceiling fan replace ceiling fan 13.D.9.B 1 EA I

(52") with light kit, switch, cover plate andwiring/Use Hunter "Greenwich" or writtenapproved equal (lifetime warranty).

62 Light Fixture, Switch & Circuit/Roomllnstall replace closet light 13.D.9 1 EA Inew semi-flush mount ceiling light fixture,switch, cover plate and circuit. Use Angelomodel 66201.

63 Smoke Detector/Battery Operated/Install replace detector 13.D.11 1 EA Inew smoke detector, battery operated (10year lithium battery). All bedrooms andhallways adjacent to bedrooms. Use Firex#4015 or written approved equal.

BEDROOM #264 Ceiling Fan & Light Kit/52"lInstall ceiling fan replace ceiling fan 13.D.9.B 1 EA I

(52") with light kit, switch, cover plate andwiring/Use Hunter "Greenwich" or writtenapproved equal (lifetime warranty).

Tuesday, April 05,2016 519MainST Marble city, OK Page 12 0/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Electrical

BEDROOM #265 Light Fixture, Switch & Circuit/Room/Install replace closet light 13.0.9 1 EA I

new semi-flush mount ceiling light fixture,switch, cover plate and circuit. Use Angelomodel 66201.

66 Smoke Detector/Battery Operated/Install replace detector 13.0.11 1 EA Inew smoke detector, battery operated (10year lithium battery). All bedrooms andhallways adjacent to bedrooms. Use Firex#4015 or written approved equal.

BEDROOM #367 Ceiling Fan & Light Kitl52"lInstall ceiling fan replace ceiling fan 13.o.9.B 1 EA I

(52") with light kit, switch, cover plate andwiring/Use Hunter "Greenwich" or writtenapproved equal (lifetime warranty).

68 Light Fixture, Switch & Circuit/Room/Install replac3e light in 13.0.9 1 EA Inew semi-flush mount ceiling light fixture, closetswitch, cover plate and circuit. Use Angelomodel 66201.

69 Smoke Detector/Battery Operated/Install replace detector 13.0.11 1 EA Inew smoke detector, battery operated (10year lithium battery). All bedrooms andhallways adjacent to bedrooms. Use Firex#4015 or written approved equal.

ELECTRICALTuesday, April 05,2016 519 Main ST Marble city, OK Page 13 0/20

Tuesday, April 05,2016 519 Main ST Marble city, OK Page I4 0/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Electrical

ELECTRICAL70 Light Fixture/Porch/Ceiling Mounted/Install replace all porch 13.0.9 3 EA I

new exterior porch light and circuit wiring. lights

GARAGE71 Light Fixture, Switch & Circuit/Room/Install replace light in 13.0.9 1 EA I

new semi-flush mount ceiling light fixture, garageswitch, cover plate and circuit. Use Angelomodel 66201.

HALLWAY #172 Light Fixture, Switch & Circuit/Room/Install replace light in 13.0.9 1 EA I

new semi-flush mount ceiling light fixture, hallway closetswitch, cover plate and circuit. Use Angelomodel 66201.

73 Light Fixture/Room/Replace. Replace replace light in 13.0.9 1 EA Iexisting light fixture with new semi-flush hallwaymount ceiling style light fixture. Use Angelomodel 66201.

HALLWAY #274 Light Fixture, Switch & Circuit/Room/Install replace light 13.0.9 1 EA I

new semi-flush mount ceiling light fixture,switch, cover plate and circuit. Use Angelomodel 66201.

Tuesday, April 05,2016 519 MainST Marble city, OK Page 150/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Electrical

HALLWAY #275 Smoke Detector/Hard Wired with Battery replace detector 13.0.11 1 EAI

Back-Upllnstall new smoke detector, hardwired with battery backup. All bedroomsand hallways adjacent to bedrooms. UseFirex #045186 or written approved equal.

INTERIOR76 Cover Plate/Outletllnstall new outlet cover remove and replace 13.0.6. 30 EA I

plate all outlets, switchesand cover plates.

KITCHEN77 Ceiling Fan & Light Kit/52"lInstali ceiling fan Replace ceiling fan 13.0.9.B 1 EA I

(52") with light kit, switch, cover plate andwiring/Use Hunter "Greenwich" or writtenapproved equal (lifetime warranty).

78 Light Fixture, Switch & Circuit/Kitchen install new light 13.0.9 1 EA ISink/Install new switched light over kitchen above kitchen sinksink. Include new wiring circuit, switch andcover plate.

79 Light Fixture/Room/Replace. Replace replace light in 13.0.9 1 EA Iexisting light fixture with new semi-flush washer roommount ceiling style light fixture. Use Angelomodel 66201.

Trade Area Description Comments Manual Spec Quantity Enter Bid

Electrical

KITCHEN80 Smoke Detector/Battery Operated/Install Replace smoke 13.0.11 1 EA I

new smoke detector, battery operated (10 alarmyear lithium battery). All bedrooms andhallways adjacent to bedrooms. Use Firex#4015 or written approved equal.

LIVING ROOM #181 Ceiling Fan & Light Kit/52"lInstall ceiling fan Replace ceiling fan 13.D.9.B 1 EA I

(52") with light kit, switch, cover plate andwiring/Use Hunter "Greenwich" or writtenapproved equal (lifetime warranty).

82 Smoke Detector/Battery Operated/Install Replace smoke 13.0.11 1 EA Inew smoke detector, battery operated (10 detectoryear lithium battery). All bedrooms andhallways adjacent to bedrooms. Use Firex#4015 or written approved equal.

Flooring

INTERIOR83 Vinyl Floor Tile/Install new vinyl floor tile/12" install new tile 9.L 1190 SF I

x12"x1/8". throughout house,including closets.

84 Vinyl Floor Tile/Remove vinyl/composition remove all tile inside 9.L 1190 SF Ifloor tile. house

Tuesday, April 05,2016 519 Main ST Marble city, OK Page 160/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

HVAC

GARAGE85 Central Air (13 SEER) & Heatl1,001 to replace with 3 ton 12 1300 SF I

1,600sf/lnstall central air (13 SEER) and unit, to includeheat (gas-80% AFUE)/Complete lineset, filter, filtersystem/Building sizes between 1,001 and grill and stat1,600sf.

Paint & Finish

EXTERIOR86 Exterior Surfaces/Paint entire Paint exterior, to 9.N.4 400 SF I

exterior/siding, trim, soffit and fascia/Two include caulk allCoats. Include minor repairs to all surfaces. cracks joints ofNOTE:SF=FLOOR AREA/BID TO PAINT siding, make repairsALL EXTERIOR SURFACES. as needed.

INTERIOR87 Interior Surfaces/Paint all interior surfaces Paint all interior, 9.N. 1600 SF I

of structure - Two Coats. Entire interior includeing closetsexcluding kitchen and bath cabinets. Work and water heatershall include minor repairs to all surfaces. and hvac closet.SF=FLOOR AREA OF ENTIRE Paint all interior offSTRUCTURE. white

Plumbing

BATHROOM #1

Tuesday, April 05,2016 519Main ST Marble city, OK Page 170/20

Tuesday, April 05,2016 519 Main ST Marble city, OK Page 180/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Plumbing

BATHROOM #188 Bathtub-Shower Combination/Pre-Fab/2 replace shower 11.A 1 EA I

Piece/lnstall new 2 piece tub/shower unit.Use Lasco 2603-2PRHW or writtenapproved equal.

89 Commode & Seat/Install new commode, replace stool 11.A 1 EA Iseat, supply line, shutoff and wax seal. UseAmerican Standard Cadet or writtenapproved equal.

90 Shower Faucet & Diverterllnstall new replace faucet and 11.A 1 EA Ibath/shower faucet with diverter. Use Delta head on showermodel N1348 or written approved equal.

BATHROOM #291 Shower Faucet & Diverter/lnstall new replace in bathroom 11.A 1 EA I

bath/shower faucet with diverter. Use Delta #2model N1348 or written approved equal.

92 Shower Stall & Glass Door/36" x 36". Install replace stand up 11.A 1 EA Ishower stall with glass door and trim. 36" x shower36"

GARAGE

Tuesday, April 05,2016 519MainST Marble city, OK Page 190/20

Trade Area Description Comments Manual Spec Quantity Enter Bid

Plumbing

GARAGE93 Water Heater/Gas/40 Gallon/Install new 40 replace water heater 11.A 1 EA I

gal. gas water heater. Work shall includeelevating to 18" (if in garage), replacementof TPR, all combustion air and gas &electrical hook-ups for code legal installation.

KITCHEN94 Sink & FauceUKitchen. Install new kitchen install new faucet 11.A 1 EA I

sink (33" x 22") & Faucet (Use Delta single- and sink, to includehandle model1 OO-WF or written approved new drain lines andequal). Work shall include new drain lines trap.and trap.

95 Washer Box, Valves & Drain. Install new install new washer 11.A 1 EA Iwasher box) valves and drain line. box

Roofing

EXTERIOR96 Roof/shinglesllnstall. Install new 30 year remove and replace 7.A. 26 S Iarchitectural shingles as per manufacturer's all shingles, drip

recommendations. edge, roof jacks, feltand flashing.

Site Work

EXTERIOR

Trade Description Quantity Enter BidArea Comments Manual Spec

Site Work

97EXTERIORCleanup/Final. Final cleanup of entireProject.

Thermal Protection

98INTERIORInsulation/Add/Open Exterior Wall/R-13.Add R-13 insulation to exterior wall. Use R-13/kraft faced batts.

clean entire workarea up, mow yard,remove all trash anddebris inside andoutside

Remove all oldinsulation and installnew on all exteriorwalls

14

1 SF 1'--- _

800 SF 1 _

Tuesday, April 05,2016 519MainST Marble city, OK

TOTAL

Page 200/20