17
ECS-TELL upgrade @ CBPF/LHCb André Massafferri Centro Brasileiro de Pesquisas Físicas Express of Intention to contribute onto ECS development of the Upgrade of TELL module in CBPF/Brasil our understanding status, discuss directions the institute & people massafferri@cbp f.br Fermilab + LHCb (Muon & Physics) ... maybe not on Eletronics @ LHCb mostly based on feedback from Guido and Beat

ECS-TELL upgrade @ CBPF/LHCb

  • Upload
    lars

  • View
    41

  • Download
    0

Embed Size (px)

DESCRIPTION

ECS-TELL upgrade @ CBPF/LHCb. Express of Intention to contribute onto ECS development of the Upgrade of TELL module in CBPF/Brasil. our understanding status, discuss directions. the institute & people. André Massafferri Centro Brasileiro de Pesquisas Físicas. - PowerPoint PPT Presentation

Citation preview

Page 1: ECS-TELL upgrade @ CBPF/LHCb

ECS-TELL upgrade @ CBPF/LHCb

André MassafferriCentro Brasileiro de Pesquisas Físicas

Express of Intention to contribute onto ECS development of the Upgrade of TELL

module in CBPF/Brasil

our understanding

status,discuss directions

the institute & people

[email protected]

Fermilab + LHCb (Muon & Physics)

... maybe not on Eletronics @ LHCb

mostly based on feedback from Guido and Beat

Page 2: ECS-TELL upgrade @ CBPF/LHCb

The CBPFRio de Janeiro / Brasil

(1949)

meson discovery Lattes,Ochialini,Pow

ell (1947)Feynmann (50’s) QFT

Experimental & theory

others

HEP, cosmology, solid, nuclear, theory, phenomenology, …

• LNCC (scientific computing LAB)• IMPA (pure math)• LNLS (syncrotron light LAB)

Centro Brasileiro de Pesquisas Físicas

• 15 LABs

• brandy new one (large) for HEP research coupled to one of Electronics

www.cbpf.br

http://portal.cbpf.br/index.php?page=tecnologia.labs

were born @ cbpf

pos-graduation reference in Latin America

Page 3: ECS-TELL upgrade @ CBPF/LHCb

High Energy Physics in CBPF

80’s: Charm Physics Program – Fixed Target - Fermilabe691, e769, e791, e831

(2001)

Physics: mostly 3-body hadronic decaysAdvanced Computing Processor (parallel arch)

Reconstruction & stripping

e831• new concept: Topological HLT• gas gain uniformity test MWPC • Front-End Amplifier Muon SystemJoin to UFRJ

ASICs design Test system

Rafael

Daniele, Werner

Possible collaboration new

Tracking Nakada @ CBPF

Page 4: ECS-TELL upgrade @ CBPF/LHCb

High Energy Physics in CBPF

80’s: Charm Physics Program – Fixed Target - Fermilabe691, e769, e791, e831

(1995)

Physics: mostly 3-body hadronic decaysAdvanced Computing Processor (parallel arch)

Reconstruction & stripping

e831

D SQ2Q3Q4S

233359 3323057

Q4Q3Q2

meters

Forward Proton Detector @ D0 (Run II)

• new concept: Topological HLT• gas gain uniformity test MWPC • Front-End Amplifier

Page 5: ECS-TELL upgrade @ CBPF/LHCb

High Energy Physics in CBPF

90’s: Cosmics detectors Auger Observatory

South site Argentina

00’s: also neutrinos

produced from nuclear reactor

First stage of a long term neutrino’s

oscillation experiment

00’s: GRID ROC Latin America

Page 6: ECS-TELL upgrade @ CBPF/LHCb

ECS & CBPF

• 2008 – CBPF interest to participate on upgrade

• Feb 2009 – conversation with Guido @CERN

possible ECS contribution onto the new module: still to be defined by Beat Jost

• now – ready to collaborate onto the development of ECS-TELL upgrade

full support from our agencies: people,

instrumentation, travel

(phys) Pablo Diniz: technologist [Phd Berlin, DSP, semiconductors]

(tech) Fernando Sousa: master student

(eng) Herman Lima: technologist [FPGA]

(eng) Leonardo Lessa: master student [1 year CMS computing]

(phys) Irina Nasteva: posdoc [5 years UK, C++ & NEMO]

gradually

André Massafferri: researcher Muon SW offline

INFN: MWPC Muon Test system

(eng) Rafael Nobrega: fellow INFN: ECS Muon System FEB working @ CERN

ex (Herman) DataProc

since 2009

Page 7: ECS-TELL upgrade @ CBPF/LHCb

TELL1 upgrade: possible arquiteture (among

many) TELL1 TELL-upgrade: arch very different (L0)

1. ECS unit

2.TopAlgo3. phys. frame: PCB + MEZZANINO +

PWR

3 PHASEs

Guido scheme

possible starting point for CBPF

Page 8: ECS-TELL upgrade @ CBPF/LHCb

Upgrade: SMA200-Intel PCIe Arria II-Altera

• same arch + different technology

1. ECS unit

FPGA

mother

JTag

I2C

parallel

extra I/O

Gluecard interface

PCICCPC

Top AlgorithmETHERNET

Control

room / PVSS

• Test this unit on TELL1 if possible

• short term tasks inside group

Rafael: Arria II & PCIe (tool as JUNGO)

Fernando: output communications

Lessa: definitive (low level) driver Irina: Top Algo of ECS-TELL1

Page 9: ECS-TELL upgrade @ CBPF/LHCb

1. ECS unit

SMA200CCPC

JTag

I2C

ethernet

Arria II

Beat scheme

Page 10: ECS-TELL upgrade @ CBPF/LHCb

evaluation board Arria @ CERNsince June09

1. ECS unit: Development using evaluation boards

SMA200DK Arria II GX

soon @CBPF

SMA200CCPC

ethernet 4x 4x

2x PCIe

4x

Page 11: ECS-TELL upgrade @ CBPF/LHCb

JTAG USB

ethernet

& leds

PCIe

SMA200

1. ECS unit: Development using evaluation boards

SMA200DK Arria II GX

soon @CBPF

Page 12: ECS-TELL upgrade @ CBPF/LHCb

• Output communication in FPGA: done for I2C

• PCIe implementation on Arria FPGA using Jungo driver is evolving

• Just started: Dev of dedicated device driver + API

Study TopAlgo ECS-TELL1

using last compatible CSL kernel

1. ECS unit: Development using evaluation boards

SMA200DK Arria II GX

soon @CBPF

Cyclone FPGA code from TELL1 site

move to use Altera IP blocks (free)

PC

I PPCIe App

JUNGO

FPGA

Jungodriver

USB

Signal Tapping

OK

An alternative solution for Jungo

driver; can be interesting if

reliable

Page 13: ECS-TELL upgrade @ CBPF/LHCb

Integration

3. phys. frame: PCB + MEZZANINO +

PWR

2. TopAlgo

1. ECS unit:

Page 14: ECS-TELL upgrade @ CBPF/LHCb

Conclusion• We are ready to collaborate onto ECS of the

next TELL module: man power

• CBPF has been participating on HEP & instrumention: new lab

• Full support from our agencies for R&D

• and likely for mass production (local industry)

• a TELL-upgrade workshop in Rio 2010 ?

Page 15: ECS-TELL upgrade @ CBPF/LHCb

Backup slides

Page 16: ECS-TELL upgrade @ CBPF/LHCb
Page 17: ECS-TELL upgrade @ CBPF/LHCb