ORACLE® BUSINESS INTELLIGENCE APPLICATIONS 11.1.1.9.1

ENTERPRISE ASSET MANAGEMENT ANALYTICS METRIC REFERENCE GUIDE

VERSION 1.1

February 2015

Page 2: Eam

Disclaimer

This document is provided for information purposes only, and the contents hereof are subject to change without notice. This document is not warranted to be error-free, nor is it subject to any other warranties or conditions, whether expressed orally or implied in law, including implied warranties and conditions of merchantability or fitness for a particular purpose.

We specifically disclaim any liability with respect to this document, and no contractual obligations are formed either directly or indirectly by this document. This document may not be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without our prior written permission.

Copyright 2015, Oracle®. All Rights Reserved.

Page 3: Eam

Contents

Enterprise Asset Management Analytics Metric Reference Guide iii

Contents

Chapter 1. Introduction

1.1 Document Structure ............................................................................................................ 1-1

Chapter 2. Enterprise Asset Management Analytics

2.1 EAM - Asset Failure Analysis ............................................................................................. 2-2

2.2 EAM - Asset History ............................................................................................................ 2-5

2.3 EAM - Asset Maintenance Cost .......................................................................................... 2-6

2.4 EAM - Asset Maintenance Workorders .............................................................................. 2-9

2.5 EAM - Asset Meter Reading ............................................................................................. 2-13

2.6 EAM - Asset Quality .......................................................................................................... 2-14

2.7 EAM - Inventory Aging ...................................................................................................... 2-14

2.8 EAM - Maintenance Material Usage ................................................................................. 2-16

2.9 EAM - Maintenance Resource Availability ........................................................................ 2-17

2.10 EAM - Maintenance Resource Usage .............................................................................. 2-18

2.11 EAM - MRO Inventory ....................................................................................................... 2-22

Page 4: Eam
Page 5: Eam

Enterprise Asset Management Analytics Metric Reference Guide 1-1

Introduction 1 This document describes metrics available in Release 11.1.1.8 of Oracle® Business Intelligence Applications. These metrics are housed within the Oracle® Business Intelligence Applications repository. They are used in the pre-built analyses, and / or are available for customers to use via Oracle® Answers in building new analyses or extending existing analyses. Oracle® Answers is the ad-hoc query and reporting tool used for building and modifying analyses. This document also includes additional metrics which can be made accessible by means of minimal configuration. These additional metrics are included in the Business Modeling and Mapping Layer of the Oracle® Business Intelligence Applications repository. Configuration required before using them merely involves exposing these metrics to the Presentation Layer within the underlying repository.

1.1 Document Structure

Chapter 2 lists readily available metrics categorized by subject area with the associated metrics for Enterprise Asset Management Analytics. Snapshot of an Asset Maintenance Cost Subject Area as seen from Oracle® Answers is shown beside. The highlighted section in this snapshot lists the metrics available in the Subject Area.

These metrics are categorized by folders to which they belong within the Business Modeling and Mapping Layer of the Oracle® Business Intelligence Applications repository. They can be made available for use in Answers by configuring the Oracle® Business Intelligence Applications repository using the Oracle® Business Intelligence Administration Tool. For more information on Oracle® Business Intelligence Applications, refer http://www.oracle.com/technology/products/bi/bi-applications.html

Page 6: Eam

Enterprise Asset Management Analytics Metric Reference Guide 2-2

Enterprise Asset Management Analytics 2

This chapter describes metrics available in Enterprise Asset Management Analytics of Oracle® Business

Intelligence Applications 11.1.1.8 of this chapter corresponds to different Subject Areas in Enterprise Asset

Management Analytics.

2.1 EAM - Asset Failure Analysis

No Metric Name Description

2.1.1 Fact - Asset Failure Analysis.Failure Cost

This is the actual maintenance cost incurred on failure work orders. This is reported by failure date.

2.1.2 Fact - Asset Failure Analysis.Count of Failures

The total number of failures reported for the given dimensionality. By time, this is the total number of failures reported in the period.

2.1.3 Fact - Asset Failure Analysis.Down Time Incurred

It is the amount of down time that has been required when a work order is performed. Maintenance work orders have a shut down required attribute that will be used for this calculation. Sum(case when shutdown required=’Y’ then actual completion date – actual start date)

2.1.4 Fact - Asset Failure Analysis.Planned Downtime

It is the shutdown hours of the Asset for planned Maintenance i.e. work order subtype in('PREVENTIVE ','PROACTIVE') and work order status not in 'UNRELEASED'

2.1.5 Fact - Asset Failure Analysis.Unplanned Downtime

It is the shutdown hours of the Asset for unplanned Maintenance i.e. work order subtype = 'REACTIVE' and work order status not in 'UNRELEASED'.

2.1.6 Fact - Asset Failure Analysis.Mean Time Between Failures (Days)

The average of days between two failure instances. This is analyzable by failure dates

2.1.7 Fact - Asset Failure Analysis.Mean Time To Repair

This is the time taken in days between the work order completion date and the associated failure date This should be analyzed by completion date.

2.1.8 Fact - Asset Failure Analysis.Mean Time Between Repairs

The number of days where an asset was in working condition. Calculated as the difference between mtbf and mttr.

2.1.9 Fact - Asset Failure Analysis.Downtime %

100* Down Time Incurred / sum of Down Time Incurred.

Page 7: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-3

No Metric Name Description

2.1.10 Fact - Asset Failure Analysis.Failure Count %

It is the percentage of Failure count i.e. (100 * count of Failure WO's / count of Work Orders )

2.1.11 Fact - Asset Failure Analysis.Planned Downtime %

100 * Unplanned Downtime / sum of Downtime incurred.

2.1.12 Fact - Asset Failure Analysis.Unplanned Downtime %

100 * Unplanned Downtime / sum of Downtime incurred.

2.1.13 Fact - Asset Failure Analysis.Failure Cost - QTD

Quarter to Date actual maintenance cost incurred on failure work orders.

2.1.14 Fact - Asset Failure Analysis.Count of Failures - QTD

Quarter to Date Number of Failures reported for the given dimensionality. By time, this is the total number of failures reported in the period.

2.1.15 Fact - Asset Failure Analysis.Failure Cost - YTD

Year to Date actual maintenance cost incurred on failure work orders.

2.1.16 Fact - Asset Failure Analysis.Count of Failures - YTD

Year to Date Number of Failures reported for the given dimensionality. By time, this is the total number of failures reported in the period.

2.1.17 Fact - Asset Failure Analysis.WAGO Failure Cost

Week ago This is the actual maintenance cost incurred on failure work orders.

2.1.18 Fact - Asset Failure Analysis.WAGO Count of Failures

Week Ago the total number of failures reported for the given dimensionality.

2.1.19 Fact - Asset Failure Analysis.MAGO Failure Cost

Month Ago actual maintenance cost incurred on failure work orders.

2.1.20 Fact - Asset Failure Analysis.MAGO Count of Failures

Month Ago the total number of failures reported for the given dimensionality.

2.1.21 Fact - Asset Failure Analysis.QAGO Failure Cost

Quarter ago actual maintenance cost incurred on failure work orders.

2.1.22 Fact - Asset Failure Analysis.QAGO Count of Failures

Change in the Count of Failures from last quarter.

2.1.23 Fact - Asset Failure Analysis.YAGO Failure Cost

Year ago actual maintenance cost incurred on failure work orders.

Page 8: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-4

No Metric Name Description

2.1.24 Fact - Asset Failure Analysis.YAGO Count of Failures

Year Ago the total number of failures reported for the given dimensionality.

2.1.25 Fact - Asset Failure Analysis.YAGO Downtime Incurred

Year ago down time that has been required when a work order is performed. Maintenance work orders have a shut down required attribute that will be used for this calculation. Sum(case when shutdown required=’Y’ then actual completion date – actual start date)

2.1.26 Fact - Asset Failure Analysis.YAGO Downtime %

Year ago Downtime percentage (100* Down Time Incurred / sum of Down Time Incurred).

2.1.27 Fact - Asset Failure Analysis.Chg QAGO Failure Cost

Change in the Failure Cost from from last Quarter.

2.1.28 Fact - Asset Failure Analysis.Chg QAGO Count of Failures

Change in the Count of Failures from last quarter.

2.1.29 Fact - Asset Failure Analysis.Chg YAGO Failure Cost

Change in the Failure Cost from from last Year.

2.1.30 Fact - Asset Failure Analysis.Chg YAGO Count of Failures

Change in the Count of Failures from last year.

2.1.31 Fact - Asset Failure Analysis.% Chg QAGO Failure Cost

Percentage of change in the Failure Cost from from last Quarter.

2.1.32 Fact - Asset Failure Analysis.% Chg QAGO Failure Cost

Quarter ago actual maintenance cost incurred on failure work orders.

2.1.33 Fact - Asset Failure Analysis.% Chg QAGO Count of Failures

Change in the Count of Failures from last quarter.

2.1.34 Fact - Asset Failure Analysis.% Chg YAGO Failure Cost

Percentage of change in the Failure Cost from last Year.

2.1.35 Fact - Asset Failure Analysis.% Chg YAGO Count of Failures

Percentage of change in the Count of Failures from last year.

Page 9: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-5

2.2 EAM - Asset History

No Metric Name Description

2.2.1 Fact - Asset History.Asset Cost

Cost of procurement of an asset. Reported by acquired date.

2.2.2 Fact - Asset History.Preventive Cost

The actual cost (material, equipment and labor) of maintenance work orders that originate from PMS. The total of Breakdown and Preventive costs account for the total maintenance costs in the organization.

2.2.3 Fact - Asset History.Actual Maintenance Cost

It is the sum of actual equipment, labor and material cost used for servicing the maintenance work order it includes PMS and Break down work orders.

2.2.4 Fact - Asset History.Unplanned Maintenance Cost

The actual cost (material, equipment and labor) for the Unplanned Work Orders where work order type is ‘REACTIVE’ (i.e.) where the work order is not planned.

2.2.5 Fact - Asset History.Number of Years Since Installation

This is the number of years since the asset was installed. Reported by acquired date.

2.2.6 Fact - Asset History.Actual Maintenance Cost - YTD

Year to Date actual usage cost of Maintenance used for servicing the maintenance work order.

2.2.7 Fact - Asset History.YAGO Asset Cost

Year ago Cost of procurement of an asset.

2.2.8 Fact - Asset History.YAGO Preventive Cost

Year ago actual cost (material, equipment and labor) of maintenance work orders that originate from PMS.

2.2.9 Fact - Asset History.YAGO Actual Maintenance Cost

Year ago Actual Maintenance cost used for servicing the maintenance work order.

2.2.10 Fact - Asset History.YAGO Unplanned Maintenance Cost

Year ago actual cost (material, equipment and labor) for the Unplanned Work Orders where work order type is ‘REACTIVE’ (i.e.) where the work order is not planned.

2.2.11 Fact - Asset History.Chg YAGO Asset Cost

Change in the Asset Cost from last year.

2.2.12 Fact - Asset History.Chg YAGO Preventive Cost

Change in the Preventive Cost from last year.

2.2.13 Fact - Asset History.Chg YAGO Actual Maintenance Cost

Change in the Actual Maintenance Cost from last year.

2.2.14 Fact - Asset History.Chg YAGO Unplanned Maintenance Cost

Change in the Unplanned Maintenance Cost from last year.

2.2.15 Fact - Asset History.% Chg YAGO Asset Cost

Percentage of change in the Asset Cost from last year.

2.2.16 Fact - Asset History.% Chg YAGO Preventive Cost

Percentage of change in the Preventive Cost from from last year.

Page 10: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-6

No Metric Name Description

2.2.17 Fact - Asset History.% Chg YAGO Actual Maintenance Cost

Percentage of change in the Actual Maintenance Cost from last year.

2.2.18 Fact - Asset History.% Chg YAGO Unplanned Maintenance Cost

Percentage of change in the Unplanned Maintenance Cost from last year.

2.2.19 Fact - Asset History.Count of Failures

The total number of failures reported for the given dimensionality. By time, this is the total number of failures reported in the period.

2.3 EAM - Asset Maintenance Cost

No Metric Name Description

2.3.1 Fact - Asset Maintenance Cost.Breakdown Cost

The actual cost (material, equipment and labor) of maintenance work orders that do not originate from PMS. The total of Breakdown and Preventive costs account for the total maintenance costs in the organization. These also include the cost of the follow up work orders that get entered as part of the PMS activity but are not directly generated by the PMS Scheduling.

2.3.2 Fact - Asset Maintenance Cost.Preventive Cost

The actual cost (material, equipment and labor) of maintenance work orders that originate from PMS. The total of Breakdown and Preventive costs account for the total maintenance costs in the organization.

2.3.3 Fact - Asset Maintenance Cost.Breakdown Cost %

It is the % of Breakdown cost upon the Actual Maintenance cost i.e.100 * Breakdown cost /Actual Maintenance cost

2.3.4 Fact - Asset Maintenance Cost.Preventive Cost %

It is the % of Preventive Cost upon the Actual Maintenance cost i.e.100 * Preventive Cost /Actual Maintenance cost

2.3.5 Fact - Asset Maintenance Cost.Actual Maintenance Cost

It is the sum of actual equipment, labor and material cost.

2.3.6 Fact - Asset Maintenance Cost.Actual Labor Cost

It is the actual usage cost of labor used for servicing the maintenance work order. Calculated by OLTP based on actual resource hours used (type labor)

2.3.7 Fact - Asset Maintenance Cost.Actual Material Cost

It is the actual usage cost of material issued for servicing the maintenance work order. Includes both material issues and non stock item issues that come in through purchase requisitions and are issue directly to the work order.

2.3.8 Fact - Asset Maintenance Cost.Actual Equipment Cost

It is the actual usage cost of equipment used for servicing the maintenance work order. Calculated by OLTP based on actual resource hours used (type equipment)

2.3.9 Fact - Asset Maintenance Cost.Estimated Cost

The Sum of the System estimated equipment, labor and material cost used for servicing the maintenance work order.

2.3.10 Fact - Asset Maintenance Cost.Estimated Labor Cost

This is the estimated usage cost of equipment that is calculated by the OLTP based on the operations involved in the Maintenance BOM and the cost of the labor resources required for the operations.

Page 11: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-7

No Metric Name Description

2.3.11 Fact - Asset Maintenance Cost.Estimated Material Cost

It is the estimated usage cost of Material issued that is calculated by the source system based on the value of both stock items and non-stock items. Both items are valued at the cost at which they were issued to the WO.

2.3.12 Fact - Asset Maintenance Cost.Estimated Equipment Cost

It is the estimated usage cost of equipment that is calculated by the source system based on the operations involved in the Maintenance BOM and the cost of the equipment resources required for the operations.

2.3.13 Fact - Asset Maintenance Cost.Estimated Cost Variance

Difference between the system estimated and the actual maintenance cost used for servicing the maintenance work order.

2.3.14 Fact - Asset Maintenance Cost.Cost Variance %

100 * Estimated Cost Variance / Estimated Cost i.e. Difference between the system estimated and the actual maintenance cost divided by actual maintenance cost

2.3.15 QTD Metrics.Actual Maintenance Cost - QTD

Quarter to Date actual usage cost of Maintenance used for servicing the maintenance work order.

2.3.16 QTD Metrics.Actual Labor Cost - QTD

Quarter to Date actual usage cost of labor used for servicing the maintenance work order.

2.3.17 QTD Metrics.Actual Material Cost - QTD

Quarter to Date actual usage cost of material issued for Maintenance used for servicing the maintenance work order.

2.3.18 QTD Metrics.Actual Equipment Cost - QTD

Quarter to Date actual usage cost of equipment used for servicing the maintenance work order.

2.3.19 QTD Metrics.Estimated Cost - QTD

Quarter to Date Estimated Cost is Sum of the System estimated equipment, labor and material cost used for servicing the maintenance work order.

2.3.20 YTD Metrics.Actual Maintenance Cost - YTD

Year to Date actual usage cost of Maintenance used for servicing the maintenance work order.

2.3.21 YTD Metrics.Actual Labor Cost - YTD

Year to Date actual usage cost of labor used for servicing the maintenance work order.

2.3.22 YTD Metrics.Actual Material Cost - YTD

Year to Date actual usage cost of material issued for Maintenance used for servicing the maintenance work order.

2.3.23 YTD Metrics.Actual Equipment Cost - YTD

Year to Date actual usage cost of equipment used for servicing the maintenance work order.

2.3.24 YTD Metrics.Estimated Cost - YTD

Year to Date Estimated Cost is Sum of the System estimated equipment, labor and material cost used for servicing the maintenance work order.

2.3.25 AGO Metrics.QAGO Actual Maintenance Cost

Quarter ago Actual Maintenance cost used for servicing the maintenance work order.

2.3.26 AGO Metrics.QAGO Actual Labor Cost

Quarter ago Actual usage cost of labor used for servicing the maintenance work order.

2.3.27 AGO Metrics.QAGO Actual Material Cost

Quarter ago Actual usage cost of material issued for servicing the maintenance work order.

2.3.28 AGO Metrics.QAGO Actual Equipment Cost

Quarter ago Actual usage cost of equipment used for servicing the maintenance work order.

2.3.29 AGO Metrics.YAGO Actual Maintenance Cost

Year ago Actual Maintenance cost used for servicing the maintenance work order.

Page 12: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-8

No Metric Name Description

2.3.30 AGO Metrics.YAGO Actual Labor Cost

Year ago Actual usage cost of labor used for servicing the maintenance work order.

2.3.31 AGO Metrics.YAGO Actual Material Cost

Year ago Actual usage cost of material issued for servicing the maintenance work order.

2.3.32 AGO Metrics.YAGO Actual Equipment Cost

Year ago Actual usage cost of equipment used for servicing the maintenance work order.

2.3.33 AGO Metrics.YAGO Estimated Cost

Year ago System Estimated usage cost used for servicing the maintenance work order.

2.3.34 AGO Metrics.YAGO Estimated Labor Cost

Year ago System Estimated usage cost of labor used for servicing the maintenance work order.

2.3.35 AGO Metrics.YAGO Estimated Material Cost

Year ago Estimated usage cost of material issued for servicing the maintenance work order.

2.3.36 AGO Metrics.YAGO Estimated Equipment Cost

Year ago System Estimated usage cost of equipment used for servicing the maintenance work order.

2.3.37 AGO Metrics.YAGO Breakdown Cost

Year ago Breakdown Cost for maintenance work orders that do not originate from PMS.

2.3.38 AGO Metrics.YAGO Preventive Cost

Year ago actual cost (material, equipment and labor) of maintenance work orders that originate from PMS.

2.3.39 AGO Metrics.YAGO Unplanned Maintenance Cost

Year ago actual cost (material, equipment and labor) for the Unplanned Work Orders where work order type is ‘REACTIVE’ (i.e.) where the work order is not planned.

2.3.40 AGO Metrics.YAGO Cost Variance %

Year ago Cost Variance percentage i.e. 100 * Estimated Cost Variance / Estimated Cost.

2.3.41 AGO Metrics.Chg QAGO Actual Maintenance Cost

Change in the Actual Maintenance Cost from last quarter.

2.3.42 AGO Metrics.Chg YAGO Actual Maintenance Cost

Change in the Actual Maintenance Cost from last year.

2.3.43 AGO Metrics.Chg YAGO Actual Labor Cost

Change in the Actual Labor Cost from last year.

2.3.44 AGO Metrics.Chg YAGO Actual Material Cost

Change in the Actual Material Cost from last year.

2.3.45 AGO Metrics.Chg YAGO Actual Equipment Cost

Change in the Actual Equipment Cost from last year.

2.3.46 AGO Metrics.Chg YAGO Estimated Cost

Change in the Estimated Cost from last year.

2.3.47 AGO Metrics.Chg YAGO Estimated Labor Cost

Change in the Estimated Labor Cost from last year.

2.3.48 AGO Metrics.Chg YAGO Estimated Material Cost

Change in the Estimated Material Cost from last year.

2.3.49 AGO Metrics.Chg YAGO Estimated Equipment Cost

Change in the Estimated Equipment Cost from last year.

2.3.50 AGO Metrics.Chg YAGO Preventive Cost

Change in the Preventive Cost from last year.

Page 13: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-9

No Metric Name Description

2.3.51 AGO Metrics.Chg YAGO Breakdown Cost

Change in the Breakdown Cost from last year.

2.3.52 AGO Metrics.Chg YAGO Unplanned Maintenance Cost

Change in the Unplanned Maintenance Cost from last year.

2.3.53 AGO Metrics.Chg YAGO Cost Variance %

Change in the Cost Variance percentage from last year.

2.3.54 AGO Metrics.% Chg QAGO Actual Maintenance Cost

Percentage of change in the Actual Maintenance Cost from last quarter.

2.3.55 AGO Metrics.% Chg YAGO Actual Maintenance Cost

Percentage of change in the Actual Maintenance Cost from last year.

2.3.56 AGO Metrics.% Chg YAGO Actual Labor Cost

Percentage of change in the Actual Labor Cost from last year.

2.3.57 AGO Metrics.% Chg YAGO Actual Material Cost

Percentage of change in the Actual Material Cost from last year.

2.3.58 AGO Metrics.% Chg YAGO Actual Equipment Cost

Percentage of change in the Actual Equipment Cost from last year.

2.3.59 AGO Metrics.% Chg YAGO Estimated Labor Cost

Percentage of change in the System Estimated Labor Cost from last year.

2.3.60 AGO Metrics.% Chg YAGO Estimated Cost

Percentage of change in the System Estimated Cost from last year.

2.3.61 AGO Metrics.% Chg YAGO Estimated Equipment Cost

Percentage of change in the System Estimated Equipment Cost from last year.

2.3.62 AGO Metrics.% Chg YAGO Estimated Material Cost

Percentage of change in the System Estimated Material Cost from last year.

2.3.63 AGO Metrics.% Chg YAGO Preventive Cost

Percentage of change in the Preventive Cost from from last year.

2.3.64 AGO Metrics.% Chg YAGO Breakdown Cost

Percentage of change in the Breakdown Cost from from last year.

2.3.65 AGO Metrics.% Chg YAGO Unplanned Maintenance Cost

Percentage of change in the Unplanned Maintenance Cost from last year.

2.4 EAM - Asset Maintenance Workorders

No Metric Name Description

2.4.1 Fact - Asset Maintenance Work Orders.Cycle Time

The time taken to complete a work order i.e. actual start date - actual complete date of work order (reported on completion dates)

Page 14: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-10

No Metric Name Description

2.4.2 Fact - Asset Maintenance Work Orders.Days Delayed

This is the number of days between the planned completion date and the actual completion date if the actual completion date is beyond the planned completion date

2.4.3 Fact - Asset Maintenance Work Orders.Cycle Time Bucket Range

2.4.4 Fact - Asset Maintenance Work Orders.Planned Work Orders

The number of work orders where work order subtype in 'PREVENTIVE','PROACTIVE'. This includes all planned work orders (both work orders generated from PMS as well as work orders that are Planned but not generated through PMS ex: follow up orders) When analyzed by time, this joins on scheduled Start Date

2.4.5 Fact - Asset Maintenance Work Orders.Planned Work Orders %

100 * Planned work orders / count of Work orders.

2.4.6 Fact - Asset Maintenance Work Orders.Unplanned Work Orders

The number of work orders where work order type is 'REACTIVE' (i.e.) where the work order is not planned When analyzed by time, this joins on scheduled Start Date

2.4.7 Fact - Asset Maintenance Work Orders.Unplanned Work Orders %

100 * Planned work orders / count of Work orders.

2.4.8 Fact - Asset Maintenance Work Orders.Count of Cancelled Work Orders

It is the count of Cancelled Work Orders that have work order status ='CANCELLED' these work orders fall under this category.

2.4.9 Fact - Asset Maintenance Work Orders.Count of Completed Work Orders

It is the count of Completed Work Orders that have work order status ='COMPLETE' these work orders fall under this category.

2.4.10 Fact - Asset Maintenance Work Orders.Count of Preventive Work Orders

It is the number of preventive maintenance work orders which is originate from PMS.

2.4.11 Fact - Asset Maintenance Work Orders.Count of Routine Work Orders

It is the count of Routine Work Orders that have work order priority <> 'Emergency' these work orders fall under this category.

2.4.12 Fact - Asset Maintenance Work Orders.Count of Emergency Work Orders

It is the count of Emergency Work Orders that have work order priority ='Emergency' these work orders fall under this category.

2.4.13 Fact - Asset Maintenance Work Orders.Count of Reactive Work Orders

It is the number of Reactive maintenance work orders that have work order subtype='Reactive' these work orders fall under this category.

2.4.14 Fact - Asset Maintenance Work Orders.Count of Work Orders

It is the Count of Work Orders created in source system irrespective of status.

Page 15: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-11

No Metric Name Description

2.4.15 Fact - Asset Maintenance Work Orders.YAGO Planned Work Orders

Year ago Planned work orders that the number of work orders where work order subtype in 'PREVENTIVE', ‘PROACTIVE’. This includes all planned work orders (both work orders generated from PMS as well as work orders that are Planned but not generated through PMS ex: follow up orders)

2.4.16 Fact - Asset Maintenance Work Orders.YAGO Unplanned Work Orders

Year ago Unplanned Work Orders that the number of work orders where work order type is ‘REACTIVE’ (i.e.) where the work order is not planned.

2.4.17 Fact - Asset Maintenance Work Orders.YAGO Count of Completed Work Orders

Change in the Count of Completed Work Orders from last year.

2.4.18 Fact - Asset Maintenance Work Orders.Chg YAGO Planned Work Orders

Change in the Planned Work Orders from last year.

2.4.19 Fact - Asset Maintenance Work Orders.Chg YAGO Unplanned Work Orders

Change in the Unplanned Work Orders from last year.

2.4.20 Fact - Asset Maintenance Work Orders.Chg YAGO Count of Completed Work Orders

Percentage of change in the Count of Completed Work Orders from last year.

2.4.21 Fact - Asset Maintenance Work Orders.% Chg YAGO Planned Work Orders

Percentage of change in the Planned Work Orders from last year.

2.4.22 Fact - Asset Maintenance Work Orders.% Chg YAGO Unplanned Work Orders

Percentage of change in the Unplanned Work Orders from last year.

2.4.23 Fact - Asset Maintenance Work Orders.% Chg YAGO Count of Completed Work Orders

Percentage of change in the Count of Completed Work Orders from last year.

2.4.24 Fact - Asset Maintenance Work Orders.Work Order Completing Late

It is the count of work orders which are completed late then the scheduled date.

2.4.25 Fact - Asset Maintenance Work Orders.Work Order Completing Late %

100 * Work Order Completing Late / count of Work orders.

2.4.26 Fact - Asset Maintenance Work Orders.On Time Completion

On – Time Completion is the count of all maintenance work orders that have a actual completion date less than the planned completion date.

2.4.27 Fact - Asset Maintenance Work Orders.YAGO On Time Completion

Year ago On – Time Completion is the count of all maintenance work orders that have a actual completion date less than the planned completion date.

Page 16: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-12

No Metric Name Description

2.4.28 Fact - Asset Maintenance Work Orders.On Time Completion %

On – Time Completion % is the percentage of On-Time Completed maintenance work orders to all completed maintenance work orders in that period.

2.4.29 Fact - Asset Maintenance Work Orders.QAGO On Time Completion %

It is the percentage of On Time Completion quarter ago.

2.4.30 Fact - Asset Maintenance Work Orders.YAGO On Time Completion %

Year ago On – Time Completion % is the percentage of On-Time Completed maintenance work orders to all completed maintenance work orders in that period.

2.4.31 Fact - Asset Maintenance Work Orders.Down Time Incurred

DownTime incurred during maintenance work orders.

2.4.32 Fact - Asset Maintenance Work Orders.YAGO Downtime Incurred

Year ago down time that has been required when a work order is performed. Maintenance work orders have a shut down required attribute that will be used for this calculation. Sum(case when shutdown required=’Y’ then actual completion date – actual start date)

2.4.33 Fact - Asset Maintenance Work Orders.Chg YAGO Downtime Incurred

Change in the Downtime Incurred from last year.

2.4.34 Fact - Asset Maintenance Work Orders.% Chg YAGO Downtime Incurred

Percentage of change in the Downtime Incurred from last year.

2.4.35 Fact - Asset Maintenance Work Orders.Count of Released Work Orders

It is the count of Released Work Orders that have work order status ='RELEASED' these work orders fall under this category.

2.4.36 Fact - Asset Maintenance Work Orders.Count of Backlog Work Orders

Backlog indicates the count of all maintenance work orders that have yet to be addressed. All released work orders that are not in Completed, Closed or Cancelled statuses fall under this category.

2.4.37 Fact - Asset Maintenance Work Orders.Count of Past Due Backlog

Count of all backlogged maintenance work orders that have a planned completion date in the past.

2.4.38 Fact - Asset Maintenance Work Orders.Past Due Backlog %

It is the percentage of Past Due Backlog Work Orders to the Released maintenance Work Orders (100* Count of Past Due Backlog WO's / Count of Released WO's).

2.4.39 Fact - Asset Maintenance Work Orders.QAGO Past Due Backlog %

Quarter ago Past Due Backlog percentage (100* Count of Past Due Backlog WO's / Count of Released WO's).

2.4.40 Fact - Asset Maintenance Work Orders.YAGO Past Due Backlog %

Year ago Past Due Backlog percentage (100* Count of Past Due Backlog WO's / Count of Released WO's).

Page 17: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-13

No Metric Name Description

2.4.41 Fact - Asset Maintenance Work Orders.Backlog %

It is the percentage of Backlog work orders to the count of total work orders (100 * Count of Backlog WO / Count of total Work Orders).

2.4.42 Fact - Asset Maintenance Work Orders.QAGO Backlog %

Quarter ago Backlog percentage (100 * Count of Backlog WO divided by Count of total Work Orders).

2.4.43 Fact - Asset Maintenance Work Orders.YAGO Backlog %

Year ago Backlog percentage (100 * Count of Backlog WO divided by Count of total Work Orders).

2.4.44 Fact - Asset Maintenance Work Orders.QAGO Past Due Backlog

Quarter ago Maintenance work order Past Due Backlog quantity.

2.4.45 Fact - Asset Maintenance Work Orders.QAGO Backlog

Quarter ago Maintenance work order Backlog quantity.

2.4.46 Fact - Asset Maintenance Work Orders.YAGO Past Due Backlog

Year ago Maintenance work order Past Due Backlog quantity.

2.4.47 Fact - Asset Maintenance Work Orders.YAGO Backlog

Year ago Maintenance work order Backlog quantity.

2.4.48 Fact - Asset Maintenance Work Orders.Chg QAGO Past Due Backlog

Change in the Maintenance work order Past Due Backlog quantity from last quarter.

2.4.49 Fact - Asset Maintenance Work Orders.Chg QAGO Backlog

Change in the Maintenance work order Backlog quantity from last quarter.

2.4.50 Fact - Asset Maintenance Work Orders.Chg YAGO Past Due Backlog

Change in the Maintenance work order Past Due Backlog quantity from last year.

2.4.51 Fact - Asset Maintenance Work Orders.Chg YAGO Backlog

Change in the Maintenance work order Backlog quantity from last year.

2.4.52 Fact - Asset Maintenance Work Orders.% Chg QAGO Past Due Backlog

Percentage of change in the Maintenance work order Past Due Backlog Quantity from last quarter.

2.4.53 Fact - Asset Maintenance Work Orders.% Chg QAGO Backlog

Percentage of change in the Maintenance work order Backlog quantity from last quarter.

2.4.54 Fact - Asset Maintenance Work Orders.% Chg YAGO Past Due Backlog

Percentage of change in the Maintenance work order Past Due Backlog Quantity from last year.

2.4.55 Fact - Asset Maintenance Work Orders.% Chg YAGO Backlog

Percentage of change in the Maintenance work order Backlog quantity from last year.

2.5 EAM - Asset Meter Reading

Page 18: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-14

No Metric Name Description

2.5.1 Fact - Asset Meter Reading.Actual Reading

The reading as on the Meter Reading date. For Change meters, this will be the incremental value and for Absolute meters, this will be the same as the current meter reading till date.

2.5.2 Fact - Asset Meter Reading.Meter Reading Till Date

The meter reading till date. For Absolute meters, this will be the same as the actual reading. For Change meters, this will be the summary of meter readings entered till date

2.5.3 Fact - Asset Meter Reading.Prior Reading

The last reading on the meter.

2.5.4 Fact - Asset Meter Reading.Change in Reading Value

Difference between Actual Reading and Prior Reading.

2.6 EAM - Asset Quality

No Metric Name Description

2.6.1 Fact - Asset Quality.Count of Tests Is the number of tests performed

2.6.2 Fact - Asset Quality.Test Quantity Test quantity is the quantity used in the test

2.6.3 Fact - Asset Quality.Result Value Result value of attribute being tested

2.7 EAM - Inventory Aging

No Metric Name Description

2.7.1 Facts - Inventory Aging.Available Quantity

This metric is the quantity of product available to fill open orders. Available product is defined as unrestricted inventory that is not reserved, blocked or otherwise unavailable for immediate demand fulfillment. The Available Quantity metric is an important component for understanding historical inventory fluctuations, stockouts, and allocation situations. By analyzing available inventory activity over time, slow-moving and obsolete materials can be identified.

2.7.2 Facts - Inventory Aging.Available Amount

Available Amount represents the Available Quantity valued at the cost of an item

Page 19: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-15

No Metric Name Description

2.7.3

Facts - Inventory Aging.Obsolete Inventory Quantity

The quantity of items that is obsolete. Measurable for both lot-controlled and non-lot controlled items. For non-lot controlled items, if the shelf life plus the date on which the item was received into the inventory is lesser than the current date, then the item is considered as obsolete. For lot controlled items, if the lot expiration date is lesser than the current date, then the lot is considered as obsolete. The item level reporting for lot controlled items is a summarized value from the lot level obsoletes.

2.7.4 Facts - Inventory Aging.Obsolete Inventory Value

The value at standard cost of items that is obsolete. Measurable for both lot-controlled and non-lot controlled items. For non-lot controlled items, if the shelf life plus the date on which the item was received into the inventory is lesser than the current date, then the item is considered as obsolete. For lot controlled items, if the lot expiration date is lesser than the current date, then the lot is considered as obsolete. The item level reporting for lot controlled items is a summarized value from the lot level obsoletes.

2.7.5 Facts - Inventory Aging.Year Ago Obsolete Inventory Value

Year Ago obsolete inventory value based on the Gregorian and Enterprise Calendars

2.7.6

Facts - Inventory Aging.Days In Inventory

This is the total No.of Days since the inventory is lying

2.7.7 Facts - Inventory Aging.Days Left Expiry

This is the number of days by when all the inventory of this item/lot will expire (maximum of days left expiry across receipt date)

Page 20: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-16

No Metric Name Description

2.7.8 Facts - Inventory Aging.Days Since Expired

This is the number of days since when the earliest lot/item available in inventory has expired (maximum of days since expired across receipt date)

2.7.9 Facts - Inventory Aging.Year Ago Obsolete Inventory Quantity

Year Ago obsolete inventory Quantity based on the Gregorian and Enterprise Calendars

2.8 EAM - Maintenance Material Usage

No Metric Name Description

2.8.1 Fact - Material Usage.Actual Material Quantity

It is the actual quantity of materials that were issued to a maintenance work order. This includes issue of both stock items and non-stock items.

2.8.2 Fact - Material Usage.Standard Material Quantity

It is the standard quantity of materials that should be used to service a maintenance work order as per the maintenance work order BOM. This could include both stock items and direct (non-stock) items.

2.8.3 Fact - Material Usage.Actual Material Cost

It is the actual value of the materials that were issued to a maintenance work order. This includes value of both stock items and non-stock items. Both items are valued at the cost at which they were issued to the WO

2.8.4 Fact - Material Usage.Standard Material Cost

It is the standard value of materials that should be used to service a maintenance work order as per the maintenance work order BOM. This could include both stock items and direct (non-stock) items and is valued at item cost.

2.8.5 Fact - Material Usage.YAGO Actual Material Cost

Year ago Actual usage cost of material issued for servicing the maintenance work order.

Page 21: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-17

No Metric Name Description

2.8.6 Fact - Material Usage.YAGO Standard Material Cost

Year ago Planned usage cost of material issued for servicing the maintenance work order.

2.8.7 Fact - Material Usage.Chg YAGO Actual Material Cost

Change in the Actual Material Cost from last year.

2.8.8 Fact - Material Usage.Chg YAGO Standard Material Cost

Change in the Planned Material Cost from past year.

2.8.9 Fact - Material Usage.% Chg YAGO Actual Material Cost

Percentage of change in the Actual Material Cost from last year.

2.8.10 Fact - Material Usage.% Chg YAGO Standard Material Cost

Percentage of change in the Planned Material Cost from last year.

2.8.11 Fact - Material Usage.Material Qty Usage Variance

Difference between Actual Quantity Used and the Standard Quantity of the Material

2.8.12 Fact - Material Usage.Material Cost Variance

Difference between Actual Cost and the Standard Cost of the Material

2.8.13 Fact - Material Usage.Material Qty Usage Variance %

It is % of Material Qty Usage Variance by Standard Quantity

2.8.14 Fact - Material Usage.Material Cost Variance %

It is % of Material Cost Variance by Standard Cost

2.8.15 Fact - Material Usage. YAGO Material Cost Variance

It is the Material Cost Variance Year ago

2.8.16 Fact - Material Usage.Chg YAGO Material Cost Variance

It is the difference between Material Cost Variance and the Year ago Material Cost Variance

2.8.17 Fact - Material Usage. % Chg YAGO Material Cost Variance

It is the % difference between Chg YAGO Material Cost Variance by Material Cost Variance

2.9 EAM - Maintenance Resource Availability

No Metric Name Description

2.9.1 Fact - Resource Availability.Resource Availability

It is the available hours of resources that were can be use for service a maintenance work order. This includes both equipment and Labor resources.

Page 22: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-18

No Metric Name Description

2.9.2 Fact - Resource Availability.Resource Availability Value

It is the Cost of resources that were available to do the service a maintenance work order. This includes both equipment and people resources and is costed at the usage rate.

2.9.3 Fact - Resource Availability.YAGO Resource Availability

Change in the Resource Availability from last year.

2.9.4 Fact - Resource Availability.Chg YAGO Resource Availability

Percentage of change in the Resource Availability from last year.

2.9.5 Fact - Resource Availability.% Chg YAGO Resource Availability

Percentage of change in the Resource Availability from last year.

2.9.6 Fact - Resource Availability.Actual Resource Hours

This is the actual hours of resources that were used in order to service a maintenance work order. This includes both equipment and Labor resources.

2.9.7 Fact - Resource Availability.YAGO Actual Resource Hours

Year ago actual hours of resources that were used in order to service a maintenance work order.

2.9.8 Fact - Resource Availability.Chg YAGO Actual Resource Hours

Change in the Actual Resource Hours from last year.

2.9.9 Fact - Resource Availability.% Chg YAGO Actual Resource Hours

Percentage of change in the Actual Resource Hours from last year.

2.9.10 Fact - Resource Availability.Resource Utilization %

100 * Resource actual hours / Resource available hours. Reported by transaction date.

2.9.11 Fact - Resource Availability.% QAGO Resource Utilization

Percentage of Resource Utilization from last quarter.

2.9.12 Fact - Resource Availability.% MAGO Resource Utilization

Percentage of Resource Utilization from last month.

2.9.13 Fact - Resource Availability.% YAGO Resource Utilization

Percentage of Resource Utilization from last year.

2.9.14 Fact - Resource Availability.% Chg YAGO Resource Utilization

Percentage of change in the Resource Utilization from last year.

2.10 EAM - Maintenance Resource Usage

No Metric Name Description

2.10.1 Fact - Resource Usage.Actual Resource Cost

It is the actual Cost of resources that were used in order to service a maintenance work order. This includes both equipment and people resources and is costed at the usage rate.

2.10.2 Fact - Resource Usage.Actual Resource Hours

This is the actual hours of resources that were used in order to service a maintenance work order. This includes both equipment and Labor resources.

Page 23: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-19

No Metric Name Description

2.10.3 Fact - Resource Usage.Actual Equipment Hours

It is the actual hours of resources (type as Equipment) that were used in order to service a maintenance work order.

2.10.4 Fact - Resource Usage.Actual Labor Hours

It is the actual hours of resources (type as Labor) that were used in order to service a maintenance work order.

2.10.5 Fact - Resource Usage.Standard Resource Cost

It is the Planned Resource Cost of the resources (type as Equipment and Labor) used for service maintenance Work order.

2.10.6 Fact - Resource Usage.Standard Resource Hours

It is the Planned Resource hours of the resources (type as Equipment and Labor) used for service maintenance Work order.

2.10.7 Fact - Resource Usage.Standard Equipment Hours

It is the Planned hours of the Equipment used for the service Maintenance for Work Order.

2.10.8 Fact - Resource Usage.Standard Labor Hours

It is the Planned hours of the Labor used for the service Maintenance for Work Order.

2.10.9 Fact - Resource Usage.Resource Efficiency

It shows how efficiently the resources (type as Equipment and Labor) involved in a maintenance organization are able to fulfill the task. This is the actual hours of resources used in maintenance work orders upon the available hours.

2.10.10 Fact - Resource Usage.Equipment Efficiency

It shows how efficiently the resources (type as Equipment) involved in a maintenance organization are able to fulfill the task. It is the actual hours of resources used in maintenance work orders divided by available hours.

2.10.11 Fact - Resource Usage.Labor Efficiency

It shows how efficiently the resources (type as Labor) involved in a maintenance organization are able to fulfill the task. It is the actual hours of resources used in maintenance work orders upon the available hours.

2.10.12 Fact - Resource Usage.Resource Cost Variance

Difference between Actual Cost and the Standard Cost of the Resource (type as Equipment and Labor) work.

2.10.13 Fact - Resource Usage.Resource Cost Variance %

It is % of Resource Cost Variance by Standard Cost

2.10.14 Fact - Resource Usage.Resource Qty Usage Variance

Difference between Actual Time and the Standard Time of the Resource (type as Equipment and Labor) work.

2.10.15 Fact - Resource Usage.Resource Qty Usage Variance %

It is % of Resource Qty Usage Variance by Standard Time

2.10.16 Fact - Resource Usage.Equipment Qty Usage Variance

Difference between Actual Time and the Standard Time of the Resource (type as Equipment) work.

Page 24: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-20

No Metric Name Description

2.10.17 Fact - Resource Usage.Equipment Qty Usage Variance %

It is % of Equipment Qty Usage Variance by Standard Time

2.10.18 Fact - Resource Usage.Labor Qty Usage Variance

Difference between Actual Time and the Standard Time of the Resource (type as Labor) work.

2.10.19 Fact - Resource Usage.Labor Qty Usage Variance %

It is % of Labor Qty Usage Variance by Standard Time

2.10.20 Fact - Resource Usage.YAGO Actual Resource Cost

Year ago actual Cost of resources that were used in order to service a maintenance work order.

2.10.21 Fact - Resource Usage.Chg YAGO Actual Resource Cost

Change in the Actual Resource Cost from last year.

2.10.22 Fact - Resource Usage.YAGO Actual Resource Hours

Year ago actual hours of resources that were used in order to service a maintenance work order.

2.10.23 Fact - Resource Usage.Chg YAGO Actual Resource Hours

Change in the Actual Resource Hours from last year.

2.10.24 Fact - Resource Usage.% Chg YAGO Actual Resource Hours

Percentage of change in the Actual Resource Hours from last year.

2.10.25 Fact - Resource Usage.% Chg YAGO Resource Cost

Percentage of change in the Actual Resource Cost from last year.

2.10.26 Fact - Resource Usage.YAGO Labor Efficiency

Year ago Labor Efficiency shows how efficiently the resources (type as Labor) involved in a maintenance organization is able to fulfill the task.

2.10.27 Fact - Resource Usage.YAGO Equipment Efficiency

Year ago Equipment Efficiency shows how efficiently the resources (type as Equipment) used in a maintenance organization is able to fulfill the task.

2.10.28 Fact - Resource Usage.YAGO Resource Efficiency

Year ago Resource Efficiency shows how efficiently the resources (type as Equipment and Labor) involved in a maintenance organization is able to fulfill the task.

2.10.29 Fact - Resource Usage.Chg YAGO Labor Efficiency

Change in the Labor Efficiency year from last year.

2.10.30 Fact - Resource Usage.Chg YAGO Equipment Efficiency

Change in the Equipment Efficiency from last year.

2.10.31 Fact - Resource Usage.Chg YAGO Resource Efficiency

Change in the Resource Efficiency from last year.

2.10.32 Fact - Resource Usage.% Chg YAGO Labor Efficiency

Percentage of change in the Labor Efficiency from last year.

Page 25: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-21

No Metric Name Description

2.10.33 Fact - Resource Usage.% Chg YAGO Equipment Efficiency

Percentage of change in the Equipment Efficiency from last year.

2.10.34 Fact - Resource Usage.% Chg YAGO Resource Efficiency

Percentage of change in the Resource Efficiency from last year.

2.10.35 Fact - Resource Usage.YAGO Resource Usage Qty Variance

Change in the Resource Usage Variance from last year.

2.10.36 Fact - Resource Usage.YAGO Equipment Usage Qty Variance

Year ago Equipment Usage Variance is difference between Standard Time and the Actual Time of the Resource (type as Equipment) work.

2.10.37 Fact - Resource Usage.YAGO Labor Usage Qty Variance

Year ago Labor Usage Variance is difference between Standard Time and the Actual Time of the Resource (type as Labor) work.

2.10.38 Fact - Resource Usage.YAGO Resource Cost variance

Year ago Resource Cost variance is difference between Standard Cost and the Actual Cost of the Resource (type as Equipment and Labor) work.

2.10.39 Fact - Resource Usage.Chg YAGO Resource Usage Qty Variance

Change in the Resource Usage Variance from last year.

2.10.40 Fact - Resource Usage.Chg YAGO Equipment Usage Qty Variance

Change in the Equipment Usage Variance from last year.

2.10.41 Fact - Resource Usage.Chg YAGO Labor Usage Qty Variance

Change in the Labor Usage Variance from last year.

2.10.42 Fact - Resource Usage.Chg YAGO Resource Cost variance

Change in the Resource Cost variance from last year.

2.10.43 Fact - Resource Usage.% Chg YAGO Resource Usage Qty Variance

Percentage of change in the Resource Usage Variance last year.

2.10.44 Fact - Resource Usage.% Chg YAGO Equipment Usage Qty Variance

Percentage of change in the Equipment Usage Variance from last year.

2.10.45 Fact - Resource Usage.% Chg YAGO Labor Usage Qty Variance

Percentage of change in the Labor Usage Variance from last year.

2.10.46 Fact - Resource Usage.% Chg YAGO Resource Cost variance

Percentage of change in the Resource Cost variance from last year.

Page 26: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-22

2.11 EAM - MRO Inventory

No Metric Name Description

2.11.1 Facts - MRO Inventory.Opening Quantity

Available Quantity (Ending Balance) of the previos period.

2.11.2 Facts - MRO Inventory.Available Quantity

This metric is the quantity of product available to fill open orders. Available product is defined as unrestricted inventory that is not reserved, blocked or otherwise unavailable for immediate demand fulfillment. The Available Quantity metric is an important component for understanding historical inventory fluctuations, stockouts, and allocation situations. By analyzing available inventory activity over time, slow-moving and obsolete materials can be identified.

2.11.3 Facts - MRO Inventory.Value Only Amount

Value Only Group Amount represents a group of material managed only on value basis and not on quantity basis. For these, materials quantity is never updated. Example: Hierarchy articles and group articles.

2.11.4 Facts - MRO Inventory.Standard Cost Amount

The total inventory value in chart of accounts or group currency for the product at the standard cost.

2.11.5 Facts - MRO Inventory.In Transit Quantity

This is the total physical quantity in transit for the product (in inventory unit of measure).

2.11.6 Facts - MRO Inventory.Value Transfer Amount

This is the in-transit amount of value-only group amount stated in group currency.

2.11.7 Facts - MRO Inventory.Inspection Quantity

This is the total physical quantity of the product under inspection (in inventory unit of measure). This quantity would become available for use once they pass inspection.

2.11.8 Facts - MRO Inventory.Restricted Quantity

This metric is the balance of inventory that is on reserve and restricted from use for open orders or manufacturing production orders. This type of inventory is also known as allocated or assigned material. The Restricted Quantity metric is useful in determining the amount of material that is on reserve for future production or customer orders.

2.11.9 Facts - MRO Inventory.Blocked Quantity

This is the total physical quantity of the product under hold for specific reasons (in inventory unit if measure). This quantity would become available for use once the hold is released -- these would typically include stocks that may have been damaged slightly and need to undergo a re-certification process etc.

2.11.10 Facts - MRO Inventory.Replenishment Quantity

This represents the standard re-order quantity size for replenishment of inventory of this product (in inventory units of measure).

2.11.11 Facts - MRO Inventory.Available Consignment Quantity

Quantity in the warehouse that belongs to a consignment vendor and is not subject to usage restrictions. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

Page 27: Eam

Enterprise Asset Management Analytics

Enterprise Asset Management Analytics Metric Reference Guide 2-23

No Metric Name Description

2.11.12 Facts - MRO Inventory.Inspection Consignment Quantity

Quantity in the warehouse that belongs to a consignment vendor and is in quality inspection. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

2.11.13 Facts - MRO Inventory.Restricted Consignment Quantity

Quantity in the warehouse that belongs to a consignment vendor and has usage restrictions. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

2.11.14 Facts - MRO Inventory.Block Consignment Quantity

Quantity of all blocked batches that belong to a consignment vendor. Examples of batches are: Production lots, delivery lots etc.

2.11.15 Facts - MRO Inventory.Reorder Point

Reorder Point is the inventory level at the storage location that triggers a re-order for replenishment of this product.

2.11.16 Facts - MRO Inventory.# of Products Requiring Reorder

This metric tells us the number of inventory items that have a current available quantity less than the suggested inventory reorder point. By knowing the number of products that need re-ordeing we can better understand the related inventory processes required (e.g., purchase requisitions that need to be created and processed, etc.)

2.11.17 Facts - MRO Inventory.Inventory Turn

Inventory Turn measures the number of times that inventory turns over in a recent one year period. It is an indicator of how well a company's products are doing in the market. It is calculated as dividing annual inventory sold to customers by the average inventory level.

2.11.18 Facts - MRO Inventory.Inspection Amount

This is the total physical quantity of the product under inspection (in inventory unit of measure). This quantity would become available for use once they pass inspection.

2.11.19 Facts - MRO Inventory.Restricted Amount

This metric is the balance of inventory that is on reserve and restricted from use for open orders or manufacturing production orders. This type of inventory is also known as allocated or assigned material. The Restricted Quantity metric is useful in determining the amount of material that is on reserve for future production or customer orders.

2.11.20 Facts - MRO Inventory.Blocked Amount

This is the total physical quantity of the product under hold for specific reasons (in inventory unit if measure). This quantity would become available for use once the hold is released -- these would typically include stocks that may have been damaged slightly and need to undergo a re-certification process etc.

2.11.21 Facts - MRO Inventory.Replenishment Amount

This represents the standard re-order quantity size for replenishment of inventory of this product (in inventory units of measure).

2.11.22 Facts - MRO Inventory.Available Consignment Amount

Quantity in the warehouse that belongs to a consignment vendor and is not subject to usage restrictions. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

Page 28: Eam

Enterprise Asset Management Analytics Metric Reference Guide 2-24

No Metric Name Description

2.11.23 Facts - MRO Inventory.Inspection Consignment Amount

Quantity in the warehouse that belongs to a consignment vendor and is in quality inspection. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

2.11.24 Facts - MRO Inventory.Restricted Consignment Amount

Quantity in the warehouse that belongs to a consignment vendor and has usage restrictions. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

2.11.25 Facts - MRO Inventory.Block Consignment Amount

Quantity of all blocked batches that belong to a consignment vendor. Examples of batches are: Production lots, delivery lots etc.

2.11.26 Facts - MRO Inventory.WIP_Amount

The value of inventory which is work in progress.

2.11.27 Facts - MRO Inventory.Days Inventory Outstanding

DIO (Days Inventory Outstanding). Also called Inventory DSI (Days Sales of Inventory) DSI/DIO = (Average Inventory/Cost of Goods Sold) * 365 Or DSI/DIO = 365/Inventory Turns

2.11.28 Facts - MRO Inventory.YAGO Standard Cost Amount

The inventory value, a year ago, for the product at the standard cost in the chart of accounts in group currency.

2.11.29 Facts - MRO Inventory.Chg YAGO Standard Cost Amount

(Standard Cost Amount - Year Ago Standard Cost Amount)

2.11.30 Facts - MRO Inventory.% Chg YAGO Standard Cost Amount

The total inventory value in chart of accounts or group currency for the product at the standard cost.

2.11.31 Facts - MRO Inventory.YAGO Available Quantity

(Standard Cost Amount - Year Ago Standard Cost Amount) * 100/ (Year Ago Standard Cost Amount)

2.11.32 Facts - MRO Inventory.Chg YAGO Available Quantity

(Available Quantity - Year Ago Available Quantity)

2.11.33 Facts - MRO Inventory.% Chg YAGO Available Quantity

(Available Quantity - Year Ago Available Quantity) * 100/ (Year Ago Available Quantity)

2.11.34 Facts - MRO Inventory.YAGO Available Consignment Quantity

Quantity, a year ago, in the warehouse that belongs to a consignment vendor and is not subject to usage restrictions. A consignment vendor retains ownership of the quantity until it is withdrawn from stores.

2.11.35 Facts - MRO Inventory.Chg YAGO Available Consignment Quantity

(Available Consignment Quantity - Year Ago Available Consignment Quantity)

2.11.36 Facts - MRO Inventory.% Chg YAGO Available Consignment Quantity

(Available Consignment Quantity - Year Ago Available Consignment Quantity)*100/(Year Ago Available Consignment Quantity)