DESIGN OF SEDIMENT BASIN SECTION 1
STEP 1 Sizing of Sediment Basin
Table 39.4 - Sediment Basin Type
Table 39.5 - Dry Sediment Basin sizing Guidelines
A (catchment area) = 0.401 in hacres
tc = 20 minutes
Required surface area = 100.25 refer table 39.5 ( m2 )
Total volume required = 120 refer table 39.5 ( m3 )
Settling zone reqiured, V1 = 60.15 m3
(half of Total volume)
Settling zone depth, y1 = 1 from table 39.5 ( m )
Try settling zone width, w1 = 7 m
Required settling zone length, L1 = 15 m
Average surface area = 105 m2
> 100.25 OK !
L1 / y1 ratio = 15.00 m < 200 OK !
L1 / w1 ratio = 2.14 m > 2 OK !
STEP 2 Sediment storage zone
Z = 2
Required sediment storage, V2= 60.15 depth storage, d1 = 1
For slide slope, Z = 2(H) : 1(V)
w2 = 5
L2 = 13.0
from equation V2 new = 63 V2 new > V2 OK !
y2 = 7 y2 > 0.3 m OK !
STEP 3 Overall basin dimensions
At top water level
Width, WTWL = 9 m
Length, LTWL = 13 m
Base
Width, WB = -23 m
Length, LB = -15 m
Depth : Settling zone, y1 = 1 m
Sediment Storage zone, y2 = 7 m
Total depth = 8 m
Side Slope Z = 2(H) : 1(V)
STEP 4 Sizing of outlet pipe
Outlet riser : 900 mm dia perforted MS pipe
Average surface area, Aav = 231.000 m2
Orifice area, A total = 0.01 m2
Using An orifice size of 50mm, the area of each orifice is, Ao = 1.96 x 10-3
m2
Ao = 0.00196 m2
Total number of orifice required = A total / 1.96 x 10-3
= 3
STEP 5 Sizing of emergency spilway
Minimum primary outlet diameter = 300 mm
The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3
ln 10
I30 = a + b ln t + c ln (t2) + d ln (t
3) equation 13.2
Pd = P30 - FD(P60-P30) equation 13.3
* Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM)
I = Pd/d equation 13.4
Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values)
ln 10
I30 = 129.15 mm/hr
Runoff Coefficient, C = 0.84 Post-development (Chart 14.4)
0.77 Pre-development
Q10 = C.10
I30.A /360 equation 14.7
For Post-development, Q10 = 0.12 m3/s
For Pre-development, Q10 = 0.11 m3/s
Qriser = CO AO (2gHO)1/2
CO = 0.6
= 0.93 m3/s
Qspillway = Q10 - Qriser
= -0.81 m3/s
From Equation 20.9, Qspillway = CSP B HP1.5
= 3.95 m3/s
> 2.97 m3/s OK !
Try CSP = 1.7
B = 5 m
HP = 0.6 m
Design Chart 20.2
Total depth including spillway = 8.9 m
DESIGN OF SEDIMENT BASIN SECTION 2
STEP 1 Sizing of Sediment Basin
Table 39.4 - Sediment Basin Type
Table 39.5 - Dry Sediment Basin sizing Guidelines
A (catchment area) = 13.105 in hacres
tc = 30 minutes
Required surface area = 3276.25 refer table 39.5 ( m2 )
Total volume required = 3932 refer table 39.5 ( m3 )
Settling zone reqiured, V1 = 1965.75 m3
(half of Total volume)
Settling zone depth, y1 = 0.6 from table 39.5 ( m )
Try settling zone width, w1 = 40 m
Required settling zone length, L1 = 82 m
Average surface area = 3276.25 m2
> 3276.25 OK !
L1 / y1 ratio = 136.51 m < 200 OK !
L1 / w1 ratio = 2.05 m > 2 OK !
STEP 2 Sediment storage zone
Z = 2
Required sediment storage, V2=V1 = 1965.75 depth storage, d1 = 0.6
For slide slope, Z = 2(H) : 1(V)
w2 = 38.8
L2 = 80.7
from equation V2 new = 2076 V2 new > V2 OK !
y2 = 0.7 y2 > 0.3 m OK !
STEP 3 Overall basin dimensions
At top water level
Width, WTWL = 41 m
Length, LTWL = 81 m
Base
Width, WB = 36 m
Length, LB = 78 m
Depth : Settling zone, y1 = 0.6 m
Sediment Storage zone, y2 = 0.7 m
Total depth = 1.3 m
Side Slope Z = 2(H) : 1(V)
STEP 4 Sizing of outlet pipe
Outlet riser : 900 mm dia perforted MS pipe
Average surface area, Aav = 3064.861 m2
Orifice area, A total = 0.030 m2
Using An orifice size of 50mm, the area of each orifice is, Ao = 1.96 x 10-3
m2
Ao = 0.00196 m2
Total number of orifice required = A total / 1.96 x 10-3
= 16
STEP 5 Sizing of emergency spilway
Minimum primary outlet diameter = 300 mm
The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3
ln 10
I30 = a + b ln t + c ln (t2) + d ln (t
3) equation 13.2
Pd = P30 - FD(P60-P30) equation 13.3
* Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM)
I = Pd/d equation 13.4
Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values)
ln 10
I30 = 129.15 mm/hr
Runoff Coefficient, C = 0.84 Post-development (Chart 14.4)
0.77 Pre-development
Q10 = C.10
I30.A /360 equation 14.7
For Post-development, Q10 = 3.95 m3/s
For Pre-development, Q10 = 3.62 m3/s
Qriser = CO AO (2gHO)1/2
CO = 0.6
= 0.93 m3/s
Qspillway = Q10 - Qriser
= 3.02 m3/s
From Equation 20.9, Qspillway = CSP B HP1.5
= 4.60 m3/s
> 3.02 m3/s OK !
Try CSP = 1.65
B = 6 m
HP = 0.6 m
Design Chart 20.2
Total depth including spillway = 2.2 m
DESIGN OF SEDIMENT BASIN SECTION 3
STEP 1 Sizing of Sediment Basin
Table 39.4 - Sediment Basin Type
Table 39.5 - Dry Sediment Basin sizing Guidelines
A (catchment area) = 15.575 in hacres
tc = 30 minutes
Required surface area = 3893.75 refer table 39.5 ( m2 )
Total volume required = 4673 refer table 39.5 ( m3 )
Settling zone reqiured, V1 = 2336.25 m3
(half of Total volume)
Settling zone depth, y1 = 0.6 from table 39.5 ( m )
Try settling zone width, w1 = 30 m
Required settling zone length, L1 = 30 m
Average surface area = 900 m2
> 3893.75 OK !
L1 / y1 ratio = 50.00 m < 200 OK !
L1 / w1 ratio = 1.00 m > 2 OK !
STEP 2 Sediment storage zone
Z = 2
Required sediment storage, V2=V1 = 2336.25 depth storage, d1 = 0.6
For slide slope, Z = 2(H) : 1(V)
w2 = 28.8
L2 = 28.8
from equation V2 new = 526 V2 new > V2 OK !
y2 = 0.7 y2 > 0.3 m OK !
STEP 3 Overall basin dimensions
At top water level
Width, WTWL = 31 m
Length, LTWL = 29 m
Base
Width, WB = 26 m
Length, LB = 26 m
Depth : Settling zone, y1 = 0.6 m
Sediment Storage zone, y2 = 0.7 m
Total depth = 1.3 m
Side Slope Z = 2(H) : 1(V)
STEP 4 Sizing of outlet pipe
Outlet riser : 900 mm dia perforted MS pipe
Average surface area, Aav = 787.280 m2
Orifice area, A total = 0.008 m2
Using An orifice size of 50mm, the area of each orifice is, Ao = 1.96 x 10-3
m2
Ao = 0.00196 m2
Total number of orifice required = A total / 1.96 x 10-3
= 4
STEP 5 Sizing of emergency spilway
Minimum primary outlet diameter = 300 mm
The 10 year ARI rainfall intensity is derived from equation 13.3 and Table 13.3
ln 10
I30 = a + b ln t + c ln (t2) + d ln (t
3) equation 13.2
Pd = P30 - FD(P60-P30) equation 13.3
* Value F D derived from Table 13.3 & Figure 13.3 (Volume 4-MSMAM)
I = Pd/d equation 13.4
Equation 13.3,13.4 & Figure 13.3 for short duration storms (IDF values)
ln 10
I30 = 129.15 mm/hr
Runoff Coefficient, C = 0.84 Post-development (Chart 14.4)
0.77 Pre-development
Q10 = C.10
I30.A /360 equation 14.7
For Post-development, Q10 = 4.69 m3/s
For Pre-development, Q10 = 4.30 m3/s
Qriser = CO AO (2gHO)1/2
CO = 0.6
= 0.93 m3/s
Qspillway = Q10 - Qriser
= 3.77 m3/s
From Equation 20.9, Qspillway = CSP B HP1.5
= 3.95 m3/s
> 3.77 m3/s OK !
Try CSP = 1.7
B = 5 m
HP = 0.6 m
Design Chart 20.2
Total depth including spillway = 2.2 m
V1 153.12
Y1 1
W1 8
L1 19.14 19
L1/Y1 19.14 < 200
L1/W1 2.3925 > 2
Y2 0.6
V2 54.2376
d1 1
z 2
w2 6
L2 17.14
W2+L2 23.14
W2L2 102.84
> 51.04 1
2