View
106
Download
0
Embed Size (px)
Citation preview
T: 01908 870170 1 www.edenprojectsgroup.co.uk
Company Profile
2016
T: 01908 870170 2 www.edenprojectsgroup.co.uk
Introduction
Eden was established in 2012 with a strong desire to
provide turnkey solutions to the construction industry
from design through to completion.
The company was established by combining a multi-
discipline design practice with a contracting company
which enables us to effectively deliver our goal.
We have the ability to deliver design & build solutions in
house for all types of projects as well as providing
traditional contracting services. This includes highly
technical healthcare, scientific and pharmaceutical
projects as well as high end fit out, residential, retail and
education projects. Our Service & Maintenance division
can provide for all the aftercare needs our clients expect.
Based in Milton Keynes we can deliver projects ranging
from £100K to £6M in value. We are happy to consider
any forms of contract.
Management Team
John-Paul Cain
Pre-Construction Director
Brian Sutton
Managing Director
Chris Harris
Projects Director
T: 01908 870170 3 www.edenprojectsgroup.co.uk
Contents
Introduction .................................................................................... 2
Company Structure ......................................................................... 4
Services & Sectors ........................................................................... 5
Company Information ..................................................................... 6
Accreditations ................................................................................. 7
Case Studies .................................................................................... 8
Brookfield, 99 Bishopsgate ......................................................... 9
Clockwork Estates, Zurich House .............................................. 10
Paul Smith, Floral Street Store .................................................. 11
Chase Farm Hospital, Endoscopy Ward .................................... 12
Kent Fire Authority, Rochester Fire Station .............................. 13
Busy Bees, Croydon Nursery ..................................................... 14
Rickmansworth School, Swimming Pool ................................... 15
Contact Us ..................................................................................... 16
T: 01908 870170 4 www.edenprojectsgroup.co.uk
Company Structure
Eden Projects Group Ltd is our official company name,
however the company has three distinct divisions, these
are:
The Build division provides main contracting services.
The MEC division provides the Mechanical & Electrical Contracting services for our projects,
we effectively have “In House” M&E.
The Service division provides the aftercare on our projects as well as providing PPM and
Reactive Maintenance on a contract basis to clients.
T: 01908 870170 5 www.edenprojectsgroup.co.uk
Services & Sectors
Services
We provide the following services:
Design & Build Construction
Refurbishment (Internal & External)
Fit Out
M&E Contracting
Service & Maintenance
Key Sectors
We have a very good track record in the following sectors:
Commercial
Education
Healthcare
Residential
Retail
Public Sector
Leisure
Pharmaceutical
Industrial
Projects Values
Our target project value is between £100K and £6M.
Geographical Areas
Our preferred geographical areas are:
London
South & East of England
The Midlands
However, we will consider working outside of these areas on a project by project basis.
T: 01908 870170 6 www.edenprojectsgroup.co.uk
Company Information
Company Name – Eden Projects Group Ltd
Address – 15 Wharfside
Bletchley
Milton Keynes
MK2 2AZ
Telephone – 01908 870170
Websites – www.edenprojectsgroup.co.uk
www.edenbuild.co.uk
www.edenmec.co.uk
www.edenservice.co.uk
Company Number – 8086879
VAT Number – 154 0284 32
UTR Number – 61205 28426
Turnover – 2015/16 - £10M
Insurance Levels – Employers Liability - £10M
Public/Product Liability - £10M
Professional Indemnity - £10M
T: 01908 870170 7 www.edenprojectsgroup.co.uk
Accreditations
We take the quality of the services we deliver seriously and look to give our clients
assurance of this by obtaining accreditations as necessary, below is a summary of the
accreditations we currently hold:
ISO 9001 – Cert No. GB2004843
ISO 14001 – Cert No. EM2000798
ISO 18001 – Cert No. HS230569
CHAS
Constructionline – Reg. No. 145590
Achilles UVDB – Supplier No. 197258
Electrical Contractors Association
FGAS – Company No. REF1009519
Gas Safe – Reg No. 558916
T: 01908 870170 8 www.edenprojectsgroup.co.uk
Case Studies
Below is a list of selected case studies from various sectors, the details follow in the
subsequent pages. Please feel free to request case studies specific to your requirements and
we will be happy to provide any we have.
Commercial / Fit Out
Brookfield, 99 Bishopsgate, Various Fit Outs
Residential
Clockwork Estates, Zurich House
Retail
Paul Smith, Floral Street Store
Healthcare
Chase Farm Hospital, Endoscopy Ward
Public Sector
Kent Fire Authority, Rochester Fire Station
Education
Busy Bees, Croydon Nursery
Leisure
Rickmansworth School, Swimming Pool
Notable Service Contracts
Milton Keynes College
Shakespeare Globe Theatre, London
T: 01908 870170 9 www.edenprojectsgroup.co.uk
Brookfield, 99 Bishopsgate
Project Description
Over the past few years Eden have worked on
various projects at 99 Bishopsgate directly for
Brookfield or for various tenants.
All projects involved careful collaboration with the
landlord’s management team, the building is a
prestigious, busy, occupied building in Central
London.
Value
The projects ranged in value from £150K to £2.5M.
Timescales
All projects were typically undertaken on fast track
programmes, working within live occupied building
with intrusive works being undertaken out of hours.
All projects were completed in 2015/2016.
Services
The projects comprised of:
Level 3&4 fit out for Deutsche Bank
Level 1, 5 & 15 fit out for i2 Office
Upgrade of HVAC infrastructure from
Basement Level to Level 5
Replacement of existing electrical busbar
systems
Replacement of Lift Motor Room cooling
systems
Other Sector Experience - Commercial / Fit Out
Level 5, Citigroup, Canary Wharf
Level 30, Bank Street, Canary Wharf
Level 4, Cannon Place, Cannon Street
T: 01908 870170 10 www.edenprojectsgroup.co.uk
Clockwork Estates, Zurich
House
Project Description
Eden undertook the conversion of an existing
government building into 32 new residential flats.
The project was undertaken on a full design and
build basis
Value
The total construction cost was circa £2.2M.
Timescales
The programme duration was approximately 10
months and was completed in August 2016.
Services
The project comprised of:
Façade Replacement
Roof Upgrades
Lift Replacement
Cold Water Booster Sets
Smoke Extract Shafts
Partitioning
Decorations
External Landscaping
New M&E Infrastructure
Other Sector Experience - Residential
Clockwork Estates, Albion House
Clockwork Estates, Chantrey Court
T: 01908 870170 11 www.edenprojectsgroup.co.uk
Paul Smith, Floral Street
Store
Project Description
Eden undertook a substantial Fit-out of the existing
flagship retail outlet at Covent Garden. A key aspect
of the project was to keep the store in operation
during the works, which was accomplished through
8 detailed phases.
The project was undertaken on a full design and
build basis.
Value
The total construction cost was circa £500K.
Timescales
The programme duration was approximately 8
weeks and was completed in August 2016.
Services
The project comprised of:
Adaptation of Store
Re-Furbishment of office area
Relocation of storage facilities
New staff area including kitchen
Bespoke joinery
Industrial chic M&E services
Other Sector Experience - Retail
Godiva Chocolate, Canary Wharf
Godiva Chocolate, St Pancras
T: 01908 870170 12 www.edenprojectsgroup.co.uk
Chase Farm Hospital,
Endoscopy Ward
Project Description
Eden undertook the services installations for a new
Endoscopy Ward built on the Chase Farm Hospital
site.
The project was undertaken on a full design and
build basis.
Value
The total construction cost was circa £1.9M.
Timescales
The programme duration was approximately 16
weeks and was completed in December 2015.
Services
The project comprised of:
Air Handling Units with heat recovery
Air Source Heat Pumps
VRV Systems
BMS Systems
Public Health & Sanitaryware
Other Sector Experience - Healthcare
Spire Healthcare, Southampton, Operating
Theatre
Queen Elizabeth Hospital, Kings Lynn, UCV
Operating Theatre
Luton & Dunstable Hospital, Fracture Clinic
Northwick Park Hospital, Harrow,
Paediatrics Ward
T: 01908 870170 13 www.edenprojectsgroup.co.uk
Kent Fire Authority,
Rochester Fire Station
Project Description
Eden undertook the Mechanical & Electrical
installations to a new build Fire Station and Road
Safety Training Centre in Rochester.
The project was undertaken on a JCT with CDP
contract.
Value
The total construction cost was circa £5.5M.
Timescales
The programme duration was approximately 13
months and completed in December 2015.
Services
The project comprised of:
LED Lighting
Heat Recovery Ventilation
VRV Air Conditioning Systems
Security/ Fire Alarm Systems
Natural Ventilation
Underfloor Heating
Cold Water Booster Sets
Generator Back Up
Boiler Systems
BMS Systems
PV Array
Other Sector Experience - Public Sector
Medway Fire Station, Kent Fire Authority
T: 01908 870170 14 www.edenprojectsgroup.co.uk
Busy Bees, Croydon
Nursery
Project Description
Eden undertook the conversion of an existing
residential property to create a new nursery for the
UK's largest childcare provider with over 250
nurseries nationwide.
The project was undertaken on a full design and
build basis.
Value
The total construction cost was circa £450K.
Timescales
The programme duration was approximately 6
weeks and was completed in in July 2016.
Services
The project comprised of:
Extensive external landscaping including soft
play area
Safety flooring throughout
Full design and build M&E installation
Internal & external renovations
Other Sector Experience - Education
Levels 2, 3, 4 & 6, Bedford College Tower
Block
LLDD Facility, Milton Keynes College
Redbridge College, Hair & Beauty Training
Salon
T: 01908 870170 15 www.edenprojectsgroup.co.uk
Rickmansworth School,
Swimming Pool
Project Description
Eden undertook the full refurbishment of an existing
dilapidated swimming pool for Rickmansworth
School.
The project was undertaken on a full design and
build basis
Value
The total construction cost was circa £1M.
Timescales
The programme duration was approximately 16
weeks and was completed in in January 2015.
Services
The project comprised of:
Complete Re-Furbishment of the whole
building
Wet-room finishes throughout
New changing and shower facilities
New ceilings throughout
Channel drainage systems
Replacement roof
Replacement façade/glazing
New M&E systems
IP65 LED Lighting
Heat Recovery Ventilation
New Boiler Systems working with a
CHP system
New Security/ Fire Alarm Systems
T: 01908 870170 16 www.edenprojectsgroup.co.uk
Contact Us
Address – Eden Projects Group Ltd
15 Wharfside
Bletchley
Milton Keynes
MK2 2AZ
Telephone – 01908 870170
Sales – Neil Stanley, Development Director
M: 07881 820454
Pre-Construction – John-Paul Cain, Pre-Construction Director
M: 07801 556104
Build – Brian Sutton, Managing Director
M: 07791 143628
MEC – Chris Harris, Projects Director
M: 07432 603901
Service – Scott Merry, Service Department Manager
M: 07415 797123