EC2003-11

Embed Size (px)

Citation preview

  • 7/29/2019 EC2003-11

    1/2

    EQUIPMENT

    Item

    Equipment No. Description

    Vital

    Essential

    Non-Esse

    ntial

    Start-up

    DutyType DUTY

    LOAD

    ( A )

    RATED

    LOAD

    ( B )

    LOAD

    FACTOR= A/B

    ( C )

    EFFICIENCY

    AT LOADFACTOR C

    ( D )

    POW

    FACTAT LO

    FACTO

    kW kW In decimal In decimal cos

    1 500 C-PS-WSWA ELECTRIC SUBMERGIBLE PUMP X X C 43.64 43.64 1.00 0.85 0.682 500 D-PS-WSWB ELECTRIC SUBMERGIBLE PUMP X C 43.64 43.64 1.00 0.85 0.683 500 E-PS-WSWC ELECTRIC SUBMERGIBLE PUMP X C 43.64 43.64 1.00 0.85 0.684 460-HC-001 AIR COMPRESSOR UNIT X Z I 23.00 23.00 1.00 0.85 0.95 420-PB-001 FUEL GAS SYSTEM X Y C 15.20 15.20 1.00 1.00 1.06 530-PB-001 SKID CHEMICAL "OO" STATION X X C 1.50 1.50 1.00 0.80 0.87 500 C-PB-001 SKID CHEMICAL WSWA X X C 1.50 1.50 1.00 0.80 0.88 500 D-PB-001 SKID CHEMICAL WSWB X C 1.50 1.50 1.00 0.80 0.89 500 E-PB-001 SKID CHEMICAL WSWC X C 1.50 1.50 1.00 0.80 0.8

    12 520-PB-001..5 INJECTION PUMP AUXILIARY X 4 X C 80.00 80.00 1.00 0.85 0.813 440-EL-001 EXTERNAL LIGHTING X S 24.00 24.00 1.00 0.95 0.914 - RECTIFIER 24 VDC X Z C 0.28 0.28 1.00 0.95 0.715 - DCS X Z C 2.45 2.45 1.00 0.95 0.7

    - X 0.28 0.28 1.00 0.95 0.7- X 15.00 15.00 1.00 0.95 0.9- - 30.00 30.00 1.00 0.90 0.7- - X 110.00 110.00 1.00 0.87 0.8- - X 110.00 110.00 1.00 0.87 0.8- - X 11.00 11.00 1.00 0.88 0.8

    22 550-PC-001 A PRIMARY COOLING PUMPA A X Y C 15.00 15.00 1.00 0.85 0.824 550-PC-002 A SECONDARY COOLING PUMP A X Y C 22.00 22.00 1.00 0.85 0.825 510-PB-001 SKID FILTERING X I 3.75 3.75 1.00 0.85 0.926 460-SW-001 EDG AIR COMPRES. BUILDI. SWITC. X S 4.00 4.00 1.00 0.90 0.927 410-SW-001..5 INJ. PUMP BUILD. SWITCH. X 5 X S 20.00 1.00 0.90 0.9

    28 410-PB-001 OFFICE ROOM PANELBOARD X I 9.00 9.00 1.00 0.90 0.929 410-PB-002 ELECTRIC ROOM PANELBOARD X I 9.00 9.00 1.00 0.90 0.930 410-PB-003 WORK./STOR. ROOM PANELBOARD X I 9.00 9.00 1.00 0.90 0.931 410-PB-003 CONTROL ROOM PANELBOARD X I 9.00 9.00 1.00 0.90 0.932 410-PB-005 TRANSF. CABIN PANELBOARD X I 9.00 9.00 1.00 0.90 0.933 400-CP-001 CATHODIC PROTECTION X I 1.00 0.934 500D-PB-003 DISTRIBUTION PANELBOARD MVS2 X S 9.00 9.00 1.00 0.90 0.9

    Maximum of normal running plant load : kW = 611.1 SQRT(kW2 + kvar2) = 739.2 kVA TOTAL( Est. x * E + y * F ) kvar = 415.8

    orecas ng oa = 623.5 + var = 753.6 kVA kVA = SQRT (kW2 + kvst. x * + y * + z * var = 423.2

    NOTES:a oa c ass ca on: c sor e oa : onsume oa s:

    As a preliminary consideration - for pumps, shaft load on duty point; E - "Continuous"; all loads th

    all the loads and services of the - for instrumentation, computers, communication, air including lighting and w

    pumping station could be considered conditioning, the required load during full operation F - "Intermittent and Spare";

    "Essential". of plant; loading, etc. and all elec

    - for lighting during dark hours; all loads with contempor

    b ) Duty Type: - for workshops, the average total load in normal full G - "Stand-by"; loads require

    "C" Continuous; "I" Intermittent; "D" Discontinuous operation. or those of normally not

    "R" Spare; "S" Stand-dy running steam-driven on

    e ) Start-up loads: Note: if the users are absorb

    "X" I Start phase; "Y" II Start phase; "Z" I-II Start phases

  • 7/29/2019 EC2003-11

    2/2

    EQUIPMENT

    Item

    Equipment No. Description

    Vital

    Essential

    Non-Essential

    Restatri

    ng

    DutyType DUTY

    LOAD( A )

    RATED

    LOAD( B )

    LOAD

    FACTOR

    = A/B

    ( C )

    EFFICIENCY

    AT LOAD

    FACTOR C

    ( D )

    P

    F

    A

    FA

    kW kW In decimal In decimal

    35 500P-PB-002 DISTRIB. PANEL. HEAD WELL WSW4 X X S 9.000 9.000 1.00 0.9036 500A-PB-002 DISTRIB. PANEL. HEAD WELL WSW3 X S 9.00 9.00 1.00 0.9037 500C-PB-002 DISTRIB. PANEL. HEAD WELL WSWA X S 9.00 9.00 1.00 0.9038 500D-PB-002 DISTRIB. PANEL. HEAD WELL WSWB X X S 9.00 9.00 1.00 0.9039 500E-PB-002 DISTRIB. PANEL. HEAD WELL WSWC X X S 9.00 9.00 1.00 0.9040 X S

    41 X S #42 X S

    43 X S

    44 S45 X S

    46 S

    47 X S

    48 X S

    49

    50

    51

    52

    53

    54

    55

    56

    57

    58

    5960

    61

    62

    63

    64

    65

    66

    Maximum of normal running plant load : kW = 611.1 SQRT(kW2 + kvar2) = 739.2 kVA TOTAL( Est. x * E + y * F ) kvar = 415.8

    Forecasting Load kW = 628.5 SQRT(kW2 + kvar2) = 759.1 kVA kVA = SQRT (kW2

    ( Est. x * E + y * F + z * G ) kvar = 425.6

    NOTES:a oa c ass ca on res ar ng: c sor e oa : onsume oa s

    As a preliminary consideration - for pumps, shaft load on duty point; E - "Continuous"; all loa

    all the loads and services of the - for instrumentation, computers, communication, air including lighting a

    pumping station could be considered conditioning, the required load during full operation F - "Intermittent and Spa

    "Essential". of plant; spare of electricall

    - for lighting during dark hours; G - "Stand-by"; loads re

    b ) Duty Type: - for workshops, the average total load in normal full or those of normally

    "C" Continuous; "I" Intermittent; "D" Discontinuous operation. running steam-drive

    "R" Spare; "S" Stand-dy

    Note: if the users are ab

    e ) Start-up loads:

    "X" I Start phase; "Y" II Start phase; "Z" I-II Start phases