Dallas TOD: HUD Challenge Grant Planning Update

Economic Development

Committee September 17, 2012

1

Page 3: ECO DallasTOD HUD ChallengeGrant 091712

Background • City was awarded a $2.225 million grant

under the HUD Sustainable Communities Challenge Grants program in 2010.

• Grant funds are available for planning and pre development assistance related to affordable housing and TOD during a three-year period

• Fregonese Associates was selected from 12 firms to carry out the planning activities related to the grant.

2

Page 4: ECO DallasTOD HUD ChallengeGrant 091712

Grant Study Areas

There are five separate plans being developed:

1. Vickery Meadow

(Walnut Hill and Park Lane Stations)

2. MLK 3. Hatcher 4. Lancaster Corridor (VA

Medical and Kiest Stations)

5. Buckner

3

Page 5: ECO DallasTOD HUD ChallengeGrant 091712

Project Process

Existing Conditions

and Visioning

January - May

Plan Development and Strategies

April - August

Draft and Final Plan

September - December

Implementation

1 2 3 4 1

4

Page 6: ECO DallasTOD HUD ChallengeGrant 091712

First Phase (Completed) January – May 2012

• Draft the Public Engagement Plan • Create Public Involvement Toolkit • Conduct Stakeholder Interviews • Conduct Developer and Broker Interviews • Evaluate Station Area Existing Conditions • Develop Guiding Principles • Develop Library of Feasible Buildings and

Development Prototypes • Evaluate Policy Framework and Local Market

5

Page 7: ECO DallasTOD HUD ChallengeGrant 091712

Second Phase May – December 2012

• Conduct a Community Visioning Workshop • Workshop Results and Major Ideas Open House

Events • Existing Conditions Analysis, Findings and

Market Feasibility Study Findings • Develop and Compare Draft Scenarios • Create 2-D and 3-D Visualizations to

Communicate the Scenarios • Redevelopment Feasibility Analysis • Develop Station Area Visions • First Five Year Implementation Strategy

6

Page 8: ECO DallasTOD HUD ChallengeGrant 091712

Overview of Approach for Each Station Area

–Land Use Concept Plan –Strategic Near-Term Opportunities –Catalytic Projects

• Conceptual Site Plans • Visualizations • Development Programs and Proforma

Analysis 7

Page 9: ECO DallasTOD HUD ChallengeGrant 091712

8

Page 10: ECO DallasTOD HUD ChallengeGrant 091712

Draft

9

Page 11: ECO DallasTOD HUD ChallengeGrant 091712

Draft

Draft

10

Page 12: ECO DallasTOD HUD ChallengeGrant 091712

VA Med Center Station

Kiest Station

Adaptive Reuse Concept

Lancaster Urban Village

Opal TOD Concept

Draft

11

Catalyst Sites

Page 13: ECO DallasTOD HUD ChallengeGrant 091712

Catalytic Projects in the Lancaster Corridor

1. Lancaster Opal TOD Concept

2. Adaptive Reuse Concept

12

Page 14: ECO DallasTOD HUD ChallengeGrant 091712

Lancaster Opal TOD

Mixed-income apartments, housing for veterans, housing for special needs, neighborhood retail, service office and restaurants. A: 3 and 4 Story Phase One Mixed-Use Building B: 2 and 3 Story Phase Two Residential Units 13

Page 15: ECO DallasTOD HUD ChallengeGrant 091712

Existing Building

Draft 14

Lancaster Opal TOD Concept

Page 16: ECO DallasTOD HUD ChallengeGrant 091712

15 Draft

Adaptive Reuse Concept – Old Payless Shoe Store

Page 17: ECO DallasTOD HUD ChallengeGrant 091712

Adaptive Reuse Opportunity - Before

16

Draft

Page 18: ECO DallasTOD HUD ChallengeGrant 091712

Lancaster Adaptive Reuse Opportunity– After

17

Draft

Page 19: ECO DallasTOD HUD ChallengeGrant 091712

18

Page 20: ECO DallasTOD HUD ChallengeGrant 091712

Draft

19

Page 21: ECO DallasTOD HUD ChallengeGrant 091712

Draft 20

Page 22: ECO DallasTOD HUD ChallengeGrant 091712

Hatcher Station

Hatcher Square

Adaptive Reuse Concept

Draft

21

Scyenne Road

Catalyst Sites

Page 23: ECO DallasTOD HUD ChallengeGrant 091712

Catalytic Projects in Hatcher

1. Hatcher Square

2. Adaptive Reuse Concept on Second Avenue

22

Page 24: ECO DallasTOD HUD ChallengeGrant 091712

23 Draft

Hatcher Square Conceptual Site Plan

Page 25: ECO DallasTOD HUD ChallengeGrant 091712

24 Draft

Adaptive Reuse Concept Opportunity

Page 26: ECO DallasTOD HUD ChallengeGrant 091712

Hatcher 2nd Ave Catalyst Development Opportunity Site - Before

25

Page 27: ECO DallasTOD HUD ChallengeGrant 091712

Hatcher 2nd Ave Catalyst Development Opportunity Site - After

26

Draft

Page 28: ECO DallasTOD HUD ChallengeGrant 091712

27

Page 29: ECO DallasTOD HUD ChallengeGrant 091712

Draft

28

Page 30: ECO DallasTOD HUD ChallengeGrant 091712

Draft

29

Page 31: ECO DallasTOD HUD ChallengeGrant 091712

MLK Station

Station Development Concept

Adaptive Reuse Concept

30

Catalyst Sites

Page 32: ECO DallasTOD HUD ChallengeGrant 091712

Catalytic Projects in MLK

1. MLK Station Area Development Concept– artist lofts, apartments and small retail

2. Adaptive Reuse Concept

31

Page 33: ECO DallasTOD HUD ChallengeGrant 091712

32 Draft

MLK Station Concept

Page 34: ECO DallasTOD HUD ChallengeGrant 091712

33 Draft

Adaptive Reuse Concept

Page 35: ECO DallasTOD HUD ChallengeGrant 091712

MLK Adaptive Reuse Concept - Before

34

Draft

Page 36: ECO DallasTOD HUD ChallengeGrant 091712

35

Draft

MLK Adaptive Reuse Concept - After

Page 37: ECO DallasTOD HUD ChallengeGrant 091712

36

Page 38: ECO DallasTOD HUD ChallengeGrant 091712

Draft

37

Page 39: ECO DallasTOD HUD ChallengeGrant 091712

Draft

38

Page 40: ECO DallasTOD HUD ChallengeGrant 091712

DART Station

New Commercial Development Concept

Commercial and Residential Development Concept

39

Catalyst Sites

Page 41: ECO DallasTOD HUD ChallengeGrant 091712

Catalytic Projects in Buckner

1. DART Station parking lot redevelopment concept

2. Residential and Commercial Development concept at Buckner and Elam

40

Page 42: ECO DallasTOD HUD ChallengeGrant 091712

41 Draft

Residential and Commercial Development Concept

Page 43: ECO DallasTOD HUD ChallengeGrant 091712

42 Draft

Buckner and Elam Mixed Use Development Concept

Page 44: ECO DallasTOD HUD ChallengeGrant 091712

43 Draft

Buckner Station Retail Development Concept

Page 45: ECO DallasTOD HUD ChallengeGrant 091712

DART Parking Lot Development Catalyst Development Concept – Before

44

Draft

Page 46: ECO DallasTOD HUD ChallengeGrant 091712

DART Parking Lot Development Catalyst Development Opportunity – After (Phase A)

45

Draft

Page 47: ECO DallasTOD HUD ChallengeGrant 091712

46

Page 48: ECO DallasTOD HUD ChallengeGrant 091712

Draft

47

Page 49: ECO DallasTOD HUD ChallengeGrant 091712

Draft

48

Page 50: ECO DallasTOD HUD ChallengeGrant 091712

Walnut Hill Station

Site Plan Concept for old Sam’s Club Area

Adaptive Reuse Concept

Park Lane Station

49

Mixed Use Library Concept

Catalyst Sites

Page 51: ECO DallasTOD HUD ChallengeGrant 091712

Catalytic Projects in Vickery Meadow

1. Mixed Use Library Development Concept

2. Site Plan concept for old Sam’s Club site and surrounding area

3. Adaptive reuse concept of liquor store building at Five Points

50

Page 52: ECO DallasTOD HUD ChallengeGrant 091712

51

Conceptual Drawing for Mixed Use Library Project - draft

Page 53: ECO DallasTOD HUD ChallengeGrant 091712

Draft

Mixed Use Library Concept

52

Page 54: ECO DallasTOD HUD ChallengeGrant 091712

53 Draft

Site Plan Concept for old Sam’s Club site and surrounding area

Page 55: ECO DallasTOD HUD ChallengeGrant 091712

54

Draft

Adaptive Reuse Concept

Page 56: ECO DallasTOD HUD ChallengeGrant 091712

Next Steps • Developer roundtable in later this week to obtain Dallas

developer feedback on catalyst project feasibility • Focus groups planned for October for additional

community input • Catalyst projects will be designed to be complete

development proposals with financial and design considerations

• Present opportunity sites, transportation enhancements for better DART access and area plans to public in October meetings – Obtain additional feedback prior to presentation to

Dallas City Council in December/January • Upon completion of area plans, City will issue Call for

Projects to solicit study area projects seeking grant funding for preconstruction and land acquisition

55

Page 57: ECO DallasTOD HUD ChallengeGrant 091712

October – Roll out the Projects to the Public

56

Page 58: ECO DallasTOD HUD ChallengeGrant 091712

Visit the project website: www.dallastod.com