7
N 2016 CALIFORNIA GREEN BUILDING STANDARDS CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 11 TITLE 19 CALIFORNIA CODE OF REGULATIONS PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS 2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 1 2016 CALIFORNIA BUILDING CODE (CBC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 2 (2015 INTERNATIONAL BUILDING CODE (IBC) W/2016 CALIFORNIA AMENDMENTS) 2016 CALIFORNIA ELECTRICAL CODE (CEC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 3 (2014 NATIONAL ELECTRICAL CODE (NEC) W/2016 CALIFORNIA AMENDMENTS) 2016 CALIFORNIA MECHANICAL CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 4 (2015 UNIFORM MECHANICAL CODE (UMC) W/2016 CALIFORNIA AMENDMENTS 2016 CALIFORNIA PLUMBING CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 5 (2015 UNIFORM PLUMBING CODE (UPC) W/2016 CALIFORNIA AMENDMENTS) 2016 CALIFORNIA ENERGY EFFICIENCY STANDARDS CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 6 2016 CALIFORNIA FIRE CODE (CFC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9 (2015 INTERNATIONAL FIRE CODE (IFC) W/2016 CALIFORNIA AMENDMENTS) 2016 CALIFORNIA EXISTING BUILDING CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART10 (2015 INTERNATIONAL EXISTING BUILDING CODE (IEBC)) 2016 CALIFORNIA REFERENCED STANDARDS CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 12 AMERICANS WITH DISABILITIES ACT (ADA) TITLE II - ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAG) 1990 STATE FIRE MARSHAL REGULATIONS AND AMENDMENTS TO-DATE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, CALIFORNIA STATE ACCESSIBILITY STANDARDS CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 19 1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE CURRENT EDITION OF THE CALIFORNIA BUILDING CODE, CALIFORNIA MECHANICAL CODE, CALIFORNIA PLUMBING CODE, CALIFORNIA FIRE CODE, CALIFORNIA ELECTRICAL CODE, CALIFORNIA GREEN BUILDING CODE AND ALL APPLICABLE LOCAL CODES, ORDINANCES AND STATE AMENDMENTS. 2. THE CONTRACTOR SHALL CHECK ALL THE DRAWINGS IMMEDIATELY UPON THEIR RECEIPT AND SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS BEFORE STARTING WORK. IMEG ENGINEERS PROJECT MANAGER SHALL BE NOTIFIED OF ANY DISCREPANCIES. 3. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY SHOWN, NOTED OR APPROVED BY IMEG ENGINEERS. NOTCH DETAIL, IF SHOWN, ARE FOR GENERAL GUIDANCE ONLY, IMEG ENGINEERS SHALL BE CONTACTED IN WRITING TO APPROVE THE LOCATIONS OF PROPOSED NOTCHES. 4. CONNECTIONS AND IMPLIED CONSTRUCTION ASSEMBLIES THAT ARE NOT SPECIFICALLY DESCRIBED OR DETAILED SHALL BE CONSTRUCTED USING STANDARD CONSTRUCTION PRACTICES IN COMPLIANCE WITH THE GOVERNING CODES AND ORDINANCES. 5. WHEN DETAILS LABELED "TYPICAL" OR "SIMILAR" ARE GIVEN ON THE DRAWINGS, THE CONTRACTOR SHALL APPLY THE INTENT OF THE DETAIL TO THAT SPECIFIC CONDITION. 6. WRITTEN INFORMATION AND DIMENSIONS SHALL TAKE PRECEDENCE OVER GRAPHIC INFORMATION. DO NOT SCALE DRAWINGS. 7. DRAWINGS AND SPECIFICATIONS FOR THIS WORK HAVE BEEN PREPARED IN ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF PRACTICE TO MEET THE MINIMUM REQUIREMENTS OF THE CURRENT EDITION OF THE CBC. ANY OMISSIONS OR DISCREPANCIES ON THE PLANS OR ANY DEVIATIONS FROM THE PLANS WHICH ARE NECESSITATED BY FIELD CONDITIONS OR ANY CONDITION DIFFERENT FROM THOSE INDICATED ON THE PLANS SHOULD BE BROUGHT TO THE ATTENTION OF IMEG ENGINEERS PRIOR TO CONTINUING WITH CONSTRUCTION. ALL WORK IS TO BE COORDINATED SO THAT COOPERATION BETWEEN ALL TRADES WHERE REQUIRED IS ACCOMPLISHED. 8. CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR THE ORDER AND MEANS OF CONSTRUCTION AND ALL TEMPORARY BRACING AND ERECTION DURING CONSTRUCTION. 9. APPROVALS BY THE PROJECT INSPECTOR(S) SHALL NOT CONSTITUTE AUTHORITY TO DEVIATE FROM THE PLANS AND SPECIFICATIONS. 10. THE PROVISIONS OF CFC AND CBC CHAPTER 33 SHALL BE ENFORCED ON THIS PROJECT. 11. ALL WORK SHALL CONFORM TO 2016 TITLE 24, CALIFORNIA CODE OF REGULATIONS (CCR) 12. A PROJECT INSPECTOR EMPLOYED BY THE DISTRICT (OWNER) AND APPROVED BY THE DIVISION OF THE STATE ARCHITECT SHALL PROVIDE CONTINUOUS INSPECTION OF THE WORK. THE DUTIES OF THE INSPECTOR ARE DEFINED IN SECTION 4-342, PART 1, TITLE 24, CCR. CLASS 3. 13. TITLE 24 PARTS 1-5 MUST BE KEPT ON SITE DURING THE CONSTRUCTION. THE SCOPE OF WORK AS STATED BELOW DOES NOT CONSTITUTE A DETAILED AND FULL EXPLANATION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS. REMOVAL AND REPLACEMENT OF EXISTING EXHAUST FANS WITH NEW EXHAUST FANS AT LOCKER ROOMS. ALL OTHER STRUCTURES AND ELEMENTS SHOWN ARE EXISTING, FOR REFERENCE ONLY. 10931 STAMY RD, WHITTIER, CA 90604 LOCKER ROOMS EXHAUST FAN UPGRADE EAST WHITTIER CITY SCHOOL DISTRICT CODE REFERENCES VICINITY MAP HILLVIEW MIDDLE SCHOOL PROJECT TEAM OWNER OWNER EAST WHITTIER CITY SCHOOL DISTRICT 14421 E. WHITTIER BLVD, WHITTIER, CA 90605 (562) 907-5900 GENERAL NOTES SCOPE OF WORK IMEG 901 VIA PIEMONTE, SUITE 400 ONTARIO, CA 91764 tel: (909) 477-9615 MECHANICAL PROJECT MANAGER: ERIC DESPLINTER, PE MECHANICAL ENGINEER: CHRISTIAN GUYNES, PE ELECTRICAL ENGINEER: JUSTIN IGNACIO, EIT IMEG 901 VIA PIEMONTE, SUITE 400 ONTARIO, CA 91764 tel: (909) 477-9615 ELECTRICAL IMEG 901 VIA PIEMONTE, SUITE 400 ONTARIO, CA 91764 tel: (909) 477-9615 STRUCTURAL STRUCTURAL ENGINEER: TERRY TSANG E R E T S I G E R R E E N I G N E L A N O I S S E O R P D F I A N O F C A L I F O R S T A T E D P M E R I C e S L I M E HA N I C A L C . N T E R Exp. 12/31/19 38688 REFERENCE SCALE IN INCHES 0 1 2 © 2018 IMEG CORP. IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP. AGENCY APPROVAL REVISIONS PROFESSIONAL SEAL CONSULTANT No. Date Revision / Issue DISCLAIMER SHEET INFORMATION Date Job Number Drawn Checked Approved SHEET TITLE SCALE Scale: SHEET NUMBER Issue "LOCKER ROOMS EF UPGRADE" EAST WHITTIER CITY SCHOOL DISTRICT 2/1/2018 7:53:59 PM 10931 STAMY ROAD, WHITTIER, CA 90604 HILLVIEW MIDDLE SCHOOL T0.0 COVER SHEET Approver ED CG 18001320.00 02/01/18 BID DOCUMENTS HILLVIEW MIDDLE SCHOOL 18001320.00 901 VIA PIEMONTE SUITE 400 ONTARIO, CA 91764 PH: 909.477.6915 FAX: 909.477.6916 www.imegcorp.com SHEET INDEX DWG.NO. DESCRIPTION T0.0 COVER SHEET M001 GENERAL NOTES, LEGEND AND DRAWING INDEX M101 MECHANICAL FIRST FLOOR DEMOLITION PLAN M201 MECHANICAL FIRST FLOOR REMODEL PLAN M301 DETAILS/CONTROLS E001 GENERAL NOTES, SPECIFICATIONS, LEGEND AND DRAWING LIST E201 FIRST FLOOR POWER PLAN

EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

N

2016 CALIFORNIA GREEN BUILDING STANDARDS CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 11

TITLE 19 CALIFORNIA CODE OF REGULATIONS

PUBLIC SAFETY, STATE FIRE MARSHAL REGULATIONS

2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 1

2016 CALIFORNIA BUILDING CODE (CBC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 2

(2015 INTERNATIONAL BUILDING CODE (IBC) W/2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ELECTRICAL CODE (CEC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 3

(2014 NATIONAL ELECTRICAL CODE (NEC) W/2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA MECHANICAL CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 4

(2015 UNIFORM MECHANICAL CODE (UMC) W/2016 CALIFORNIA AMENDMENTS

2016 CALIFORNIA PLUMBING CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 5

(2015 UNIFORM PLUMBING CODE (UPC) W/2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ENERGY EFFICIENCY STANDARDS CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 6

2016 CALIFORNIA FIRE CODE (CFC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9

(2015 INTERNATIONAL FIRE CODE (IFC) W/2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA EXISTING BUILDING CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART10

(2015 INTERNATIONAL EXISTING BUILDING CODE (IEBC))

2016 CALIFORNIA REFERENCED STANDARDS CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 12

AMERICANS WITH DISABILITIES ACT (ADA)

TITLE II - ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAG)

1990 STATE FIRE MARSHAL REGULATIONS AND AMENDMENTS TO-DATE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, CALIFORNIA STATE

ACCESSIBILITY STANDARDS

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 19

1. ALL MATERIAL AND WORKMANSHIP SHALL CONFORM TO THE CURRENT EDITION

OF THE CALIFORNIA BUILDING CODE, CALIFORNIA MECHANICAL CODE,

CALIFORNIA PLUMBING CODE, CALIFORNIA FIRE CODE, CALIFORNIA

ELECTRICAL CODE, CALIFORNIA GREEN BUILDING CODE AND ALL APPLICABLE

LOCAL CODES, ORDINANCES AND STATE AMENDMENTS.

2. THE CONTRACTOR SHALL CHECK ALL THE DRAWINGS IMMEDIATELY UPON

THEIR RECEIPT AND SHALL VERIFY ALL DIMENSIONS AND SITE CONDITIONS

BEFORE STARTING WORK. IMEG ENGINEERS PROJECT MANAGER SHALL BE

NOTIFIED OF ANY DISCREPANCIES.

3. NO STRUCTURAL MEMBER SHALL BE CUT OR NOTCHED UNLESS SPECIFICALLY

SHOWN, NOTED OR APPROVED BY IMEG ENGINEERS. NOTCH DETAIL, IF SHOWN,

ARE FOR GENERAL GUIDANCE ONLY, IMEG ENGINEERS SHALL BE CONTACTED

IN WRITING TO APPROVE THE LOCATIONS OF PROPOSED NOTCHES.

4. CONNECTIONS AND IMPLIED CONSTRUCTION ASSEMBLIES THAT ARE NOT

SPECIFICALLY DESCRIBED OR DETAILED SHALL BE CONSTRUCTED USING

STANDARD CONSTRUCTION PRACTICES IN COMPLIANCE WITH THE GOVERNING

CODES AND ORDINANCES.

5. WHEN DETAILS LABELED "TYPICAL" OR "SIMILAR" ARE GIVEN ON THE

DRAWINGS, THE CONTRACTOR SHALL APPLY THE INTENT OF THE DETAIL TO

THAT SPECIFIC CONDITION.

6. WRITTEN INFORMATION AND DIMENSIONS SHALL TAKE PRECEDENCE OVER

GRAPHIC INFORMATION. DO NOT SCALE DRAWINGS.

7. DRAWINGS AND SPECIFICATIONS FOR THIS WORK HAVE BEEN PREPARED IN

ACCORDANCE WITH GENERALLY ACCEPTED STANDARDS OF PRACTICE TO

MEET THE MINIMUM REQUIREMENTS OF THE CURRENT EDITION OF THE CBC.

ANY OMISSIONS OR DISCREPANCIES ON THE PLANS OR ANY DEVIATIONS FROM

THE PLANS WHICH ARE NECESSITATED BY FIELD CONDITIONS OR ANY

CONDITION DIFFERENT FROM THOSE INDICATED ON THE PLANS SHOULD BE

BROUGHT TO THE ATTENTION OF IMEG ENGINEERS PRIOR TO CONTINUING

WITH CONSTRUCTION. ALL WORK IS TO BE COORDINATED SO THAT

COOPERATION BETWEEN ALL TRADES WHERE REQUIRED IS ACCOMPLISHED.

8. CONTRACTOR AND SUBCONTRACTORS ARE RESPONSIBLE FOR THE ORDER

AND MEANS OF CONSTRUCTION AND ALL TEMPORARY BRACING AND ERECTION

DURING CONSTRUCTION.

9. APPROVALS BY THE PROJECT INSPECTOR(S) SHALL NOT CONSTITUTE

AUTHORITY TO DEVIATE FROM THE PLANS AND SPECIFICATIONS.

10. THE PROVISIONS OF CFC AND CBC CHAPTER 33 SHALL BE ENFORCED ON THIS

PROJECT.

11. ALL WORK SHALL CONFORM TO 2016 TITLE 24, CALIFORNIA CODE OF

REGULATIONS (CCR)

12. A PROJECT INSPECTOR EMPLOYED BY THE DISTRICT (OWNER) AND APPROVED

BY THE DIVISION OF THE STATE ARCHITECT SHALL PROVIDE CONTINUOUS

INSPECTION OF THE WORK. THE DUTIES OF THE INSPECTOR ARE DEFINED IN

SECTION 4-342, PART 1, TITLE 24, CCR. CLASS 3.

13. TITLE 24 PARTS 1-5 MUST BE KEPT ON SITE DURING THE CONSTRUCTION.

THE SCOPE OF WORK AS STATED BELOW DOES NOT CONSTITUTE A DETAILED

AND FULL EXPLANATION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.

REMOVAL AND REPLACEMENT OF EXISTING EXHAUST FANS WITH NEW EXHAUST

FANS AT LOCKER ROOMS.

ALL OTHER STRUCTURES AND ELEMENTS SHOWN ARE EXISTING, FOR REFERENCE

ONLY.

10931 STAMY RD, WHITTIER, CA 90604

LOCKER ROOMS EXHAUST FAN UPGRADE

EAST WHITTIER CITY SCHOOL DISTRICT

CODE REFERENCES

VICINITY MAP

HILLVIEW MIDDLE SCHOOL

PROJECT TEAM

OWNER

OWNER

EAST WHITTIER CITY SCHOOL DISTRICT

14421 E. WHITTIER BLVD,

WHITTIER, CA 90605

(562) 907-5900

GENERAL NOTES

SCOPE OF WORK

IMEG901 VIA PIEMONTE, SUITE 400ONTARIO, CA 91764tel: (909) 477-9615

MECHANICAL

PROJECT MANAGER: ERIC DESPLINTER, PEMECHANICAL ENGINEER: CHRISTIAN GUYNES, PEELECTRICAL ENGINEER: JUSTIN IGNACIO, EIT

IMEG901 VIA PIEMONTE, SUITE 400ONTARIO, CA 91764tel: (909) 477-9615

ELECTRICAL

IMEG901 VIA PIEMONTE, SUITE 400ONTARIO, CA 91764tel: (909) 477-9615

STRUCTURAL

STRUCTURAL ENGINEER: TERRY TSANG

ER

ET

SIG

ER

RE

ENI

GN

E

LANOISSEORPD

F

I A

N

OF CA L I FOR

STA

TE

D PM

ER

IC

eS LI

ME

HAN I CAL

C

.

NTE

R

Exp. 12/31/19

38688

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY SCHOOL DISTRICT

2/1

/2018 7

:53:5

9 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

T0.0

COVER SHEET

Approver

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

SHEET INDEX

DWG.NO. DESCRIPTION

T0.0 COVER SHEET

M001 GENERAL NOTES, LEGEND AND DRAWING INDEX

M101 MECHANICAL FIRST FLOOR DEMOLITION PLAN

M201 MECHANICAL FIRST FLOOR REMODEL PLAN

M301 DETAILS/CONTROLS

E001 GENERAL NOTES, SPECIFICATIONS, LEGEND AND DRAWING LIST

E201 FIRST FLOOR POWER PLAN

Page 2: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

SECTION 23 00 00 - BASIC MECHANICAL REQUIREMENTS

SECTION 23 05 29 - HANGERS AND SUPPORT FOR HVAC PIPING AND DUCTWORK

SECTION 23 34 23 - POWER VENTILATORS

SECTION 23 37 00 - AIR INLETS AND OUTLETS

2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE CALIFORNIA CODE

OF REGULATIONS (CCR) TITLE 24, PART 1

2016 CALIFORNIA BUILDING CODE (CBC) CALIFORNIA CODE OF REGULATIONS (CCR)

TITLE 24, PART 2

(2015 INTERNATIONAL BUILDING CODE (IBC) W/CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ELECTRICAL CODE (CEC) CALIFORNIA CODE OF REGULATIONS

(CCR) TITLE 24, PART 3

(2014 NATIONAL ELECTRICAL CODE (NEC) W/CALIFORNIA AMENDMENTS)

2016 CALIFORNIA MECHANICAL CODE CALIFORNIA CODE OF REGULATIONS (CCR)

TITLE 24, PART 4

(2015 UNIFORM MECHANICAL CODE (UMC) W/CALIFORNIA AMENDMENTS)

2016 CALIFORNIA PLUMBING CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE

24, PART 5

(2015 UNIFORM PLUMBING CODE (UPC) W/CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ENERGY EFFICIENCY STANDARDS CODE CALIFORNIA CODE OF

REGULATIONS (CCR) TITLE 24, PART 6

2016 CALIFORNIA FIRE CODE (CFC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE

24, PART 9

(2015 INTERNATIONAL FIRE CODE (IFC) W/CALIFORNIA AMENDMENTS)

2016 CALIFORNIA REFERENCED STANDARDS CODE CALIFORNIA CODE OF

REGULATIONS (CCR) TITLE 24, PART 12

AMERICANS WITH DISABILITIES ACT (ADA) TITLE II - ACCESSIBILITY GUIDELINES FOR

BUILDINGS AND FACILITIES (ADAG)

1990 STATE FIRE MARSHAL REGULATIONS AND AMENDMENTS TO-DATE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, CALIFORNIA STATE

ACCESSIBILITY STANDARDS

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 19

STANDARDS:

NFPA 13 AUTOMATIC SPRINKLER SYSTEM (2016)

NFPA 14 STANDPIPE SYSTEMS (2016)

NFPA 17 DRY CHEMICAL EXTINGUISHING SYSTEMS (2016)

NFPA 17a WET CHEMICAL SYSTEMS (2016)

NFPA 20 STATIONARY PUMPS (2016)

NFPA 22 WATER TANKS FOR PRIVATE FIRE PROTECTION (2016)

NFPA 24 PRIVATE FIRE MAINS (2016)

NFPA 72 NATIONAL FIRE CODE (2016)

NFPA 80 FIRE DOORS AND OTHER OPENING PROTECTIVES (2016)

NFPA 92 STANDARD FOR SMOKE CONTROL SYSTEMS (2015)

REFERS TO "SMACNA" HVAC DUCT CONSTRUCTION STANDARDS

EXHAUST AIR

DOWN THRU ROOF

SUPPLY AIR

DTR

EA

SA

E OR EXH.

S OR SUPP.

XXX

TYP TYPICAL

UNLESS NOTED OTHERWISE

UP THRU ROOF

EQUIPMENT NUMBER

UTR

U.N.O.

CUBIC FEET OF AIR PER MINUTE

SUPPLY

EXHAUST

CFM

GI GALVANIZED IRON

STATIC PRESSURES.P.

ABOVE FINISHED FLOOR

GALVANIZED

AFF

GALV.

EXISTING DUCT OR EQUIPMENT TO BE REMOVED

EXIST. EXISTING(E)

MANUFACTURER& MODEL NO.

AIR

CFMQUANTITY IN

W.C.

S.P.

SERVEDFINISH

AREALOCATION REMARKS

MILL FINISH1900WALL

0.01ON

4.63

SIZE

W x H

(IN.)

FREEAREAVEL.

(FPM)

COMPLETE WITH BIRDSCREEN, AND GRAVITY SHUTTERS.

MILL FINISHWALL

ONCOMPLETE WITH BIRDSCREEN, AND GRAVITY SHUTTERS.

INTAKE LOUVER SCHEDULE

1900 0.01 4.6354x30

54x30

BOY'S LOCKERS

GIRL'S LOCKERSRUSKIN

L375D

RUSKIN

L375D

SYMBOL ABBREV. DESCRIPTION

1. ALL INDICATED DIMENSIONS ARE APPROXIMATE AND ARE GIVEN FOR ESTIMATE PURPOSES ONLY.

BEFORE PROCEEDING WITH THE WORK CAREFULLY CHECK AND VERIFY ALL DIMENSIONS, SIZES,

REQUIRED CLEARANCES AND ASSUME FULL RESPONSIBILITY FOR THE FITTING OF ALL EQUIPMENT

AND MATERIALS HEREIN REQUIRED TO OTHER PARTS OF THE WORK AND TO THE WORK OF OTHER

TRADES.

2. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL SPECIAL FITTINGS

AND LOCATIONS ARE NOT EXACTLY LOCATED.

3. THIS CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING OUT HIS WORK

AND EQUIPMENT. HE SHALL COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER

TRADES AND ALL JOB CONDITIONS.

4. ALL LINE VOLTAGE WIRING, EQUIPMENT AND LINE VOLTAGE CONDUIT SHOWN DASHED SHALL BE BY

THE ELECTRICAL CONTRACTOR. LOW VOLTAGE WIRING AND LOW VOLTAGE CONDUIT SHALL BE BY

THE HVAC CONTRACTOR. VERIFY ELECTRICAL CHARACTERISTICS PRIOR TO BID AND MATERIAL

PURCHASE.

5. WHERE ANCHORAGE DETAILS ARE NOT SHOWN ON THE DRAWINGS, THE FIELD INSTALLATION

SHALL BE SUBJECT TO THE APPROVAL OF THE MECHANICAL AND STRUCTURAL ENGINEER.

6. INSTALL ALL FRESH AIR INTAKES OF MECHANICAL EQUIPMENT AS TO BE 10'-0" FROM ANY AND ALL

SANITARY VENTS OR EXHAUST FAN DISCHARGE. WHEN NECESSARY, EXTEND VENTS OR PROVIDE

ADDITIONAL FRESH AIR INTAKE DUCTWORK AS DIRECTED BY THE ENGINEER.

7. THE SIZES, WEIGHTS AND CAPACITIES OF ALL EQUIPMENT SCHEDULED ON THE PLAN HAVE BEEN

CAREFULLY COMPUTED. SHOULD EQUAL ITEMS BY DIFFERENT MANUFACTURERS (SEE

SPECIFICATIONS) BE SUBMITTED FOR APPROVAL, ALL SUCH SUBMITTALS SHALL INCLUDE 1/4"

SCALE SHOP DRAWINGS SHOWING METHOD OF INSTALLATION.

8. REQUIRED ROUTINE MAINTENANCE ACTION SHALL BE CLEARLY STATED AND INCORPORATED ON A

READILY ACCESSIBLE LABEL, WHICH MAY BE LIMITED TO IDENTIFYING BY TITLE AND/OR

PUBLICATION NUMBER THE OPERATION AND MAINTENANCE MANUAL FOR THAT PARTICULAR MODEL

AND TYPE OF PRODUCT. ONE COPY OF THIS INFORMATION SHALL BE FURNISHED BY THE

CONTRACTOR TO THE OWNER.

9. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH ALL TRADES AT THE SITE. ANY COSTS TO

INSTALL WORK TO ACCOMPLISH SAID COORDINATION WHICH DIFFERS FROM THE WORK AS SHOWN

ON THE PLANS SHALL BE INCURRED BY THE CONTRACTOR. ANY DISCREPANCIES, AMBIGUITIES OR

CONFLICTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT DURING BID TIME FOR

CLARIFICATION. ANY SUCH CONFLICTS NOT CLARIFIED PRIOR TO BID SHALL BE SUBJECT TO THE

INTERPRETATION OF THE ARCHITECT AT NO ADDITIONAL COST TO THE OWNER.

10. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DO ALL CORING, SAW CUTTING, PATCHING

AND REFINISHING OF EXISTING WALLS AND SURFACES WHEREVER IT IS NECESSARY FOR HIM TO

PENETRATE FOR HIS WORK. ALL OPENINGS SHALL BE SEALED TO MEET THE FIRE RATING OF THE

PARTICULAR WALL, FLOOR OR CEILING PENETRATED.

11. BEFORE BIDDING THE PROJECT THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY THE

CLEARANCES AVAILABLE TO BRING THE SPECIFIED EQUIPMENT AND MATERIAL TO THE SITE.

1. SUBMITTALS: SUBMIT FOR REVIEW 1 ELECTRONIC COPY OF SHOP DRAWINGS,

BROCHURES (CATALOG DATA), AND LISTS OF PROPOSED MATERIALS GIVING

MANUFACTURERS' NAMES, CATALOG NUMBER, TRADE NAMES, CUTS AND DETAILED

DESCRIPTION. WHEN MORE THAN ONE ITEM OF ITS KIND APPEARS ON SUBMITTAL

DATA, CAREFULLY DESIGNATE PARTICULAR ARTICLE SELECTED BY TYPE AND SIZE.

SUBMITTED DATA SHEETS SHALL CONTAIN ALL INFORMATION AND PRODUCT

CHARACTERISTICS SCHEDULED AND SPECIFIED.

2. THE CONTRACTOR SHALL FURNISH A WRITTEN GUARANTEE ON ALL MATERIALS,

EQUIPMENT AND WORKMANSHIP, FOR A PERIOD OF 1 YEAR FROM DATE OF

ACCEPTANCE OF THE WORK BY THE OWNER.

3. SCALE AND FIGURED DIMENSIONS ARE APPROXIMATE AND ARE FOR ESTIMATING

PURPOSE ONLY. BEFORE PROCEEDING WITH THE WORK, THE CONTRACTOR SHALL

ASSUME ALL RESPONSIBILITY FOR THE FITTINGS OF HIS MATERIAL AND EQUIPMENT TO

OTHER PARTS OF THE EQUIPMENT AND STRUCTURE.

4. WHERE APPARATUS AND EQUIPMENT HAVE BEEN INDICATED ON DRAWINGS, THE

DIMENSIONS HAVE BEEN TAKEN FROM THE SPECIFIED MANUFACTURER. THE

CONTRACTOR SHALL MAKE CHANGES IN PIPING, DUCTING AND CONTROLS TO SUIT

ACTUAL INSTALLED TYPES WITHOUT ADDITIONAL COST TO THE OWNER. THE

CONTRACTOR SHALL CHECK THE DRAWINGS TO SEE THAT THE EQUIPMENT HE

CONTEMPLATES INSTALLING WILL FIT THE SPACES PROVIDED.

5. ALL WORK NOT SHOWN IN COMPLETE DETAIL SHALL BE INSTALLED IN CONFORMANCE

WITH ACCEPTED STANDARD PRACTICE.

6. PIPING, DUCTWORK, AND OTHER EQUIPMENT SHOWN AS EXISTING HAVE BEEN TAKEN

FROM OWNER'S DRAWINGS. CONTRACTOR SHALL VERIFY EXACT LOCATION AND SIZES

IN THE FIELD AND NON DESTRUCTIVE FIELD INVESTIGATION.

7. BEFORE BIDDING THE PROJECT THE CONTRACTOR SHALL VISIT THE SITE AND VERIFY

THE CLEARANCES AVAILABLE TO BRING THE SPECIFIED EQUIPMENT AND MATERIAL TO

THE SITE.

8. THE DRAWINGS ARE ESSENTIALLY DIAGRAMMATIC TO THE EXTENT THAT ALL OFFSETS,

BENDS, SPECIAL FITTINGS AND LOCATIONS ARE NOT EXACTLY LOCATED. MECHANICAL

TRADES SHALL FOLLOW THESE DRAWINGS IN LAYING OUT THEIR WORK, CONSULT

GENERAL CONSTRUCTION DRAWINGS TO FAMILIARIZE THEMSELVES WITH ALL

CONDITIONS AFFECTING THEIR WORK AND SHALL VERIFY SPACES IN WHICH THEIR

WORK WILL BE INSTALLED. WHERE JOB CONDITIONS REQUIRE CHANGES IN INDICATED

LOCATIONS AND ARRANGEMENT, MAKE SUCH CHANGES AT NO ADDITIONAL COST TO

THE OWNER.

9. THIS CONTRACTOR SHALL COMPLY WITH ALL CONTRACT DOCUMENTS IN LAYING HIS

WORK AND EQUIPMENT. HE SHALL COORDINATE THE WORK OF THIS SECTION WITH THE

WORK OF OTHER TRADES AND ALL JOB CONDITIONS.

10. WHERE MATERIAL IS SHOWN ON DRAWINGS BUT NOT SPECIFIED, IT SHALL BE OF SAME

TYPE AND QUALITY AS EXISTING MATERIAL. SUBMIT DATA FOR APPROVAL.

11. UPON COMPLETION AND BEFORE FINAL ACCEPTANCE OF THE WORK, ALL DEBRIS,

TEMPORARY PROTECTIVE COVERINGS, RUBBISH, LEFTOVER MATERIALS, TOOLS AND

EQUIPMENT SHALL BE REMOVED FROM THE SITE.

12. FINALLY, THE ENTIRE INSTALLATION SHALL BE LEFT IN A NEAT, CLEAN AND USABLE

CONDITION.

1. MECHANICAL SUPPORTING DEVICES

A. GENERAL: MECHANICAL EQUIPMENT AND MATERIALS ARE NOT TO BE SUSPENDED

OR SUPPORTED FROM PIPE, ELECTRICAL CONDUIT, CEILING SYSTEMS OR ANY

NON-STRUCTURAL MEMBER.

B. FASTEN TO CONCRETE MASONRY UNITS WITH EXPANSION ANCHORS OR

SELF-TAPPING MASONRY SCREWS. FOR EXPANSION ANCHORS INTO HOLLOW

CONCRETE BLOCK, USE SLEEVE-TYPE ANCHORS DESIGNED FOR THE SPECIFIC

APPLICATION. DO NOT FASTEN IN MASONRY JOINTS. DO NOT USE POWDER

ACTUATED FASTENERS, WOODEN PLUGS, OR PLASTIC INSERTS.

1. PROPELLER FANS

A. GENERAL: DIRECT-DRIVEN AS SCHEDULED PROPELLER FANS CONSISTING OF FAN

BLADES, HUB, HOUSING, ORIFICE RING, MOTOR, DRIVE ASSEMBLY, AND

ACCESSORIES.

B. CONSTRUCTION: FAN SHALL BE OF BOLTED AND WELDED CONSTRUCTION

UTILIZING CORROSION RESISTANT FASTENERS. THE MOTOR SHALL BE MOUNTED

ON A 12 GAUGE STEEL WIRE GUARD. WALL PANEL TO BE MINIMUM 14 GAUGE.

C. PROVIDE WITH THE FOLLOWING ACCESSORIES:

C.A. GRAVITY SHUTTERS: ALUMINUM BLADES IN ALUMINUM FRAME; INTERLOCKED

BLADES WITH NYLON BEARINGS.

C.B. WALL SLEEVE.

C.C. VARIABLE-SPEED CONTROLLER.

C.D. BIRDSCREEN.

1. LOUVERS - FIXED - GALVANIZED

A. LOUVERS SHALL BE A MINIMUM 4" DEEP, 18 GAUGE GALVANIZED STEEL FRAME, AND

18 GAUGE GALVANIZED STEEL BLADES.

B. LOUVERS SHALL BE FURNISHED WITH 1/2" MESH X 19 GAUGE GALVANIZED BIRD

SCREEN IN REMOVABLE FRAME.

C. LOUVERS SHALL BE OF THE DRAINABLE BLADE DESIGN WITH WATER COLLECTED

ON THE LEADING EDGE OF THE BLADE AND DIVERTED TO THE JAMB.

D. LOUVERS SHALL BE SEALED AROUND PERIMETER TO AVOID MOISTURE

PENETRATION BETWEEN THE LOUVER FRAME AND WALL.

E. LOUVERS SHALL BE FURNISHED WITH GRAVITY SHUTTERS.

LEGEND

CODES AND STANDARDSGENERAL NOTES

SPECIFICATIONS

ER

ET

SIG

ER

RE

ENI

GN

E

LANOISSEORPD

F

I A

N

OF CA L I FOR

STA

TE

D PM

ER

IC

eS LI

ME

HAN I CAL

C

.

NTE

R

Exp. 12/31/19

38688

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY

SCHOOL DISTRICT

2/1

/2018 8

:29:1

1 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

M001

GENERAL NOTES, LEGEND

AND DRAWING INDEX

ED

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

DRAWING INDEX

DWG.NO. DESCRIPTION

M001 GENERAL NOTES, LEGEND AND DRAWING INDEX

M101 MECHANICAL FIRST FLOOR DEMOLITION PLAN

M201 MECHANICAL FIRST FLOOR REMODEL PLAN

M301 DETAILS/CONTROLS

EXHAUST FAN SCHEDULE

TYPE MARK I.D. NUMBER LOCATION SERVICECATOLOG DATA FAN DATA MOTOR

OPERATING WEIGHT(LBS)

REMARKSMANUFACTURER MODEL CFM ESP (IN) FAN RPM

WHEELDIAMETER I(N)

INPUT WATTS HP RPM VOLTAGE PHASE HERTZ

EF 1 LOCKERS BOY'S LOCKER ROOM Loren Cook Company 14XP26D102 900 0.10 938 14.75 113 1/6 1080 115 1 60 70 COMPLETE WITH SHUTTER GUARD, BIRDSCREEN, AND FAN SPEED CONTROLLER

EF 2 LOCKERS BOY'S LOCKER ROOM Loren Cook Company 14XP26D102 900 0.10 938 14.75 113 1/6 1080 115 1 60 70 COMPLETE WITH SHUTTER GUARD, BIRDSCREEN, AND FAN SPEED CONTROLLER

EF 3 LOCKERS GIRLS LOCKER ROOM Loren Cook Company 14XP26D102 900 0.10 938 14.75 113 1/6 1080 115 1 60 70 COMPLETE WITH SHUTTER GUARD, BIRDSCREEN, AND FAN SPEED CONTROLLER

EF 4 LOCKERS GIRLS LOCKER ROOM Loren Cook Company 14XP26D102 900 0.10 938 14.75 113 1/6 1080 115 1 60 70 COMPLETE WITH SHUTTER GUARD, BIRDSCREEN, AND FAN SPEED CONTROLLER

Page 3: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

F-43

INSTR

F-44

F-47

F-48

EQUIP.

F-49

GIRL'S.

F-32

ENTRY

F-34

LOCKERS

F-36

LOCKERS

F-38

LOCKERS

F-1

INSTR.

F-3F-5

F-6

EQUIP.

F-7

BOY'S

F-9

ENTRY

F-10

JANITOR

F-24

DRYINGROOM

GIRL'SSHOWER

F-27

F-28

F-29

F-30

F-26

F-15

LOCKERS

F-16

LOCKERS

F-17

LOCKERS

F-14

TOWEL RM.

F-13

LOCKERS

F-12

LOCKERS

F-11

LOCKERS

F-18

CORRIDOR

F-51

CORRIDOR

F-25

STORF-41 F-40 F-39

FH

STAMY ROADEXISTING

BUILDINGF

EXISTING

BUILDINGD

EXISTING

BUILDINGE

EXISTING

BUILDINGA

EXISTING

BUILDINGB

EXISTING

BUILDINGG

EXISTINGBUILDING

C

EXISTINGBUILDING

J

EXISTING

BUILDINGH

EXISTING

BUILDINGI

EXISTINGPARKING LOT #2

EXISTING

PARKING LOT #1

(E) EF

(E) EF

(E) EF

(E) EF

PROJECT LOCATION

ER

ET

SIG

ER

RE

ENI

GN

E

LANOISSEORPD

F

I A

N

OF CA L I FOR

STA

TE

D PM

ER

IC

eS LI

ME

HAN I CAL

C

.

NTE

R

Exp. 12/31/19

38688

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY SCHOOL DISTRICT

As indicated

2/1

/2018 7

:36:3

3 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

M101

MECHANICAL FIRST FLOOR

DEMOLITION PLAN

ED

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

DEMOLITION KEY NOTES

1/8" = 1'-0"1

MECHANICAL FIRST FLOOR DEMOLITION PLAN

KEY PLAN

GENERAL SHEET NOTES

1. REMOVE EXISTING EXHAUST FAN AND ASSOCIATED ACCESSORIES/SUPPORTS.

Page 4: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

F-43

INSTR

F-44

F-47

F-48

EQUIP.

F-49

GIRL'S.

F-32

ENTRY

F-34

LOCKERS

F-36

LOCKERS

F-38

LOCKERS

F-1

INSTR.

F-3F-5

F-6

EQUIP.

F-7

BOY'S

F-9

ENTRY

F-10

JANITOR

F-24

DRYINGROOM

GIRL'SSHOWER

F-27

F-28

F-29

F-30

F-26

F-15

LOCKERS

F-16

LOCKERS

F-17

LOCKERS

F-14

TOWEL RM.

F-13

LOCKERS

F-12

LOCKERS

F-11

LOCKERS

F-18

CORRIDOR

F-51

CORRIDOR

F-25

STORF-41 F-40 F-39

FH

STAMY ROADEXISTING

BUILDINGF

EXISTING

BUILDINGD

EXISTINGBUILDING

E

EXISTINGBUILDING

A

EXISTINGBUILDING

B

EXISTINGBUILDING

G

EXISTING

BUILDING

C

EXISTING

BUILDINGJ

EXISTINGBUILDING

H

EXISTING

BUILDINGI

EXISTING

PARKING LOT #2

EXISTINGPARKING LOT #1

1

EF

2

EF

3

EF

4

EF

60"x24" INTAKE LOUVER 60"x24" INTAKE LOUVER

1

11

1

22

PROJECT LOCATION

ER

ET

SIG

ER

RE

ENI

GN

E

LANOISSEORPD

F

I A

N

OF CA L I FOR

STA

TE

D PM

ER

IC

eS LI

ME

HAN I CAL

C

.

NTE

R

Exp. 12/31/19

38688

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY SCHOOL DISTRICT

As indicated

2/1

/2018 7

:36:3

5 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

M201

MECHANICAL FIRST FLOOR

REMODEL PLAN

ED

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

1/8" = 1'-0"1

MECHANICAL FIRST FLOOR REMODEL PLAN

REMODEL KEY NOTES

KEY PLAN

GENERAL SHEET NOTES

1 FOR EXHAUST FAN MOUNTING DETAIL, REFER TO 1/M301.

2 FOR INTAKE LOUVER MOUNTING DETAIL, REFER TO 2/M301.

1. FOR EXHAUST FAN CONTROLS REFER TO DETAIL 3/M301.

Page 5: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

CLIP ANGLE AROUND ENTIRE PERIMETER OF LOUVER.

BIRD SCREEN

(E) CMU WALL

EXTENDED DRIP SILL

CAULK ALLAROUND (TYP.)

FASTEN LOUVER TO CLIP ANGLES ON 18" MINIMUM CENTERS.

MOUNT FACE OFLOUVER FLUSHWITH EXTERIORFINISH UNLESSOTHERWISE NOTED.

1.

2.

NOTES:

SEAL ALL JOING ON BOTTOM INTERIOR SURFACE OF DUCT WITHIN 6'-0" OF THELOUVER WATER TIGHT.

CAULK SHEETMETAL SCREWS WHERE THEY PENETRATE METAL.

#12 S.M.S. @ 18" O.C.

3/8" HILTI KWIK BOLT TZ @ 18" O.C.

EF

-

1

115V-1∅-60HZ

WALL SWITCH

PER ELEC.

DETAIL NOTES:

SEE CONTROL WIRING LEGEND #4 THIS SHEET.

TYPICAL FOR

EF-1 & EF-2

DISC.

WIRING NOTES:

ELECTRICAL CONTRACTOR.

CIRCUIT BREAKER

DISCONNECT SWITCH

CONTRACTOR (DIVISION 23).

C.B.

DISC.

CONTRACTOR (DIVISION 26).

EQUIPMENT FURNISHED AND INSTALLED BY ELECTRICAL

EQUIPMENT FURNISHED AND INSTALLED BY MECHANICAL

LINE VOLTAGE WIRING AND CONDUIT FURNISHED AND INSTALLED BY

LOW VOLTAGE WIRING AND CONDUIT FURNISHED AND INSTALLED BY MECHANICALCONTRACTOR. SEE SPECIFICATION SECTIONS 26 05 19 AND 26 05 33 FOR CONDUIT ANDWIRING REQUIREMENTS. ALL LOW VOLTAGE WIRING TO BE IN CONDUIT.

NTS 3

NTS 2

NTS 1

NTS 6

NTS 5

NTS 4

NTS 9

NTS 8

NTS 7

INTAKE LOUVER MOUNTING DETAIL

EXHAUST FAN MOUNTING DETAIL

EXHAUST FAN WIRING DIAGRAM

CONTROL LEGEND

WINDOW

WINDOW

WINDOW

WINDOW

SUPPORT BRACKET

1/4" PLYWOOD BLANK-OFF

2x4 BLKG. (TYP.)

CAULK AND SEALWATER TIGHT ALL SIDES

3/8" HILTI KWIK BOLT TZ @16" O.C. MIN 3 TOP &BOTTOM

#10 x 1-1/4" LAG

SCREW @ 5" O.C.

#10 S.M.S.

3"x3"x1/4" ANGLE IRON

SUPPORT BRACKET

3/8" HILTI KWIK BOLT TZ

MIN. 1-1/2" EMB.

(E) CONCRETE WALL

BIRD SCREEN

PLYWOOD BLANK-OFF

FIELD PAINT EXTERIOR AND

INTERIOR BLACK

BIRD SCREEN

SHUTTER GUARD

CAULK AND SEAL WATER

TIGHT ALL SIDES

#10 x 1-1/2" LAG

SCREW @ 6" O.C.

3/8" HILTI KWIK BOLT TZ

@ 16" O.C.

NOT USED

NOT USED

NOT USED

NOT USED

NOT USED

ER

ET

SIG

ER

RE

ENI

GN

E

LANOISSEORPD

F

I A

N

OF CA L I FOR

STA

TE

D PM

ER

IC

eS LI

ME

HAN I CAL

C

.

NTE

R

Exp. 12/31/19

38688

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY

SCHOOL DISTRICT

2/1

/2018 7

:36:3

6 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

M301

DETAILS/CONTROLS

ED

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

Page 6: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

DUPLEX GROUND FAULT INTERRUPTING TYPE RECEPTACLE,

20 AMP, 125 VOLT, 2 POLE, 3 WIRE.

CONDUIT RUN, CONCEALED IN CEILING OR WALLS.

MOUNT AT +18 INCHES TO CENTER UNLESS NOTED OTHERWISE.

PANEL DESIGNATION.

SURFACE MOUNTED BRANCH CIRCUIT PANELBOARD.

P1

WEATHERPROOF

NOTE INDICATOR

WP

- -

VANDAL PROOF TYPE MOTOR RATED SWITCH.SM

PIPING, AND ELECTRICAL DISTRIBUTION SYSTEM BRACING NOTE.1.

PIPING, AND ELECTRICAL DISTRIBUTION SYSTEMS SHALL BE BRACED TO

COMPLY WITH THE FORCES AND DISPLACEMENTS PRESCRIBED IN ASCE

7-05 SECTION 13.3 AS DEFINED IN ASCE 7-10 SECTION 13.6.8, 13.6.7,

13.6.5.6, AND 2016 CBC, SECTIONS 1616A.1.23, 1616A.1.24, 1616A.1.25. AND

1616A.1.26.

THE BRACING AND ATTACHMENTS TO THE STRUCTURE SHALL BE

DETAILED ON THE APPROVED DRAWINGS OR THEY SHALL COMPLY WITH

ONE OF THE OSHPD PRE-APPROVALS (OPM #) AS MODIFIED TO SATISFY

ANCHORAGE REQUIREMENTS OF ACI 318, APPENDIX D.

COPIES OF THE MANUAL SHALL BE AVAILABLE ON THE JOBSITE PRIOR TO

THE START OF HANGING AND BRACING OF THE PIPE, AND ELECTRICAL

DISTRIBUTION SYSTEMS.

THE STRUCTURAL ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY

OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS.

INCLUDED IN THE CONTRACTOR'S BID.

DAYS PRIOR TO THE OUTAGE. ANY OVERTIME PAY SHALL BE

SHUTDOWN MUST BE COORDINATED WITH THE OWNER AND ENGINEER 14

MINIMUM. HOWEVER, WHEN AN INTERRUPTION IS NECESSARY, THE

4. ALL INTERRUPTION OF ELECTRICAL POWER SHALL BE KEPT TO A

THE MOST STRINGENT RULE SHALL APPLY.

WHERE THE CODES HAVE DIFFERENT LEVELS OF REQUIREMENTS,

ALL LOCAL CODES HAVING JURISDICTION.

INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS

CALIFORNIA CODE OF REGULATIONS TITLE 24 (CCR)

AMERICAN NATIONAL STANDARD INSTITUTE (ANSI)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

AMERICAN STANDARD ASSOCIATION (ASA)

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

INSULATED POWER CABLE ENGINEERS ASSOCIATION

AMERICAN SOCIETY OF TESTING MATERIALS (ASTM)

CALIFORNIA ELECTRICAL CODE (CEC) - 2016 EDITION

(NEMA)

(IPCEA)

(IEEE)

SHALL COMPLY WITH THE REQUIREMENTS OF THE FOLLOWING:

IN ADDITION, THE MATERIALS, EQUIPMENT, AND INSTALLATION

DATA SUBMITTED BY THE MANUFACTURER ATTESTING TO ITS SAFETY.

LISTING. CUSTOM MADE EQUIPMENT SHALL HAVE COMPLETE TEST

RECOGNIZED TESTING AUTHORITY WHERE UL DOES NOT HAVE A

THEIR LABEL, OR LISTED AND CERTIFIED BY A NATIONALLY

SHALL BE LISTED BY UNDERWRITER'S LABORATORIES (UL) AND BEAR

3. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND

AND ANCHOR THE EQUIPMENT TO THE SUPPORTING STRUCTURE.

RESIST A LOAD WHICH EXCEEDS THE FORCE LEVEL USED TO RESTRAIN

THE EQUIPMENT AS A WHOLE INCLUDING ITS ATTACHMENTS, WILL

ELEMENTS, SUB-ASSEMBLIES AND/OR PARTS OF SAID EQUIPMENT, AND

DESIGNED AND CONSTRUCTED IN SUCH A MANNER THAT ALL PORTIONS,

2. ALL ELECTRICAL PREFABRICATED EQUIPMENT SHALL BE

ALL DAMAGES CAUSED BY HIM OR HIS WORK.

RESPONSIBLE FOR THE PROPER AND APPROVED REPAIR OF ANY AND

WHEN TRENCHING FOR HIS WORK. THE CONTRACTOR SHALL BE

UTILITY LINES. THE CONTRACTOR SHALL USE EXTREME CAUTION

CALLED TO THE FACT THAT THERE ARE EXISTING UNDERGROUND

AND ASPHALT AS REQUIRED TO PERFORM HIS WORK. ATTENTION IS

TRENCHING, BACKFILLING, COMPACTION AND PATCHING OF CONCRETE

12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SAWCUTTING,

CONCEALED IN WALLS, OR BELOW SLAB ON GRADE UNLESS NOTED

CONDUIT SHALL BE INSTALLED CONCEALED IN THE CEILING SPACE,

11. CONDUIT SHALL NOT BE INSTALLED IN ANY FLOOR SLAB.

OTHERWISE.

TO ROUGHING IN ALL CONDUIT TO THIS EQUIPMENT.

RESPONSIBLE FOR OBTAINING MANUFACTURER'S SHOP DRAWINGS PRIOR

OPERATIONS SHALL BE PROVIDED. THE CONTRACTOR SHALL BE

WIRING, CONTROLS, AND CONDUIT FOR MECHANICAL AND PLUMBING

LOCATION OF EQUIPMENT. DISCONNECT SWITCHES, STARTERS,

THE DRAWINGS OF OTHER TRADES FOR CONTROL DIAGRAMS, SIZE AND

ELECTRICAL DRAWINGS, AND DRAWINGS OF OTHER TRADES. REVIEW

CONNECTIONS AS INDICATED ON THE SINGLE LINE DIAGRAM,

CONNECTION TO MOTORS AND EQUIPMENT REQUIRING ELECTRICAL

OF THEIR RESPECTIVE EQUIPMENT. SUPPLY POWER AND MAKE

9. COORDINATE WITH OTHER TRADES AS TO THE EXACT LOCATION

SHALL BE MADE BY THE CONTRACTOR.

8. ALL FINAL CONNECTIONS TO OWNER FURNISHED EQUIPMENT

FOR EQUIPMENT.

REVIEW AND TO COORDINATE WITH THE PLUMBING DRAWINGS

NOTED AND SHALL BE COORDINATED WITH OTHER SECTIONS. DO NOT

ELECTRICAL, ARCHITECTURAL, AND PLUMBING ITEMS OR FEATURES.

SCALE THE ELECTRICAL DRAWINGS FOR LOCATIONS OF ANY

SHALL BE AT THE OPTION OF THE CONTRACTOR UNLESS OTHERWISE

13. DRAWINGS ARE DIAGRAMMATIC ONLY. ROUTING OF RACEWAYS

7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO

GUARANTEE OF MATERIALS AND WORKMANSHIP FROM THE DATE OF

6. THE CONTRACTOR SHALL FURNISH A ONE YEAR WRITTEN

FROM EACH REPRESENTATIVE].

AFTER RECEIPT OF APPROVAL AND RECOMMENDATION OF ACCEPTANCE

FINAL ACCEPTANCE OF THE WORK WILL BE MADE BY THE OWNER

ITEM OR SYSTEM [TO THE FULL SATISFACTION OF EACH REPRESENTATIVE.

COMPETENT PERSONNEL TO DEMONSTRATE THE OPERATION OF ANY

OWNER WILL INSPECT THE WORK. THE CONTRACTOR SHALL PROVIDE

DRAWINGS HAVE BEEN FULLY COMPLETED, REPRESENTATIVES OF THE

5. AFTER ALL REQUIREMENTS OF THE SPECIFICATIONS AND/OR THE

SUBSTANTIAL COMPLETION.

10. EXACT METHOD AND LOCATION OF CONDUIT PENETRATION AND

OPENINGS IN CONCRETE WALLS OR FLOORS OR STRUCTURAL STEEL

MEMBERS SHALL BE AS DIRECTED BY THE ARCHITECT AND REVIEWED AND

APPROVED BY DSA. PERFORM CORING, SAW CUTTING, PATCHING, AND

REFINISHING OF EXISTING WALLS AND SURFACES WHEREVER IT IS

NECESSARY TO PENETRATE. NO STRUCTURAL MEMBER, FLOOR OR WALL

SHALL BE CUT, NOTCHED OR BORED UNLESS SPECIFICALLY DETAILED ON

THE APPROVED PLANS OR REVIEWED AND APPROVED BY THE ARCHITECT

OF RECORD AND DSA PRIOR TO BEGINNING SUCH WORK. OPENINGS

SHALL BE SEALED IN AN APPROVED METHOD TO MEET THE FIRE RATING

OF THE PARTICULAR WALL, FLOOR OR CEILING. EXACT METHOD AND

LOCATIONS OF CONDUIT PENETRATIONS AND OPENINGS IN CONCRETE

WALLS OR FLOORS SHALL BE UL APPROVED.2016 CALIFORNIA BUILDING CODE (CBC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 2

(2015 INTERNATIONAL BUILDING CODE (IBC) W/ 2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ELECTRICAL CODE (CEC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 3

(2015 NATIONAL ELECTRICAL CODE (NEC) W/ 2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA ENERGY CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 6

2016 CALIFORNIA FIRE CODE (CFC)

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9

(2015 INTERNATIONAL FIRE CODE (IFC) W/ 2016 CALIFORNIA AMENDMENTS)

2016 CALIFORNIA GREEN BUILDING STANDARDS CODE

2016 CALIFORNIA EXISTING BUILDING CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART10

(2015 INTERNATIONAL EXISTING BUILDING CODE (IEBC))

2016 CALIFORNIA REFERENCED STANDARDS CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 12

AMERICANS WITH DISABILITIES ACT (ADA)

TITLE II - ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES (ADAG)

1990 STATE FIRE MARSHAL REGULATIONS AND AMENDMENTS TO-DATE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, CALIFORNIA STATE

ACCESSIBILITY STANDARDS

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 19

2016 CALIFORNIA BUILDING STANDARDS ADMINISTRATIVE CODE

CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 1

(CAL GREEN), PART II, TITLE 24 C.C.R.

2016 NFPA 72 - NATIONAL FIRE ALARM AND SIGNALING CODE

SPECIFICATIONS

APPLICABLE CODES AND STANDARDS

SCHOOL EQUIPMENT ANCHORAGE NOTESPART 1 - GENERAL

1.01 SCOPE OF WORK

A. WORK COVERED BY THIS SECTION CONSISTS OF FURNISHING ALL

LABOR, EQUIPMENT, SUPPLIES, AND MATERIALS, UNLESS OTHERWISE

SPECIFIED, AND IN PERFORMING ALL OPERATIONS NECESSARY FOR

THE INSTALLATION OF A COMPLETE AND OPERABLE ELECTRICAL

SYSTEM AS REQUIRED BY THESE SPECIFICATIONS AND AS INDICATED

ON THE DRAWINGS.

B. THE CONTRACTOR SHALL EXAMINE ALL DRAWINGS AND

SPECIFICATIONS IN A MANNER TO BE FULLY COGNIZANT OF ALL

WORK REQUIRED UNDER THIS SECTION.

C. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED

PERMITS UNLESS OTHERWISE ARRANGED AND SCHEDULE ALL

REQUIRED INSPECTIONS FOR THE EXECUTION OF THE WORK UNDER

THIS CONTRACT.

1.02 GENERAL REQUIREMENTS

A. WORK DONE UNDER THIS SECTION SHALL COMPLY WITH THE LATEST

EDITION OF THE CALIFORNIA ELECTRICAL CODE, CEC (NATIONAL

ELECTRICAL CODE NEC), THE STATE OF CALIFORNIA TITLE 24, THE

STATE BUILDING STANDARDS, (OSHA) OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION, AND TO ANY APPLICABLE LOCAL

JURISDICTIONAL REQUIREMENTS. IN CASE OF CONFLICT BETWEEN

REQUIREMENTS, THE MOST RESTRICTIVE SHALL APPLY.

1.03 ELECTRICAL CONTRACTOR'S RESPONSIBILITY

A. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN A

COMPLETE SET OF DRAWINGS AND SPECIFICATIONS. CONTRACTOR

SHALL CHECK THE DRAWINGS OF THE OTHER TRADES AND SHALL

CAREFULLY READ THE ENTIRE SPECIFICATIONS AND DETERMINE HIS

RESPONSIBILITIES.

B. BEFORE SUBMITTING THE BID, THE ELECTRICAL CONTRACTOR SHALL

VISIT THE JOB SITE AND FULLY ACQUAINT HIMSELF WITH EXISTING

CONDITIONS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO

INSTALL THE EQUIPMENT AND ASSOCIATED WIRING IN SUCH A

MANNER AS TO CONFORM TO THE EXISTING STRUCTURE OF THE

BUILDING, AVOID OBSTRUCTIONS, AND MEET APPLICABLE CODE

REQUIREMENTS.

C. THE INTENT OF THESE DRAWINGS IS TO DESCRIBE A COMPLETE AND

OPERABLE SYSTEM. WHERE EXISTING CONDITIONS DIFFER FROM

DRAWINGS, ADJUSTMENT SHALL BE MADE AND ALLOWANCES

INCLUDED FOR ALL NECESSARY EQUIPMENT TO COMPLETE ALL

PARTS OF THE DRAWINGS AND SPECIFICATIONS. BRING ANY

QUESTIONS TO THE ARCHITECT OR ENGINEER'S ATTENTION PRIOR TO

BIDDING.

D. WHEREVER A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE,

EQUIPMENT, DEVICES, CIRCUIT BREAKERS, ETC., ARISES ON THE

DRAWING AND/OR SPECIFICATION, THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND

SERVICES REQUIRED BY THE STRICTEST CONDITION NOTED ON

DRAWINGS AND/OR IN SPECIFICATIONS TO ENSURE COMPLETE AND

OPERABLE SYSTEMS AS REQUIRED BY THE OWNER AND ENGINEER.

1.04 WORK NOT INCLUDED

A. CERTAIN LABOR, MATERIALS, OR EQUIPMENT MAY BE FURNISHED

UNDER OTHER CONTRACTS BY THE OWNER. WHEN SUCH IS THE

CASE, THE EXTENT, SOURCE, AND DESCRIPTION OF THESE ITEMS

WILL BE INDICATED ON THE DRAWINGS OR DESCRIBED IN THE

SPECIFICATIONS. UNLESS OTHERWISE NOTED, ALL LABOR, MATERIALS

AND EQUIPMENT FOR THE COMPLETE INSTALLATION OF THE

ELECTRICAL WORK SHALL BE PROVIDED UNDER THIS SECTION OF

THESE SPECIFICATIONS.

1.05 SUBMITTALS

A. AFTER AWARD OF THE CONTRACT AND BEFORE ANY MATERIALS ARE

DELIVERED TO THE JOB SITE, A COMPLETE LIST OF ALL MATERIALS

PROPOSED TO BE FURNISHED AND INSTALLED UNDER THIS SECTION

MUST BE PROVIDED.

1.06 STANDARDS AND MATERIALS

A. ALL MATERIALS SHALL CONFORM TO THE CURRENT APPLICABLE

INDUSTRY STANDARDS, NEMA (NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION), ANSI (AMERICAN NATIONAL

STANDARDS INSTITUTE), IPCEA (INSULATED POWER CABLE ENGINEERS

ASSOCIATION), IEEE (INSTITUTE OF ELECTRICAL AND ELECTRONIC

ENGINEERS), NATIONAL ELECTRICAL SAFETY CODE.

B. UNLESS OTHERWISE INDICATED, ALL MATERIALS SHALL BE

UNDERWRITERS LABORATORIES LISTED AND LABELED, OR CERTIFIED

BY A NATIONALLY RECOGNIZED TESTING LABORATORY.

C. WORKMANSHIP AND NEAT APPEARANCE SHALL BE AS IMPORTANT

AS THE ELECTRICAL MECHANICAL EFFICIENCY. DEFECTIVE AND

DAMAGED MATERIALS SHALL BE REPLACED OR REPAIRED PRIOR TO

FINAL APPROVAL AND ACCEPTANCE. THE DRAWINGS AND

SPECIFICATIONS TAKE PRECEDENCE WHEN THEY ARE MORE

STRINGENT THAN CODES, STATUTES, OR ORDINANCES IN EFFECT.

APPLICABLE CODES, STANDARDS, ORDINANCES, AND STATUTES TAKE

PRECEDENCE WHEN THEY ARE MORE STRINGENT OR CONFLICT WITH

THE DRAWINGS OR SPECIFICATIONS.

1.07 DELIVERY AND STORAGE OF MATERIALS

A. THE CONTRACTOR SHALL INVESTIGATE EACH SPACE IN THE BUILDING

THROUGH WHICH EQUIPMENT MUST PASS TO REACH ITS FINAL

LOCATIONS. IF NECESSARY, THE MANUFACTURER SHALL BE

REQUIRED TO SHIP HIS MATERIAL IN SECTIONS, SIZED TO PERMIT

PASSING THROUGH SUCH RESTRICTED AREAS IN THE BUILDING.

B. THE CONTRACTOR SHALL RETAIN IN HIS POSSESSION AND SHALL BE

RESPONSIBLE FOR ALL PORTABLE AND DETACHABLE PARTS OF

PORTIONS OF INSTALLATIONS SUCH AS FUSES, KEY LOCKS,

ADAPTORS, BLOCKING CLIPS, AND INSERTS UNTIL FINAL COMPLETION

OF WORK. THESE PARTS SHALL BE DELIVERED TO THE OWNER UPON

COMPLETION OF THE WORK.

PART 2 - PRODUCTS

2.01 EQUIPMENT AND MATERIALS

A. ALL MATERIALS FURNISHED AND INSTALLED UNDER THIS CONTRACT

SHALL BE NEW, FREE FROM DEFECTS, AND SHALL BE GUARANTEED

FOR A PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE OF

THE WORK. SHOULD ANY TROUBLE DEVELOP DURING THEIR PERIOD

DUE TO DEFECTIVE MATERIALS OR FAULTY WORKMANSHIP, THE

CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS AND

LABOR TO CORRECT THE TROUBLE WITHOUT ANY COST TO THE

OWNER. ANY DEFECTIVE MATERIAL OR INFERIOR WORKMANSHIP

NOTED AT THE TIME OF INSTALLATION SHALL BE CORRECTED

IMMEDIATELY TO THE SATISFACTION OF THE OWNER.

2.02 CONDUIT

A. PROVIDE RACEWAYS AS INDICATED ON THE DRAWINGS AND AS

B. ALL CONDUITS CONCEALED (CO) SHALL BE SCHEDULE EMT UNLESS

OTHERWISE INDICATED ON THE DRAWING. ALL EMPTY CONDUIT SHALL BE

PROVIDED WITH A at" POLYPROPYLENE PULL STRING.

C. WHERE CONDUIT CROSSES AN EXPANSION JOINT, PROVIDE APPROVED

FITTINGS WHICH ALLOW DEFLECTIONS EQUIVALENT TO TWICE THE

MOVEMENT ALLOWED BY THE DESIGN.

D. PVC SCHEDULE 40 CONDUITS SHALL BE USED ONLY IN

UNDERGROUND APPLICATION, CONDUIT RISERS THOUGHT SLAB SHALL

BE "GRC".

2.03 CONDUCTORS

A. PROVIDE A COMPLETE SYSTEM OF CONDUCTORS IN RACEWAY

SYSTEMS AS SHOWN ON THE DRAWINGS AND THEN HEREIN

SPECIFIED. ALL WIRE SHALL BE ROUTED THROUGH AN APPROVED

RACEWAY REGARDLESS OF VOLTAGE APPLICATION.

2.04 FITTINGS

A. CONNECTOR, COUPLING, LOCKNUT, BUSHINGS AND CAPS USED WITH

RIGID CONDUIT SHALL BE STEEL, THREADED AND GALVANIZED.

BUSHINGS SHALL BE INSULATED.

B. EMT FITTINGS, CONNECTORS AND COUPLINGS SHALL BE STEEL, ZINC,

OR CADMIUM PLATED, COMPRESSION TYPE, WITH INSULATED THROAT.

C. FLEXIBLE STEEL CONDUIT CONNECTORS SHALL BE TWIST-IN-TYPE

WITH INSULATED THROAT. THE FINISH SHALL BE ZINC OR CADMIUM

PLATING.

D. EMT CONDUIT FITTINGS SHALL BE THE COMPRESSION TYPE; SET

SCREW FITTINGS SHALL NOT BE USED.

2.05 JUNCTION AND PULL BOXES

A. FOR INTERIOR DRY LOCATIONS, BOXES SHALL BE GALVANIZED

ONE-PIECE DRAWN STEEL, KNOCKOUT TYPE WITH REMOVABLE,

MACHINE SCREW SECURED COVERS.

B. ALL BOXES SHALL BE SIZED FOR THE NUMBER AND SIZES OF

CONDUCTORS AND CONDUITS ENTERING THE BOX AND EQUIPPED

WITH PLASTER RINGS WHERE REQUIRED.

2.06 OUTLET BOXES

A. FOR FIXTURES, BOXES SHALL BE GALVANIZED, ONE-PIECE DRAWN

STEEL, KNOCKOUT TYPE EQUIPPED WITH 3/8" FIXTURE STUDS AND

PLASTER RINGS WHERE REQUIRED.

B. FOR CONVENIENCE OUTLETS, WALL SWITCHES, OR OTHER DEVICES,

OUTLET BOXES SHALL BE GALVANIZED ONE-PIECE DRAWN STEEL,

KNOCKOUT TYPE 4"X4"X1-1/2" MINIMUM.

C. FOR LOCATIONS WHERE STANDARD BOXES ARE NOT SUITABLE,

SPECIAL BOXES SHALL BE DESIGNED TO FIT SPACE OR MEET OTHER

REQUIREMENTS AND SUBMITTED FOR APPROVAL.

2.07 RECEPTACLES

A. ALL DEVICES SHALL CONFIRM TO THE NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION (NEMA) STANDARDS AND SHALL BE

UNDERWRITERS' LABORATORIES, INC. (UL) LISTED AND LABELED AND

SHALL BE "SPECIFICATIONS GRADE," MEETING THE REQUIREMENTS OF

THE FEDERAL SPECIFICATIONS FOR RECEPTACLE OUTLETS.

B. SINGLE AND DUPLEX RECEPTACLES SHALL BE SPECIFICATION GRADE,

CONVENIENCE RECEPTACLES SHALL BE U-GRPUNDED TYPE, 125

VOLTS, RATED 20 AMPERES, SIDE AND BACK WIRED WITH BINDING

SCREWS ONLY WITH DOUBLE WIPE CONTACTS AND SPRING STEEL

BACK UP CLIPS. HUBBELL MODEL #5362, ARROW HART OR PASS &

SEYMOUR. SEE ITEM C. BELOW FOR RECEPTACLE COLOR.

C. THE GROUND CONTACT SHALL BE ONE PIECE AND INTERNALLY

CONNECTED TO THE FRAME WITH GROUND TERMINAL FOR EXTERNAL

GROUND.

D. GROUND FAULT RECEPTACLES SHALL BE 20 AMPERES, 125 VOLTS

DUPLEX, THREE WIRE GROUND WITH PILOT LIGHT AND TEST AND

RESET BUTTONS. SUITABLE FOR FEED THROUGH WIRING, COLOR TO

BE SELECTED, HUBBELL #5362GF SERIES, OR PASS & SEYMOUR

2091 SIL SERIES.

E. EACH RECEPTACLE OUTLET INSTALLED WITHIN 72" OF SINK OR WET

OR DAMP LOCATION ON ROOF, OUTDOOR BELOW GRADE (PIT),

JANITORS, CLOSETS, AND BATHROOMS, SHALL HAVE AND AUTOMATIC

5 MA., INDIVIDUAL GROUND FAULT (GFI) PROTECTION.

F. ALL RECEPTACLES OUTLETS SHALL BE OF THE SAME MANUFACTURE.

C. PLASTIC COVER PLATES SHALL HIGH IMPACT THERMOPLASTIC, HIGH

STRENGTH, SCRATCH- RESISTANT, SMOOTH AND

SELF-EXTINGUISHING, HUBBELL "PI" SERIES OR PASS & SEYMOUR

RP SERIES.

D. WHERE OUTLETS ARE TO BE WEATHERPROOF, PROVIDE AN AISI TYPE

302 STAINLESS WITH DOUBLE HINGED COVER PASS & SEYMOUR

#WDP-8.

E. PROVIDE PLASTIC COVER PLATES UNLESS NOTED OTHERWISE.

2.09 SUPPORTING DEVICES

A. ALL EQUIPMENT CONDUITS SHALL BE SUPPORTED, ANCHORED AND

BRACED IN ACCORDANCE WITH THE

B. MOST STRINGENT CODES AND REQUIREMENTS. COMPLY WITH

CHAPTER 23 OF THE LATEST CBC (CALIFORNIA BUILDING CODE).

3.05 INSTALLATION

A. WORKMANSHIP IS TO BE NEAT, BY EXPERIENCED WORKMEN WITH ADEQUATE

SUPERVISION, AND IN LINE WITH NORMAL INDUSTRY WORK PRACTICES.

B. VERIFY LOCATION OF EACH OUTLET FOR POWER, SIGNAL,

TELEPHONE/DATA, AND EACH LIGHTING FIXTURE WITH ARCHITECT

PRIOR TO ROUGH-IN. INCLUDE IN BID COST OF RELOCATING EACH

ITEM WITHIN TEN-FEET RADIUS OF ITS INDICATED LOCATION.

C. ALL CONDUIT TO BE RUN CONCEALED UNLESS OTHERWISE NOTED.

ALL CONDUITS SHALL BE ROUTED OVERHEAD IN CEILING SPACES. NO

CONDUITS SHALL BE PERMITTED IN CONCRETE SLAB, MASONRY

WALLS UNLESS SPECIFICALLY SO INDICATED. CONDUIT SHALL BE RUN

SO AS NOT TO INTERFERE WITH OTHER PIPING FIXTURES OR

EQUIPMENT.

D. WHERE ALLOWED, EXPOSED CONDUIT RUNS SHALL BE INSTALLED

PARALLEL OR PERPENDICULAR TO WALLS, STRUCTURAL MEMBERS,

OR INTERSECTION OF VERTICAL PLANES AND CEILINGS.

E. ALL ELECTRICAL CONDUITS AND OTHER ELECTRICAL RACEWAYS

PASSING THROUGH FIRE RATED CEILINGS, SLABS, WALLS AND

PARTITIONS SHALL BE SEALED TO PREVENT THE SPREAD OF FIRE,

SMOKE, AND GASSES. USE A UL LISTED AND APPROVED FIRE-STOP

MATERIAL EQUAL TO RATING OF A WALL OR A FLOOR SLAB

PENETRATED; INSTALLATION OF FIRE-STOP MATERIAL SHALL BE IN

ACCORDANCE WITH MANUFACTURERS INSTRUCTIONS.

F. UNLESS WRITTEN PERMISSION IS GRANTED BY THE ARCHITECT, NO

MATERIAL SHALL BE MOUNTED ON THE EXTERIOR WALLS OR

PARAPET TOP OF THE BUILDING.

G. ALL POWER WIRING SHALL BE INSTALLED IN CONDUIT.

H. ALL WIRES FOR ALL SYSTEMS SHALL BE CONTINUOUS FROM SWITCH

TO TERMINAL OR FURTHEST OUTLET. NO JOINTS SHALL BE MADE

EXCEPT IN PULL, JUNCTION OR OUTLET BOXES, OR IN PANEL OR

SWITCHBOARD GUTTERS.

3.06 GROUNDING

A. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AS INDICATED ON

DRAWINGS AND AS REQUIRED BY THE LATEST EDITION OF

APPLICABLE CODES.

B. FURNISH AND INSTALL ALL GROUNDING CONDUCTORS, CONDUIT AND

CLAMPS. THE SIZE OF THE GROUNDING CONDUCTORS SHALL BE NOT

LESS THAN THAT SPECIFIED IN THE CEC AND NEC.

C. EACH BRANCH CIRCUIT SHALL BE EQUIPPED WITH CODE SIZE GREEN

GROUND, EQUIPMENT WIRE (PER NEC 250-95) (NOT INDICATED ON

DRAWINGS) WITHIN THE SAME CONDUIT FOR ALL CIRCUITS OF

PANELBOARDS.

3.07 BRANCH CIRCUITS

A. NO MORE THAN THREE BRANCH CIRCUITS PERMITTED IN ONE

CONDUIT UNLESS INDICATED OTHERWISE.

3.08 PROTECTION

A. USE ALL MEANS NECESSARY TO PROTECT THE WORK AND

MATERIALS FROM LOSS DURING AND AFTER INSTALLATION, AND

PROVIDE ADEQUATE AND PROPER STORAGE FACILITIES DURING THE

PROGRESS OF THE WORK. PROVIDE FOR THE SAFETY AND GOOD

CONDITION OF ALL WORK UNTIL FINAL ACCEPTANCE OF THE WORK

BY THE OWNER. REPLACE ALL DAMAGE OR DEFECTIVE WORK,

MATERIAL, AND EQUIPMENT AT NO EXPENSE TO THE OWNER BEFORE

REQUESTING FINAL ACCEPTANCE.

3.09 CLEANING OF EQUIPMENT, MATERIAL, AND PREMISES

A. SITE SHALL BE LEFT BROOM CLEAN AFTER COMPLETION OF WORK

EACH DAY. UPON COMPLETION OF THE WORK, LEAVE THE PREMISES

CLEAN OF ALL DIRT AND DEBRIS.

B. ALL EQUIPMENT AND MATERIAL CONNECTED WITH THIS PROJECT

SHALL BE INSTALLED COMPLETE, THOROUGHLY CLEANED, AND ALL

RESIDUE REMOVED FROM INSIDE SURFACES. EXTERIOR SURFACES OF

ALL MATERIAL AND EQUIPMENT SHALL BE CLEANED AND DELIVERED

IN A PERFECT, UNBLEMISHED CONDITION.

3.10 HANDLING OF WIRE AND CABLE

A. HANDLE WIRE AND CABLE SO AS TO AVOID DAMAGE TO

CONDUCTORS AND TAKE EVERY PRECAUTION TO AVOID SHARP

BENDING OR SCORING OF THE CABLE. CABLE SHALL NOT BE LAID

NOR DRAGGED UPON THE GROUND.

B. THE CONTRACTOR SHALL BE REQUIRED TO REMOVE AND REPLACE

AT HIS OWN EXPENSE ALL WIRE AND CABLE DAMAGED DUE TO

IMPROPER HANDLING, AND SHALL PAY FOR THE NEW WIRE OR

CABLE.

3.11 TESTING AND INSPECTIONS

A. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED

PERMITS AND ARRANGE ALL REQUIRED INSPECTIONS FOR THE

EXECUTION OF THE WORK UNDER THIS CONTRACT.

B. THE CONTRACTOR SHALL REPLACE ALL DAMAGED OR DEFECTIVE

EQUIPMENT OR WORK.

C. ALL CIRCUITS SHALL BE TESTED FOR CONTINUITY AND CIRCUIT

INTEGRITY BY THE CONTRACTOR. ADJUSTMENTS SHALL BE MADE FOR

CIRCUITS NOT COMPLYING WITH TESTING CRITERIA.

D. THE CONTRACTOR SHALL FURNISH ALL INSTRUMENTS AND PERFORM

ANY ADDITIONAL TESTS REQUIRED BY THE AUTHORITY HAVING

JURISDICTION. HE SHALL ALSO CORRECT ALL FAILURES AND

REPLACE ANY DAMAGED PORTIONS OF THE WORK RESULTING FROM

THOSE TESTS. THE COST OF THE FOREGOING ITEMS SHALL BE PAID

BY THE CONTRACTOR.

E. THE CONTRACTOR SHALL FURNISH THE OWNER CERTIFICATES OF

INSPECTION AND APPROVAL BY THE ELECTRICAL INSPECTION

AUTHORITY ON ALL WORK COMPETED AS REQUIRED.

2.08 DEVICE PLATES

A. PROVIDE PLATE FOR ALL SWITCHES, RECEPTACLES, JUNCTION BOXES,

TELEPHONE, DATA AND OTHER OUTLETS.

B. STAINLESS STEEL PLATE SHALL BE AMERICAN IRON AND STEEL

INSTITUTE (AISI) TYPE 302, WITH BEVELED EDGES, 0.040" THICK

WITH A SATIN SMOOTH FINISH. SMOOTHIE. HUBBELL #97071 SERIES.

PART 3 - EXECUTION

3.01 WORKMANSHIP AND COMPLETION OF INSTALLATION

A. THE CONTRACTOR SHALL MAINTAIN ON JOB SITE A SET OF THE

WORKING DRAWINGS WHICH SHALL BE UPDATED DAILY IN DETAIL FOR

WORK ACCOMPLISHED. UPON COMPLETION OF THE WORK, A SET OF

REPRODUCIBLE CONTRACT DRAWINGS SHALL BE OBTAINED FROM THE

GENERAL CONTRACTOR AND ALL CHANGES AS NOTED ON THE

RECORD SET OF PRINTS SHALL BE INCORPORATED THEREON WITH

RED INK IN A NEAT, LEGIBLE, UNDERSTANDABLE AND PROFESSIONAL

MANNER.

B. ALL EQUIPMENT AND MATERIAL CONNECTED WITH THIS PROJECT

SHALL BE INSTALLED COMPLETE, THOROUGHLY CLEANED, AND ALL

RESIDUE REMOVED FROM INSIDE SURFACES. EXTERIOR SURFACES OF

ALL MATERIAL AND EQUIPMENT SHALL BE CLEANED AND DELIVERED

IN A PERFECT, UNBLEMISHED CONDITION.

D. PERFORM ALL WORK IN A MANNER WHICH WILL NOT CAUSE

UNNECESSARY INCONVENIENCE OR DANGER TO THE OCCUPANTS,

NOR INTERFERE WITH THE ACTIVITIES IN THE BUILDING.

E. UPON COMPLETION OF THE INSTALLATION AND AS A CONDITION OF

ITS ACCEPTANCE FURNISH ONE COPY OF THE FINAL INSPECTION

CERTIFICATE TO THE OWNER.

F. THE CONTRACTOR SHALL COORDINATE AND SCHEDULE EACH POWER

INTERRUPTION WITH OWNER, AND SHALL PROVIDE AT LEAST ONE

WEEKS NOTICE OF PROPOSED INTERRUPTION AND WORK TO BE

ACCOMPLISHED.

3.02 PREPARATION COORDINATION.

A. THE CONTRACTOR SHALL COORDINATE THIS WORK WITH ALL OTHER

CONTRACTORS FURNISHING LABOR, MATERIALS AND WORK, SO THAT

THE WORK AS WHOLE SHALL BE EXECUTED AND COMPLETED

WITHOUT CONFLICT OR DELAY.

3.03 TRENCHING AND BACK FILLING

A. PERFORM ALL SUCH TRENCHING AND BACKFILLING IN ACCORDANCE

WITH DRAWING DETAILS.

B. EXAMINE THE DRAWINGS AND SPECIFICATIONS AND DETERMINE THE

WORK TO BE PERFORMED BY THE ELECTRICAL, PLUMBING AND

3.04 CORE CUTTING, DRILLING, AND PATCHING

A. NO HOLES WILL BE ALLOWED IN ANY STRUCTURAL MEMBERS

WITHOUT THE WRITTEN APPROVAL OF THE ARCHITECT OR

STRUCTURAL ENGINEER AND GENERAL CONTRACTOR.

HEREIN SPECIFIED. CONDUITS SHALL BE RIGID STEEL "GRC" (THICK

WALL) GALVANIZED; ELECTRICAL METALLIC TUBING "EMT" (THIN

WALL); FLEXIBLE STEEL, GALVANIZED; LIQUID-TIGHT, FLEXIBLE

STEEL CONDUIT WITH GROUND BOND; OR SCHEDULE 40 PVC.

GENERAL NOTES

OTHER TRADES. PROVIDE THE TYPE AND AMOUNT OF ELECTRICAL

MATERIALS AND EQUIPMENT NECESSARY TO PLACE THIS WORK IN

PROPER OPERATION, COMPLETELY WIRED TESTED AND READY FOR

USE. THIS SHALL INCLUDE ALL CONDUIT, WIRE, DISCONNECTS,

RELAYS, AND OTHER DEVICES FOR THE REQUIRED OPERATION

SEQUENCE OF ALL ELECTRICAL, AND OTHER SYSTEMS OREQUIPMENT.

SYMBOL DESCRIPTION

LEGEND

Exp. 6-30-2019

ELACIRTC

LE

Lic. E16934

ET

AT

S

ROFILACFO

N

AI

F

DPRO ESS IONA

L

ENG

I NE

ER

RE

GIS

TERE

NE

STO

RC. IGNACIO

,JR

.

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY SCHOOL DISTRICT

2/1

/2018 7

:31:0

3 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

E001

GENERAL NOTES,SPECIFICATIONS, LEGENDAND DRAWING LIST

Approver

Checker

Author

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

DRAWING LIST

DWG.NO. DESCRIPTION

E001 GENERAL NOTES, SPECIFICATIONS, LEGEND AND DRAWING LIST

E201 FIRST FLOOR POWER PLAN

Page 7: EAST WHITTIER CITY SCHOOL DISTRICT · nfpa 17a wet chemical systems (2016) nfpa 20 stationary pumps (2016) nfpa 22 water tanks for private fire protection (2016) nfpa 24 private fire

F-43

INSTR

F-44

F-47

F-48

EQUIP.

F-49

GIRL'S.

F-32

ENTRY

F-34

LOCKERS

F-36

LOCKERS

F-38

LOCKERS

F-1

INSTR.

F-3F-5

F-6

EQUIP.

F-7

BOY'S

F-9

ENTRY

F-10

JANITOR

F-24

DRYINGROOM

GIRL'SSHOWER

F-27

F-28

F-29

F-30

F-26

F-15

LOCKERS

F-16

LOCKERS

F-17

LOCKERS

F-14

TOWEL RM.

F-13

LOCKERS

F-12

LOCKERS

F-11

LOCKERS

F-18

CORRIDOR

F-51

CORRIDOR

F-25

STORF-41 F-40 F-39

S S

S

S

S S

FH

STAMY ROADEXISTING

BUILDINGF

EXISTING

BUILDINGD

EXISTING

BUILDINGE

EXISTINGBUILDING

A

EXISTINGBUILDING

B

EXISTINGBUILDING

G

EXISTING

BUILDING

C

EXISTING

BUILDINGJ

EXISTINGBUILDING

H

EXISTING

BUILDINGI

EXISTING

PARKING LOT #2

EXISTING

PARKING LOT #1

M(E)

N(E)

EF-1

EF-3

EF-2EF-4

MM

MM

22

2

2

1

1

1

1

22

2

2

1

1

1

1

PROJECT LOCATION

Exp. 6-30-2019

ELACIRTC

LE

Lic. E16934

ET

AT

S

ROFILACFO

N

AI

F

DPRO ESS IONA

L

ENG

I NE

ER

RE

GIS

TERE

NE

STO

RC. IGNACIO

,JR

.

REFERENCE SCALE IN INCHES

0 1 2

© 2018 IMEG CORP.

IMEG CORP. RESERVES PROPRIETARY RIGHTS, INCLUDING COPYRIGHTS, TO THIS DRAWING AND THE DATA SHOWN THEREON. SAID DRAWING AND/OR DATA ARE THE EXCLUSIVE PROPERTY OF IMEG CORP. AND SHALL NOT BE USED OR REPRODUCED FOR ANY OTHER PROJECT WITHOUT THE EXPRESS WRITTEN APPROVAL AND PARTICIPATION OF IMEG CORP.

AGENCY APPROVAL

REVISIONS

PROFESSIONAL SEAL

CONSULTANT

No. Date Revision / Issue

DISCLAIMER

SHEET INFORMATION

Date

Job Number

Drawn

Checked

Approved

SHEET TITLE

SCALE

Scale:

SHEET NUMBER

Issue

"LOCKER ROOMS EF UPGRADE"

EAST WHITTIER CITY SCHOOL DISTRICT

As indicated

2/1

/2018 7

:31:0

4 P

M

10931 STAMY ROAD, WHITTIER, CA 90604

HILLVIEWMIDDLE SCHOOL

E201

FIRST FLOOR POWER PLAN

ED

ED

CG

18001320.00

02/01/18

BID DOCUMENTS

HIL

LV

IEW

M

IDD

LE

SC

HO

OL

18001320.0

0

901 VIA PIEMONTESUITE 400ONTARIO, CA91764

PH: 909.477.6915FAX: 909.477.6916www.imegcorp.com

1/8" = 1'-0"1

FIRST FLOOR POWER PLAN

KEY PLAN

REMODEL KEY NOTES

DEMO KEY NOTES

GENERAL NOTES

1. REFER TO SPECIFICATIONS ON SHEET E0.1 FOR ANY CONDUIT PENETRATION, FIRE AND WEATHERPROOF CAULKING THROUGH EXISTING WALL.

2. PANELBOARD CIRCUITS WERE BASED ON PANEL DIRECTORY FIELD VERIFICATION. PANEL FRONTS WERE NOT REMOVED. CONTRACTOR SHALL VERIFY.

3. FOR EXACT LOCATIONS AND MOUNTING FOR EXHAUST FANS, REFER TO MECHANICAL SHEETS AND DETAILS.

4. CONTRACTOR SHALL ATTEND A MANDATORY JOB WALK WHERE THE OWNER AND REPRESENTATIVES WILL INDICATE WHAT IS EXPECTED ON HOW CONDUITS ARE ROUTED IN CONCEALED MANNER. EXPOSED INSTALLATION OF CONDUIT IS ONLY ALLOWED WHERE PASSING OR RUNNING THROUGH CONCRETE OR BLOCK WALLS.

5. PAINT ALL NEW EXPOSED CONDUITS AND BOXES TO MATCH ADJACENT FINISH.

6. COORDINATE TERMINATION OF CONDUITS WITH MECHANICAL CONTRACTOR OR INSTALLERS.

7. EXACT LOCATION OF PANEL TO BE FIELD VERIFIED.

8. ANY AND ALL PENETRATION FOR ELECTRICAL FEED THROUGH THE RATED WALLS MUST BE FIRE CAULKED WITH AN ACCEPTABLE/APPROVED PRODUCT/MATERIAL BY THE DESIGN TEAM.

9. UPDATE PANEL DIRECTORY AFTER CONSTRUCTION.

1 CONNECT NEW EXHAUST FAN TO EXISTING CIRCUIT. EXTEND CONDUIT AS REQUIRED.

VERIFY EXACT LOCATION FOR EXHAUST FAN CONTROLS WITH OWNER. REFER TO MECHANICAL SHEETS.

2

DISCONNECT AND REMOVE EXISTING EXHAUST FAN FROM CIRCUIT. REFER TO MECHANICAL SHEETS.

EXISTING CIRCUIT TO REMAIN AND TO BE REUSED. CUT PORTION OF EXISTING EXPOSED CONDUIT AND WIRES. LEAVE 12" WIRE SLACK.

1

2