43
CCC / CUP

Echelon and Creative Urban Projects - Forward Pinellas

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Echelon and Creative Urban Projects - Forward Pinellas

CCC / CUP

Page 2: Echelon and Creative Urban Projects - Forward Pinellas

•  Founded 2009

•  Over 100 years of combined experience

•  Trusted source of information for urban cable cars — The Gondola Project

Background

Page 3: Echelon and Creative Urban Projects - Forward Pinellas

Select Clients

Page 4: Echelon and Creative Urban Projects - Forward Pinellas
Page 5: Echelon and Creative Urban Projects - Forward Pinellas

Built

Page 6: Echelon and Creative Urban Projects - Forward Pinellas

Proposed

Page 7: Echelon and Creative Urban Projects - Forward Pinellas

Cable Transit in Cities

Page 8: Echelon and Creative Urban Projects - Forward Pinellas

Cable Transit in Cities

• 150 projects projects in various stages of planning and construction

• 100+ cities exploring cable transit

• 30+ public transit aerial cable cars

Page 9: Echelon and Creative Urban Projects - Forward Pinellas

Cable Transit in Cities

Brest

London New York

Hong Kong

Berlin

Singapore

Paris Region x 14 (proposed)

Portland

Barcelona

Mexico City

La Paz

San Diego x3 (proposed)

Page 10: Echelon and Creative Urban Projects - Forward Pinellas

Cable Transit in Cities

0

5

10

15

20

25

Pre-1999 2000-2003 2004-2007 2008-2011 2012-Present

Syst

ems

Bui

lt

Years

Urban Cable Cars

Page 11: Echelon and Creative Urban Projects - Forward Pinellas

Innovations

Hon Thom – An Thoi Cable Car

•  7.9km / 3,500 pphpd / 30 passengers/cabin / 15.6 mins / 6 towers (tallest: 160m) / 2 stations / $458mm / 8.5m/s

•  Longest 3S + Longest Single Section

Page 12: Echelon and Creative Urban Projects - Forward Pinellas

City Cable Car – Cable + Rail (Hybrid)

Peak 2 Peak Gondola – 1.8mi (3km) freespan

Ha Long Cable Car – 230 person double decker cabin + 620ft (188m) tower

La Paz – 21mi / 34km total (9mi / 15km today)

Page 13: Echelon and Creative Urban Projects - Forward Pinellas

Advantages

•  Ecologically friendly

•  Electrically propelled

•  Small footprint

•  Safest form of transport

•  Quick installation

•  High availability and reliability

•  100% barrier free

•  Low implementation costs

•  Intermodality

Page 14: Echelon and Creative Urban Projects - Forward Pinellas

Track Record of Success

•  More than 24,000 ropeways operating around the world — 14,800 installations by Doppelmayr

•  ~3,500 ropeways operating in US (2016)

•  0 deaths from lift malfunction since 1993 with 8.16 billion miles in lift rides

•  Largest ropeway manufacturers operational for 100+ years

•  Doppelmayr/Garaventa – 124 years (1893)

•  Leitner Ropeways – 129 years (1888)

•  Poma – 80 years (1937)

Page 15: Echelon and Creative Urban Projects - Forward Pinellas

Clearwater Gondola

Page 16: Echelon and Creative Urban Projects - Forward Pinellas

Tampa Bay Cable Transit

•  Conceptual analysis

•  Six cable transit lines explored and analyzed

•  Explore improving connections between Tampa and St Pete

•  Estimated 1/3 – 2/3 cost of conventional rapid transit

Page 17: Echelon and Creative Urban Projects - Forward Pinellas

Challenges

•  Traffic congestion during peak travel seasons

•  Limited parking •  Poor alternative

transportation options •  Limited amount of beach-

front property (beach is only 3.25 miles long and 0.38 miles wide)

Page 18: Echelon and Creative Urban Projects - Forward Pinellas

Challenges

•  Traffic congestion during peak travel seasons

•  Limited parking •  Poor alternative

transportation options •  Limited amount of beach-

front property (beach is only 3.25 miles long and 0.38 miles wide)

Page 19: Echelon and Creative Urban Projects - Forward Pinellas
Page 20: Echelon and Creative Urban Projects - Forward Pinellas

Jolley Trolley

•  Poor Level of Service •  30 min headways•  $2.25 – 5.00 / person

Page 21: Echelon and Creative Urban Projects - Forward Pinellas

Parking

Page 22: Echelon and Creative Urban Projects - Forward Pinellas

Coachman Park Parking

Page 23: Echelon and Creative Urban Projects - Forward Pinellas

Downtown Parking

Page 24: Echelon and Creative Urban Projects - Forward Pinellas

Parking

WASTED SPACE

GENERATOR OF POLLUTION DUE TO IDLING AND SEARCHING FOR SPOTS

INEFFICIENT USE OF VALUABLE LAND

Page 25: Echelon and Creative Urban Projects - Forward Pinellas

Clearwater

Page 26: Echelon and Creative Urban Projects - Forward Pinellas

Clearwater Cable Car

Page 27: Echelon and Creative Urban Projects - Forward Pinellas
Page 28: Echelon and Creative Urban Projects - Forward Pinellas
Page 29: Echelon and Creative Urban Projects - Forward Pinellas
Page 30: Echelon and Creative Urban Projects - Forward Pinellas
Page 31: Echelon and Creative Urban Projects - Forward Pinellas
Page 32: Echelon and Creative Urban Projects - Forward Pinellas
Page 33: Echelon and Creative Urban Projects - Forward Pinellas

Complementary Transit

Enhance and complement existing transport modes to Clearwater Beach

Page 34: Echelon and Creative Urban Projects - Forward Pinellas

Clearwater Cable Car

LENGTH: 1.9mi (3,000m)

SPEED: 15 – 20mph (7.0 – 9 m/s)

FREQUENCY: 30 - 60s

CAPACITY: 2,500 – 5,000 pphpd

TRAVEL TIME: 8 – 10 mins

ESTIMATED COST: ~ $75mm USD (±30%)

Page 35: Echelon and Creative Urban Projects - Forward Pinellas

Total Travel Times

VS

15 – 20 mins Up to 35 – 40 mins

Page 36: Echelon and Creative Urban Projects - Forward Pinellas

Total Travel Times

Measure Clearwater Cable Car

Driving Difference

Time to Find Parking + Board Cable Car (Clearwater)

5-10 0 +5-10

Travel Time Across Causeway

10 Up to 25 -15

Time to Find Parking (Beach)

0 10-15 -10-15

TOTAL TRAVEL TIME

15 – 20 Up to 35 -- 40 -20

Page 37: Echelon and Creative Urban Projects - Forward Pinellas

Benefits

1.  Alleviate traffic congestion on causeway

2.  Enhance pedestrian realm3.  Serve existing and future

demand4.  Unparalleled ride experience 5.  Reduce parking constraints

and traffic on beach6.  Serve the reverse flow

Page 38: Echelon and Creative Urban Projects - Forward Pinellas

Clearwater Cable Car

Page 39: Echelon and Creative Urban Projects - Forward Pinellas

Reverse Flow

Page 40: Echelon and Creative Urban Projects - Forward Pinellas

Predictable, Reliable & Resilient

30 – 60s cabin frequency Research shows that short wait times and predictable schedules are important to spurring transit ridership Resilient in up to 65mph winds Not subject to traffic

Page 41: Echelon and Creative Urban Projects - Forward Pinellas

More Benefits

1.  Connects to Aquarium2.  Induced demand 3.  Sustainable 4.  Park Once Play5.  Can be financed by the

private sector – most cable car systems are profitable

6.  Joy of the Journey Itself

Page 42: Echelon and Creative Urban Projects - Forward Pinellas

Joy of the Journey Itself

“… a means of transport whose purpose lie in opening up the beautiful countryside and in the pleasure of the journey for its own sake.” - Swiss Museum of Transport

Page 43: Echelon and Creative Urban Projects - Forward Pinellas

Thank you