66
111518 CFD Talk with Kevin Gage pressure vs absolute pressure o Relative pressure is zero so gage pressure o Reference pressure is zero psi AIM needs less input boundaries Alec o Transient model changes with longer duration Kevin’s o ANSYS Aim o Pressure relative to sea level o Probably 5 degree attack angle o Steady State Model o Green sections are fully body Open Actions o Find distance between original geometry o Run Steady state model o Measure the distance between the centerline and the default axis o Model a half body instead of a quarter body to account for angle of attack o Add a 5 degree attack angle to account for gusts of wind near altitude Look into how big those gusts are (the balloon people) 111518 Agenda Decide 2nd semester meeting times 9:30 AM - 12:15 PM Tues/Thur Brainstorm list of required materials from Home Depot or Lowes FiberFix patch on inside and bond https://www.homedepot.com/p/FiberFix-2-in-x-8-in-3-in- x-3-in-5-in-x-5-in-Rigid-Patch-3-Pack- 857101004969/206783889 What Bondo? https://www.homedepot.com/p/3M-Bondo-32-fl-oz- Lightweight-Body-Filler-PN0262/202077782 Overview of open actions Upcoming Schedule: Thanksgiving Break o Most people gone Saturday 11/17 - Sunday 11/25

edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

111518 CFD Talk with Kevin

Gage pressure vs absolute pressureo Relative pressure is zero so gage pressureo Reference pressure is zero psi

AIM needs less input boundaries Alec

o Transient model changes with longer duration Kevin’s

o ANSYS Aimo Pressure relative to sea levelo Probably 5 degree attack angle o Steady State Model o Green sections are fully body

Open Actionso Find distance between original geometry o Run Steady state model o Measure the distance between the centerline and the default axiso Model a half body instead of a quarter body to account for angle of attack o Add a 5 degree attack angle to account for gusts of wind near altitude

Look into how big those gusts are (the balloon people)

111518 Agenda Decide 2nd semester meeting times

9:30 AM - 12:15 PM Tues/Thur Brainstorm list of required materials from Home Depot or Lowes

FiberFix patch on inside and bond https://www.homedepot.com/p/FiberFix-2-in-x-8-in-3-in-x-3-in-5-in-x-5-in-

Rigid-Patch-3-Pack-857101004969/206783889 What Bondo?

https://www.homedepot.com/p/3M-Bondo-32-fl-oz-Lightweight-Body- Filler-PN0262/202077782

Overview of open actions

Upcoming Schedule: Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Meagan might be gone 11/25-11/26?o Art gone week after Thanksgiving

Gate Review with Art in Class - Thursday, 12/6 Detailed Design Review - Saturday, 12/8 Break Between Semesters

o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break

Integration Weekend tentatively 3/30/19 MSD 2

o Tues/Thurs

Page 2: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o 9:30 AM  - 12:15 PM

Open Actions Meagan

Update CAD Make rods diameter similar to outer wall thickness Add hole for pipe

Load path Update Waiting on John to constrain engine

Meet with Dr. Lam after Thanksgiving break Bulk upload notes (eventually)

Tony Figure out shrinkage of methane - Tony (By thursday)

Figure out temperature of inside gases and perform Linear expansion equation Ask Boedo if you get stuck

Figure out the tension required of mounting structure - Tony afterwards Unfilled tank is put in tension (in the rods) compression (in the tank).

Once tank is filled and temp drops, it will compress. You don’t want the tank to lose contact with the structure

Drew Purchasing

FiberFix patches and bondo Need to order bulkhead attachment materials

Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

Try to return aluminum Apply for NY Space Grant - Due December 1st

Travel to Northeastern for Integration (March) Shipping the rocket to CA (hella expensive)

Dig through drive for shipping receipts (Georgia - Boston)o 2-3 tanks of gas (x2 cars) =

UPS Estimationo https://wwwapps.ups.com/fctc/timeandcost?

loc=en_US&ActionOriginPair=SeamlessExperience___StartSession&FREIGHT_TYPE=LTL

Ship Before April 30th to Mark’s House

Alec

Page 3: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Update CFD Talk with Kevin on Thursday

Start FEA on bulkhead redesign Wednesday Need thrust numbers (Tony)

Alex Repair nosecone coupler Get rough estimates for material properties (fiberglass and carbon fiber from

body tubes and nose cone) Thanksgiving week

Claire Update nose cone drawings Make Tank mount adapters drawing (next week)

Waiting on Meagan Update 3 Point Bending stuff (eventually)

Adjust design to incorporate saw horses, laser pointer, and measurement attachments

111318 Agenda Brainstorm NY Space Grant usage

Due December 1st Engine bulkhead

Machining costs Helium Bulkhead

Probably should be under northeastern New nosecone Travel to conference Travel to Northeastern

2-3 tanks of gas (x2 cars) = Shipping the ro☻cket to CA (hella expensive)

Decide 2nd semester meeting times Brainstorm list of required materials from Home Depot or Lowes

Overview of open actions

Upcoming Schedule: Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Call-in team meeting to be scheduled (if needed)

Decide on Thursday 11/15o Meagan might be gone 11/25-11/26?

Detailed Design Review tentatively 12/8 Break Between Semesters

o Gate Review on 12/6?o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break

Integration Weekend tentatively 3/30/19 MSD 2

Page 4: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Only have to meet once a week with Arto Decide meeting time after 11/12o Should still be Tues/Thurs

Open Actions Meagan

Update CAD Make rods diameter similar to outer wall thickness Add hole for pipe

Load path Update Waiting on John to constrain engine

Tony Figure out shrinkage of methane - Tony

Figure out temperature of inside gases and perform Linear expansion equation Ask Boedo if you get stuck

Figure out the tension required of mounting structure - Tony afterwards Unfilled tank is put in tension (in the rods) compression (in the tank).

Once tank is filled and temp drops, it will compress. You don’t want the tank to lose contact with the structure

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

Try to return aluminum

Alec Update CFD

Need mass flow rate out of engine Start FEA on bulkhead redesign

Need thrust numbers (Tony) Alex

Repair nosecone coupler Update new cone drawings

Claire Make Tank mount adapters drawing (next week)

Waiting on Meagan Update 3 Point Bending stuff (eventually)

Page 5: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

111018 Preliminary Design Review Agenda

Room: GLE-2139 12:30 pm - 2:00 pm (1.5 hrs): Assign parts and practice presenting

o Drew - Team Vision, BOMo Meagan - Bulkhead Designo Claire - Engine Bulkhead Redesign, 3 Point Bending Test Apparatuso Alec - ANSYS stuff, Riskso Alex - Nosecone Tip, Nosecone Bendingo Tony (by 1:30 pm) - Engine Bulkhead Redesign, Design + Flowcharts

2:00 pm - 3:00 pm (1 hr): Preliminary Detailed Design Reviewo With Art, Kevin, John, Julian

Start presenting by 2:10 pm (!!!) 3:00 pm - 3:30 pm (0.5 hr): Peer Evals What needs completed before Saturday?

o Engine Bulkhead Redesign Tony and Claire

o Upload Foam Ring Benchmarking and Drawing? Waterjetting will be next phase

Agenda Vision - Drew CFD- Alec Nosecone-Alex Engine Bulkhead

Why redesign -Tony Redesign - Claire / Tony

Tank Mounting - Meagan BOM -Drew Test Plans -

Nosecone -Alex3 point bending -Claire

Design Flowcharts - Tony Risks- Alec Plans for next phase - Meagan

110818 Agenda Semester cutoff and plans for next semester

Tentatively - Last Design Review 12/8 Also tentative cutoff for the semester

Discuss a visit to Northeastern Virtual Meeting for Full Vehicle Model (everybody) Virtual CFD Meeting (Kevin and us)

Assign and Research NY Space Grant stuff Due December 1st Drew

Overview of open actions

Page 6: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM

o 2-3 pm Review GLE-2149 (3149 is reserved for KGCOE open house !!)

Full Team Call - Sunday 11/11 @ 9 PM Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Full team meetings 11/18, 11/25 @ 9 pmo Call-in team meeting to be scheduled (if needed)

Decide on Thursday 11/15 Detailed Design Review tentatively 12/8 Break Between Semesters

o Gate Review on 12/6?o Soft stop for end of semester (tentatively 12/8)o Schedule meetings over break

Integration Weekend tentatively 3/30/19 MSD 2

o Only have to meet once a week with Arto Decide meeting time after 11/12o Should still be Tues/Thurs

Open Actions Meagan

Update CAD Round rods Make rods diameter similar to outer wall thickness Add hole for pipe Make rods longer and add more threads Thicken Top and Dimensions Check in full assembly for piping

Might have to cut a semi-circle hole for fuel tube Load path

Update Waiting on John to constrain engine Might break things if uploaded to GrabCAD

Rename Test fit Nose Cone Tip Material, Wall thickness, PSI, Temp for methane tank

Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Look for better thermal data - On Hold Tony

Upload old design (designs and flowcharts) Drew

Purchasing Need to order bulkhead attachment materials

Waiting on Meagan

Page 7: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Cryo rated gasketo Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

EDGE Upload nose cone test plan Upload meshing/CFD stuff to EDGE

Whiteboard Photos Create list of outstanding EDGE items

Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)o Gasket Benchmarking

Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)

Plans for Next Phaseo Meagan

Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations

o Add Tank Mount Drawing Cut Foam

Waterjet at Brinkman Lab - Submit What inputs we need

o DXF File Check helium tank diameter for inside diameter of

foam ringo 6-8” boundary around foam edgeo Bring material into shopo Put work order in

On shop computer Alec

Alex Machining of nosecone tip

If nosecone tip doesn’t fit - redo drawing and wait for more material Talk to Professor Ghoneim to discuss vibrational table versus accelerometers

Accuracy of model/ random variation Claire

Make Tank mount adapters drawing (next week) Waiting on Meagan

Machine Nose Cone tip on Monday Engine Bulkhead

Page 8: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

110618 Agenda Semester cutoff and plans for next semester

Tentatively - Last Design Review 12/8 Also tentative Cutoff for the semester

Overview of open actions Meagan, Tony, and Alec work on load path geometry

Trim down main assembly to min

Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM

o 2-3 pm Review GLE-2149 (3149 is reserved for KGCOE open house !!)

Thanksgiving Breako Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Move to next agendao Full Team Meetings every Sunday

11/18 11/25

Break Between Semesterso Decide a soft stop for end of semester (tentativelyo Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

Update CAD Put in grabcad Thicken Top and Dimensions Check in full assembly for piping

Might have to cut a semi-circle hole for fuel tube Load path

Waiting on John to constrain engine Stick in structures -> FEA -> Static Model

Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Got FEA analysis from Kevin

Look for better thermal data - On Hold Look up reverting GrabCAD

Tony Start Load Path model

Meagan started it, ask her for explanation (Sunday after 4pm) Engine bulkhead failure modes

In Slack - No testing Ask for other information (Thursday)

Upload old GTech FEA to EDGE

Page 9: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Add blurb describing why we need to redesign based off picture

Upload old design (designs and flowcharts) Drew

Purchasing Need to order bulkhead attachment materials

Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

EDGE Create list of outstanding EDGE items

Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)

Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)

Plans for Next Phaseo Meagan

Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations

o Add Tank Mount Drawing Cut Foam

Waterjet at Brinkman Lab What inputs we need (by 11/6)

o DXF File Check helium tank diameter for inside diameter of

foam ringo 6-8” boundary around foam edgeo Bring material into shopo Put work order in

On shop computer Alec (work on this weekend)

Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment

Waiting on Meagan’s CAD model Rough CFD Model

Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries

Meshing As complete as possible

Alex Machining of nosecone tip

Friday failed Plan is to go on Monday (go before 4pm)

Page 10: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Need to use programmable latheo Don’t really know how to use programmable lathe

Use ruined piece first to test angle Help with 3 point bending test Write blurbs for Testing

Write then send to Drew Claire

Make Tank mount adapters drawing (next week) Waiting on Meagan (should be done by saturday)

Machine Nose Cone tip on Monday

Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip

110318 Agenda Overview of open actions

Do Work Meagan, Tony, and Alec work on load path geometry

Trim down main assembly to min

Upcoming Schedule: Group Meeting

o Saturday, 11/3 at 2PM, on campus (location TBD: look at slack) No Tony (zero on peer review)

Preliminary Design Review - Saturday 11/10 - Meet at 12:30PMo 2-3 pm Review

GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison

o Supposedly made schedule Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Break Between Semesterso Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

Update CAD Put in grabcad Thicken Top and Dimensions Check in full assembly for piping

Page 11: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Might have to cut a semi-circle hole for fuel tube Material, Wall thickness, PSI, Temp for methane tank

Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Got FEA analysis from Kevin

Look for better thermal data - On Hold Look up reverting GrabCAD

Tony Start Load Path model

Meagan started it, ask her for explanation (Sunday after 4pm) Engine bulkhead failure modes

In Slack - No testing Ask for other information (Thursday)

Upload old GTech FEA to EDGEo Add blurb describing why we need to redesign based off

picture Upload old design (designs and flowcharts)

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

Update Wrike EDGE

Upload nose cone test plan Upload meshing/CFD stuff to EDGE

Stuff from whiteboard Update BOM Create list of outstanding EDGE items

Prototyping, Engineering Analysis, Simulationo Bulkhead FEA (Tony)

Feasibility: Prototyping, Analysis, Simulationo Add Alec’s Powerpoint (once ready)

Plans for Next Phaseo Meagan

Nosecone Stiffness ‘Blurb’ Drawings, Schematics, Flow Charts, Simulations

o Add Tank Mount Drawing Cut Foam

Waterjet at Brinkman Lab What inputs we need (by 11/6)

Page 12: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o DXF Fileo 6-8” boundary around foam edgeo Bring material into shopo Put work order in

On shop computer Alec (work on this weekend)

Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment

Waiting on Meagan’s CAD model Rough CFD Model

Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries

Meshing As complete as possible

Alex Machining of nosecone tip

Friday - 2pm with Claire Help with 3 point bending test Write blurbs for Testing

Claire Make Tank mount adapters drawing (next week)

Waiting on Meagan (should be done by saturday) Machine Nose Cone tip on Friday Put Nosecone Tip pictures on word document

Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip

110118 Agenda Overview of open actions

Do Work Meagan, Tony, and Alec work on load path geometry

Trim down main assembly to min

Upcoming Schedule: Preliminary Design Review - Saturday 11/10 - Meet at 12:30PM

o 2-3 pm (Actual Presentation Text Art to let him know when we decide (including room number)

o GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison - ON HOLD

Page 13: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Thanksgiving Breako Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Break Between Semesterso Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

MechE lab computers should have full Ansys access - if not, see Dr. Boedo Update CAD

Put in grabcad Thicken Top and Dimensions - Thursday Check in full assembly for piping - Thursday

Might have to cut a hole Material, Wall thickness, PSI, Temp for methane tank

Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD

Tony Start Load Path model

Meagan started it, ask her for explanation (Thursday) Engine bulkhead failure modes

In Slack - No testing Ask for other information (Thursday)

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

EDGE Upload Bending Test Apparatus drawing Upload nose cone test plan Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures Upload meshing/CFD stuff to EDGE Create list of outstanding EDGE items

Prototyping, Engineering Analysis, Simulationo Nothing

Feasibility: Prototyping, Analysis, Simulation

Page 14: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Only content is link to ANSYS calculations Plans for Next Phase Nosecone Stiffness ‘Blurb’ Designs and Flowchart Drawings, Schematics, Flow Charts, Simulations

o Only Nose Cone Tip stuff Cut Foam

Waterjet at Brinkman Lab Talk to Jan and Rob

o When we can use it Down for at least 1-2 weeks

o What inputs we need DXF File 6-8” boundary around foam edge Bring material into shop Put work order in

Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Rough CFD Model Still tinkering with Fluent to get things to run correctly Having troubles with missing inputs from existing Still tinkering with boundaries

Meshing As complete as possible

Alex Machining of nosecone tip

Friday - 2pm with Claire Help with 3 point bending test Blurb for nose cone testing

Claire Beef up 3-point test plan

Will have by Thursday Make Tank mount adapters drawing (next week)

Waiting on Meagan Machine Nose Cone tip on Friday

Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip

Page 15: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

103018 Agenda Meagan leaving early for interview or just wont show! Overview of open actions

EDGE Requirements for Preliminary Detailed Design Feasibility: Prototyping, Analysis, Simulation

Nose cone tip CFD - Alec Bulkhead attachment rings

3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts

Do Work Meagan, Tony, and Alec work on load path geometry

Trim down main assembly to min

Upcoming Schedule: Preliminary Design Review - Saturday 11/10

o 2-3 pm ? Text Art to let him know (including room number)

o GLE-2149 (3149 is reserved for KGCOE open house !!) Northeastern schedule comparison - ON HOLD Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Break Between Semesterso Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys (recommended by Dr. Ghosh)

MechE lab computers should have full Ansys access - if not, see Dr. Boedo

Update CAD Put in grabcad Thicken Top and Dimensions - Thursday Check in full assembly for piping - Thursday

Might have to cut a hole Material, Wall thickness, PSI, Temp for methane tank

Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Got FEA analysis from Kevin

Look for better thermal data - On Hold Look up reverting GrabCAD

Tony

Page 16: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Start Load Path model Meagan started it, ask her for explanation Engine bulkhead failure modes

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for thermal expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

EDGE Upload Bending Test Apparatus drawing Upload nose cone test plan Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures Upload meshing/CFD stuff to EDGE

Cut Foam Waterjet at Brinkman Lab

Waterjet is down (1-2 weeks) Talk to Jan and Rob

o When we can use ito What inputs we need

Or talk to Construct Mike on external waterjet sources Alec (work on this weekend)

Feasibility: Prototyping, Analysis, Simulation - Status Update Tank Mounting Attachment

Waiting on Meagan’s CAD model Rough CFD Model

Make sure dimensions are in English units Done

In Fluent Have a rough model runs for about 1s

Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ Ended on 20’ - can be changed later

Meshing As complete as possible

Alex Machining of nosecone tip

Complete sometime this week Friday - 2pm

Claire Beef up 3-point test plan

Will have by Tuesday Upload Bending Test Apparatus drawing to Drive

Working on drawings of test apparatus.

Page 17: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Tuesday Make Tank mount adapters drawing (next week)

Waiting on Meagan

Goals - next week Drew be able to order tank mounting material Alec to be able to run initial CFD Tony working on load path geometry Alex to machine nosecone tip

102718 Agenda Group Meeting Saturday 10/27 at 4:30pm

GLE-3149 Overview of open actions

EDGE Requirements for Preliminary Detailed Design Feasibility: Prototyping, Analysis, Simulation

Nose cone tip CFD - Alec Bulkhead attachment rings

3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts

Do Work Meagan, Tony, and Alec work on load path geometry

Trim down main assembly to min

Upcoming Schedule: Leads Meeting Sunday 10/28 at 8pm

o Alec (Yes), Tony (Maybe - has exam Monday), Claire (Yes), Alex (Maybe), Meagan (Yes - also has exam Monday), Drew (NO - Meeting 8-10)

Preliminary Design Review - Saturday 11/10o GLE-2149 (3149 is reserved for KGCOE open house !!)

Northeastern schedule comparison - ON HOLD Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Break Between Semesterso Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

Meeting scheduled with Dr. Lam Friday (tomorrow 10/26) 8-8:30am

Page 18: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Invite Dr. Lam to last Saturday review Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys

(recommended by Dr. Ghosh) Update CAD

Put in grabcad Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday

Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD

Tony Start Load Path model Engine bulkhead failure modes

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for expansion numberso https://www.mcmaster.com/7549A11 o http://www.ppgaerospace.com/Products/Sealants/

Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx 3 Point Bending Test Apparatus

EDGE Flesh out Gasket Benchmarking (Saturday) Upload Bending Test Apparatus drawing Upload 3 Point Testing Apparatus BOM Edit Nosecone pictures

Cut Foam Waterjet at Brinkman Lab

Waterjet is down (1-2 weeks) Jan and Rob

Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Rough CFD Model Make sure dimensions are in English units In Fluent Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ box

Meshing Alex

Process for machining of nosecone tip

Page 19: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Verify the diameter of the tip and the actual nosecone and landing length (by 10/25) - Maybe move to Claire

Potential Machining Week 10 Beef up nosecone test plan

Claire Post nosecone tip drawing and tag Kevin Beef up 3-point test plan

Will have by Saturday meeting. Upload Bending Test Apparatus drawing to Drive

Working on drawings of test apparatus.  Will have by Saturday meeting. Upload 3 Point Testing Apparatus BOM to Drive

Available in MSD SVN folder (Prelim Detailed Design -> 3-Point Bending Apparatus)

Already put up on EDGE page Make Tank mount adapters drawing (next week)

Waiting on Meagan

Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip

Questions for Full Team Meeting-Thermal expansion ratings

102518 Agenda In-Class

Brief announcements ME Shop/Brinkman Lab Overview (4435)

Directly after announcements - Sending Alex Potential “change” MSD Time

Update when everyone has scheduled classes 8am next semester (T,Th) Art said we can do 9am-12pm, 10am-1pm?

Overview of open actions EDGE Requirements for Preliminary Detailed Design

Feasibility: Prototyping, Analysis, Simulation Nose cone tip CFD - Alec Bulkhead attachment rings

3D Printed Drawings, Schematics, Flowcharts, Simulations Test Plans Designs and Flowcharts

Do Work

Page 20: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Meagan, Tony, and Alec work on load path geometry Trim down main assembly to min

Upcoming Schedule: Claire at interviews Thursday 10/25 and Friday 10/26 (Good Luck!) Group Meeting Saturday 10/27 at 4:30pm

o GLE-3149 Leads Meeting Sunday 10/28 at 8pm

o Alec (Yes), Tony (Maybe - has exam Monday), Claire (Yes), Alex (Maybe), Meagan (Yes - also has exam Monday), Drew (NO - Meeting 8-10)

Preliminary Design Review - Saturday 11/10o GLE-3149

Northeastern schedule comparison - ON HOLD Thanksgiving Break

o Most people gone Saturday 11/17 - Sunday 11/25o Call-in meeting to be scheduled

Break Between Semesterso Schedule meetings over break

Integration Weekend tentatively 3/30/19

Open Actions Meagan

Meeting scheduled with Dr. Lam Friday (tomorrow 10/26) 8-8:30am Invite Dr. Lam to last Saturday review

Will reach out to Dr. Boedo & Dr. Ghoneim tomorrow about Ansys (recommended by Dr. Ghosh)

Update CAD Put in grabcad Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday

Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Look for better thermal data - On Hold Look up reverting GrabCAD

Tony Start Load Path model Engine Bulkhead failure modes

Drew Purchasing

Need to order bulkhead attachment materials Waiting on Meagan Cryo rated gasket

o Needs to be tensile strength ratedo 3” Diametero Waiting for expansion numberso https://www.mcmaster.com/7549A11

Page 21: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o http://www.ppgaerospace.com/Products/Sealants/ Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx

3 Point Bending Test Apparatus EDGE

Flesh out Gasket Benchmarking (Saturday) Upload Bending Test Apparatus drawing Edit Nosecone Pictures Make digital mesh image

Cut Foam Waterjet at Brinkman Lab

Alec (work on this weekend) Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Rough CFD Model Make sure dimensions are in English units In Fluent Talk to Kevin about 30 ft Diameter and 30’ x 60’ x 60’ box

Meshing Alex

Process for machining of nosecone tip Verify the diameter of the tip and the actual nosecone and landing length

(by 10/25) - Maybe move to Claire Potential Machining Week 10

Beef up nosecone test plan Claire

Post nosecone tip drawing and tag Kevin Beef up 3-point test plan

Will have by Saturday meeting. Upload Bending Test Apparatus drawing to Drive

Working on drawings of test apparatus.  Will have by Saturday meeting. Upload 3 Point Testing Apparatus BOM to Drive

Available in MSD SVN folder (Prelim Detailed Design -> 3-Point Bending Apparatus)

Already put up on EDGE page Make Tank mount adapters drawing (next week)

Waiting on Meagan

Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip

102318 Agenda In-Class

Brief announcements

Page 22: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Overview of The Construct:policies, resources, etc. 11:15 AM GLE-4435 Technology Tryouts 1:00 PM GLE-4425 (Q&A session, pick up a handout at start

of class if interested) RAFFLE!

Meagan wins! Potential “change” MSD Time

8am next semester (T,Th) Updates from leads meeting:

Estimated Launch May 18th (may be pushed back) Use topic specific channels/ post more updates and pictures NE starting building VTS

Pics in #prop Looking into tracing profile of tank No deadline for accelerometer

Alec needs frequency range Posted slack

should we VTS and integrate If we have time great, if not oh well drives schedule difference between tanks and skins

or just dump cryo stuff without Have NE measure it?

Overview of open actions EDGE Requirements for Preliminary Detailed Design

Team Vision (Written by Claire) Feasibility: Prototyping, Analysis, Simulation

Nose cone tip -Alex Bulkhead attachment rings - Meagan

3D Printed Gasket - Drew CFD, Mesh - Alec

Drawings, Schematics, Flowcharts, Simulations -Meagan/Claire Bill of Materials Test Plans - Alex and Claire Designs and Flowcharts - Tony Risk Assessment

Do Work

Schedule:Next 4 weeks: Review tentatively November 10th

Northeastern schedule comparison - ON HOLD Final deadline of of March/April Testing? Semester Breakage (work slipping)?

o

Open Actions

Page 23: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Meagan

Update CAD

Put in grabcad

Thicken Top and Dimensions-Saturday

Check in full assembly for piping -Saturday

Material, Wall thickness, PSI, Temp for methane tank

Bothering NE

Seamless Tanks (http://seamlesstanks.com/)

On Hold -try not welding

Engine Bulkhead Redesign

Look for better thermal data - On Hold

Look up reverting GrabCAD

Tony

Finish CFD model

Spline or datum

Start Load Path model

Drew

Purchasing

Need to order bulkhead attachment materials

Cryo rated gasket

o Needs to be tensile strength rated

o 3” Diameter

o Need expansion rates

https://www.mcmaster.com/7549A11

Page 24: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

http://www.ppgaerospace.com/Products/Sealants/Specialty-

Products/PR-1665-Cryogenic-Adhesive.aspx

Alec

Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment

Waiting on Meagan’s CAD model

Rough CFD Model

Alex

Process for machining of nosecone tip

Verify the diameter of the tip and the actual nosecone

Look at risks, make necessary updates, upload to EDGE

Beef up nosecone test plan

Claire

Make nosecone tip drawing (10-23)

Edit drawing

Drop a link to Kevin when done

Edge (whenever)

Bending Test Apparatus drawing

Make Tank mount adapters drawing (next week)

Goals - next week

Drew be able to order tank mounting material

Alec to be able to run enitial CFD

Tony working on load path geometry

Alex to machine nosecone tip

Page 25: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

101818 Agenda Kickoff lecture ~30 minutes

Overview of next phase Subject matter consultation Purchasing Use of engineering standards

Overview of open actions EDGE Requirements for Preliminary Detailed Design

Team Vision Feasibility: Prototyping, Analysis, Simulation

Nose cone tip Bulkhead attachment rings

3D Printed Drawings, Schematics, Flowcharts, Simulations Bill of Materials Test Plans Designs and Flowcharts Risk Assessment

Do Work

Schedule: Next 4 weeks: November 10th

Northeastern schedule comparison Final deadline of of March/April Testing? Semester Breakage (work slipping)?

Open Actions Meagan

Update CAD Put in grabcad Update weight -Thursday Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday

Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign Look for better thermal data

Tony Finish CFD model

Spline or datum Start Load Path model

Page 26: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Drew Purchasing

Foam - ordered https://www.mcmaster.com/93265K48

Tender Descender Sheath - ordered https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-

9/recovery-tether-sheath-p-52.html Need to order bulkhead attachment materials

Cryo rated gasketo Needs to be tensile strength ratedo 3” Diameter

https://www.mcmaster.com/7549A11 http://www.ppgaerospace.com/Products/Sealants/Specialty-

Products/PR-1665-Cryogenic-Adhesive.aspx Put BOM on EDGE Put nosecone pictures under prototyping

Alec Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Rough CFD Model Alex

Flush out test plan and upload to EDGE (for Tuesday) Nose cone stiffness

Process for machining of nosecone tip Lathe - Talk to machine shop (10/16) Verify the diameter of the tip and the actual nosecone

Look at risks, make necessary updates, upload to EDGE Claire

Make nosecone tip drawing (10-23) Edit drawing

Edge (whenever) Bending Test Apparatus drawing

Make Tank mount adapters drawing (next week)

Goals - next week Drew be able to order tank mounting material Alec to be able to run enitial CFD Tony working on load path geometry Alex to machine nosecone tip

101618 Agenda System Design Recap Sit-in on another system review? Yes - at 12:30 (wherever you want to go ;) ) Overview of open actions

EDGE Requirements for Preliminary Detailed Design Team Vision

Page 27: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Feasibility: Prototyping, Analysis, Simulation Nose cone tip Bulkhead attachment rings

3D Printed Drawings, Schematics, Flowcharts, Simulations

Detailed fabrication instructions for each unique part List of purchased parts

Bill of Materials Test Plans Designs and Flowcharts Risk Assessment

Do Work

System Design Review Recap

Weight difference comparison of both ideas

Cage Concern Gasket Number of Rods Plumbing Concerns Tolerance in rolled tank Securing one end at tank seal

Welding Concerns Braising temps Heat treat (reheat treat) 900 psi rating

Schedule: Next 4 weeks: November 10th

Northeastern schedule comparison Final deadline of of March/April Testing? Semester Breakage (work slipping)?

Open Actions Meagan

Update CAD Add screenshots under supplemental Put in grabcad Update weight -Thursday Thicken Top and Dimensions-Saturday Check in full assembly for piping -Saturday

Pic Showing interference Hand off drawings next week Link in slack

Bring in old nosecone To Alex Monday

Start compiling inputs for analysis (the ones that we already have) started

Page 28: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Searching for better thermal data Bothering NE

Temperature of material for skin analysis (material properties) On Hold -Waiting for more analysis details

Material, Wall thickness, PSI, Temp for methane tank Bothering NE Seamless Tanks (http://seamlesstanks.com/) On Hold -try not welding

Engine Bulkhead Redesign (next week) Find Failure method

Tony Finish CFD model

Spline or datum Start Load Path model

Drew Purchasing

Foam - ordered https://www.mcmaster.com/93265K48

Tender Descender Sheath - ordered https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-

9/recovery-tether-sheath-p-52.html Aluminum - delivered Need to order wood from Home Depot for nose cone testing

Waiting on Alex On Hold until model

Need to order bulkhead attachment materials On hold until model

Upload BOM to Edge Look into gasket - Weird cryo adhesive from Kevin

http://www.ppgaerospace.com/Products/Sealants/Specialty-Products/PR-1665-Cryogenic-Adhesive.aspx

Updated Gantt chart to remove semesters Alec

Looking into meshing and determine loadpath Rough CFD Model Edge

“Update” risk (Thursday) Feasibility for tank mount

Alex Specing out materials for testing with potential cost (by Thursday) Flush out test plan for nosecone Process for machining of nosecone tip

Lathe - Talk to machine shop (10/16) Claire (all actions by (

Make nosecone tip drawing (thursday) Edge (whenever)

Team vision Bending Test Apparatus drawing

Make Tank mount adapters drawing (next week)

101118 Agenda

Page 29: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Key Dates: System Review

o Need to send link out to edge page by Friday noono Saturday 10/13/18 2pm - 3pm GLE 3149

Practice beforehand (@ 12:30pm!!) Peer evaluations afterwards Total time time commitment (12:30-3:30)

Meagan gone Oct 17-21st Claire gone Oct 11-12th, 24-25th Soft Requirement to go to a review next week

Agenda: In-Class

No Claire (flying out for interview - good luck, watch for hurricanes!) Overview of open actions from last meeting

Open Actions: Meagan

Send Art skype link Update CAD

Add screenshots under supplemental Put in grabcad Link in slack

Bring in old nosecone To Alex Monday

Start compiling inputs for analysis (the ones that we already have) started Searching for better thermal data Bothering NE

Temperature of material for skin analysis (material properties) Material, Wall thickness, PSI, Temp for methane tank

Waiting on CAD updates, will see if I can verify through customer website?

Bothering NE Seamless Tanks (http://seamlesstanks.com/)

Plans for Next Phase Review Thursday

Tony Update CFD File with new geometry

Lots of dimensions were wrong Contact Alec to see what he needs

Design and Flowcharts (for Thursday) Write blurb and do for two other components

Drew Add accelerometer pdf to Design review materials Add updated Wrike ‘screenshot’ (between Thursday and Systems Review) Upload Nosecone Feasibility to EDGE Remove system architecture text Purchase Tender Descender, Foam, and Aluminum

Page 30: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Order wood from Home Depot for nose cone testing Talk to MSD about Foam order (Thursday)

https://www.mcmaster.com/93265K48 Purchased

Order Tender Descender Sheath (Thursday) FruityChutes RT-L2

o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html

Tank Mounting Cage Rods (4) Aluminum

o What kind? Welded Ring for Tank Mounting (2)

Aluminumo What kind?

Ordered Nose Cone Tip Aluminum

o 6061o Bar stock - 6”o 1 1/4” Diametero https://www.mcmaster.com/1615t73

Alec Add accelerometer location Create Boundary for CFD (by Saturday) Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Send Accelerometer stuff and determine locations Waiting on VTS

Read through Northeastern Report by Tuesday Alex

Nosecone Stiffness Hand sketches - done Upload to drive

Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip

Lathe - Talk to machine shop (by 10/16/18) Start process week of 16th

Systems Architecture Write blurb for EDGE (by Thursday)

Feasibility Upload to drive and write blurb (by Thursday)

Claire Get even more interviews!

First 3 WEEKS- October 4th Tank Mount CAD-Meagan Accelerometer Locations for Northeastern- Alec All MECE's learn ANSYS

Page 31: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o some Cross Section Model- Claire/Tony

o CAD needs to be updated Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan

o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex

100918 Agenda

Key Dates: Team Meeting

o Tuesday 10/09/18 6pm - 8pm Missing Alec (Excused - Informed Beforehand - A+ Work)

System Reviewo Need to send link out to edge page by Friday noono Saturday 10/13/18 2pm - 3pm GLE 3149

Practice beforehand (@ 12:30pm!!) Peer evaluations afterwards Total time time commitment (12:30-3:30)

Meagan gone Oct 17-21st Claire gone Oct 11-12th, 24-25th

Agenda: Overview of open actions from last meeting

Open Actions: Meagan

Bring Tip Thursday Work on tank mount CAD

Waiting for John to provide methane tank update (should be by 10/5) Need to verify

MAKE GRABCAD FOLDER -> RIT MSD (an airframe subfolder) Start compiling inputs for analysis (the ones that we already have) started

Searching for better thermal data Temperature of material for skin analysis (material properties)

Feasibility: Prototyping, Analysis, Simulation - Status Update Engine Bulkhead

Material, Wall thickness, PSI, Temp for methane tank Waiting on CAD updates, will see if I can verify through customer

website? Seamless Tanks (http://seamlesstanks.com/)

Need to bulk upload notes (by Friday) Plans for Next Phase (by Tuesday) Through Nov 10th

Update Gantt chart Machining Nosecone tip, setting up bending testing apparatus , Check

with Alec for analysis, run cfd, Measure stuff with calipers

Page 32: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Responded to Dr. Debartolo’s email about hazardous material (we have none)

Tony Update CFD File with new geometry

Tuesday by meeting (will let Alec know when done) Design and Flowcharts

Look at MyCourses or other EDGE pages Highlight components being designed by FAR-OUT JR

Drew Concept Development

Needs improved formatting Morphological Chart

Needs improved formatting Add BOM and Benchmarking to EDGE

In Google Drive Add pictures to benchmarking and write description Purchase Tender Descender, Foam, and Aluminum

Order wood from Home Depot for nose cone testing Foam

https://www.mcmaster.com/93265K48 Purchased

Order Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)

o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html

Tank Mounting Cage Rods (4) Aluminum

o What kind? Welded Ring for Tank Mounting (2)

Aluminumo What kind?

Nose Cone Tip Aluminum

o 6061o Bar stock - 6”o 1 1/4” Diametero https://www.mcmaster.com/1615t73

Create Budget sheet Alec

Learn more about Ansys and Fluent Create Boundary for CFD

Waiting on updated geometry from Tony Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Send Accelerometer stuff and determine locations Waiting on VTS

Read through Northeastern Report by Tuesday Alex

Page 33: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Nosecone Stiffness Hand sketches - done Upload to drive

Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip (by Tuesday 10/16)

Lathe Systems Architecture (By Tuesday)

Will Review Thursday Feasibility

By Tuesday Talk with Dr. Ghoneim at 4pm 10/4

Look up nosecone from Public Missiles Claire

Feasibility: Prototyping, Analysis, Simulation - Status Update 3-Point Bending

Completed on EDGE Morph Chart

Remove text Redo image 3

Talk with Dr. Ghoneim at 4pm 10/4

NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan

o Reviewing Thursday Accelerometer Locations for Northeastern- Alec

o Reviewing Thursday All MECE's learn ANSYS

o some Cross Section Model- Claire/Tony

o CAD needs to be updated Nosecone Tip CAD Verification- Tony

o Good Estimate Loads on Structure- Alec/Alex/Meagan

o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team

o Done Continuous EDGE Updates- Drew

o Doin’ fineeeeeee Nosecone Stiffness Test Plan- Alex

o Workin’

100418 Agenda

Key Dates: Team Meeting

o Tuesday 10/09/18 6pm - 8pm Missing Alec

System Review

Page 34: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Saturday 10/13/18 2pm - 3pm GLE 3149

Agenda: In Class:

Work time Prepare for your SLDRs

Workin on it Overview of open actions from last meeting Investigate coming tasks (Wrike, EDGE, and MSD to-do’s)

Edge requirements for this section System Architecture - TBD Designs and Flowcharts -TBD

Updates from Leads Meeting: Have access to the Vertical Test Stand Folder Northeastern Needs to update full vehicle CAD (Deadline Mon 8th)

o CAD is currently incorrecto Need a list

Need to suggest accelerometers Mark (the PM) would like monthly full team meetings

Open Actions: Meagan

Work on tank mount CAD Waiting for John to provide methane tank update (should be by 10/5) Can’t make the option that mates with methane tank because tank CAD is

wrong… MAKE GRABCAD FOLDER

Start compiling inputs for analysis (the ones that we already have) started Searching for better thermal data

Temperature of material for skin analysis (material properties) Feasibility: Prototyping, Analysis, Simulation - Status Update

Engine Bulkhead Material, Wall thickness, PSI, Temp for methane tank

Waiting on CAD updates, will see if I can verify through customer website?

Seamless Tanks (http://seamlesstanks.com/) Need to bulk upload notes (by Friday) Check beam model by Boedo

Referred me to Dr. Ghoneim Plans for Next Phase (by Tuesday)

Update Gantt chart Machining Nosecone tip, setting up bending testing apparatus

Measure stuff with calipers Tony

Update CFD File with new geometry Tuesday by meeting (will let Alec know when done)

Design and Flowcharts Look at mycourses or other EDGE pages Highlight components being designed by FAR-OUT JR

Page 35: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Drew Concept Development

Needs improved formatting Morphological Chart

Needs improved formatting Add BOM and Benchmarking to EDGE

In Google Drive Add pictures to benchmarking and write description Purchase Tender Descender, Foam, and Aluminum

Order wood from Home Depot for nose cone testing Foam

https://www.mcmaster.com/93265K48 Purchased

Order Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)

o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html

Tank Mounting Cage Rods (4) Aluminum

o What kind? Welded Ring for Tank Mounting (2)

Aluminumo What kind?

Nose Cone Tip Aluminum

o 6061o Bar stocko 2” Diameter,

Create Budget sheet Alec

Create updated Risk Assessment - Done needs to be put on edge - Upload by Tuesday

Learn more about Ansys and Fluent Create Boundary for CFD

Waiting on updated geometry from Tony Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Waiting on Meagan’s CAD model

Send Accelerometer stuff and determine locations Waiting on VTS

Read through Northeastern Report by Tuesday Alex

Nosecone Stiffness Hand sketches - done Upload to drive

Drew to upload Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip

Lathe

Page 36: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Systems Architecture By Tuesday

Feasibility By Tuesday

Talk with Dr. Ghoneim at 4pm 10/4 Look up nosecone from Public Missiles

Claire Feasibility: Prototyping, Analysis, Simulation - Status Update

3-Point Bending Completed on EDGE

Morph Chart Remove text Redo image 3

Talk with Dr. Ghoneim at 4pm 10/4

NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan

o Waiting on stuff Accelerometer Locations for Northeastern- Alec

o Waiting on stuff All MECE's learn ANSYS

o some Cross Section Model- Claire/Tony

o CAD needs to be updated Nosecone Tip CAD Verification- Tony

o Good Estimate Loads on Structure- Alec/Alex/Meagan

o Working on models, grouped info we have Tech Talk with Kevin (former GT Structures Lead)- Whole Team

o Done Continuous EDGE Updates- Drew

o Doin’ fineeeeeee Nosecone Stiffness Test Plan- Alex

o Workin’

10/02/18 Agenda

Key Dates: System Review

o 10/13/18 2pm-3pm Team Meeting

o 10/09/18 6-8pm

Agenda: In Class

Watch Systems Level Design Review Prep module (for class) Brief announcements Sign up for System Level Design Review (SLDR)

Must attend another team’s SLDR

Page 37: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

By end of class (!!) Workshops

Team Purchasing - 11:30 am GLE 4435 2-3 days after tracking number says delivered to actually get to

MSD Contact Fruity Chutes to discuss NYS tax-exempt university [email protected] - Senior Design Lab Assistant email account

Help for Project Managers - 1:00 pm I/O Devices - 1:00 pm

Overview of open actions from last meeting Investigate coming tasks (Wrike, EDGE, and MSD to-do’s)

Edge requirements for this section Concept Development

Needs improved formatting (Drew) Morphological Chart

Needs improved formatting (Drew) System Architecture - TBD Designs and Flowcharts -TBD

Discuss and distribute inputs for analysis List of model inputs

- Simplified Load Path Geometry -- Solid Body Geometry- Fin Geometry- Material Properties- Fluid Properties- Temperatures

Updates from Leads Meeting: Have access to the Vertical Test Stand Folder Northeastern Needs to update full vehicle CAD (Deadline Mon 8th)

o CAD is currently incorrecto Need a list

Need to suggest accelerometers Mark (the PM) would like monthly full team meetings

Open Actions: Meagan

Work on tank mount CAD Can’t make the option that mates with methane tank because tank CAD is

wrong... Start compiling inputs for analysis (the ones that we already have) started Feasibility: Prototyping, Analysis, Simulation - Status Update

Engine Bulkhead Material, Wall thickness, PSI, Temp for methane tank

Waiting on CAD updates, will see if I can verify through customer website?

Need to bulk upload notes (by Friday) Check beam model by Boedo

Tony Verify external geometry

Page 38: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Download desktop application Check nosecone and boattail for Thursday

Drew Update Gantt chart

Updated, need to create new archived link Upload Standards documentation

Needs to be on EDGE Create BOM

In Google Drive (add to EDGE) Update customer name on EDGE

Updated Create Benchmarking off Kevin’s report (use bulkhead mounting)

Upload by Thursday Purchase Tender Descender, Foam, and Aluminum

Foam https://www.mcmaster.com/93265K48

Tender Descender Sheath Fruitychutes RT-L2 (60 lbs. ?)

o https://fruitychutes.com/buyachute/recovery-tethers-line-cutters-c-9/recovery-tether-sheath-p-52.html

Tank Mounting Cage Rods (4) Aluminum

o What kind? Welded Ring for Tank Mounting (2)

Aluminumo What kind?

Nose Cone Aluminum

o 6061 Create Budget sheet

Alec Create updated Risk Assessment - Done needs to be put on edge Learn more about Ansys and Fluent Create Boundary for CFD Feasibility: Prototyping, Analysis, Simulation - Status Update

Tank Mounting Attachment Send Accelerometer stuff and determine locations

Alex Nosecone Stiffness

Hand sketches Specing out materials for testing with potential cost - by Thursday Process for machining of nosecone tip

Claire Feasibility: Prototyping, Analysis, Simulation - Status Update

3-Point Bending

(Pulled from last term) NEXT 3 WEEKS- October 4th Tank Mount CAD-Meagan Accelerometer Locations for Northeastern- Alec

Page 39: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

All MECE's learn ANSYS Cross Section Model- Claire/Tony Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan Tech Talk with Kevin (former GT Structures Lead)- Whole Team Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex

Tuesday Meeting -Edge Updated Needed

-Team Vision --Functional Decomp

-Remove text -Benchmarking  -Drew-Concept Development

-Claire-Feasibility - Alex / Claire-Morph Chart

-Remove text -Redo image 3 -Claire

-Concept Selection -Drew to update

-Systems Architecture - Alex-Design and Flowcharts - Tony`-Risk Assessment -Alec -Design Review  -Drew-Plans for Next Phase - Meagan

093018 Agenda-Tank mounting cad-Verify geometry-Feasibility doc

-Claire materials-Alex sketches

Actions that can be done next week: Find cryo rated foam from McMaster Carr (should be grey or black)  -Drew

Waiting for next week’s purchasing meeting Nose cone tip material Economical Polyethylene Foam Insulation Sheets

Create Boundary for CFD Learn more about ansys and fluent -Alec Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week

5 in d 28 in l Cad model???? More at leads meeting

Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week 4 in total 2 sets of 2 in

Page 40: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Find material off list  -DrewBuy:

Tank Mounting Cage Rods (4)o Aluminum

o What kind?o Vendor - McMaster Carr

Welded Ring for Tank Mounting (2)o Aluminum

o What kind?o Vendor - McMaster Carro ~7.5” Diameter, 4-6” Height

Nose Coneo Aluminumo Vendor - McMaster Carr

Tender Descender Sheatho Vendor - Fruitychutes

Foamo ~7.5” diameter circles

4 inches total - 2 sets of 2 incheso Vendor - McMaster Carr

Economical Polyethylene Foam Sheets 3’ x 4’ ; 1” thick; $37.18 Enough for ~24 circles

09272018 Thursday Team Agenda:

Key Dates: Meeting Sunday 30th 7-9pm 3149 System Review

Overview of open actions from last meeting Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Discuss and distribute inputs for analysis

List of model inputs - Simplified Load Path Geometry -- Solid Body Geometry- Fin Geometry- Material Properties- Fluid Properties - Temperatures

Open Actions: Check Edge requirements for this section -Drew

Update customer name - Drew Benchmarking - Drew - off Kevin’s report - Can use bulkhead mounting (for

Sunday) Concept Development - TBD Feasibility: Prototyping, Analysis, Simulation - Status Update

Nosecone Stiffness (Alex) Hand sketches for Sunday

3-Point Bending (Claire)

Page 41: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Tank Mounting Attachment (Alec) Engine Bulkhead (Meagan)

Morphological Chart and Concept Selection (Uploaded) Systems Level Design Documents

System Architecture - TBD Designs and Flowcharts -TBD Updated Risk Assessment -Alec

Start compiling inputs for analysis (the ones that we already have) started -Meagan Saturday

DECIDED ENGLISH UNITS Work on tank mount CAD -Meagan - Sunday Update Gantt chart -Drew Sunday Standards documentation - Drew Verify nose cone geometry -Tony Thursday Verify external geometry -Tony  Sunday BOM -Tony/Drew Thursday

Add what we have

Actions that can be done next week: Find cryo rated foam from McMaster Carr (should be grey or black)  -Drew

Waiting for next week’s purchasing meeting Nose cone tip material Economical Polyethylene Foam Insulation Sheets

Create Boundary for CFD Learn more about ansys and fluent -Alec Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week

5 in d 28 in l Cad model???? More at leads meeting

Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week 4 in total 2 sets of 2 in

Find material off list  -DrewBuy:

Tank Mounting Cage Rods (4)o Aluminum

o What kind?o Vendor - McMaster Carr

Welded Ring for Tank Mounting (2)o Aluminum

o What kind?o Vendor - McMaster Carro ~7.5” Diameter, 4-6” Height

Nose Coneo Aluminum

o 6061

Page 42: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Vendor - McMaster Carr Tender Descender Sheath

o Vendor - Fruitychutes Foam

o ~7.5” diameter circles 4 inches total - 2 sets of 2 inches

o Vendor - McMaster Carr Economical Polyethylene Foam Sheets

3’ x 4’ ; 1” thick; $37.18 Enough for ~24 circles

092518 Tuesday Team Agenda:

Overview of open actions from last meeting Feasibility analysis Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown

Parts to be manufactured Parts to be analyzed System level breakdown of analysis

Discuss and distribute inputs for analysis List of model inputs

- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity

Previous Open Actions: Find cryo rated foam from McMaster Carr (should be grey or black)  -Drew

Nose cone tip material Economical Polyethylene Foam Insulation Sheets

Check Edge requirements for this section -Drew Functional Decomposition (To be uploaded) Benchmarking - Drew - off Kevin’s report - Can use bulkhead mounting Concept Development - TBD Feasibility: Prototyping, Analysis, Simulation - Work assigned today in class Morphological Chart and Concept Selection (to be uploaded)

Systems Level Design Documents System Architecture - TBD Designs and Flowcharts -TBD Updated Risk Assessment -Alec - Thursday

Start compiling inputs for analysis (the ones that we already have) -Meagan Saturday Work on tank mount CAD -Meagan (Working on this starting Tuesday because Exams :

(((( ) - Saturday Update documented morph table - Claire

Completed and saved to SVN folder - Systems Level Design Documents

Page 43: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Learn more about ansys and fluent -Alec can't continue until geometries are done Verify nose cone geometry -Tony Thursday Verify external geometry -Tony  Saturday Material testing chart -Alex BOM -Tony/Drew Thursday Material, Wall thickness, PSI, Temp for methane tank -Meagan to ask John -Next week Question Kevin on how many foam rings are needed - Meagan ask in Slack -Next week

092218 AgendaSaturday Team Agenda:

System-level concepts selection Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown

Parts to be manufactured Parts to be analyzed System level breakdown of analysis

Discuss and distribute inputs for analysis List of model inputs

- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity

Systems Concept (Engine Mount)

Saturday: design breakdown of potential tank mounts Create design matrix

092018 AgendaClass will consist of:

Brief Announcements Revisit/iterate on functional decomposition as necessary Discuss system-level concepts, and concept selection criteria. Full-time job search with Sarah Burke  

Team Agenda: review/edit functional decomposition with Meagan and Drew included System-level concepts selection Investigate coming tasks (wrike, EDGE, and MSD to-do’s) Component Level breakdown (will be done saturday)

Parts to be manufactured Parts to be analyzed System level breakdown of analysis

Morphological Table Concatenate members 10 ideas to breakdown table

Page 44: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Distribute inputs for analysis List of model inputs

- Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity

Systems Concept (Engine Mount) Made drawings on whiteboard Saturday: design breakdown of potential tank mounts Create design matrix

Key Dates-Meet Friday at 6:30pm for foods and beverages (high importance!!) -Meet Saturday

Actions: Find cryo rated foam from McMaster Carr (should be grey or black)  -Drew Check Edge requirements for this section -Drew Start compiling inputs for analysis (the ones that we already have) -Meagan Work on tank mount CAD -Meagan (Working on this starting Tuesday because Exams :

(((( ) Create agenda for saturday - Alex Create documented morph table - Claire Learn more about ansys and fluent -Alec Verify nose cone geometry -Tony Verify external geometry -Tony Material testing chart -Alex Y’ALL SLEEP - EVERYONE

091818 In Class Agenda:

Class will consist of: Brief Announcements Work through functional decomposition with team and Art - Claire

Initial functional decomposition diagram finished (picture will be put into Whiteboard Photos folder on the MSD Google Drive)

Art reviewed the initial functional diagram - Reword some of the blocks

Page 45: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Initial functional decomposition diagram drafted up into Google Drawings   Review initial functional decomposition diagram on Thursday - 9/20

Review Peer Evals with Art Art didn’t need to go over the peer review Put peer review on public directory on project EDGE (Claire will do this by 9/20)

Other things to do:

Review Edge requirements for next phase and assign tasks including:

Functional Decomposition - Claire Initial functional decomposition diagram started in class Art reviewed initial diagram Review initial functional decomposition diagram on Thursday

Benchmarking Concept Development Feasibility: Prototyping, Analysis, Simulation Morphological Chart and Concept Selection Concept Selection System Architecture Designs and Flowcharts Updated Risk Assessment

Review Project requirements for next phase

Accelerometer Locations for Northeastern- Alec All MECE's learn ANSYS Cross Section Model- Claire/Tony Model simplification for analysis Nosecone Tip CAD Verification- Tony Estimate Loads on Structure- Alec/Alex/Meagan Continuous EDGE Updates- Drew Nosecone Stiffness Test Plan- Alex Tank Mount CAD-Meagan

Actions and To-dos -look into what is needed for Analysis

- List of analyses - Possible simplification of cad models - Model inputs needed

- Accel Locations - Still need Vertical test stand

- Stiffness of nosecone - Look at specs - define if average is sufficient

- Nosecone Tip Cad Verification - Tank Mount

- Touch base with Meagan on where this is at

Page 46: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

List of model inputs - Simplified Load Path Geometry -- Solid Body Geometry - Fin Geometry - Material Properties - Fluid Properties - Temperatures- FBD- Acceleration/Thrust/Velocity

091618 Tech Talk with Kevin 2D analysis

o Reduce element count Change from 3D to 2D or 1D

List of analysis needed o Cross section view of rocket?

Stress distribution within rocket Way to do that within ANSYS or other post processing software ANSYS

o Solver and Mesher Tecplot

o https://www.tecplot.com/o Imports data from ANSYS results

Symmetry In final product, not every component will be placed exactly center Using this would be the last option, if all other options don’t pan

out Machining Bulkhead

o Does it require a 5-axis CNC? No Tank holding or engine bulkhead?

Tank bulkheado All made but need mounting setupo Need fiberglass washer

Bulkheads may reach 150 F - may need insulation Need to revisit GTech report

Engine bulkheado Need redesigned and remachined

Same footprint Radial holes need to bolt into bulkhead

Might need more material o This is FAR OUT Jrs responsibility

Prior concerns?o Manufacturing

Finishing tank mounting solution Revising the engine bulkhead

Uncertain design will survive launch

Page 47: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Missing fins Stability analysis near end of rocket build

o Stability is the difference between the center of gravity and the aerodynamic forces/pressures

Fin shapes decide where center of pressure goeso Easiest to changeo Small/short fins can reduce flutter

Rest of rocket hardware determines center of gravity Parachute Harness Engine bulkhead connecting to (other?) bulkhead rods

o 4 rods that need to be trimmed down at end Match Drilling - Drilling consistent bolt holes for bulkhead mounting

Will be a problem in Spring Drill holes while parts are assembled

o Recovery Ordered parachutes, ejection mechanisms, and Tender Descender The design requires both parachutes to be released from the same bay

Speed cannot be reduced too much during descent because cross breeze can cause the rocket to drift away

Drogue parachute drags out main parachute Pull tests

Tender Descender sheath needs to be purchased Link for sheath dropped in Airframe folder on Google Drive

091318 Agenda Run through edge

o Still need Team Values and Norms - Alex Planning and Schedule - Tony Meeting Notes - Meagan (Meagan got the notes into Word and Claire

linked it to EDGE) Design Review - TBD Planning Next Phase

Prep for Review on on Saturdayo Run through gantt chart and incorporate feedbacko Show up early at 10am Saturdayo Show Art how to use skype for business to connect into meeting (Meagan @

noon) Plans for Next Phase

o Subsystems Peer Review

o Can still talk about it on Saturday Self reflection first

Pros and Improvement Review GT Structures Report

o What do we want Kevin to go over? 2D analysis List of analysis needed

Take turns leading class meetings

Page 48: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

o Who volunteers for Tuesday Drew -> Tony -> Alex -> Alec -> Claire -> Meagan

o Preps agenda and sends it out early and asks for inputo Talk about how it goes and incorporate feedback (learning experience :) )

Meeting with Dr. Lamo Try to Setup a meeting with her next week

McGreggors dinner next week?o Dinner/ Family Bonding

Meet at 6:30 on 9/21

Key Dates Launch Initiative Review Thur 09/12/18 Problem Definition Review Sat 9/15/18 11am EDT GLE 1139 Tech Talk with Kevin Sun 9/16/18 6:30pm GLE 3139

Actions: Post the edge link in #airframe so that other FAR OUT people can read it ahead of time-

Meagan Ask for test Stand -Alec Updated Use case with stakeholders- Claire Update Team Norms -Alex House of Q talk to Art - Drew Create powerpoint for review

o Agenda -Drewo Risks to note -Aleco ER and CR to note -Claire o Changed to plan - Meagan

091118 Agenda Reserve Room

o Drew - GLE 1139 Reserve a locker

o Claire Update Edge (a lot needs to be updated due Thursday by start of class)

o Sections Problem Definition Due

Team Vision (Done) Project Summary - Claire Project Background - Meagan Use Cases (Done) Project Goals and Key Deliverables

o Wording - Tonyo Gantt Chart - Meagan

Send link to Tony Customer Requirements - Claire Engineering Requirements - Claire

Page 49: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Constraints - Tonyo Per Structures Report

House of Quality - Drew Design Review Materials - TBD Plans for Next Phase - ALL

Planning & Execution Risk - Alec Team Values & Norms - Alex Intellectual - Drew Other Team Resources -Alec

o GLE 3149 Meeting Minutes, Notes, And & Actions

o Bulk upload as one documents- Meagan Communications - Alec

Presentationo Address mic issue

Alec - Test speaker Meagan Test Speaker

o Advice for Edge presentation Click on picture to enlarge Know what drives requirements Know dimensions Have Gantt chart assigned to people Are you supposed to go in depth with the requirements?

Just send ahead of time

Things to do-Agenda-Pre-read

-Present off of edge-Link Edge page to powerpoint

-Attend other design reviewThursday 09/11/18 P19103 @11:30

-Pear Eval-Sheet from Art

1. What did you do well2. What could you have done differently

-Risks

Saved for Thursday 09/11/18 Prep for Review on on Saturday Review GT Structures Report Post the edge link in #airframe so that other FAR OUT people can read it ahead of time

Page 50: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

090818 Agenda

-Google docs magic thing---- not possible -Gantt????????

-can make “live” links aka snapshots in time-Solid Works -Ansys -Edge update -Design Review

Planning and Execution Problem Definition -Usecase-Customer Requirements -Engineering Requirements -Risks Management -Team Values and Norms -Communication

Agenda For Tuesday (09/11/18)-Reserve Room-Review GT Structures Report

-please have this read ahead of time

Other tasks before Review Powerpoint

090618 In Class Agenda

1. Key Datesa. General Worktimes Saturdays @ 4:30-6:30pm

i. This Saturday will be working on technical loginsb. Problem Definition Review Saturday 15th @ 11amc. Potential Tech Time with Kevin Sunday 16th @ 6:30pm

i. Needs to be confirmed2. Review/Update what’s needed on Edge

a. Customer requirementsb. Team Rolesc. Team Values/Norms

3. Prep for 3 week reviewa. Update CR and ER

4. Rough Agenda

a.

Page 51: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

Risks:-Raw Stock damage -Manufacturing defect -Suppliers failure to meet delivery -Northeaster does not supply test data for vibrations as scheduled-Engine doesn't not fit in designed space -Analysis shows rocket design will fail -Design is not able to be manufactured-Loss of funding/exceeding funding -Damage during testing  -Project transportation -Injury during build-Injury during flight -Loss of other teams support -Error in analysis leading to structural failure

Next Meeting:

Agenda:-Google docs magic thing---- not possible -Gannt????????-Solid Works -Ansys -Design Review -Edge update

090418 In Class Agenda1. Pick Team Name

a. Team Rocket 1,2,3,3 ,2= (11)b. Team Relatively closec. Far Out Jr 2, 3,2,2,3 = (12)d. Getting Highe. Flying High 3,2,1,1 = (7)f. Structurally Sound?1 = (1)g. Richie’s Rocketsh. RIT Rocketsi. RIT Rockettes 1 = (1) j. Liquid Meltdown 3,1 = (4)

2. Team Values/ Norms

Value 5 1

Be a reasonable Bring donuts to meetings, or lunch on Growl at other members,

Page 52: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

human being :) occasion.  Help out team members where you can. Remembers personal hygiene...

talks over others

Punctual You’re at the designated meeting spot by the agreed upon time.  Communicate if you’re going to be late or miss a meeting.

Where you at?

Good Communication

CHECK SLACK! Give warning if you have to miss meetings, effectively share ideas and work.  Speak up if you’re having trouble with something. Be direct.

F*** you (thank you for communicating) :). Real passive

Being Prepared Work completed, notes/questions prepared, has a pencil/pen. Please bring laptop.

Shows up without donuts/necessary materials for meetings

Reliable Getting your work done in a timely manner.   Whats work?

Respectful! Allow everyone's opinions to be heard and considered.

F*** you (we appreciate your opinion) :)

3. Team Visiona. Share IP equally.

4. Team Rolesa. Done!

5. Pick outside meeting time from the when2meeta. Options

i. 4:30 - 6:30 Saturdays 1. -Thur Problem Definition 2. -Sat This week Tech Night 4:30 pm 3. -Tue-Thur Week 2 Review Kevins Document  4. -Sunday- Week 2 Kevin Tech night 6:30pm

b. Make a list of times people will be gonei. Drew - End of September

ii. Meagan - Oct 17-21iii. Claire - This weekendiv. Tony - September 29th (possibility)v. Alex -

6. Pick tech time with Kevina. Moved to maybe 2 weeks out - 6:30 Sunday 16th

7. Discuss Competitiona. Per the discussion at the leads meeting Sunday. We’re thinking that we won’t

make the competition deadline but would like to launch in May. Would like to discuss everyone’s thoughts on this.

Page 53: edge.rit.eduedge.rit.edu/edge/P19103/public/Project Management/Me…  · Web view111518 CFD Talk with Kevin. Gage pressure vs absolute pressure. Relative pressure is zero so gage

8. Debrief about Saturday’s Design Reviewa. Where accelerometers will be placed

9. Review Customer Requirements Questions10. Key times

a. Problem definition Review Saturday 15th at 11am

090118 Vertical Test Stand Design Review Specs

o ~11 ft tall Tank Fit Up info

o ¼” holes for the mounting o Recessed on one side

Mounting plateso Look into removing bottom plate below engine

Or if keeping plate need a large clearance Data Collection

o Accelerometer needs to be purchased by northeastern Would like multiple accelerometers

Min 2 because it’s a noisy sensor Could try for vibrations at joints

o Load cell One purchased and one to buy by northeastern Issues with positioning because needs to be thru holes relatively close

Stand designo Are we sealing off electronics?

COTS box and clear coat (ie nail polish) Testing

o Failure analysis for leak testing Fails under what load

o Sealing with kcl Kcl vs npt

o Order min 3 tanks (have one ported with potentially npt) Almost if not identical to the seamless Keep one as backup

o Proof to leak check Do not change configuration

Further Design o bulkhead / tank adapter design

Change part of the loadpath o Use a teflon O-ring seal (ie cryo seals)

Proof of concept by chilling and crushing/pressing