  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

    Work Item Unit Overall Average (RM)SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKEXCAVATIONExcavating to reduce levelMaximum depth not exceeding 1.00m

    m3 Location Range (RM) Average (RM) RM 10.00D 10.00 - 10.00 10.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKSITE PREPARATIONClearing undergrowthClearing site of undergrowth, bushes, scrub and thelike

    m2 Location Range (RM) Average (RM) RM 501.95A 5.00 - 5000.00 2502.50C 0.50 - 1.00 0.75D 1.00 - 2.70 1.85E 2.00 - 2.00 2.00H 2.00 - 3.00 2.67

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKEXCAVATIONExcavating to reduce levelMaximum depth not exceeding 0.25m

    m3 Location Range (RM) Average (RM) RM 3.50B 3.00 - 3.00 3.00F 4.00 - 4.00 4.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKFILLINGMaterial arising from excavationFilling to excavation

    m3 Location Range (RM) Average (RM) RM 12.67A 10.00 - 10.00 10.00H 10.00 - 18.00 15.33

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKDISPOSAL OF WATERSurface waterKeeping the surface of the site and the excavationsfree from surface water

    Item Location Range (RM) Average (RM) RM 5312.50A 5000.00 - 10500.00 9125.00B 500.00 - 3000.00 1500.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKDISPOSAL OF EXCAVATED MATERIALDisposal off siteRemoving from site; location at contractor's discretionincluding provision of a shoot, dump, payment for

    m3 Location Range (RM) Average (RM) RM 8.75

    1 / 4

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

    Work Item Unit Overall Average (RM)royalties, fees, levies and other charges B 12.00 - 12.00 12.00

    C 5.00 - 5.00 5.00D 10.00 - 10.00 10.00F 8.00 - 8.00 8.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKEXCAVATIONExcavating to reduce levelEXTRA OVER; excavating in rock met with inexcavations of such size or position by using wedges,lever, special plant, explosive or chemicals

    m3 Location Range (RM) Average (RM) RM 27.50B 50.00 - 50.00 50.00C 5.00 - 5.00 5.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKFILLINGMaterial arising from excavationTo make up levels over 250mm thick

    m3 Location Range (RM) Average (RM) RM 10.63C 1.00 - 3.50 2.25E 19.00 - 19.00 19.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKSITE PREPARATIONClearing site; Alternatif method of measurementClear all vegetation, trees irrespective of girth, etc., allbuildings, structures or other obstructions whichinterfere with the execution of the work and remove alldebris off site; area approximately 1 hectares as perdrawing

    Item Location Range (RM) Average (RM) RM 35403.47A 5000.00 - 10000.00 7187.50B 7000.00 - 125000.00 66000.00C 1500.00 - 50000.00 23900.00D 16000.00 - 16000.00 16000.00E 90000.00 - 90000.00 90000.00F 8000.00 - 10000.00 9333.33

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKDISPOSAL OF WATERGround waterKeeping the excavations free from ground water

    Item Location Range (RM) Average (RM) RM 2516.67A 600.00 - 10000.00 3866.67B 500.00 - 2000.00 1166.67

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKFILLING

    m3 Location Range (RM) Average (RM) RM 2.78

    2 / 4

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

    Work Item Unit Overall Average (RM)Material arising from excavation to be selected andtreatedFilling to excavation

    A 2.00 - 2.00 2.00B 2.00 - 3.00 2.33C 4.00 - 4.00 4.00

    SITE PREPARATION AND EARTHWORKEXCAVATION AND EARTHWORKEXCAVATIONExcavating to reduce levelMaximum depth exceeding 4.00m but not exceeding6.00m

    m3 Location Range (RM) Average (RM) RM 7.00C 7.00 - 7.00 7.00

    3 / 4

  • Portal RATOL & Rates PreMoCAWANGAN KONTRAK DAN UKUR BAHAN 30.09.2015

    NotaSekiranya anda mempunyai sebarang pertanyaan, sila hubungi: Ketua Penolong Pengarah KananBahagian Perolehan dan Khidmat KosCawangan Kontrak dan Ukur BahanIbu Pejabat JKR MalaysiaTingkat 19, Menara Tun Ismail Mohamed AliNo 25, Jalan Raja Laut50582 Kuala Lumpur

    u.p: En Husnan HusinTel: 03-26161111Email: [email protected]

    Catatan

    4 / 4