Upload
satishgoel
View
53
Download
0
Tags:
Embed Size (px)
DESCRIPTION
DPR of karanatka project for E-district
Citation preview
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 1
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Detailed Project Report for State Wide Rollout
Of e-District MMP in Karnataka
Government of Karnataka
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 2
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Table of Contents
Table of Contents ................................................................................................................................... 2
List of Acronyms ..................................................................................................................................... 5
1 Background of Project and Other Basic Information ...................................................................... 7
1.1 Title of the Project .................................................................................................................. 7
1.2 Background of the Project ...................................................................................................... 7
1.3 Rollout of the project without pilot phase ............................................................................. 7
1.4 Project Initiator Details ........................................................................................................... 7
1.5 State Designated Agency ........................................................................................................ 8
1.6 Location of Project Implementation ....................................................................................... 8
1.7 Expected outcome of the Project ........................................................................................... 8
2 Project Overview and Executive Summary ................................................................................... 10
2.1 Details of Stakeholders ......................................................................................................... 10
2.2 Efficiencies envisaged for the proposed services ................................................................. 11
2.3 Details of Locations to be Covered for State wide Rollout ................................................... 20
2.4 Project activities and timelines ............................................................................................. 21
2.5 Project Cost ........................................................................................................................... 22
3 Karnataka State Information ......................................................................................................... 24
3.1 Details of all Districts............................................................................................................. 24
3.2 Details of officers involved in processing the selected services ........................................... 29
3.3 Details of District e-Governance Society (DeGS) .................................................................. 29
3.4 State specific e-Governance initiatives ................................................................................. 29
3.4.1 State Data Centre .......................................................................................................... 29
3.4.2 Karnataka State Wide Area Network ............................................................................ 30
3.4.3 Common Service Centres .............................................................................................. 32
3.4.4 State Service Delivery Gateway (SSDG), e-Forms and State Portal .............................. 35
3.4.5 Status of Other state MMPS ......................................................................................... 35
3.4.6 Status of SeMT .............................................................................................................. 37
3.4.7 Other e-Governance Initiatives ..................................................................................... 38
3.5 Status of Data Digitization in each district ............................................................................ 39
3.6 Status of existing Service Delivery Channels ......................................................................... 42
4 Project Details and Implementation Model .................................................................................. 46
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 3
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.1 Stake Holder Analysis ............................................................................................................ 46
4.2 Services and Service Levels ................................................................................................... 49
4.3 Implementation Strategy ...................................................................................................... 49
4.4 Key Activities ......................................................................................................................... 50
4.4.1 Study of Process Re-engineering .................................................................................. 50
4.4.2 Study of Change Management...................................................................................... 50
4.4.3 Assessment of Gap Infrastructure ................................................................................ 52
4.4.4 To Be scenario District wise .......................................................................................... 53
4.4.5 To Be Scenario for servers at SDC ................................................................................. 55
4.4.6 Work of Data Digitization .............................................................................................. 57
4.4.7 Work of Training ........................................................................................................... 58
4.4.8 Architecture of E-District Application ........................................................................... 60
4.4.9 Mechanism for ensuring compliance to service levels ................................................. 80
4.4.10 Public Awareness Campaign, Citizen Feedback Mechanism & Post Implementation
Assessment ................................................................................................................................... 82
4.4.11 Post Implementation Institutional Mechanism for O&M phase .................................. 84
4.4.12 Estimated time frame and costs (In Lakhs) ................................................................... 85
4.4.13 Details of Monitoring, Evaluation and Assessment ...................................................... 85
4.4.14 SLAs for IT infrastructure & Services in terms of uptime & Service Levels ................... 90
4.4.15 Site Preparation ............................................................................................................ 92
4.4.16 The schedule of implementation along with identification of responsibilities ............ 93
4.4.17 Project Risks & Mitigation Measures ............................................................................ 93
5 Operation and Maintenance Phase .............................................................................................. 97
5.1 Projected Revenue ................................................................................................................ 97
5.2 Projected Operational Expenses ........................................................................................... 98
5.3 Revenue Model ..................................................................................................................... 98
5.4 Institutional arrangement for Operations & Maintenance Phase ...................................... 112
6 Financial Estimates ...................................................................................................................... 114
6.1 Total Project Cost ................................................................................................................ 114
6.2 Hardware for all Offices ...................................................................................................... 116
6.3 Site Preparation Cost .......................................................................................................... 120
6.4 Data Digitization and Migration .......................................................................................... 120
6.5 Network Connectivity (Horizontal) ..................................................................................... 121
6.6 Training Costs ...................................................................................................................... 121
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 4
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6.7 Awareness and Communication ......................................................................................... 123
6.8 State Programme Management Unit .................................................................................. 123
6.9 Support Services ................................................................................................................. 124
6.10 Application Enhancement/Development & Support .......................................................... 126
6.11 Seed Money to DeGS .......................................................................................................... 127
6.12 STQC Testing ....................................................................................................................... 127
6.13 Impact Assessment ............................................................................................................. 127
7 Annexure ..................................................................................................................................... 129
7.1 Details of Districts in Karnataka .......................................................................................... 129
7.2 Hardware Breakup for DHQ, SDO and Taluka Offices ......................................................... 137
7.2.1 Hardware Requirement at each District Head Quarter .............................................. 137
7.2.2 Hardware Requirement at each Sub Divisional Office ................................................ 137
7.2.3 Hardware Requirement at each Taluka Office ............................................................ 137
7.2.4 Hardware Requirements at Social Welfare(for SC Only) ............................................ 138
7.2.5 Hardware Requirements at Tribal Welfare (for ST Only) ............................................ 138
7.2.6 Hardware Requirements at Social Welfare(common SC and ST) ............................... 138
7.2.7 Hardware Requirements at Taluka Level Social Welfare Office ................................. 138
7.2.8 Hardware Requirements at District Backward Caste and Minority Office ................. 139
7.3 Manpower Details at each office ........................................................................................ 140
7.4 Site Preparation Costs ......................................................................................................... 145
7.5 Transactions of RTC & RDS at Nemmadi Telecentres for the year 2006-07 to 2010-11 .... 146
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 5
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
List of Acronyms
AC Assistant Commissioner
ADM Additional District Magistrate
AMC Annual Maintenance Contract
AV Anti Virus
B1 Bangalore One centres
B2C Business to Citizens
BDO Block Development Office
BPR Business Process Re-engineering
TO Taluka Office
CSC Common Service Centre
DC Deputy Commissioner
DDO Drawing Disbursing Officer
DeGS District e-Governance Society
DEO District Education Officer
DHQ District Head Quarter
DIO District Information Officer
DIT Department of Information Technology
DPR Detailed Project Report
DR Disaster Recovery
EDCS Electronic Delivery of Citizen Services
e-form Electronic form
e-Gov Electronic Government
FRS Functional Requirement Specification
G2B Government to Business
G2C Government to Citizen
G2G Government to Government
GoI Government of India
GO Government Order
HRMS Human Resources Management System
ICT Information Communication Technology
IEEE Institute of Electrical and Electronics Engineers
ISO International Organization for Standardization
K1 Karnataka One Centres
KSWAN Karnataka State Wide Area Network
KVA Kilo Volt Ampere
LAN Local Area Networking
MIS Management Information System
MMP Mission Mode Project
MoCIT Ministry of Communications and Information Technology
MS Microsoft
NeGP National e-Governance Plan
NIC National Informatics Centre
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 6
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
O&M Operations & Maintenance
OFC Optical Fibre Cable
OS Operating System
PeMT Project e-Mission Team
PMU Programme/Project Management Unit
POP Point of Presence
PPP Public Private Partnership
RFP Request for Proposal
RTI Right to Information
S/w Software
SCA Service Centre agency
SDA State Designated Agency
SDC State Data Centre
SDLC Software Development Life Cycle
SDO Sub Divisional Office
SeMT State e-Governance Mission Team
SI System Integrator
SLA Service Level Agreement
SRS Software Requirement Specification
SSDG State Service Delivery Gateway
STQC Standardisation Testing and Quality Certification
UPS Uninterrupted Power Supply
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 7
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
1 Background of Project and Other Basic Information
1.1 Title of the Project
Detailed Project Report for State wide roll out of e-District MMP in Karnataka.
1.2 Background of the Project
e-District is one of the 27 MMPs under NeGP, with the Department of Information Technology
(DIT), Government of India (GoI) as the nodal Department, to be implemented by State
Government or their designated agencies. This MMP aims at electronic delivery of identified
high volume citizen centric services, at district and sub-district level, those are not part of any
other MMP. To achieve these objectives service levels and outcomes for each of these services
will be clearly laid down by the concerned State, with a view to improving the efficiency and
effectiveness of the service delivery. The MMP envisages leveraging and utilizing the four pillars
of e-infrastructure namely SDCs, SWAN, Service Delivery Channels such as Nemmadi, Karnataka
One and Bangalore One optimally to deliver public services electronically to citizens.
1.3 Rollout of the project without pilot phase
Yes, the project is rolled out without pilot phase.
1.4 Project Initiator Details
i. Department/ Ministry initiating the project: Department of e-Governance
ii. Background of the department/ ministry:
Department of e-Governance was created under Department of Personnel and
Administrative Reforms (e-Governance). The main objective of the department was to plan
and leverages the ICT for benefit of common man.
Department of e-Governance plays the following roles:
• Creation of Policy framework, setting the vision and guidelines for e Governance
projects.
• Creation of Administrative framework for approval of e Governance Projects of all the
Departments.
• Technical assistance to Departments for taking up e Governance Projects
• Creation and maintenance of Core- e infrastructure that can be used by Departments
for planning and implementing e Governance initiatives.
• Development and promotion of common standards in designing of the e Governance
projects.
The Department has created two unique institutions to give thrust to planning and
implementing e Governance infrastructure that can be used by all the Government
Departments for planning and implementing e-Governance initiatives. These are:
Directorate of Electronic Delivery of Citizen Services (EDCS): A Government Department
mandated with the implementation of key e-Governance projects like e-District, SSDG,
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 8
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
and operations of service delivery centres such as Bangalore One, Karnataka One and
Nemmadi for G2C and B2C services.
iii. Name and Job Title of the key contact person (person responsible for initiation):
Dr. D. S. Ravindran, IFS, Director(i/c), Directorate of Electronic Delivery of Citizen
Services, Department of e-Governance, Government of Karnataka.
iv. Contact Details:
Address : No. 146, Gate 2, MS Building, Bangalore - 560001
Fax : 080 22371089
Landline : 080 22373840
Mobile : 09449055222
Email : [email protected], [email protected]
1.5 State Designated Agency
i. Name of the State Designated Agency: Directorate of Electronic Delivery of Citizen
Services (EDCS), Department of e-Governance, Government of Karnataka.
ii. Year of Establishment: 2006
Name and Job Title of the key contact person: Dr. D.S. Ravindran, IFS, Director,
Directorate of Electronic Delivery of Citizen Services
iii. Contact Details:
Address : No. 146, Gate 2, MS Building, Bangalore - 560001
Fax : 080 22371089
Landline : 080 22373840
Mobile : 09449055222
Email : [email protected], [email protected]
1.6 Location of Project Implementation
SI. No. Locations No. of Units
1 District Head Quarters(DHQ)/Deputy Commissioner’s Offices 30
2 Sub Divisional Offices (SDO)/Assistant Commissioner’s Offices 52
3 Taluka Offices(TO) 177
4 Department of Social Welfare and Tribal Welfare 221
5 Department of Backward Castes and Minorities 30
1.7 Expected outcome of the Project
Enhanced and Improved e-Governance Infrastructure
Augmented capacities of district staff
Efficient service delivery mechanism
Delivery of selected services to the Citizen through existing Service Delivery Channels
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 9
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Complete work flow automation of selected service
Networked department/offices
Interlinked services and reuse of available resources
Opportunity to strengthen Decentralized & participatory Planning
Better Services to citizen
Generation of an efficient MIS for better decision making
Faster retrieving of the records due to computerized records
e-District model based on sustainable operations
Improvement in efficiency of the employees and reduction in workload
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 10
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
2 Project Overview and Executive Summary
G2C and G2G services are delivered by the district administration leveraging Information
Communication and Technology. e-District will serve as a perfect example of process level
automation wherein automation of workflow and internal processes of District Administration will
be undertaken through a comprehensive automation of backend processes of different
departments. The initiative will have provisions for seamless integration of various departments like
Revenue, Food, Social Welfare, Tribal Welfare, Backward Castes and Minorities, Agriculture,
Fisheries, Excise, Municipalities and ESCOMs for providing services to the citizens through a
common delivery interface.
The project would help in creating an electronic workflow system for the district administration and
help in providing efficient individual department services through the existing Service Delivery
Channels which would be the primary front end channels.
2.1 Details of Stakeholders State Government would closely work with Department of Information Technology (DIT), Ministry of
Communications and Information Technology (MoCIT), Government of India (GoI) to seek over all
guidance and implementation monitoring. District Administration would also work closely with the
project implementation partner for activities like Hardware Installation and Commissioning, Site
Preparation, Capacity Building of the staff and executive resources of District administration on the
e-District application.
The stakeholders for this project are:
Department of Information Technology, Ministry of Communications & Information
Technology
State Government
State Designated Agency
District Administration
State Project Management Unit
System Integrator
Service Delivery Channels (Nemmadi, Karnataka One and Bangalore One)
State Government would work closely with Department of Information Technology (DIT),
Ministry of Communication and Information Technology and Implementation monitoring
agency. DIT would extend over all guidance to the State Government and District Administration
in this regard. District Administration would also work very closely with the project
implementation partner (Consultant) to undertake the stakeholder consultations and focused
meetings comprehend change requirements, document the observations, prepare roadmap of
activities, and suggest areas for Government Process Reengineering (GPR) and identifying area
for capacity building at the District level. District administration and project implementation
partner would also work closely with the technical solution provider for developing and
customizing the software and implement the technical solution.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 11
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
The commitment from various stakeholders would be:
Department of Information Technology, Ministry of Communication and Information
Technology: To provide technical assistance to address technology, financing, process
reengineering, organizational capacity building, reviewing and monitoring the status the
project and provide skilled manpower resources to implement the project in the form of
a Consultant.
State Government: To identify the project champion and ensuring complete
involvement of the project champion from start to the finish of the project and
expeditious enforcement of legal changes for awarding sanctity to the Process Changes.
District Administration: To undertake overall coordination with all the stakeholders in
the project, provide institutional support and commitment to the program; help to
bring-in the process changes and overall guidance to the project. The stakeholder from
the district would be Deputy Commissioner, Assistant Commissioner, Sub Divisional
Officer /Magistrate, Tahsildhar Officer, etc.
State Project Management Unit (PMU): To devise the overall strategy and design
process flows for the selected services. Carry out the field study and stakeholder
assessments in order to understand the requirements of the citizens and business
groups, Re-Engineering of the existing delivery mechanism, drawing the Project Plan and
timelines, status reporting at the Project and Program level, risk management,
addressing the current requirements and help in creating a facility for development of
capacity leveraging the available capacity building institutions.
System Integrator: To develop or customize the application software as per the State
specific requirements and over all Technical Standards as mentioned in guidelines for
state wide rollout.
Service Delivery Channel Partners: The envisaged services as part of the e-District
project would be delivered through the existing service delivery channels.
2.2 Efficiencies envisaged for the proposed services A problem or issue refers to any situation or matter that poses to be difficulty for the
Citizens, Businesses or Government in the process of obtaining services. The specific
problem(s) or issue(s) faced by Citizens, Businesses or Governments that would be
addressed by means of provision of improved services through this proposed project are:
Ability to get easy access to government services for a common man
Getting real time update on the status of the services requested by a common man
Availability of a central data repository for the government resulting in delivery of
services to a citizen in an inefficient manner
Availability of instant MIS reports at various levels of government
Ensuring Transparency in processing and delivery of services.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 12
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
1 Certificates
1 Domicile 10-15 7
2 Nativity 10-15 7
3 Rural Area Certificate 10-15 7
4 Dependent Certificate 10-15 7
5 Next of Kin Certificate 10-15 7
6 Destitute Certificate 10-15 7
7 Non-Remarriage Certificate (for Compassionate Appointments) 10-15 7
8 No Graduate in the family certificate 10-15 7
9 Certificate for Destitute Children for admission in Orphanage School
10-15 7
10 Destitute Widow Certificate for priority in getting job opportunity
10-15 7
11 Non-Marriage Certificate (for Compassionate Appointments) 10-15 7
12 Mother Tongue Certificate (Linguistic Minorities - for Reservation in Education Inst Border Dist)
10-15 7
13 Certificate for Non Violation of Section 79 A & B ( Issued in AC & Taluka )
10-15 7
14 NOC (Land Grant Cases) 10-15 7
15 NOC (Lands Granted through Land Tribunal/Land Reforms) 10-15 7
16 Certificate of Land not coming under PTCL(SC/ST) act 1978 10-15 7
17 Correction of Name(Applicant/Father/Mother) in Birth Certificate
10-15 7
18 Correction of Name(Applicant/Father/Mother) in Death Certificate
10-15 7
19 Non-Availability of Birth Certificate 10-15 7
20 Non-Availability of Death Certificate 10-15 7
21 Project Displacement Certificate (PDC) Ex: Land acquired for Highways, Irrigation and Housing projects ,etc
20-40 7
2 Social Welfare (Pensions)
1 Freedom fighter honorarium 30 7
2 Inter-caste Marriage Assistance scheme (In some case issued by Taluka Social Welfare Officer)
30-40 7
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 13
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
3 Assistance for last rites for BPL Card Holders 30 7
4 Physically Handicap Pension (For Persons having more than 75% Disability are not being covered under Nemmadi)
90 7
5 Old Age Pension (OAP1) (Age between 60-64 Years) 90 7
6 Old Age Pension (OAP3) (Age between 80 Years and above ) 90 7
7 Aam Admi Bima Yojana 30 7
8 Adarsha Vivaha Yojana 30 7
3 Revenue Court Cases
1 Receipt of Disputes regarding Mutation 90 30
1) Issuance of notices
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
2 Receipt of Appeal in Revenue Court Cases 90 30
1) Issuance of notices
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
3 Water and Path Ways Disputes u/s 90A of land revenue act 90 30
1) Issuance of notices
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
4 Boundary Disputes u/s Section 49 E and F of KLR Act , 1964 (Rules 51 and 52)
90 30
1) Issuance of notices
2) Listing of cases
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 14
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
5 Dues and Recovery
1) Track Default loan processes(such as Nationalized/Co-operative Banks, Financial Assistance given by Taluka and Gram Panchayats, SGSY etc)
180 90
2) Recovery of Government dues( Commercial Taxes, Excise, Stamp Duty, Transport, Ex-Minister's Rental Dues, other State Dues)
180 90
3) Court Recoveries (Judicial Magistrate First Class JMFCs), Consumer Courts, Labour Courts, Family Courts etc)
180 90
4) Recoveries under Karnataka State Financial Corporation , Karnataka Small Scale Industrial Development Corporation, Khadi Gram Udyog, BSNL
180 90
5) Issuance of Revenue Recovery Certificate 180 90
6 Certified Copies(Not taken up under NLRMP)
1)Closed Files of all sections such as Revenue Court Cases and Record of Rights(RRT) Cases
30-40 10
2) Closed Files of Land Grant Cases under Sec 94A,B and C of Land Revenue Act Files and Registers, 90 A of Land Revenue Act,
30-40 10
3) Closed Files of Water and Path Way Disputes Cases under 90 A of Land Revenue Act
30-40 10
4) Closed Files of Land Reforms Sections such as Land Tribuanal Cases of Sec 77 and 77 A of Land Reforms Act
30-40 10
5) Issue of Certified copies of Records available in Record Room of Taluka offices
30-40 10
6) Issue of Certified copies from Deputy Commissioner offices 30-40 10
7) Issue of Certified copies from Assistant Commissioner offices 30-40 10
8) Survey Records not taken under NLRMP (Pakka, Tippan, Village Maps, Atlas)
30-40 1
4 Ration Card services
1 Issue of New Ration Card 60 10
2 Issue of Duplicate Ration Card 15 10
3 Addition of Name in Ration Card 15 10
4 Deletion of Name in Ration Card 15 10
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 15
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
5
Deletion of certain family members ( partial) in Ration Card and issuance of new Ration card for the remaining family members
15 10
6 Correction of Name, Age and Sex in Ration Card 15 10
7 Correction of incorrect card category entries like APL, BPL & AAY
15 10
8 Correction of wrong photographs of family members in Ration Cards
15 10
9 Correction of incorrect entries in the Ration card like Gas connections
15 10
10 Application for surrender of Ration card 15 10
5 RTI and Grievances
1 Filling of Applications of Grievances and Status Tracking No Defined Timelines
No Defined Timelines
2 RTI applications and status tracking filed to the PIO (Taluka Office) and first appellant authority for VA, RI/DT( Nada Office)
15-30 7
3
RTI applications and status tracking filed to the PIO ( Assistant Commissioner's Office) and first appellant authority for Taluka Office
15-30 7
4
RTI applications and status tracking filed to the PIO ( Deputy Commissioner's Office) and first appellant authority for Assistant Commissioner's Office
15-30 7
5 RTI appeals before State Information Commission 15-30 7
6 Licensing
Arms License
1 Issue of arms license 60 30
2 Renewal of arms license 20 7
3 Duplicate arms license 20 7
4 Entry of weapon 20 7
5 Addition of Weapon 20 7
6 Deletion of Weapon 20 7
7 NOC for sale of weapon 20 7
8 Permission to carry weapon 30 10
9 Extension of purchase period 20 7
10 Change of address 30 10
11 Cancellation of license 60 30
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 16
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
12 Addition/deletion of retainer 60 30
13 NOC for import of weapon 30 10
14 Licenses for Crop protection weapons 30 10
15 Renewal of arms license for Crop protection weapons 30 10
16 Duplicate arms license for Crop protection weapons 30 10
17 Entry of weapon for Crop protection weapons 30 10
18 Addition of Weapon for Crop protection weapons 30 10
19 Deletion of Weapon for Crop protection weapons 30 10
20 NOC for sale of weapon for Crop protection weapons 30 10
21 Permission to carry weapon for Crop protection weapons 30 10
22 Extension of purchase period(for Crop protection weapons 30 10
23 Change of address for Crop protection weapons 30 10
24 Cancellation of license for Crop protection weapons 30 10
Small Savings
1 Small Saving Agents 30 10
2 Stamp Vendors 30 10
Business
1 Arms Dealers 60 20
2 Cinemas and Dramas 120 30
3 Video Parlour/Entertainment Clubs 120 30
Mining
1 Temporary permission for mining 90 45
2 Permanent license for mining 90 45
3 NOC for explosive Licenses 90 45
4 License to store explosives for Mining 90 45
5 License for the sale of crackers 90 45
7 Magisterial(MAG) Court Cases
1
Application for Magisterial Court Cases (under Sec 107, 109, 110, 144 & 145 of CRPC) 109 – Suspicious Offender
Currently there are no defined
30
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 17
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
107 – Trouble Maker 110 – Habitual Offender
Timelines
1) Issuance of Notices
2) Listing of Cases
3) Adjournment of Cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
2 Unnatural Death Cases
Currently there are no defined Timelines
30
8 Scholarships (Dept of Social Welfare, Dept of Tribal Welfare
and Dept of Backward Castes & Minorities)
1 Scholarship and admission in hostels for SC 90 30
2 Scholarship and admission in hostels for ST 90 30
3 Scholarship and admission in hostels for BC and Minorities 90 30
4 Govt of India (GoI) Post metric Scholarships for SC 90 30
5 Govt of India (GoI) Post metric Scholarships for ST 90
6 State specific Scholarship for Hostel Admission for Post Metric Students for BC and Minorities
90 30
7 State specific Scholarship for Post Metric Students for BC and Minorities
90 30
8 State specific Pre-Metric Scholarships for SC 90 30
9 State specific Pre-Metric Scholarships for Hostel Admission for SC
90 30
10 State specific Pre-Metric Scholarships for ST 90 30
11 State specific Pre-Metric Scholarships for Hostel Admission for ST
90 30
12 State specific Pre-Metric Scholarships for BC and Minorities 90 30
13 State specific Pre-Metric Scholarships for Hostel Admission for BC and Minorities
90 30
14 Higher Education Special Scholarship Schemes for SC 90 30
15 Higher Education Special Scholarship Schemes for ST 90 30
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 18
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
16 Higher Education Special Scholarship Schemes for BC and Minorities
90 30
17 GOI Scholarships for Admission of Students whose parents are engaged in unclean occupation
90 30
18 Admission of students in reputed Institutions 90 30
9 Revenue Services
1 Application for Land Conversion ( In districts except undivided South Canara )
120 30
2 Application for Land Conversion of Lands granted under Land Reforms Act ( In districts except undivided South Canara)
120 30
3
Application for Land Conversion in Taluka offices for Patta Lands as per Rule 106 A of Karnataka Land Revenue Rules, 1966
7 5
10 Department of Agriculture
1 Issuance of soil health card
30 7
2 Fertilizer dealer registration
30 7
3 Agriculture information Services
4 Insecticides licenses
30 7
5 Seeds license
30 7
6 Fertilizers license
30 7
7 Duplicate agriculture licenses
10 1
8
Grant/Renewal of Agriculture License - to Sell, Stock, or Exhibit for sale or distribute of insecticides / pesticides / Fertilizers; Amendment of Seed License; Issue and Renewal of F - licenses (Petrol Bunks and Gas Agencies) , Private God owns, Wholesale Food Grains, Retail Food Grains
30 7
11 Department of Excise
1 License for liquor shop
15 7
2 Renewal of retail liquor licenses ( only those licenses valid in the preceding year)
15 7
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 19
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service
Levels (Days)
Proposed
Service
Levels
(Days)
3 Renewal of fruit Winery licenses ( only those licenses valid in the preceding year)
15 7
4
Renewal of distillery/brewery/fortified winery licenses and bottling licenses ( only those licenses valid in the preceding year)
30 7
5 Shifting of liquor shop
30 7
6 License for liquor distribution
30 7
7 License for narcotics ( ND4) drugs for Lab purposes
30 7
8 Licenses for rectified spirit
30 7
12 Department of Fisheries
1 Application for Registration of Fishing Vessels
30 7
2 Supply of kerosene for boats at subsidized rates
30 7
3 ID Cards to the fisherman
15 7
13 Utility Services
1 Payment of Electricity Bills
1 1
2 Payment of Water Bills
1 1
3 Payment of Telephone/Mobile Bills
1 1
14 Status Update Services
1 Application for Financial Assistance under Chief Minister’s Relief Fund
No Defined timelines
20
15 Other Category of Services
1 License for Sale and Procurement of Toddy 60 15
2 Application for providing compensation to on SC/ST citizens for committed atrocities
30-40 10
3 Application from citizens for inter-caste marriage 30-40 10
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 20
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
2.3 Details of Locations to be Covered for State wide Rollout
Karnataka State has 30 districts, 52 sub Divisions and 177 Talukas and intends to cover e-District
rollout in all District Head Quarters, sub-divisional offices and Taluka Offices. Nemmadi
telecentres have been delivering a number of citizen centric services particularly the rural
masses. There are 800 such telecentres across the Karnataka state. The e-District project rollout
is envisaged to leverage the states core infrastructures Like State Data Centre, KSWAN and the
existing Service Delivery Channels like Karnataka One, Bangalore One and Nemmadi centres.
Details of Locations to be covered
SI. No.
Name of the District
No. of Horizontal offices to be connected to DHQ
No. of SDO offices to be connected to DHQ
No. of Talukas
1 Bangalore Rural NA 1 4
2 Ramnagaram NA 1 4
3 Bangalore Urban NA 2 5
4 Chitradurga NA 1 6
5 Davangere NA 2 6
6 Kolar NA 1 5
7 Chikkaballapur NA 1 6
8 Shimoga NA 2 7
9 Tumkur NA 3 10
10 Bagalkot NA 2 6
11 Belgaum NA 3 10
12 Bijapur NA 2 5
13 Dharwad NA 1 5
14 Gadag NA 1 5
15 Haveri NA 2 7
16 Karwar NA 4 11
17 Bellary NA 2 7
18 Bidar NA 2 5
19 Gulbarga NA 2 7
20 Yadgir NA 1 3
21 Koppal NA 1 4
22 Raichur NA 2 5
23 Chamarajanagar NA 1 4
24 Chikmagalur NA 2 7
25 Dakshina Kannada
NA 2 5
26 Hassan NA 2 8
27 Kodagu NA 1 3
28 Mandya NA 2 7
29 Mysore NA 2 7
30 Udupi NA 1 3
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 21
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Other offices that also need to be connected.
Connectivity Required at the following offices
District Social Welfare (Exclusive) 14
District Tribal Welfare (Exclusive) 14
District Social and Tribal Welfare (Common) 16
Taluka Social and Tribal Welfare (Common) 177
District Backward Caste and Minority Offices 30
District and Taluka Agriculture Offices 207
District, Sub-Div. and Taluka Excise Offices 270
District, Regional and Taluka Fisheries Offices 162
Total No. of Offices 890
2.4 Project activities and timelines
The state wide e-District rollout would be implemented in the phased manner. The following
table provides details of the project timelines and for the state wide rollout:
Project Activities and Timelines
Activity Group Activities TimeLine(Days)
Pre-Project Development
Submission of DPR 15
Project Development Approval of DPR by DIT, GoI 15
Appointment of State PMU 15
Current State Assessment Study 45
BPR & Gap Assessment 45
Data Migration & Digitization Plan 30
Training & Change Management Plan
30
Issue of Government Orders 60
Functional Requirement Specifications (FRS)
60
RFP Preparation and Approval 60
Selection of System Integrator 60
Scope of works of customised application for non pilot states
40
Project Implementation
Software Requirement Specification (SRS)
60
Customisation and Development of Software Application
90
User Acceptance Testing of e District application
60
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 22
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Third party application audit by STQC
45
Hardware procurement & Commissioning
150
Site preparation for e-District project
150
Completion of Training & Change Management activities
50
Digitization of Historical data 90
Deployment of e-District application at SDC
30
Go-Live of e-District application 30
Project Post Implementation
Constitution of Joint Entity for (O&M) of e-District project
30
Project handover from Project PMU Consultant to Joint Entity
365
Citizen Satisfaction Survey 1 30
Post Go-Live project assessment 45
Citizen Satisfaction Survey 2 30
Project closure report from State Government to DIT
45
2.5 Project Cost
Project Cost
SI. NO
Description Unit No. of Units
Year Total Cost(Rs.
Lakhs) for 3 Years
1 2 3
A DPR Preparation
State
1
10.00
10.00
B IT Infrastructure
Hardware/Computing Facility
District
30
3,929.28
3,929.28
Systems at SDC
State
1
175.00
175.00
Systems Support for 3 Years
State
1
24.00
24.00
24.00
72.00
Networking and Horizontal Connectivity
District
30
250.00
250.00
250.00
750.00
C Application Software
Software for Non-Pilot State
State
1
55.00
55.00
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 23
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Third Party/STQC Testing
State
1
35.00
35.00
Application Support
State
1
18.00
18.00
18.00
54.00
D Capacity Building
Training
District
30
209.44
209.44
104.72
523.59
Seed Money to e-Governance Society
District
30
300.00
300.00
E Rollout
Site Preparation
District
30
535.53
535.53
1,071.06
Technical Support for 3 Years
District
30
72.00
72.00
72.00
216.00
Data Digitization
District
30
750.00
750.00
1,500.00
F Program and Projetc Management
Project Management(SPMU)
State
1
36.00
36.00
36.00
108.00
Project Manager for 3 Years
District
30
108.00
108.00
108.00
324.00
G Awareness and Communication
Citizen Awareness on launch of e-Services
District
30
15.00
15.00
30.00
Citizen Awareness on launch of e-Services
State
1
10.00
10.00
20.00
Baseline and Post Assessment
State
1
15.00
15.00
H Contingency @ 3%
District
District
30
259.32
State
State
1
16.32
J O & M Cost for 3 Years
Total O & M Cost for 3
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 24
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Years 2,129.30
K Grand Total
11,592.86
The Total Project Cost is Rs. 11,592.86 Lakhs
3 Karnataka State Information
3.1 Details of all Districts District Sub-division Taluk
Bangalore Rural Doddaballapura Doddaballapura
Nelamangala
Devanahalli
Hoskote
Ramnagaram Ramnagaram Ramnagaram
Channapatna
Kanakapura
Magadi
Bangalore Urban Bangalore south Bangalore south
Anekal
Bangalore North Bangalore North
Yelankha
Bangalore east
Chitradurga Chitradurga hiriyur
challakere
Chitradurga
molkalmur
holalkere
hosadurga
Davangere Davanagere Davanagere
Harihar
Channagiri
Honnali
Harapanahally Harapanahally
Jagalur
Kolar Kolar Kolar
Bangarpete
Srinivasapura
Malur
Mulbagal
Chikkaballapur Chikkaballapur Gowribidanur
Sidlaghatta
Bagepalli
Chikkaballapur
Chinthamani
Gudibande
Shimoga Shimoga Shimoga
Bhadravathi
Thirthahalli
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 25
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District Sub-division Taluk
Sagar Soraba
Sagar
Hosanagar
Shikaripura
Tumkur Tumkur Tumkur
Gubbi
Kunigal
Madhugiri Madhugiri
Pavagada
Sira
Koratagere
Tiptur Tiptur
Chicknayakana Halli
Turuvekere
Bagalkot Bagalkot Badami
Bagalkot
Bilagi
Jamkhandi Mudhol
Jamkhandi
Hungund
Belgaum Belgaum Belgaum
Hukkeri
Khanapur
Bylahongala Savadatti
Gokak
Ramdurga
Bylahongala
Chikkodi Athani
Raibhag
Chikkodi
Bijapur Bijapur Bijapur
Bagewadi
Muddebihal
Indi Sindagi
Indi
Dharwad Dharwad Dharwad
Hubli
Kalagatagi
Navalagunda
Kundagola
Gadag Gadag Gadag
Rona
Mundaragi
Naragund
Shirahatti
Haveri Haveri Haveri
Ranibennur
Hirekerur
Byadagi
Savanur Savanur
Shiggou
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 26
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District Sub-division Taluk
Hangal
Karwar Karwar Karwar
Joida
Haliyal
Kumta Kumta
Ankola
Bhatkal Honnawar
Bhatkal
Sirsi Sirsi
Siddapur
Mundagod
Yellapura
Bellary Bellary Bellary
Sandur
Sirguppa
Hospet Hospet
Hadgali
H.B.Halli
Kudligi
Bidar Bidar Bidar
Aurad
Basavakalyana Basavakalyana
Balki
Humnabad
Gulbarga Gulbarga Gulbarga
Alanda
Afzalpur
Jevargi
Sedam Sedam
Chittapur
Chincholi
Yadgir Yadgir Yadgir
Shahpur
Shorapur
Koppal Koppal Koppal
Gangavathi
Kusthagi
Yelburga
Raichur Raichur Raichur
Devadurga
Manvi
Lingasagur Lingasagur
Sindanur
Chamarajanagar Kollegal Chamarajnagar
Kollegal
Yelandur
Gundalpet
Chikmagalur Chickmagalur Chickmagalur
Koppa
Sringeri
Mudigere
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 27
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District Sub-division Taluk
Tarikere Narasimharajapura
Kadur
Tarikere
Dakshina Kannada Mangalore Mangalore
Bantwal
Puttur Puttur
Sulya
Belthangadi
Hassan Hassan Hassan
Arasikere
Chennarayapatna
Holenarasipura
Sakaleshpura Arakalgud
Alur
Belur
Sakaleshpura
Kodagu Madikeri Madikeri
Virajpet
Somwarpet
Mandya Mandya Mandya
Maddur
Malavalli
Pandavapura K.R. Pet
Pandavapura
Srirangapatna
Nagamangalal
Mysore Mysore Mysore
Nanjangud
T.Narasipura
Hunsur K..R. Nagar
Hunsur
Piryapatna
Heggadadevana Kote
Udupi Kundapura Udupi
Kundapura
Karkala
District No. of Sub-
Divisions
No. of Taluks
Population(2011) Area (Sq. km)
Bagalkot 2 6 18,90,826 5,308
Bangalore Rural 1 4 9,87,257 4,763
Bangalore Urban 2 5 95,88,910 3,344
Belgaum 3 10 47,78,439 15,313
Bellary 2 7 25,32,383 1,106
Bidar 2 5 17,00,018 6,812
Bijapur 2 5 21,75,102 9,507
Chamarajanagar 1 4 10,20,962 2,355
Chikkaballapur 1 6 12,54,377 8,984
Chikmagalur 2 7 11,37,753 3,433
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 28
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Chitradurga 1 6 16,60,378 5,540
Dakshina Kannada 2 5 20,83,625 10,591
Davangere 2 6 19,46,905 5,924
Dharwad 1 5 18,46,993 8,919
Gadag 1 5 10,65,235 3,509
Gulbarga 2 7 25,64,892 16,234
Hassan 2 8 17,76,221 7,020
Haveri 2 7 15,98,506 365
Karwar 4 11 14,36,847 3,259
Kodagu 1 3 5,54,762 1,522
Kolar 1 5 15,40,231 5,909
Koppal 1 4 13,91,292 3,045
Mandya 2 7 18,08,680 13,374
Mysore 2 7 29,94,744 6,854
Raichur 2 5 19,24,773 9,617
Ramnagaram 1 4 10,82,739 4,639
Shimoga 2 7 17,55,512 7,833
Tumkur 3 10 26,81,449 6,986
Udupi 1 3 11,77,908 3,953
Yadgir 1 3 11,72,985 3,874
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 29
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
3.2 Details of officers involved in processing the selected services
Estimated Manpower for Training and Capacity Building
Offices Estimated No.
of Officials
Deputy Commissioners Offices 1,440
Assistant Commissioners Offices 416
Tahsildhar Offices 11,151
District Social Welfare Offices (Exclusive) 56
District Tribal Welfare Offices (Exclusive) 56
District Social and Tribal Welfare Offices (Common) 64
Taluka Social and Tribal Welfare Offices (Common) 708
District Backward Caste and Minority Offices 150
District and Taluka Agriculture Offices 1,629
District, Sub-Div. and Taluka Excise Offices 1,290
District, Regional and Taluka Fisheries Offices 493
Grand Total 17,453
3.3 Details of District e-Governance Society (DeGS)
The DeGS has not been constituted in any Districts. The State Project Steering Committee will
convene a meeting shortly and issue notifications to Deputy Commissioners to constitute District e-
Governance societies and ask them to submit details on the same. Draft Orders for constitution of
DeGS is being prepared by the e-Governance Department.
Details of DeGS
SI. No. Name of District Status Date and Registration Number under societies Act
1 All Districts In Process Data will be shared once the Societies are registered
3.4 State specific e-Governance initiatives
3.4.1 State Data Centre
The State Data Centre of Government of Karnataka was set up during 2004-05 as a core
common technology infrastructure. The State Data Centre (SDC) provides the infrastructure
required for consolidating state level applications at a central facility. The State Data Centre
is hosted in a physically secure Data Centre located centrally at Reliance IDC, Khanija
Bhavan, Bangalore. It is continuously monitored by surveillance mechanisms and
administered by 24x7 operations and management staff. SDC connects to the remote Taluka
servers through KSWAN network. SDC also has dedicated fibre connectivity to the Treasury
network and the State Secretariat. Connectivity to the web is through a shared 100 Mbps
line.
Objective
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 30
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
• Centralizing & consolidating various government databases
• Providing shared infrastructure for various e-Governance projects
• Facilitating provisioning of government services online
• Facilitating provisioning of better and efficient services to citizens
• Facilitating providing services for backend departments
New State Data Centre (SDC)
The contract for setting up of the new State Data Centre has been awarded to IT major TCS. The
new SDC is being hosted on 4500 sq. Ft. of area at the Vikas Soudha, Bangalore. 1500 sq. ft is allotted
to Server Farm area. Currently up to 46 racks are being accommodated, and there are plans for
further expansion, and when fully expanded upto 52 racks can be accommodated. The new SDC will
go live shortly.
Details of State Data Centre
Status of SDC.
Status of Disaster Recovery Setup (DRS)
Likely Date of Commissioning
Whether SDC as adequate space and required IT
resources for e-District
Existing SDC
NA 2004-05 Yes
New SDC Efforts are on to implement Disaster Recovery (DR) site at NIC Data Centre in Hyderabad
Oct-2011 Yes
3.4.2 Karnataka State Wide Area Network
As part of the Government of Karnataka (GoK) e-Governance initiative, the Centre for e-
Governance (GoK) has implemented State Wide Area Network (SWAN) to address the
information communication requirements of the State Government and its Departments.
The project titled Karnataka State Wide Area Network (KSWAN) is will provide a reliable,
resilient and a secure backbone to meet the information requirements and associated
services.
Objectives of KSWAN
• Creation of the State Information Highway
• Provide Data, Voice and Video services across the State
• High performance network (Availability and Scalability)
• To improve access to computing facilities
Details of Karnataka State Wide Area Network
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 31
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
SI. No.
Name of the District
Nos. of POPs in District Head Quarter
Nos. of POPs in Taluks Office
Total Nos. of PoPs in District
1 Bangalore Rural 1 3 4
2 Ramnagaram 1 3 4
3 Bangalore Urban 1 4 5
4 Chitradurga 1 5 6
5 Davangere 1 5 6
6 Kolar 1 4 5
7 Chikkaballapur 1 5 6
8 Shimoga 1 6 7
9 Tumkur 1 9 10
10 Bagalkot 1 5 6
11 Belgaum 1 9 10
12 Bijapur 1 4 5
13 Dharwad 1 4 5
14 Gadag 1 4 5
15 Haveri 1 6 7
16 Karwar 1 10 11
17 Bellary 1 6 7
18 Bidar 1 4 5
19 Gulbarga 1 6 7
20 Yadgir 1 2 3
21 Koppal 1 3 4
22 Raichur 1 4 5
23 Chamarajanagar 1 3 4
24 Chikmagalur 1 6 7
25 Dakshina Kannada
1 4 5
26 Hassan 1 7 8
27 Kodagu 1 2 3
28 Mandya 1 6 7
29 Mysore 1 6 7
30 Udupi 1 2 3
Connectivity Required at the following offices
District Social Welfare (Exclusive) 14
District Tribal Welfare (Exclusive) 14
District Social and Tribal Welfare (Common) 16
Taluka Social and Tribal Welfare (Common) 177
District Backward Caste and Minority Offices 30
District and Taluka Agriculture Offices 207
District, Sub-Div. and Taluka Excise Offices 270
District, Regional and Taluka Fisheries Offices 162
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 32
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Total No. of Offices 890
3.4.3 Common Service Centres
In the year 2006, the Government of Karnataka had implemented the Common Services Centres in
the state to provide various citizen centric services. These Common Service Centers were set up in
the form of Rural Telecentres(Nemmadi) at the sub Taluka level( i.e. Hoblis ) in the state and Urban
Telecenters such as Bangalore One and Karnataka One centres. The success of Common Service
Centre Model in Karnataka for providing various citizen centric services was adopted by the
Department of Information technology, Government of India to conceptualize and launch the
Common Centre Scheme(CSCs) across all the states in the country . Further, The Government of
India has already recognized the existing service delivery channels i.e. Nemmadi Telecentres.
As part of the DeitY, GoI scheme for setting up Common Service Centres in the state of Karnataka,
the Govt of Karnataka decided that 4913 centres would be set up as Common Service Centres in
addition to the existing no. of Nemmadi Telecentres. In order to invite bids for setting up an
additional number of Common Service Centers ( around 5000) in the state , the Govt of Karnataka on
various occasions had floated Tenders for selecting an appropriate bidder for implementing CSCs.
However due to the non-viability of the business model as part of the CSC Scheme, the CSCs could
not be setup. However, the existing Nemmadi tele Centres ( 821) along with the Karnataka One
Centres ( 34) and Bangalore One Centres (80) continue to function as Common Service Centres.
Details of the existing service delivery channels have been mentioned in this section. There are also
plans to augment the existing no of Karnataka one and Bangalore One centres in the near future.
SI. NO. Name of District No. of Nemmadi Centres operational
No of Karnataka One Centres Operational
No of Bangalore One Centres operational
No of CSCs planned
No of CSCs operational
1 Bagalkot 21 As explained above.
As explained above. 2 Bangalore Urban 19 80
3 Bangalore Rural 17
4 Belgaum 56 4
5 Bellary 29 2
6 Bidar 30
7 Bijapur 22
8 Chamarajanagar 16
9 Chickballapura 26
10 Chickmagalore 32
11 Chitradurga 25
12 Dakshina Kannada 18 3
13 Davangere 24 3
14 Hubli -Dharwad 21 8
15 Gadag 13
16 Gulbarga 49 2
17 Hassan 40
18 Haveri 22
19 Kodagu 16
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 33
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
20 Kolar 27
21 Koppal 20
22 Mandya 33
23 Mysore 36 6
24 Raichur 37
25 Ramanagaram 19
26 Shimoga 37 3
27 Tumkur 50 3
28 Udupi 10
29 Uttara Kannada 34
30 Yadgir 22
Total 821 34 80
Nemmadi Telecentres - With the objective of delivering citizen centric services (G2C and
B2C) in a hassle free and simple manner to the Citizens of Karnataka, Nemmadi Telecenters
were started throughout the state. Nemmadi Telecentres have been set up in all Hoblis ( Sub
Taluka Level Revenue Unit) in the state. There are 800 Hoblis in the state. Currently, there
are about 821 such Telecentres operational and providing about 50 different types of
services. It was also apparent that these village Telecentres would not be viable just for
delivery of land records, and therefore other e-governance services started delivering
through these Telecentres. The revenue department delivers a number of services to the
citizens like various types of caste and income certificates, registration of births and deaths
and issue of birth and death certificates and it was decided to e-enable these services for
delivery through the proposed village Telecentres.
• To create efficient and smart virtual offices of the State Government in all the
villages.
• To enhance the accountability, transparency and Responsiveness of the government
to citizens needs.
• To provide government departments and agencies, a means of efficient and cost
effective method of service delivery to citizens.
• Initially provide land records and 38 other Services and scale up gradually to cover
the entire Departments’ services either through workflow driven or database driven.
Details of Nemmadi Telecentres
SI. NO. District No. of Delivery Channels operational
1 Bagalkot 21
2 Bangalore Urban 19
3 Bangalore Rural 17
4 Belgaum 56
5 Bellary 29
6 Bidar 30
7 Bijapur 22
8 Chamarajanagar 16
9 Chickballapura 26
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 34
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
10 Chickmagalore 32
11 Chitradurga 25
12 Dakshina Kannada 18
13 Davangere 24
14 Dharwad 21
15 Gadag 13
16 Gulbarga 49
17 Hassan 40
18 Haveri 22
19 Kodagu 16
20 Kolar 27
21 Koppal 20
22 Mandya 33
23 Mysore 36
24 Raichur 37
25 Ramanagaram 19
26 Shimoga 37
27 Tumkur 50
28 Udupi 10
29 Uttara Kannada 34
30 Yadgir 22
Total 821
Karnataka One Centres
The Karnataka One Centres have been setup in 9 cities of the state i.e. Belgaum, Bellary, Gulbarga,
Davangere, Hubli-Dharwad, Mangalore, Mysore, Shimoga and Tumkur to provide G2C services.
SI. NO. Cities No. of Delivery Channels operational
1 Belgaum 4
2 Bellary 2
3 Gulbarga 2
4 Davangere 3
5 Hubli-Dharwad 8
6 Mysore 6
7 Shimoga 3
8 Tumkur 3
9 Mangalore( Dakshina Kannada) 3
Total 34
Bangalore One Centres
Bangalore One centres have been envisaged to be setup for every two wards within Bangalore limits.
Currently there are 80 centres operational in Bangalore; in the near future the State has planned to
augment the total number of centres to 100. Additionally Mobile Units of Bangalore One Centres
would also be operational in order to reach large number of citizens.
SI. NO. District No. of Delivery Channels
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 35
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
operational
1 Bangalore(Urban) 80
3.4.4 State Service Delivery Gateway (SSDG), e-Forms and State Portal
Details of SSDG
Status of SSDG
The Request for Proposal (RFP) is in the process of
preparation.
Status of State Portal Karnataka has a state portal already with some
services online. However the state is looking at
integrating with SSDG portal.
Services under e-Form for
each district
The list of services under e-form has been
shortlisted.
3.4.5 Status of Other state MMPS
Status of Other State MMPs
SI.
N
O
Name of
State MMP
Status Nos. of
Districts
Covered
Project Cost
Project
Conceptu
alized
DPR
Approved
Under
Implementati
on
Post
Implement
ation
1. Agriculture Yes Yes RFP to be
published
shortly
All
districts
• Rashtriya
Krishi Vikas
Yojana-
Rs. 40
Crores -
from
• Under
NeGP Agri
MMP
funding (
Rs 20
Crores)is
being
provided –
for
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 36
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Hardware
procureme
nt
(includes
Servers)
upto Block
Level, Data
Entry
Services,
Application
Software
developme
nt
(through
NIC)
• State
Funding-
Rs. 5.28
Crores
2 Commercial
Taxes
Yes The
Department
has
developed
an end-to-
end
application
by an in-
house NIC
team.
3 Employmen
t Exchange
No The
Department
has
developed a
web based
application
by NIC team.
4 Land
Records
Yes NA NA Yes 30 Not
Available
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 37
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
5 Municipaliti
es
Yes DPR is
being
prepared
by the
Dept.
Yes No All
Districts
Not available
6 Gram
Panchayats
Yes The draft
DPR has
not been
approved
by the
RDPR Dept.
GoK
The State
initiated
project is
under
implementati
on. However
the e-PRI
MMP is yet to
be
implemented.
NA 30 The
tentative
project cost
as per the
draft DPR is
Rs. 175.97
Crores.
7 Police Yes Yes As part of the
tendering
process, M/s
HP has been
selected as
the SI
All
districts
The
Empowered
Committee
of MHA has
allocated Rs
60.04 Crores
for CCTNS
8 Road
Transport
Yes No Yes No All
Districts
Not
Available.
9 Treasuries Yes Yes Yes No All
Districts
Project Cost
of Rs. 90.71
Crores has
been
estimated by
the Treasury
Dept. for
about 7
years.
3.4.6 Status of SeMT
The SeMT shall support the State PeMT in project implementation and shall build up
necessary capacities to manage the project on an ongoing basis. The SeMT will appraise the
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 38
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
projects before they are sent to DIT. They will look into issues including Strategic Control,
Adherence to Standards, Security Issues and leveraging of e Infrastructure.
Currently 7 resources are working under SeMT in Karnataka State. SeMT resources are
mainly involved in preparation of Detailed Project Report, Functional Requirement
Specification, Request For Proposal etc.
Sl. No Position No of Resources
1. Head – SeMT 1
2. Sr. Consultant – Technology Management 1
3. Sr. Consultant – Change Management 1
4. Consultant – Change Management 1
5. Consultant – Program Management 2
6. Consultant – Technology Management 1
3.4.7 Other e-Governance Initiatives
Some of the highly noteworthy e-Governance initiatives undertaken by Government of
Karnataka are Human Resources Management System(HRMS), Bhoomi, e-Procurement,
Khajane, Nemmadi telecentres, Bangalore One and Karnataka Citizen centric service
centres.
a) Human Resources Management System(HRMS): The HRMS system covers
automating all the HR functions like leave, transfer, payroll, administration and
service procedures of the Government and also provides a unified view of
deployment of human resources across the state.
b) Bhoomi: Bhoomi project has been a land mark project in empowering citizens
through technology by computerisation of 20 million land records of 70 Lakh
farmers covering more than 176 Taluks of Karnataka State. Post implementation of
the Bhoomi program, the farmer just has to visit a computer centre in the taluka
office and pay a sum of Rs. 15/- to obtain his land record. Computerisation of land
records has also led to transparency and has made the records tamper proof.
c) e-Procurement: E-Procurement is developed with a Vision to ensure a Transparent,
Reliable and Accountable procurement process with ease and convenience to
government, suppliers and citizens. E-Procurement is implemented as a Unified End-
to-End Procurement Platform across all Government Departments / Agencies. The
number of tenders published during the year 2010-11 increased three fold when
compared during the year 2009-10. Basically this meant that more Government
departments, State and Public sector companies started publishing their tenders on
e-Procurement site.
d) Nemmadi Telecentres: Nemmadi means peace of mind. The Vision of the Nemmadi
project is to empower rural citizens, provide direct access of government services to
the citizens and bring government services to the doorstep of the citizen thereby
bridging the digital divide in Karnataka.
e) Bangalore One and Karnataka One Citizen Centric Services: The Bangalore One
project provides anywhere anytime facility for payment of a range of utility bills and
other citizen centric services to the citizens of Bangalore. On successful
implementation of Bangalore One project, Government of Karnataka decided to
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 39
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
replicate it to tier two cities of Karnataka. Karnataka One Project is conceptualized
to deliver the services on ‘One Stop Shop’ concept Services of multiple Government
Departments and Private Companies will be delivered under roof.
3.5 Status of Data Digitization in each district
Name of MMP/Owner department
Name of Services like certificates, Ration cards etc
Status Percentage Digitised/
Not Digitised
Remarks
Agriculture
1. Information on Pesticides, Fertilizers and Seeds
2. Providing information on soil health
3. Information on crops, farm machinery, training and Good
Agricultural Practices(GAPs)
4. Information on forecasted weather
5. Information on prices, arrivals, procurement points, and
providing interaction platform
6. Electronic certification for exports & imports
7. Information on marketing infrastructure
8. Monitoring implementation / Evaluation of schemes &
programs
9. Information on irrigation infrastructure Partial
Food and Civil Supplies
1. Issue of duplicate/renewal/surrender ration cards
2. Issue of license under Karnataka Essential Commodities
Licensing Order 1986, license to wholesale dealers in food
grains, pulses, edible oils and kerosene.
3. Issue of license under Karnataka Essential Commodities
Act, 1986 to Retail dealers in foodgrains, pulses, edible
oils and kerosene.
4. Issue of authorization to run Fair Price Shops (FPS) under
Karnataka Essential Commodities (Public Distribution
system) Control Order 1992. Partial
Commercial Taxes
For Dealers facilitation 1. Online registration under Value Added Tax (VAT) and
Central Sales Tax (CST) Acts Online filing of VAT, CST and
Profession Tax Returns
2. Online payment of Commercial Taxes including
Profession Tax
3. Online application for the issue of CST related
Declaration Forms/Certificates
4. Online application for the issue of Way Bills
5. Online submission of utilization statements in respect of Digitized
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 40
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Forms and Waybills
For Department Administration
6. Auto Business rules to validate the applications and the
information submitted by the dealers
7. Auto alerts to the concerned Charge Office in case of
change in dealer information
8. Information of the Returns to the concerned sector
officer with complete return detail Auto risk analysis of
the return submitted by the dealer
9. Auto generation of annual return data for the assessing
officer to assess the dealer
10. Auto creation of dealer ledgers and secured access to
the concerned officers
11. Auto calculation of interest due on the refund amount
Employment
Exchange
Revenue 1. Record of Rights Certificate
2. Conversion of agriculture land to non agriculture purpose
3. All types of Caste Certificate
4. All types of Income Certificate
5. Verification/Validity of Caste Certificate
6. Payment of Compensation as per Land Acquisition Act in
undisputed cases
7. Population Certificate
8. Residence Certificate
9. Agricultural Family member Certificate
10. Mutation Extract Digitized
Urban
Development
(BBMP/BWWSS
B/Municipal
Corp.)
1. Issue of Birth, Death & Still Birth Certificates at
Registration centers within one calendar year from the
date of registration
2. Issue of Birth, Death & Still Birth Certificates at
Registration centers after one calendar year from the
date of registration
3. Grant of trade licence specified category under rules
4. Khatha Extract/ Certificate
5. Sanction of Building Plan in sites upto 2400 sq.ft.
dimension for residential single dwelling unit.Permission
for new connection/Additional Connection for water
supply and Under Ground Drainage for residential
buildings excluding Apartments
6. Permission for new connections/ Additional connections Partial
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 41
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
for water supply and Under Ground Drainage for multi-
storied buildings
7. Grant of Trade licence as per the delegation of powers
8. Khatha Extract
9. New Building Licence upto 2400 sq ft residential for single
dwelling unitPermission for water supply and UGD
connection for residential buildings single dwelling unit
Gram
Panchayats
1. Alteration of Assessment list
2. Building licence
3. General licence (Trade Licence)
4. Maintenance of Drinking Water
5. Maintenance of Street lights
6. Maintenance of Village sanitation Issuing of records
related to population census, crop census, cattle census,
persons below poverty line and other records
compulsorily maintained by GramPanchayath
7. Providing employment to unskilled labours (MGNREGS)
8. NOC to Escoms
9. e-payment for the work executed under developmental
schemes Partial
Police 1. Issue of copy of FIR to the complainant 2. License for Amplified Sound System 3. License for Amusement 4. Permission for peaceful assembly and procession 5. NOC for Extension of Visa 6. Passport Verification 7. Receipt of petitions 8. NOC for petrol pump, gas agency, hotel, bar etc. 9. NOC for Crackers License 10. Arms License Verification District Partial
Transport License Related 1. Renewal of Driver’s License 2. Duplicate for driver license 3. Change of Address of the Driving License 4. On Line Submission of Application for a new License 5. Selecting a Date for Driving Skill Test 6. International Driving Permit 7. Driving License for persons holding foreign Driving License 8. Online payment of license related fees Registration Related 1. Change of address 2. Transfer of ownership
3. Obtaining of noting / terminating of hire purchase/hypothecation/lease.
4. Clearance Certificate 5. No Objection Certificate Partial
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 42
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6. Duplicate RC
Treasuries 1. Online Treasury System 2. Budget Authorization/distribution 3. Online DDO Bill Submission 4. Human Resources Management System 5. New Pension Scheme 6. Class-4 GPF Scheme 7. Income Tax Remittance System 8. Pension Payment System 9. Online pension Processing System 10. E-receipt System 11. C&AG Integration System Digitized
3.6 Status of existing Service Delivery Channels
About 42 G2C services are being delivered electronically at Nemmadi Telecentres. The transactions
have been growing phenomenally year-on-year. Broadly the services covered are from Social
Security Pensions, Birth/Death Certificates, Revenue Department, RTC, besides B2C services such as
Mobile and Insurance payment. The transactions details of individual services for the past few years
have been mentioned in the table below:
Transactions of RTC & RDS at Nemmadi Telecentres for the year 2006-07 to 2010-11
CAT
SERVICE NAME 2006-07 2007-08 2008-09 2009-10 2010-11 TOTAL
A Social Security
Pensions
Old Age Pension
8,893
1,48,088
27,984
2
-
1,84,967
Physically
Handicapped Pens
ion
2,910
29,069
65,325
1,59,089
1,20,645
3,77,038
Widow Pension
5,461
48,234
97,930
2,19,249
1,83,147
5,54,021
Sandhya Suraksha
Yojane
-
-
1,13,119
6,54,047
4,13,723
11,80,889
National Family
Benefit Scheme
-
-
1,752
14,566
23,531
39,849
Indira Gandhi
National Old Age
-
-
8,701
32,817
29,237
70,755
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 43
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Pension
Invalidate Services
-
-
-
1
17
18
Invalidate scheme
-
-
-
-
3
3
Sub Total
17,264
2,25,391
3,14,811
10,79,771
7,70,303
24,07,540
B Birth & Death
Registration/Certifica
tes
Birth Certificate
1,292
2,501
1,913
1,475
1,155
8,336
Birth Certificate
(Previous)
-
-
16
113
96
225
Death Certificate
2,788
6,207
4,924
4,229
2,941
21,089
Death Certificate
(Previous)
-
-
45
432
240
717
Birth Registration
543
1,640
1,410
1,411
921
5,925
Death Registration
840
3,324
2,981
3,002
2,147
12,294
Sub Total
5,463
13,672
11,289
10,662
7,500
48,586
C Revenue Department
Services
Population Certificate
57
119
128
83
31
418
Caste and Income
Certficate
34,881
5,41,358
9,71,800
25,22,776
21,77,730
62,48,545
Caste Certificate (Cat-
A)
3,179
72,281
1,26,342
3,22,409
2,68,677
7,92,888
Caste Certificate
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 44
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
(SC/ST) 20,714 2,75,471 5,52,029 15,62,537 13,30,455 37,41,206
OBC Certificate
(Central)
607
6,165
11,483
38,054
72,884
1,29,193
Residence Certificate
1,247
29,626
1,00,270
2,15,171
2,65,874
6,12,188
Income Certificate
13,451
2,27,999
4,82,434
9,41,556
14,45,385
31,10,825
Non Tenancy
Certificate
1,128
6,748
14,995
20,524
19,178
62,573
Widow Certificate
44
183
554
314
138
1,233
Living Certificate
119
427
1,623
948
710
3,827
Agricultural Family
member cer
713
3,863
7,989
16,142
23,004
51,711
Re-Marriage
Certificate
80
362
883
1,586
2,153
5,064
Land less Certificate
156
1,915
3,566
5,471
5,515
16,623
Surviving Family
Members Certi
900
7,666
27,126
53,059
67,953
1,56,704
Income Certificate for
compass
137
813
1,814
3,229
4,454
10,447
Unemployment
Certificate
80
442
1,040
1,672
3,543
6,777
No Govt. Job
Certificate
99
505
1,333
2,429
3,048
7,414
Agriculturist
Certificate
421
2,138
4,569
10,360
13,794
31,282
Small / Marginal
farmer Certificate
2,587
21,046
26,453
35,815
48,809
1,34,710
Agricultural Labour
Certficate
858
5,707
11,518
17,858
12,163
48,104
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 45
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Non creamy layer
Certificate
1,210
5,277
4,971
9,741
5,515
26,714
Land holding
Certificate
646
6,538
18,753
23,918
30,617
80,472
Bonafide Certificate
425
3,177
6,631
12,981
17,601
40,815
Solvency Certificate
43
112
240
452
716
1,563
Sub Total
83,782
12,19,93
8
23,78,54
4
58,19,085
58,19,947
1,53,21,29
6
Total RDS Transactions
1,06,50
9
14,59,00
1
27,04,64
4
69,09,518
65,97,750
1,77,77,4
22
D Total RTC
Transactions
4,37,18
4
42,93,39
2
53,68,27
6
57,42,905
60,64,807
2,19,06,5
64
GRAND TOTAL
5,43,69
3
57,52,39
3
80,72,92
0
1,26,52,4
23
1,26,62,5
57
3,96,83,9
86
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 46
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4 Project Details and Implementation Model
4.1 Stake Holder Analysis
Stakeholders, their roles and responsibilities in the e-District rollout have been provided in
the table below:
Stakeholder Group Roles and Responsibilities Level of Influence
Engagement/ Communication Strategy
Department of Information Technology, GoI
Provide the framework and issue Guidelines for implementation of e-District in State wide Roll out.
Appraise proposal of the State for State wide roll out
Provide technical assistance of the State for effective implementation of the MMP
Organizational Capacity Building Monitoring implementation, Consolidation of DPR, Case Studies and etc.
HIGH Communicate the effectiveness of framework and guidelines
Provide a checklist with the State Government to ensure the e-District Framework and guidelines are being followed
Government of Karnataka
Set up a State Project Steering Committee
Provide all State level support for smooth implementation of ‘e-District’ Project.
Define the State wide implementation as prescribed in the selection criteria
To enter into necessary MoUs/agreements with DIT/ other central agencies/ service providers for funding, defining service levels for identified services, ensuring service level adherence, implementation and sustainability of the State Wide roll out.
To identify and nominate the project Champion at State and District level and ensuring complete involvement of the project champion from start to finish of the project
Issue instruction and ensure formation of District e-Governance Society/ District implementation Committee in the Districts.
HIGH Periodic/Regular review with SDAs and DeGS to check the status.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 47
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Providing State financial support as per the project report. Infrastructure and other support to the State Designated Agency (SDA)
State Project Steering Committee
The SPSC would oversee the creation and functioning of the Districts e-Governance society and the SDA with reference to the e-District project, including taking decisions on the implementation strategy and oversee the process of selection of the agency for Software Development
It would be the driver of policy, regulatory and other relevant changes and would take decisions on issues relating to the BPR needs for the project.
It would take an appropriate decision on the mode and degree of integration of ‘e-District’ with the existing Service Delivery Channels. Digital and institutional infrastructure of various Government Departments
Review and approve the sustainability (Revenue) model for State wide roll out. This would include decision of on fixing of User Charges and the sharing of revenue between the District e-Governance Society etc.
Propose the State wide roll out based upon common software, approach and financial model as per the Pilot Project
HIGH Periodic review with the use a vision checklist to track the project status
Communicate e-District vision to all the owners and stakeholders.
Provide regular feedback and intervene if necessary to take corrective actions and measures.
State Designated Agency (SDA)
Extend necessary Policy level support to develop a sustainable framework for regulation, promotion and ramp-up of e-Platform for G2G and G2C systems of the District.
Synchronize roll out of e-District’ with SERVICE DELIVER CHANNELS, SWAN and SDC.
Detailed out implementation strategy, in case of time lag between SDC/SWAN and e-
HIGH Close follows up with Project Management Consultants, SeMT consultants and the SI to ensure that the e-District framework and guidelines are followed.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 48
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District implementation.
Co-ordinate and facilitate interactions between the project implementation partners/consultants, State Government Departments, District administration.
Enable creation of a comprehensive State package for e-District and other technical support.
Facilitate integration of the existing ICT enabled and other Government schemes into the e-District.
Facilitate administrative readiness and e-readiness of the District.
Facilitate selection of Project implementation Partner and Technology Solution Consultant under the guidance of State Project Committee/Apex Committee.
Facilitate fund transfer to the District authorities in case funds for the state wide roll out are allocated to SDA.
Draw up a comprehensive user charges policy and a sustainable road map for the e-District for Approval of the State Government.
District e-Governance Society(DeGS)
The DeGS would provide the close tie- ups with all the Stakeholders in this Project at field level. The Stakeholders from the District Government would include Collector/Deputy Commissioner, Sub Divisional Officer/ Magistrate, Taluk Offices and field functionaries.
Provide commitment and support to bring-in the Process changes
Provide overall guidance to the Project at the District level.
Work closely with implementation agency to undertake the field work, comprehend the requirements,
HIGH Prepare a detailed level plan to effectively co-ordinate with SI, PMU Consultants, SeMT and field level staff to ensure that e-District rollout is on right track.
Identify key decision making persons both within Government and outside and involve them and share the project status.
Establish an
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 49
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
document the observations, prepare roadmap and redesign the processes.
Build capacity of the staff and execute resources of the District Administration.
DeGS and Consultants would also work closely with technical solution provider for developing and customizing the software, implement the technical solution.
To manage, supervise and implement backend computerization of Government Departments with long term vision of Government.
Collect User charges as fixed by the State Government and keep audited accounts of the same.
Explore revenue streams for the sustenance of the District e-Governance Society and assist SDA in formulating policies accordingly.
effective escalation mechanism if there is any slippage or problems occurring.
4.2 Services and Service Levels
Please refer to Sec 2.2
4.3 Implementation Strategy The project will be implemented by the Centre for e-Governance (CeG) which is the Nodal Agency in
the State for implementation of the program. The implementation methodology to achieve the
project objectives is:
a) Formation of the District e-Governance Society (DeGS)
b) As-Is assessment and Business Process Re-engineering
c) Software development of the identified services based on the centralized architecture
d) Procurement and installation of IT infrastructure from empanelled OEMs/Vendors
e) Site preparation
f) Data entry and Data Digitization
g) Deployment of existing/modified application in State Data Centre (SDC)
h) Provide Training on familiarization of computers and on the application software
i) Rollout in the Districts
j) Interface with Service Centre Agencies(SCA)s for delivery of services through Service Deliver
Channels
k) Change Management
l) Allotment of Digital Certificates to approving authorities
m) Provide Application, System, Helpdesk and handholding Support
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 50
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
n) Advertisement and awareness campaigns
4.4 Key Activities
4.4.1 Study of Process Re-engineering
A detailed assessment of the services to be covered under the e-District scheme would be
performed that would basically comprise of examination of the existing workflow processes
and systems in each of the target districts. This is required in order to find out the
deviations, if existing pertaining to the services envisaged to be delivered and making
necessary changes in the e-District application. The State PMU would be entrusted to carry
out a detailed AS-IS assessment and BPR study. The state PMU would submit the reports to
the State Designated Agency in the state.
Sub-Activity Estimated Time Frame (Weeks)
Estimated Cost(Rs. Lakhs)
Analyzing and documenting current processes including information flows
2 Please refer the Chapter for estimated costs
Stakeholder / beneficiaries Consultations to detect problems / opportunities
2
Identifying the change opportunities and present them to the State Apex committee to get agreement on the identified problems / opportunities
1
Defining the new business processes, analyzing them and documentation of the required organizational changes and impacts
4
Obtaining approval from the State Apex committee regarding proposed changes
2
Proposing and approving of the required legal changes for implementation of the revised processes
2
Preparation of To- Be scenario document and Implementing the revised processes
3
Study of Process Re-Engineering
4.4.2 Study of Change Management
The objective is to maximize the collective efforts of all the district administration officials involved
in the change and minimize the risk of failure of implementing this project. It would focus on
assisting the district administration in cultural and attitudinal changes, organizational structural
changes etc. The change management would also include conducting workshops for information
dissemination for suggested changes, the communication plan to the district administration
employees, Citizens, collection of user charges etc
Sub-Activity Estimated Time Frame (Weeks)
Estimated Cost(Rs. Lakhs)
Development of Change Management plan
4 Please refer the Chapter for estimated costs
Developing the tools for change Management
4
Identifying the change drivers in the districts
6
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 51
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Organizing the change management workshops
12
Reinforce the value of successful change via change leaders
4
Study of Change Management
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 52
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.4.3 Assessment of Gap Infrastructure
Most of the existing hardware at the districts is obsolete and most of the equipment is non-functional. Hence the depreciation is taken as 100% and none of the As-Is hardware is considered for the DPR. Description Deputy
Commissioner Office
Assistant Commissioner
Office
Taluka
Office
District Social Welfare (DSWO)
Office
District Tribal Welfare (DTWO)
Office
District Social and Tribal Welfare
Office
Taluka Tribal Welfare (TSWO) Office
District Backward Caste and Min.
Office
Total Total As-Is in 30
District
Laptop 0 0 0
- - - - - 1
18
Desktops 8 1 6
1 1 1 0 1 19
564
Dig. Web cam
1 - -
- - - - - 1
24
Network Printers and Fax
1 - -
- - - - - 1
18
Laser Printers
3 0 2
0 0 0 0 0 6
188
UPS( 1 KVA) Online
8 1 6
1 1 1 0 1 19
564
Scanner 0 0 0
- - - - - 1
24
12 Port LAN Switch
8 - -
- - - - - 8
246
42 U Rack 0 - -
- - - - - 0
6
9 U Rack 8 - -
- - - - - 8
234
Leased Line Modem Pair
0 - -
- - - - - 0
6
Server Hardware
Servers 1 0 0 0 0 0 0 0 1 30
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 53
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Webserver 1 0 0 0 0 0 0 0 1 30
System Software
OS 8 1 6
1 1 1 0 1 19
564
RDBMS 0
Application Software
2 1 1 1 1 1 1 0 8 240
4.4.4 To Be scenario District wise
Deputy Commissione
r Office
Assistant Commissione
r Office
Taluka Office
District Social
Welfare (DSWO) Office
District Tribal
Welfare (DTWO) Office
District Social and
Tribal Welfare Office
Taluka Tribal Welfare (TSWO) Office
District Backward Caste
and Min. Office
Total Items
Laptop 30 52 177
-
-
-
-
-
259
Desktops( Incl. of Facilitation +Training centres)
1,260 364 5,487
42
42
48
354
90
7,687
Dig. Web cam(For Facilitation Centres) 120 - -
-
-
-
-
-
120
MFD(Network Printer and Fax) (Only for Facilitation Centres)
90 - -
-
-
-
-
-
90
Dig. Signatures - - -
-
-
-
-
-
-
Laser Printers 420 121 1,829
14
14
16
118
30
2,562
UPS( 1 KVA) Online 1,260 364 5,487
42
42
48
354
90
7,687
Scanner 30 52 354
-
-
-
-
-
436
12 Port LAN Switch 1,230 - -
-
-
-
-
-
1,230
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 54
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
42 U Rack 30 - -
-
-
-
-
-
30
9 U Rack 1,170 - -
-
-
-
-
-
1,170
Leased Line Modem Pair 30 - -
-
-
-
-
-
30
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 55
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.4.5 To Be Scenario for servers at SDC
The State has recommended that the bidder should provide
Component Data Centre Disaster Recovery
Total Total As-Is
Gap IT
Server Hardware
Database Server 4 2 6 0 6
Application Server 4 2 6 0 6
Web Server 2 1 3 0 3
Backup and Reporting Server 2 1 3 0 3
Production Server 2 1 3 0 3
Application Load Balancer 2 1 3 0 3
SAN Storage 1 1 2
2
42U Racks with power supply 1 1 2 0 2
10U Blade enclosure 1 1 2 0 2
KVM Switch 1 1 2 0 2
Network switch 1 1 2 0 2
Laptops 2 2 4 0 4
Miscellaneous components/cables 1
1 2
0
2
System Software
Server OS 14 7 21 0 21
RDBMS 4 2 6 0 6
Application server 2 1 3 0 3
Systems Management software 2
1 3
0
3
Development environment 2 1 3 0 3
Virtualization software 1 1 2 0 2
Anti-Virus software 14 7 21 0 21
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 56
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 57
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.4.6 Work of Data Digitization
Data digitations and migration involves the conversion of the legacy data available either in physical
or in electronic form, into target data for customized e-District application thereby resulting in
overall improvement in quality of data. The electronic data would enable seamless delivery of e-
District services to the citizens. The scope of data digitization should be based on Services identified,
current status of digitization and Quality of existing records. The digitization and migration would
include:
a) Profiling of Legacy Data
b) Conversion of Legacy Data
c) Verification of Digitized Data
d) Synchronization and Updation of digitized data
Once the legacy data is converted to target data, the source and target data needs to be verified to
ensure that the target data (in new format) is the same as the source data. The Verification of target
data should be done by team of Government staff nominated by District Administration office. The
constituted team should have representation from concerned department whose data is
digitized/migrated. The data verification team would recommend/ certify the successful completion
of digitization and migration of legacy data for e-District application as per desired standards. The
certificate of satisfaction must contain the number of records digitized/ migrated, name of database,
remarks and other relevant information
The District administration would be enabled to work on designed electronic workflow system, the
concerned officials may require referring old records of various services. The old manual records
would be digitized using the data entry module of the system.
SI. No.
Category of Services No. of Records scanned or Digitized
% of Records scanned or Digitized
1. Certificates Nil
2. Pensions Nil
3. Revenue Court Cases Nil
Dues and Recovery Nil
Certified Copies Nil
4. Ration Card services Partial 90%
5. RTI and Grievances Partial 30%
6. Licensing Nil
Arms License Nil
Small Savings Nil
Business Nil
Mining Nil
7. Magisterial Court Cases(MAG) Nil
8. Scholarships (SC &ST/BC / Minorities) Partial 50%
9. Other Revenue Services Partial 20%
10. Department of Excise Partial 15%
11. Department of Fisheries Partial 15%
12. Department of Agriculture Partial 20%
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 58
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.4.7 Work of Training
Training is an important component of the e-District program. The officials and staff of district
administration would be trained to work in the changed ICT enabled environment. Prior to the
start of the training; Implementing Agency need to prepare a training plan and submit it to SDA
for approval. Upon approval from the SDA the Implementing Agency will start to get
nominations (nominations to be given by the District Administration) of participants for various
modules. The Implementing Agency should also get the content of the training modules
validated by the SDA and then start the training at various districts.
Users for the e-District project have been classified into different categories based on their
roles, education and current skill set with respect to the technology awareness. This
classification has been done to address the issue of varied roles and responsibilities entrusted
based on the hierarchical authority. The following table illustrates the basic categories in
which the Government employees have been classified and the attributes for each of the
groups.
The exact numbers, names and contact details of officers to be trained per district. Based on
the roles and responsibilities of the government officials at various levels, the training plan will
be been prepared to capture the need, requirement of skill and capacity enhancement of the
government officials. Based on the organizational hierarchy and the envisaged roles and
responsibilities, officials have been categorized in four bands – I, II III and IV for training
purpose only. This will enable to ease the training of government staff and also at the same
time will integrate the understanding of various actors for consolidated service delivery.
Band Category Officials
Group-I Higher officers Senior State administration, Key decision makers (relevant Government orders, fund approvals, etc)
Group-II Approvers Deputy Commissioners, Assistant Commissioners, Tahsildars etc
Group-III Processing Officers FDA, SDA, Village Accountants etc.
Group -IV Field Officers Revenue Inspectors, Field Verification officials etc
Training Modules
Understanding the change in the revised process and workflow of selected service which will
emanate because of implementation of e-district application, training and capacity building of
the government official cutting across departmental lines becomes quintessential. The
following training modules are proposed to be undertaken across the departmental hierarchy –
1 Basic Computer Training
2 e-District Orientation
3 Process Training
4 Activity Training
5 Specialized Computer Training
6 e-District Application Training
The proposed training module is expected to help the government functionary to undertake
their revised roles and responsibilities with ease and without any difficulty and apprehension.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 59
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
The training modules will impart the required skill set and capacity for performance of defined
roles and responsibilities.
Training Plan
The Implementation agency must impart training to the personnel identified by the State Government. Implementation agency has to provide necessary course material, user manuals, system administrator, manuals, etc to the trainees. The Training has to be conducted at DHQ, SDO and Taluka as per the requirement and as agreed upon with the district administration. Summary of the detailed training program has been presented in the table below. SNo. Training Module GROUP-I GROUP-II GROUP-III GROUP-IV
1 E-District Orientation Y Y Y Y
2 Basic Computing Training Y Y Y Y
3 Process Training Y Y N N
4 Activity Training N N Y Y
5 Specialized Computer Training Y Y Y Y
6 e-District Application Training Y Y Y Y
Following table shows an indicative number of officials to be trained in the
aforementioned training modules.
Offices No. of Officials
Deputy Commissioner's Offices 1,440
Assistant Commissioner's Offices 416
Taluka Offices 11,151
District Social Welfare (Exclusive) 56
District Tribal Welfare (Exclusive) 56
District Social and Tribal Welfare (Common) 64
Taluka Social and Tribal Welfare (Common) 708
District Backward Caste and Minority Offices 150
District and Taluka Agriculture Offices 1,629
District, Sub-Div. and Taluka Excise Offices 1,290
District, Regional and Taluka Fisheries Offices
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 60
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
493
Grand Total 17,453
The actual training plan shall be developed during the implementation phase of the project.
4.4.8 Architecture of E-District Application
E-District is a mission critical application which has to interact in an environment where silos
of frozen assets are maintained in heterogeneous formats in multiple departments situated
at varying geographical locations. The envisioned e-District solution aims at bridging the
gaps between people, processes, applications and systems.
e-District has been envisaged by GoK as an automation of workflow and internal processes
of District Administration with the possibility of seamless integration of various departments
including Social Welfare, BC Welfare, Tribal welfare, Tahsildar’s office, Agriculture and
Fisheries Departments for providing services to the citizens. The solution also should address
the integration between specific Government functions (‘vertical’ applications) and shared
Government functions (‘horizontal’ applications) and data sharing between applications.
The e-District application architecture Principles are
e-District application development should be based upon open standards – the
application should be capable of running in multiple operating systems and
databases. Open Standards should ensures application scalability
e-District application development needs to support n-tier (thin/thick client)
architecture and should be based upon Service Oriented Architecture(SOA).
e-District services should be enabled to leverage the KSWAN, SDC, Nemmadi /B1/K1
and State Gateways.
Technology should allow for seamless integration with a host of various applications.
Application architecture should be such that the proposed application is scalable.
Open Standards are available for all to read and implement.
Architecture Goals
The objective of e-District application is to define the framework with Centralized Architecture
Design which is cost effective. The goal of the e-District application is to
Design Centralized Architecture Design
1. Reduced Total Cost of Ownership
2. Upgrades and new releases of the Application are to be done only at the central server,
rather than having to be installed on several machines
3. Easier system maintenance and administration
4. Ability to manage and monitor the system from a single, central location
5. Better Management and Administrative control
6. Better Deployment of Security
7. Economical to build redundancy at each level for business continuity and Disaster
Recovery
Browser based User Interface
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 61
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
a. Internet Users
b. Government Employees
c. Nemmadi/Bangalore One/Karnataka One users
3 or More tier Architecture environment
Leverage the applications that are already available in the central pool
Reengineer the applications wherever necessary, migrate from old technologies to the new
technologies
e-District application should support all major communication protocols including, TCP/IP
Central Messaging Processing Mechanism
Common set of specifications and single point access to departments
e-District architecture must be open to interface seamlessly with e-District portal and SSDG
Architecture Scope
The proposed architecture is for the e-District initiative for Government of Karnataka. Specifically,
the architecture focuses on the service of the below mentioned departments.
District Collectorate
Sub-Divisional Office(SDO)/Assistant Commissioner’s Office
Tahsildar’s Office
Social Welfare Department
Tribal Welfare Department
Backward Caste and Minority Welfare Department
Agriculture Department
Fisheries Department
Architecture Constraints
The overall vision of the government is to automate and E-enable the services of all the government
departments. The key architectural constraints that drove the design of the solution are:
a. Relatively new web services transactions technology and evolving support for web services
transactions. (e.g. for Business processes, spanning across multiple service components
involving different technologies such as Rules, Hibernate, usage of Web Services invocation
would require passing of transaction contexts)
b. The process invocation across server will use J2EE type of invocations. In future, this
invocation can comply with SCA (Service Component Architecture)
c. The invocation choice among key constituents of the solution such as IVR server to
application server, being web service, there is an inherent performance overhead in this
invocation method. SOAP introduces overhead in terms of propagating security tokens,
marshalling, un-marshalling of XML.
d. No usage of Stored Procedures/Functions in the Enterprise System in order to avoid
database vendor dependency.
Contextual View of e-District application Portal
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 62
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
e-District application Portal will enable the electronic delivery of Services provided by different
departments of State as shown in contextual view diagram below. The proposed e-District
application Portal solution envisages integration with existing State Government Departments as
well as any upcoming initiatives.
e-District application portal is important in allowing citizens to access government information easily
and to enjoy one-stop government services. A well-developed portal will complement and enhance
customer-focused service delivery channels which may already exist in a government. A portal
allows a department to present information, applications and services in a single consolidated
browser view. It provides a secure and individualized view of multiple online resources and
interactive services. It offers a single access point to critical information and the primary applications
necessary for an individual to avail the services. In this sense, a portal becomes an interface between
the government and the citizens.
e-District Conceptual View
e-District application portal will act as front end interface to district level e-Governance initiatives
and services. A Citizen would typically come to e-District portal to find information / avail any service
through Service Delivery Channels. e-District application is in Kannada and English, would have easy
to use navigation, search and browse features. e-District application would be connected to the
State Service Delivery Gateway (SSDG) through firewall and KSWAN/Internet and would be
accessible to state departments for information update and to various service delivery channels like
Nemmadi/B1/K1, Internet for citizen access.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 63
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Key Features of e-District Application
The following are the key features of the e-District application.
e-District application portal can be accessed via a variety of established channels, including
Internet, Nemmadi/B1/K1 , Government Service delivery counters, etc
e-District application portal will be single window to the G2C services initially and over a
period of time, G2G and G2B services may be taken up. The service delivery would happen
in integrated fashion using NeGP’s core infrastructure components – KSWAN, SDC, SERVICE
DELIVER CHANNELS and SSDG
Standardization of the Content framework based on National Portal and Website design as
per Indian Government Website design guidelines
Consolidation of all the information presently available at existing departmental websites &
portals
Consolidation and Digitization of all the electronic forms related to various services available
Integration of the e-District application portal with the State Portal
e-District application portal will provide information about government departments, line
ministries, and web links to these departments.
Provide information about government structure in the state, service offerings, budget, key
notifications, government schemes etc to the business and citizen community
The portal would primarily be available in Kannada & English
e-District application portal will be available 24 hours a day, 7 days a week, and accessible
from anywhere in the world via the internet.
Content personalization and content management.
Search functionality should be able to query both structured and unstructured content by
keywords
Consistent, easy-to-use interface: Portals typically have a consistent interface which flows
from the home page down through every area of the portal. The interface is typically
designed specifically to make use of the portal very easy. This may include bread crumbing
to link to higher levels in the hierarchy; and hovering menus, which allow for an expanded
list of links.
Aggregation: Pulling links and content together into a single place helps users know where to
go if they are looking for information. Aggregation allows a user to interact with several
systems from one single user interface.
Alerts: Users can sign up for e-mail notification when the information that they are
interested changes. This can include both key performance indicator changes and changes in
information within documents.
Self service: Portals can be a home for a variety of self-service applications, which allow
customers, employees, and others to take care of their own needs.
Personalization: The ability for groups and individual users to customize the way that the
information is displayed. Filtering content to the information that a group is interested in
and being able to change the location of the information on the screen is considered an
important way in which portals create a user-friendly experience.
The following diagram depicts the High Level View of the E-District application.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 64
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Architecture Requirements for e-District Portal
The solution is designed using the e-District Guidelines provided by DIT and the industry’s best
practices. Following considerations are used in identification of technology architecture.
Design Objectives for Proposed Technology Solution
The following section outlines these objectives from a holistic perspective, keeping in view the
requirements of all the stakeholders of the project, as well as the constraints within which the
proposed solution would need to operate. The design objectives for the proposed technology
solution in e-District application are:
Allow internal, external and associated agencies access to the online platform
Allow Citizen and SERVICE DELIVERY CHANNELS to access services through a ‘Single Window’
interface
Services should be made available using Web, SERVICE DELIVER CHANNELS, SMS
e-District application & Gateway infrastructure are to be hosted in the SDC
e-forms are processed at the department location and their status updated
Re-use existing and proposed Department infrastructure in service delivery by integrating
existing Department initiatives
With the above objectives in mind, the following section articulates the design considerations that
have been kept in mind during the design of the proposed technology solution.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 65
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Design Considerations for Proposed Technology Solution
The design considerations for the proposed technology solution, detail the requirements that the
proposed technology solution should meet in order to fulfill the objectives. The design
considerations for the proposed technology solution in the e-District application are:
High Availability
Scalability
Interoperability
Portability
Performance
Extendibility
Maintainability
Multi-lingual Support
Security
No Royalty
Information Dissemination
Automation of Processes
The following section details out each of these design considerations with respect to the project and
the proposed technology solution.
High Availability: It is an ability to withstand failure or individual components. Considering the
priority of making department service information accessible through SERVICE DELIVER CHANNELSs,
the system requires high level of availability. From the District perspective, following applications are
of high importance:
Work Flow Management for all services (transaction and workflow based services)
e-District Application
Grievance Management System
Certificates
The proposed architecture addresses these requirements through the use of clustering, load
balancing and redundancy. Cluster environment should be built for critical applications with fail-over
and fail back features.
The application Server should be kept lighter than the Database Server. Web Server should be much
lighter than the Application Server. Redundancy and Load balancing features should be built in
Application Server, Web Server and Database Server to achieve the High Availability.
System may return error occasionally, but should respond in a normal manner on retry after
reasonable amount of time, typically few seconds.
Scalability: Scalability refers to ability to service significant increase in load or page request, without
noticeable degradation of performance by means of deploying additional hardware without making
any changes to existing code.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 66
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
It is envisaged that the number of Citizens / SERVICE DELIVER CHANNELSs will increase with more
Services joining the e-District application initiative. Similarly, the State will also introduce additional
services in due course of time. To address the scalability challenge, the proposed architecture is built
around the Service Oriented Architecture (SOA) paradigm. Interactions among the various services
and integration with the existing application are achieved using XML open standards. There is a clear
cut demarcation between data and business and enterprise applications. This will enable the
implementation team to plug in new applications and new features at any point of time to address
the application level scalability requirements.
In conclusion, there must be well defined capacity management plan at the time of design phase to
clearly define hardware changes to be done for servicing increasing load.
Interoperability: The success of e-District application initiative would largely depend on the flow of
information among the heterogeneous applications (e.g. Certificate, Police, and Employment etc.
which are built on different technology platforms) and across State departments. The proposed
architecture is built around the web services standard and adopts open standards for interacting
with various applications to address the interoperability requirement. ANSI SQL standards should be
used to ensure the Interoperability.
Portability: e-District application should be portable. It should address the following requirements
No part of implementation should be portable
Any COTS products used should provide tools for exporting & importing data using open
standards
Developed source code should conform to open standards
Performance: Performance is defined as the responsiveness of e-District application. It should
manage the user load and response time. It would be the key challenge for e-District portal as more
and more citizens take part in e-District initiative and volume of data grows. It is essential that the
performance of the portal must not deteriorate with increase in volume of data or number of end
users. The proposed architecture takes care of the application level performance requirement by
load balancing and caching technique.
The performance is taken care of by restricting the number of users to consume various services by
defining an access control mechanism. However, regular performance tuning initiatives like purging
and archiving of data are to be adopted to ensure optimum performance.
Extensibility: Extensibility refers the ability to add new functionality without requiring major
changes to the existing code. e-District application should be extendible to adopt following of
changes with minimal or no changes to existing code
Providing new content processing, content management system
Significant growth of the content
Providing new transactional state services
Deleting existing transactional state services
Providing new functionality or feature or service
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 67
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Maintainability: All the applications have been categorized in three types depending upon the
change of design permissible at States:
Core Applications designed and developed for State not permitted to be modified / changed
by them.
Configurable Application designed and developed for States configurable according to their
needs.
Customizable Application designed and developed for State as optional and State has the
flexibility to either use the same or get it developed afresh based on the guidelines issued by
the NIC as per their requirements.
The core applications do not have any configurable or customizable components at State. The
configurable applications would have parameters which can be configured as per the States’
requirements.
Multi lingual support: At e-District application, repository content management system is to be
created in local language(Kannada in Karnataka State) for disseminating information to Citizens. For
providing access to States citizen’s information it is also necessary to make this information available
in English.
Security: Majority of the services are G2C services, and most of the information is in public domain.
The security requirements should address data privacy, confidentiality and access control
mechanism. In addition, the security should address the following features
PKI Infrastructure
DMZ policy
Encryption
Authentication
Authorization
Digital Signature
The following considerations are being made:
a. Application server level: The access to various applications is controlled by Active Directory (AD)
authentication services at the State level. The district would keep AD user data for authentication
and authorization at district level. Since SOA paradigm is used, the web service itself must be
secured. A standard policy driven security approach would be highly beneficial for enforcement of
uniform security across the portal for existing as well as new web services.
b. Database level security: Only authorized users are allowed to upload / change the data. The data
backup is performed as part of schedule task and is encrypted to ensure safeguard against data
theft.
c. Security: In addition, system should provide the following security features
System should support integration with third party authentication services or tools
System should provide unrestricted access to administrator or super user
Transactional Central/State services are accessible only to authenticated users
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 68
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Confidential information such as login pages and pages related to transactional services
should be served over https.
Royalty: Open Standards are free for all to implement, with no royalty or fee. Certification of
compliance by the standards organization may involve a fee.
Database Features: The following are the Database Features of the e-District application,
Should support data base partitioning and parallel processing
Should support Active-Active Configuration
Allow users to connect and use the same database from multiple nodes by using resources
of the individual node
Should be available under maximum number of Operating Systems and supported under
maximum number of Application Servers.
Should have support for generation, consumption of XML data and XML based query
capabilities.
Allow multi dimensional OLAP capabilities for Data Warehousing
e-District Application Solution Architecture
The estimated numbers of departments that are to be integrated with e-District application are
about 7, which need to interact with application and to each other for seamless delivery of
information / services to Citizens. The interactions between these departments are proposed to be
done using industry’s widely accepted and adopted Service Oriented Architecture (SOA) framework.
The interoperability should be built by using SSDG on XML (extensible Markup Language) and Web
services standards. The following are the important features of e-District application and SSDG
solution
Adopt Service Oriented Architecture
Develop business functionality as services
Provide web based interface
Extensible to support multiple access devices such as desktop computer, IVRS, Mobiles,
Service Delivery Channels etc
Ensure confidentiality of citizen’s data
Achieve interoperability between State Portals and National Portal.
Integrate with departmental applications for services
Integrate with websites of government departments and organization for content
Using SOA framework, the services at e-District application would be exposed using the web services
and same can be consumed by various departments on demand basis. The next section describes
the technology architecture proposed for e-District portal & SSDG. All the services will be realized by
the technology platform which has the following architectural building blocks
Web Server
Application Server
SSDG
Directory Server
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 69
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
SMTP Server
The Technical features of the e-District application Server are,
Open Standards like Web Services and SOA to provide inter-operatability with a number of
Operating Systems.
Driver support for accessing and storing information in a number of databases
Provides capabilities for Centralized configuration and control
Central data repository would be created at the district level, wherein data and information
would be collected, stored, retrieved, used and exchanged in an efficient manner at all levels
Leverage and utilize of the core and support infrastructure such as Common Service Centres,
State Data Centre, State-wide Area Network and Service Delivery gateway at the SDCs
Integration with existing applications with e District application
Application development should be based upon open standards
Support n tier architecture and based on SOA
Centralized Architecture Design
Production environment should be 3 or more tier architecture
Support TCP/IP protocol
High Availability Solution at the Database Level
Disaster Recovery Solution
Security Features
PKI Infrastructure
DMZ policy
Encryption
Authentication
Authorization
Digital Signature
RDMS Features
Support data base partitioning and parallel processing
Support Active-Active Configuration
Allow users to connect and use the same database from multiple nodes by using resources
of the individual node
Available under maximum number of Operating Systems and supported under maximum
number of Application Servers
Support for generation, consumption of XML data and XML based query capabilities
Allow multi dimensional OLAP capabilities for Data Warehousing
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 70
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
e-District overall Solution Architecture
Client Entities
Citizens, Service Delivery Channels & State Government are the stake holders of the e-District
application & SSDG solution, who forms the Client layer. Client Layer constitutes of Web Client which
is normally the Web browser. They access the e-District applications through various delivery
channels. The stakeholders can receive the information/deliverables by the services through channel
delivery services.
Desktop, IVRS and Service Delivery Channels users directly access e-District solution through internet
over HTTP/HTTPS protocol. Requests from Mobile users should be processed using mobile switch
which in turn forward requests to WAP gateway where WML will translate into HTML and it will
forward to e-District web server. Once the request gets processed the response is forwarded as
HTML wherein WAP gateway converts HTML into required WML format and displays on mobile
devices.
Channel Delivery Layer Entities
Channel delivery services contain the secured gateway services, which handles the number of
transactions across the entire network. The various secured gateways that are used are XML
gateway, SMS gateway, SMTP gateway, Web gateway etc.
Presentation Layer Entities
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 71
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Presentation Services handle the user management, personalization features. Based on the type of
user logged in, the layer routes the request to the respective services of the business service layer of
e-District solution.
Web: The Web Portal provides information for the stake holders over internet using a web browser.
There will be certain sections of the portal which will be accessible to all the users which is referred
to as the “public” part of the portal and certain sections which can be accessed only by authorized
users referred to as the “protected” part of the portal. Based on the role of the user being
authenticated respective functionality will be made available to the users.
Responses will be rendered using Cascading Style Sheets (CSS). JavaScript will be used for client side
validations. e-District Portal solution would support multi-lingual content and pages will be displayed
in the language selected by user.
Personalization: Personalization component of e-District solution provides its stake holders to
customize their preferences for better user experience. Personalization covers the ability for a user
to influence their experiences. Increasingly, portals themselves offer users the ability to tailor the
function available to best suit their needs. That part of personalization that is relevant for
presentation is of direct concern to authors when creating web content that support multiple
delivery contexts.
Security Layer Entities
The secure proxy server intercepts stakeholders whenever they request to access the secured
information. URL will be routed to this component, whereas it will challenge (User Id and Password)
the user for authentication if user accesses the secured information.
Authentication: e-District solution’s authentication component will authenticate by challenging
users to provide their user Id and password.
Authorization: Authorization component will make sure that stake holders must be able to access
whatever information they have got access to. An authorized system user should be allowed to
define the various available roles in the system. Each user should be mapped to the respective role.
Based on this the user should be provided access to various available functionalities of e- District
solution.
Business Logic Layer Entity
Business Services: The Business services will provide required services for its stake holders. These
services will be provided by State and various applications and consumed by State departments
using service communication components.
User Management: The user management function should address how identities and users are
created, maintained, or revoked on termination.
Self-Service: Self-Service component will provide interface to citizens manage their own profile
information like user registration, reset passwords, update contact information, request for
accessing government services if required, etc. During user registration process e-District Portal
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 72
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
must provide CAPTCHA (Completely Automated Public Turing test to tell Computers and Humans
Apart) where users should enter those details to register themselves with e-District Portal.
Content Management Services: e-District solution has large number of content objects and
documents. It manages complete life cycle of all content objects. Content generators create
information and it is stored and managed in electronic or manual record form.
Workflow Services: Workflow services capture input data, standard processes and business rules for
processing data for a pre-defined output. Workflow service addresses the application submission,
status tracking, and verification of documents, and availability of service. All the workflow services
are available Online with the availability of 24X7 and 99.9% uptime. The following are Workflow
based services:
Verification (physical and non physical)
Rejection
Approval
Monitoring
Reporting: e-District solution’s Reporting component will be used to generate reports for following
requirements but not limited to
Generate web analysis report to business users
Provide audit trail, i.e. author, date created, modifier, date modified, for each program.
Generate report for general application statistics, e.g. availability and average response time
etc.
Search: e-District solution will have search component to provide quick access to information, which
includes documents, HTML pages, images, audio files, video files etc. Search functionality should be
able to query both structured and unstructured content by keywords
Notifications: e-District solution would have facility to send notifications, alerts to its registered
users. Users should be able to subscribe for some of the services like SMS, News etc. On updates in
these services, subscribed users of e-District solution will get notifications by email.
Infrastructure Services Layer: e-District application would contain following list of Utility services to
maintain and manage the portal application.
Application logging
Exception handling
Notifications
Audit Trail
Data Layer entities
Database Server: e-District application will use Relational Database Management System (RDBMS)
for persistent store of structured data.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 73
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Document Repository: Static content of e-District application Portal such as documents, PDF files,
images, audio/video files etc would be stored in document repository. These files should not be
stored in database.
Data Layer: Static content of e-District application such as documents, PDF files, images, audio/video
files etc. would be stored in document repository. These files are not being stored in database.
Directory Server: Directory Server of e-District application contains profile information of stake
holders, Roles, application level ACL’s (access control lists), service level access control list etc. This
directory server should be made accessible using Open LDAP.
Integration Layer Entities
Service Communication Infrastructure: To provide access to different services of e-District, SSDG is
used. SSDG as a messaging middleware acts as an intelligent hub and routes service requests from a
Service Seeker (Service Access Provider) to a Service Provider (typically a back end Government
department that puts up its service for electronic delivery) and in return sends the response back to
the Service Seeker through the Gateway.
The gateway achieves integration amongst diverse set of applications built on varying platforms
through compliance with a set of e-Governance Specifications- Interoperability Interface Protocol
and Interoperability Interface Specifications (IIP/IIS) that are based on open standards such as the
W3C XML and SOAP specifications.
The Gateway specifications developed for the Gateway messaging and support/common services are
Interoperability Interface Specification (IIS)
Interoperability Interface Protocol (IIP)
Inter Gateway Interconnect Specification (IGIS)
Gateway Common Services Specification (GCSS)
Management and Monitoring Layer Entities
Application / Network / Infrastructure Management: Infrastructure components of e-District
application will manage and monitor the health of the application, network, hardware, software etc
to manage standard architectural requirements. Following are list of components that should be
monitored
CPU Usage
Hard disk Usage
Network bandwidth
email Server
Print Server
File Server
Backup and Restore: The data backup is performed as part of schedule task and is encrypted to
ensure safeguard against data theft. Automated backup & restore components of e-District
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 74
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
application & SSDG solution will take backup of required content like application code/executables,
data, content etc and restore whenever required (e.g. in the event of a disaster).
Integration Architecture
e-District application Integration Architecture depicts how various departmental applications
operating on different platforms can effectively integrated to e-District application and work
together. SSDG uses the Integration techniques, when new application systems need to access
existing application systems, while maximizing the investment in existing systems and platforms.
e-District application will integrate with following external interfaces to provide services to citizens:
Government Departments (Departmental Applications)
Websites of Government departments and organizations
State level service registry/repository
Consolidated Metadata Repository
The following departments are to be integrated with the e-District Portal.
Social Welfare Department and Tribal welfare
Agriculture Department
Fisheries Department
The Integration features to be provided by the Middleware solution are
Standards based messaging and routing switch ensuring secure and guaranteed delivery of
Services between the e-District application and the back end departments and between
departments.
De-link the backend departments from the e-District application front end service delivery
mechanisms.
Department will connect only once to the Gateway and transact with multiple Service
Delivery Channels, simplifying the view of the external world to the departments and
provide better security
Audit logging & time stamping of transactions going through it
Departments backend work flow can evolve gradually as the Gateway acts as a middleware
de-linking the backend from the front end
Gateway should have the capability to add additional functionality to support shared
common services like Authentication, payment gateway interface, etc
Use of common language viz XML for message exchange between department applications
Following diagram depicts the high level overview of e-District application integration to various
departments at district level
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 75
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
e-District Application – Integration Architecture
Application Level Integration
All the department’s applications are built on multi tier architecture or these applications business
logic is well separated from presentation and data tier. These types of applications can be integrated
using Application Level Integration.
The business logic of these applications are existing in form of .Net or Java components.
Transactional government service will be a wrapper on top of the existing code interfacing with
external applications using standard protocols.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 76
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Application level Integration
Features of Application Integration are
Business logic will reside in the form of components or well defined functions or procedures
packaged as static or dynamically linked libraries
User interface will be either web based on rich GUI.
Technologies used for application DB will be Open database like Postgress Security
Architecture e-District application security initiatives should include, DMZ Policy, encryption,
authentication, authorization and digital signature. It should take the appropriate measures
for the data privacy, confidentiality and access control.
e-District application portal’s complete security is assured by implementing the security at the
following levels,
Component level (Operating system, routers, switches etc.) security (ISO 15408)
Application level (Basic application for access control, authentication and audit trail etc.)
Security System level (Physical security, communication and operation management, business
continuity management etc.) security (ISO 27001)
Element of Security Description/Requirement Implementation Technique
Standards
Integrity Information should not be altered in an unauthorized or unexpected way or
Signing the information
Include message digest as part of the encrypted message.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 77
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
intelligible interception.
Confidentiality Information should not be revealed or read by others at all except the parties in question. Transient Message Confidentiality: Requires information be protected while in transit Persistent Message Confidentiality: Even after reaching the destination, confidentiality of the data be maintained.
XML encryption 1. Message-Level 2. Element-Level 3. Transport Level
XML-Dsig
Identity and Authentication
Users or applications while interacting with each other should furnish their identity in order to be recognized Applications or services should have a mechanism to either recognize or restrict the user access based on the identity furnished.
1. X.509 certificate 2. SAML Token 3. User name/Password credentials
WS-Security: This describes how to attach signature and encryption headers to SOAP messages. In addition, it describes how to attach security tokens, including binary security tokens such as X.509 certificates and Kerberos tickets, to messages. WSS-SMS
Authorization & Policies
Making the decision about actions that an entity is able to perform and enforcing them as appropriate.
WS-Authorization: This will describe how to manage authorization data and authorization policies. WS-Policy: WS-Policy represents a set of specifications that describe the capabilities and constraints of the security (and other business) policies on intermediaries and endpoints (e.g. required security tokens, supported encryption algorithms, privacy rules) and how to associate policies with services and endpoints.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 78
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Privacy Encryption of information.
Encryption – PKI 1. Symmetric Key – Cost of Encryption and decryption are smaller in terms of performance. 2. Asymmetric Key – Cost of encryption is higher than on decryption with private key.
Secure Proxy Server: The secure proxy server intercepts users whenever they request to access the
secured information. URL will be routed to this component, whereas it will challenge (User Id and
Password) the user for authentication if user accesses the secured information.
Security
Access Security View
Single Sign-On: Single Sign-On allows the user to sign-in only once, after which the user is directed to
the e-District portal and will not be prompted for the user id and/or password when accessing any
other Government Services provided by the departments.
Authentication: Authentication is validation of a user’s identity (ID/password). Lightweight Directory
Access Protocol (LDAP) is an internet standard protocol which is commonly used for authentication.
Allowing only authenticated users to access system resources protects those resources from
inappropriate access.
Authenticating users are the basis for providing accountability.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 79
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Use a district-wide public key infrastructure:
Collaboration and co-operation will be required to support security services across the states
and departments.
A unified approach to a Public Key infrastructure enables the state to respond to changing
requirements and conditions.
A fragmented approach to a public key infrastructure will complicate administration and
management of security across the state.
Use Public Key / Private Key technology for authentication when digital signatures are required:
Public Key / Private key technology is the most widely accepted form of digital signatures.
Digital signatures are central for most electronic business.
Authorization: Authorization will be performed in application tier. Authorization of the user is done
by verifying his credentials at the database.
Audit Trail and Logging: Logger service component will provide the functionality of logging system
activity and audit trail information. Other application components communicate with logger through
logger client component. Logger client component communicates with logger service by sending JMS
messages. Logger service reads JMS messages and saves into database.
It will use Log4J library. Logger service should be deployed on all nodes of application cluster.
Application objects running on a node will use local logger service and should not access logger
service deployed on other nodes of the cluster.
Directory Server: Directory Server of e-District Portal contains profile information of Citizens, Roles,
application level ACLs (access control lists), service level access control list etc. This directory server
should be made accessible using LDAP
IT Infrastructure: The proposed solution would consist of an e-District Portal and Departmental
applications would be integrated to the e-District portal using SSDG. This architecture would also to
be adopted by other government departments later at the time of state wide roll-out, therefore it
needs to have enough flexibility to accommodate department level variations.
Solution Deployment Architecture
The eDistrict system would leverage on the various existing applications & provide a common service
interface to the citizens & various other stakeholders. There would be service level interactions
between end users, existing applications & external systems (via the gateway interface). Citizens &
Service Deliver Channels would interact with the e-District portal via standard service interface. The
model will effectively encapsulate all legacy system & external system interfaces.
The operators of Service Deliver Channels should get authenticated before the access to the
application is made available. The Service Deliver Channels are to post the request for service and
deliver services interfacing with the applications hosted or connected through the State Data Centre.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 80
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
The deployment architecture is based on the philosophy that state services would be hosted in SDC.
The e-District Portal would host all the state level services to the citizens through a common service
gateway. The model is built around multi layer request response model. The disaster recovery site at
state data centre ensures 100% availability of the state services to the citizens.
Deployment architecture depends on number factors including response time, availability, e- District
application Technology Standards etc. Improving system availability and the ability to accommodate
increased workload are the main objectives of server or process clustering.
Typical highly available deployment architecture for e-District application is shown in Figure below.
The architecture uses an active/active cluster technology for high availability solution at data tier
and application tier.
In Active-Active Configuration, in Normal circumstances, both the nodes (hardware servers)
configured in a cluster continuously provide the services to users, so both the nodes are utilized in
online enquiries, transactions, etc. while running the same application. When one node goes down,
the entire load of the application switches over to the second node.
e-District Deployment Architecture
4.4.9 Mechanism for ensuring compliance to service levels
SLAs and objectives are a key component of successful internal and external vendor relationships.
When SLAs are not being met, both IT and the business need to be quickly alerted to the problem. In
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 81
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
order to ensure that the project SLAs are being met, the project team will have to perform
diagnostic detail needed to quickly determine the root cause of the problem and restore compliance
before damage occurs and service delivery is impacted.
The mechanism for ensuring the compliance of service levels includes both qualitative and
quantitative analysis of the project implementation. The following are the some of the key activities
that will be performed to ensure the compliance of the service levels.
Defining the objectives, monitoring targets and milestones for the assignment
Monitoring progress towards results, and resources consumed, with the use of appropriate
indicators
Identifying and managing assumptions/risks, while bearing in mind expected results and the
necessary resources
Measuring the progress by using quantifiable indicators and qualitative narratives
Defining the baseline for the assignment
Reporting on results achieved and the resources involved
The following are the various steps involved in the Quantitative and Qualitative Evaluation
Methodology for service level compliance
Regular meetings of the project team with key officials of Government to understand the
objectives, status of the project and the expectations.
Project documents will be studied in depth during this phase. Best practices adapted by the
other stakeholders, best practices in other states and documentation carried out by project
officials are referred to get an overview and understanding of the project.
Clearly communicating the governance procedures, roles and responsibilities to the project
team
Project Planning: Based on these meetings, a detailed project plan would be prepared.
Establishing the rationale for the project objectives and stakeholder expectations which will
be monitored throughout the project.
Maximizing the results and minimizing negative impact individuals, groups of people,
institutions, firms that may have a relationship with the intervention
Establishing the “cause and effect” relationships between the problems that exist and
providing the timely mitigation strategy to the project team
Preparing a Logical Framework for the project implementation in which the objectives, the
assumptions, indicators and evidence are ordered.
Developing regular monitoring and evaluation mechanism for the management to make decisions
and steer the project to success. Activities, budget schedules, outputs and assumptions, stakeholder
responses and the project’s contribution towards the longer term outcomes to be monitored on a
regular basis through the implementation.
Evaluation of the project’s outcomes, impact and contribution to the strategy to be carried out. This
will use the qualitative and quantitative analysis for measuring the impact of the project in the state.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 82
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
4.4.10 Public Awareness Campaign, Citizen Feedback Mechanism & Post Implementation
Assessment
Citizens are key stakeholders in the e-Governance initiatives undertaken at various levels and since e-District project caters to high volume citizen centric G2C services, it is very critical to identify mechanisms and strategies for creating awareness about the initiative among this set of stakeholders. Various cannels like: Print Media (local newspapers, magazines etc), Electronic media (television shows, radio, etc), display of information on official website, Display of Information boards at various Government offices and common service centers, beating of drums, creating awareness through Gram Sabha and Gram Panchayat meetings, skits may be used for the same purpose. ‘Aanganwadi’ workers may be appointed as ambassadors of e-District for promoting the concept in the rural areas.
All the expenses incurred for Awareness creation and branding should be under Administrative expenses. Incentive and motivation scheme announced by DIT at National and state level is not a part of this administrative expense. However SDA can announce various motivation schemes at the district level. The motivation schemes should be targeted towards motivating district staffs, Service Deliver Channels and other parties involved in e-district implementation. The Incentive plans can be like best performing Service Deliver Channels in terms of transaction volume per month, best department in terms of maximum processing within stipulated SLA etc.
Strategies for Promoting Awareness about E-District Project
Information is a prerequisite for regional integration, socio-economic development and promoting
the e-governance in the country. For e-District project to effectively deliver its goals, to improve the
availability of information to all the stakeholders it is very important to have a structured
Communications and Promotional Strategy for e-District portal. Proposed strategy for awareness
generation about e-District among the various stakeholders of the project in the state takes into
account the diversity and large population. These activities promote visibility of e-District and help
more number of citizens to seek the services of e-District and enhance the contribution of e-
Governance to the agenda of social transformation through participation which is central to a large
number of programmes and schemes of the government and donor agencies.
There are broadly two types or levels of initiatives that have significant potential in promoting the
awareness about e-District Project
IT focused awareness
Non-IT support services for enhancing access to e-District portal
Each of the components in awareness strategy is supplementary to each other and activates the
interest, awareness and participation of the stakeholders.
e-District Project Communication and Promotional Strategy Objectives
The Communications and Promotional Strategy for e-District would create an environment that
ensures increased access to various government services by all its stakeholders and its cooperating
partners. It objectives include:
Increase awareness about e-District to all the stakeholders through the creation of various
channels for service delivery
Enable stakeholders within their categories to access services relevant to their interests
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 83
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Facilitate the sharing and exchange of information and knowledge among the citizens of the
community.
Develop and maintain cohesion in government, internal relations, which in turn would
concretize synergy of the institution’s professional and efficiency towards its external
publics.
Foster and strengthen the partnership between state government and citizens
Build and foster relationships between the government and the news & information media
in the local, regional and international media.
Intervention Areas for Awareness Strategy
In order to achieve these objectives, the following intervention areas are identified for generating
the awareness on e-District project
General Awareness raising activities of e-District Project
Establishment and strengthening of a cross-cutting network for implementation of the e-
District project
Encouraging Media to report on e-District through maintaining and strengthening the
relationships with media
Work with different stakeholders on targeted reporting on e-Governance projects in the
state
Supporting all the stakeholders in promoting e-Governance initiatives
Organizing workshops and Training session to all stakeholders on the promotional activities
and usage of Information technology to avail the government services at all levels.
The success of the e-District portal lies in involving large number of stake holders in visiting and
participating in the portal. The Proposed e-District portal is not a regular internet portal which
provides general information. The main objective of this portal is to provide the government services
to citizens and aimed to promote the efficient service delivery. Some of the awareness strategies
that can be used for promoting the e-district portal are:
Utilizing the Exiting Business Relationships: Using existing relationships developed within the
government will build site usage and recognition with the demographic most likely to be repeat
users of the portal
Web-based Promotions: Using banner advertising on Indian government websites will increase
brand awareness to a much wider audience, while still maintaining our target demographic.
Other IT based awareness activities include:
o Quality of services of web portal & content
o Service Deliver Channels and other service delivery channels for on the spot solution to
user’s problems, toll-free number
o Prepare awareness material for wider outreach - flyers, posters, ads in NGO websites
o Popularize the project in e-journals, e-books and e-databases
o Liaison with NGO networks for raising user awareness about e-District project
o Support computer literacy programmes for accessing and using electronic portal effectively
Newspaper Advertising: Placing large ads in noted newspapers directing the rural institutes to
provide greater penetration into our targeted demographic.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 84
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
On-line Poll: Ask visitors to give their opinion on various issues related to portal. This can be
made as a regular feature by posting different questions in different times. After posting their
views the visitors can see the result of the present and previous polls. This will create interest
among the visitors and they will return to portal to see the result of the poll. This will also help
in improvement plans of the portal.
Networking: Need to promote networking among the stakeholders, NGOs and Government
officials at district and sub district level for effective service delivery and collective action.
Government could promote networking to facilitate collective action, dialogue for alternative
strategies, community mobilization, and increased access to government interventions.
Networking unleashes the strengths of the members and helps them share relevant information
through varied means.
Consultations, Communication & Feedbacks: Interacting offline with the senior officers or head
of the section on various issues and features of the portal. Develop various indices to give idea
on popularity, participation level, hours spend on portal etc and circulate them among the
departments/sections with the parameters of the individual departments. Regular consultations
like seminars/ conferences on different themes at national and regional level could be
organized to highlight issues of concern and also provide a specific direction that is required for
sustainable community development.
4.4.11 Post Implementation Institutional Mechanism for O&M phase
Monitoring will be done during roll-out and post implementation as well. The team will be
responsible for monitoring of the project and evaluation of the outcomes of the project. Project
monitoring will be done through the hired external competency during the development & rollout
phases of the project. Project development and rollout can be monitored through the reports like,
Software development schedule adherence report and rollout progress reports.
Performance levels as expected from the application software under typical working load must be
mentioned in the contract awarded for application software development. Adherence to defined
performance levels shall be dealt with in accordance to the terms defined in the contract.
The project would require a close supervision and appropriate project control for successfully
meeting the objectives after the completion of the project. The post implementation monitoring of
e-District is important for effective delivery of citizen services. The following mechanisms will be
adopted for post implementation of the e-District project.
1. The District e-Governance Society formed for implementation of e-District Project will support
the state Committees of e-District and function as the secretariat and full time implementing
body at the district. This team will be responsible for undertaking the post implementation.
2. The state project committee takes the responsibility of monitoring the project by providing
overall direction and guidance to the district e-Governance societies. The following activities
will be performed by the state project committee during the post implementation stage
To ensure that all the participating districts take active part in project
To identify key points of contacts who would be able to dedicate quality time with the
Implementation Partner throughout the roll out
To review the installation, commissioning and maintenance activities
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 85
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
To conduct review meetings at regular intervals to monitor the overall progress of the
project
3. Nodal officers of the division would be responsible controlling and monitoring the overall
project at Divisional level. Responsibility of the nodal officers include:
Implementation of e- District policies as directed / provided by State Implementation
committee or Govt. of Karnataka and giving directions to DeGS’s to follow the same at
their respective district.
Responsible for providing strategic direction for implementation of project initiatives in
the region.
Provide guidance to the District e governance society.
Identify and escalate project related issues that impact Project delivery and to bring
them before State level / other forums.
4.4.12 Estimated time frame and costs (In Lakhs)
Please refer to Sec 2.4 for Time frame and Sec 2.5 for Costs.
4.4.13 Details of Monitoring, Evaluation and Assessment
Monitoring & Evaluation Framework
Monitoring will be done during roll-out and post implementation as well. The team will be
responsible for monitoring of the project and evaluation of the outcomes of the project. Project
monitoring will be done through the hired external competency during the development & rollout
phases of the project. Project development and rollout can be monitored through the reports like,
Software development schedule adherence report and rollout progress reports.
Performance levels as expected from the application software under typical working load must be
mentioned in the contract awarded for application software development. Adherence to defined
performance levels shall be dealt with in accordance to the terms defined in the contract.
The evaluation study can be conducted by the team or can be outsourced to an independent
evaluation agency. The output will be measured against the goals for assessing the effectiveness of
the project. Measurement of output(s) can be done through reports generated through the
developed system as well as feedback from the citizens. Reports such as those providing details of
adherence to charter, demographics of the beneficiaries etc. can be used for estimating the
effectiveness of the project. On the other hand, feedback of the citizens, gathered through survey
can help judge the satisfaction level achieved by the project.
The evaluation results will be made available to all the stakeholders of the project, especially the
decision makers (senior functionaries of the government) and the citizens. For the deviations such as
those in the schedule or effectiveness of the project, root-cause analysis must be performed. If the
reason(s) is(are) among the risks already identified during project conceptualization, defined
mitigation plan(s) in light of the changed circumstances must be adopted. In case, the cause of the
problem is one which is not anticipated early on, cost-benefit analysis must be performed for the
measure and decision must be taken accordingly. To reduce the impact of unforeseen reason(s) of
deviation, frequent and periodic reporting of parameters indicating the schedule adherence and
project effectiveness is suggested.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 86
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Review and Monitoring Framework:
The project would require a close supervision and appropriate project control for successfully
meeting the objectives and its timely completion. The individual projects would be executed in the
district administered by a Project Manager under the supervision of the State Steering Committee
(SSC). The State would have full responsibility for the project and all decisions for the project would
be made by the SSC.
State Apex Committee
The Committee plays a major role in drawing out the requirements for implementation of the
project and evaluating funding opportunities for the same. Government of Karnataka constituted
State Apex Body to ensure interoperability among e-Governance projects and enforce standards in
implementation of e-Governance projects.
Chief Secretary Chairman
Principal Secretary IT,ST, BT and e-Governance Department Member & Convener
Principal Secretary, Finance Department Member
Principal Secretary, Health , Medical and Family Welfare Department Member
Principal Secretary , Revenue Department Member
Principal Secretary , Municipal Administration Department Member
Principal Secretary , Labour Department Member
Chief Executive Officer, Centre for e-Governance, e-Governance Department Member
State Informatics Officer, NIC Member
State Project Steering Committee
The State Project Steering Committee is to be set up ideally under the Chairmanship of the Chief
Secretary in the State to provide overall vision, direction and guidance.
Principal Secretary, IT,ST, BT and e-Governance Department Mission Leader
Secretary, Revenue Department Member
Secretary, Finance Department Member
Secretary, Social Welfare Department Member
Secretary, Food and Civil Supplies Department Member
Secretary, Municipal Administration Department Member
Secretary, RDPR Department Member
Secretary, Excise Department Member
Secretary, Agriculture Department Member
Director, EDCS, e-Governance Department Member
e-Dictrict Champion Member
Representative from DIT,GOI Member
Representative from C-DAC Member
Representative from NIC Member
Representative form STQC Member
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 87
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District e-Governance Society (DeGS)
The District e-Governance Society to be formed for implementation of e-District Project will support
the state Committees of e-District and function as the secretariat and full time implementing body at
the district. This team would be responsible for undertaking the groundwork for providing for an
overall direction, standardization and consistency in the implementation. The composition of the
District e-Governance Society would comprise of
1 Deputy Commissioner Chairman
2 Addl. Deputy Commissioner Member
3 Tashildhar Member
4 Joint Director, Agriculture Department Member
5 Sr. Asst. Director, Fisheries Department Member
6 Deputy Commissioner, Excise Department
Member
7 District Social Welfare Officer(DSWO) Member
8 District Tribal Welfare Officer(DTWO) Member
9 District Officer for Backward Caste and Min.
Member
10 DIO - NIC Member, Secretary
11 Designated Official from IT &Department Member
12 Any other nominated officer Member
Roles and Responsibilities
Clear roles and responsibilities of all the partners have been presented in this section. These roles
and responsibilities include the tasks and activities which would be performed by the various
stakeholders while the state wide roll out of e-district project.
Responsibility of State Apex Committee
State steering committee is the responsible for the management of the project. Responsibility of the
State steering committee is presented below:
Ensure the formulation of State Implementation committee
To appoint a Nodal Officer to represent the State and provide all State level support for
smooth state wide implementation of the ‘e-District’ Project
To enter into necessary MoUs/agreements with DIT/other central agencies/service providers
for funding
To ensure timely sign – offs
To ensure timely release of the payments as agreed in the payment terms
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 88
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
To take steps to mitigate any such potential risks that might surface during the course of the
project
Responsibility of State Project Committee
As a State agency monitoring the project, the role of owner in the successful implementation of the
proposed system includes discharging the following responsibilities:
To identify and nominate the District e-governance teams/societies (IT/ revenue
department) at the District level and ensuring complete involvement of the project
champion from start to finish of the project
To ensure that all the participating districts take active part in project
To identify key points of contacts who would be able to dedicate quality time with the
Implementation Partner throughout the roll out
To review the installation, commissioning and maintenance activities
To conduct review meetings at regular intervals to monitor the overall progress of the
project
Responsibility of Nodal Officers of particular Divisions
As a nodal officer of the division, the person would be initiating, controlling and monitoring the
overall project at Divisional level. Responsibility of the nodal Officers is specified below:
Commissioners will represent his/her region and provide all support for smooth
implementation of the Project.
Implementation of e- District policies as directed / provided by State Implementation
committee or Govt. of Karnataka and giving directions to DeGS’s to follow the same at their
respective district.
Responsible for providing strategic direction for implementation of project initiatives in the region.
Provide guidance to the District e governance society.
Identify and escalate project related issues that impact Project delivery and to bring them
before State level / other forums.
Facilitate the establishment of project related IT infrastructure within the districts covered
under the region.
To review the installation, commissioning and maintenance activities
Management of ‘e- District’ implementation through a dedicated unit
Responsible for driving project initiatives at the departmental level
Responsible to develop conceptual parameters for implementing the Project as quickly as
possible
To conduct review meetings of DeGS’s at regular intervals to monitor the overall progress of
the project
To ensure timely release of the payments as agreed in the payment terms
To take steps to mitigate any such potential risks that might surface during the course of the
project
Audit the receipt & utilization of financial support received from the State Government.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 89
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Responsibility of District e-Governance Society (DeGS)
The DeGS would provide close tie-ups with all the stakeholders in the Project at field level.
The stakeholder from the district government would include District Collector Additional
District Magistrate Sub District Magistrate, Tehsildar, Block development officer, and field
functionaries
Provide guidance to the Project at District level.
DeGS would also work closely with the technical solution provider for developing and
customizing the software, implement the technical solution
Coordinate, manage & monitor the receipt & utilization of financial support received from
the State Government / Government of India
Support the Service Delivery Channels throughout the District for providing G2C services as
per the Service Level Agreements
Collect user charges as fixed by the State Government and keep audited accounts of the
same.
Take all publicity measures and campaigning through media like TV, radio, newspaper,
conferences, seminars, public meetings, banners and posters etc for creating awareness
about transformation through e-Governance for the benefit of the rural masses.
Explore revenue streams for the sustenance of the District e-Governance Society and assist
SDA in formulating policies accordingly.
Program Management Structure
The statewide rollout of e-District Project would require a strong Project Management Structure to
be set for effective implementation of e-District Project in all 30 districts of the state. The PMU
structure would be required at key levels which have direct influence on implementation;
monitoring and control, achieving efficient and timely completion of e-District Roll Out. This would
help provide control over roll out activities and would also ensure that there is no cost and time
escalation as well as eliminate redundancy in implementation.
The total timeframe of total project implementation is being taken as 24 months and Post
implementation support is considered for 12 month. It is proposed to set up the PMU structure for
e-District Roll Out at 2 levels in the state
a. State Project Management Unit (SPMU)
b. District Project Management Unit (DPMU)
State Project Management Unit
The State Project Management Unit is proposed to set up to help and support the State Steering
Committee to rollout e-District project in Districts. The State Project Management Unit would be
mainly responsible for
a) Support State Steering Committee in monitoring, controlling and correctives during roll out
b) Support, Monitor and Guide the District Project Management Unit for implementation of e-
District Project in the districts
c) Co-ordinate and meet the requirement of Central Project Management Unit
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 90
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District Project Management Unit
a) The District Project Management Unit is proposed to set up to help and support the District
Steering Committee to rollout e-District project in the District. The District State Project
Management Unit would be mainly responsible for
b) Support District Steering Committee in monitoring, controlling and correctives during roll out
c) Monitor, Control and report the Implementation vendor performance as per the guidelines,
directives, agreement, etc.
d) Co-ordinate and meet the requirement of State Project Management Unit on behalf of the District
Steering Committee
4.4.14 SLAs for IT infrastructure & Services in terms of uptime & Service Levels
It is important to follow the standards of performance and to adhere to the SLAs to ensure project
timelines, quality and availability of services. The following are the service levels proposed for
implementation of e- District project in the state
Timely Delivery
Parameter Description
Definition Timely delivery of deliverables would comprise of software application and all documents that are to be submitted as part of the project deliverables.
Service Level Requirement All the deliverables defined in the contract has to be submitted in time on the date as mentioned in the contract with no delay.
Measurement of Service Level Parameter To be measured in Number of Business Days of delay from the date of submission as defined in the project contract.
Resolution Time
Parameter Description
Definition Time in which a complaint / query is resolved after it has been reported by IT & C Department to the Post Go – Live Support team of the System Integrator
Service Level Requirement Any query after being given a response should be classified for resolution in following three categories. Resolution Level 1 (R1): Queries regarding issues which have greater business impact wherein the regular work of the user is hampered. For example, unable to login to the system due to errors in software, online examination module not working etc. Resolution Level 2 (R2): Queries regarding issues
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 91
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
which have medium business impact wherein the user is partially able to perform his/her regular work. For example, user is able to login and perform most of his normal work, but can’t approve a certain document. Resolution Level 3 (R3): Queries regarding issues which have the least/no business impact i.e. involve cosmetic changes. Type of query allowed and Maximum Resolution Time R1 -1 Business Days R2- 3 Business Days R3 - 5 Business Days
Measurement of Service Level Parameter The Service Level would be defined in the number of business days calculated from the date of logging the call/raising the request with the SI
Installation of Hardware Equipment
Parameter Description
Definition Installation of Hardware Equipment would comprise of procurement, pre inspection check, Configuration and Testing by PA and Roll-out approval from IT & C Department
Service Level Requirement Installation of Hardware Equipment should be completed within 2 weeks after delivering to the respective offices under the project
Measurement of Service Level Parameter To be measured in Number of Business Days from the date of Intimation or Request from IT & C department
Application Response Time
Parameter Description
Definition Application response time refers to the page load time, i.e. the time for loading a webpage of the e-District portal.
Service Level Requirement The average application response time for users (time taken for loading of a single web page) should not exceed 3-4 seconds.
Measurement of Service Level Parameter a) Application response time will be measured on the basis of automated reports. b) The data should be captured through automated tools at regular intervals i.e. every hour during the business hours. Data during business hours can only be used for calculations of average response time and percentile point. c) Any planned application downtime should not
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 92
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
be included in the calculation of application response time. However, the PA should take at least 15 days prior approval from IT & C Department in writing for the planned outage.
Security & Incident Management SLAs
Parameter Description
Definition Security incidents could consist of any of the following but not limited to : a) Virus Attack – This shall include malicious code infection of any of the desktops/servers in the network. b) Denial of Service - This shall include non availability of service c) Data Theft - Compromise on any kind of data through network. d) Intrusion – Successful / unsuccessful unauthorized access to e- District Application/ network resulting in loss of confidentiality/ Integrity/ availability of data.
Service Level Requirement The total number of incidents should not be more than 5 per quarter.
Measurement of Service Level Parameter The network should be monitored for: Virus Attack - Any virus infection and passing of malicious code through IT & C s proposed network shall be monitored or member complaints of virus infection shall be logged at the help desk system and collated every quarter. Denial of Service (DoS) - Non availability of any services shall be analyzed and forensic evidence shall be examined to check whether it was due to external attacks. Intrusion - Compromise of any kind of data hosted by IT & C Department.
4.4.15 Site Preparation
For efficient management of service delivery under e-district project, Site preparation activity need
to be completed across the concerned offices. This requires making the office space prepared for
deployment of ICT infrastructure. Site preparation is not restricted to only Electrical work and LAN
connectivity but also Civil and Mechanical works to safe guard the hardware supplied. However such
expenses will be made judiciously. The success of the citizen service delivery system depends on
how robust the ICT infrastructure is and how well it is protected and maintained. Adequate safety
measures have to be taken at all the locations. Appropriate earthing, adequate insulation and Fire
Proofing, Rodent and Pest control measures have to be taken in to account at each site.
Site Preparation for DHQ, AC, Taluka, Faciltation, Training Centres, Social Welfare and BCM Offices
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 93
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
SI. NO. Particulars
Cost/Unit (Rs. Lakhs)
Requirement
Total Cost(Rs. Lakhs)
1 Computer Table 0.04 7687 307
2
Steel Framed Computer custard wheel revolving chairs with Arm and cushion seat and back (Standard size) 0.03 7687
231
3 Printer Tables 0.028 2,562
72
4 Electrical Connections including complete Wiring 0.04
3,844
154
5 Copper Plate earthing 0.08 3,844
307
Total Cost 1,071
4.4.16 The schedule of implementation along with identification of responsibilities
Please refer to sec 2.4 for Timelines and Scheduled activities.
4.4.17 Project Risks & Mitigation Measures
Risk Management is a core process within any project regardless of size, activity or sector. It is the
process whereby decisions are made to accept a known or assessed risk and/or the implementation
of actions to reduce the consequences or probability of occurrence. The benefits of systematic risk
identification and risk management include:
More realistic business and project planning
Actions being implemented in time to be effective
Greater certainty of achieving business goals and project objectives
Improved loss control
Improved control of project and business costs
Increased flexibility as a result of understanding all options and their associated risk
Fewer costly surprises.
Risk management as a process can be described as the identification and mitigation of risks, which
could cause a project to fail to achieve its objectives within time scale, cost or operational
constraints.
Identified Risks in e-District Project Implementation
The following table highlights the high risk areas in the project. These areas require more focus and
regular monitoring to ensure effective implementation of eDistrict project and address timely risks if
any. A proper risk register needs to maintain by the implementing agency and eDistrict and also a
mechanism to be evolved to identify and measure the degree of risks in different areas of the
project. An immediate attention will be required to mitigate the risks as and when any risk arises in
the project on a monthly basis. The table below shows some of the key risks that may be
encountered while implementing the eDistrict solution. The risks have been categorized and
presented for better understanding.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 94
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Risk Areas Specific Areas Technology Risks The application might not provide all required
functionality.
The application might contain excessive defects.
Techno-functional errors in the developed system.
The application is not compatible with other applications
Financial Risks Inadequate Cost Estimates Scope Risks Scope creep
Wrong identification of project scope Organizational Issues Management and Policy Issues
Lack of timely updation of data required for new system.
Legal & Contractual Risks Risk due to improper/ insufficient Legal/contractual risks agreement with the vendors, contractors etc.
Stakeholders’ Risks (Internal – Resources) Inadequate Staffing
Non acceptance of the system Stakeholders’ Risks (External – RIs) Low response for the system by RIs
Risk Mitigation
Risk mitigation strategy mentioned in the section below draws attention for various measures that
could be employed. As Risk Mitigation is a core process within any project regardless of size, activity
or sector. It is the process whereby decisions are made to accept a known or assessed risk and/or
the implementation of actions to reduce the consequences or probability of occurrence. The
following depicts the potential risk areas, their descriptions and the key factors to avoid the possible
risks in pursuing the project initiatives successfully.
Risk Mitigation Methods Proposed
Project Stage Project Risks Strategy Risk Mitigation
Project Development
Schedule overrun Retention Segregation of cause and continuing with independent activities
Cost escalation & Fund constraints
Retention Budgetary allocation
Change in Government priority towards the project
Reduction Prioritization of activities and proceed according to the priority.
Requirement of new functionality as per changing needs
Avoidance Unless critical, the project should be allowed to go with the current scope of development. New Requirements can be built in at a later stage as enhancement. Success of project with should be measured first with current scope only.
Project roll-out Different set of forces at play at the roll-out location from the ones encountered at Pilot
Reduction Communicate the benefits to the stakeholders for support. Training can also help the environment being conducive
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 95
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Location
Project success dependant on personal initiatives; Project champion moving out during the project
Avoidance Roll-out should be institutionalized and shouldn't be a personal initiative. The project should move for a process centric implementation
Project not well accepted by the users
Reduction Change management exercise should be given due importance and carried out with utmost sincerity
Schedule overrun Retention Segregation of cause and continuing with independent activities; budgetary allocation
Cost escalation Retention Budgetary allocation
Security & Confidentiality of the data
Reduction Application development & deployment should be according to "Information Architecture & Standards for GoI". Accountability for information loss/theft should be built in the system
Post Implementation
Technology obsolescence Reduction Use of SOA and open standards
Security & Confidentiality of the data
Reduction Application development & deployment should be according to "Information Architecture & Standards for GoI". Accountability for information loss/theft should be built in the system
Explanation: Avoidance : Not performing an activity that could carry risk. Reduction : Methods that reduce the severity of loss. Retention : Accepting the loss when it occurs. Transfer : Causing another party to accept the risk.
Assumptions for Risk Management
Assumptions for Risk Management are the factors that have an influence on the achievement of
project objectives, and overall success of the project. These need to be managed effectively for
timely achievement of activities, outputs and objectives as desired. Some of the assumptions that
have been taken into account are listed below:
GoK to provide necessary policy and administrative support for developing the solution;
GoK to formulate a risk management strategy;
GoK to undertake wider awareness creation amongst all stakeholders, i.e. both internal and
external;
All the employees of district administration will be trained in the new IT applications, as
applicable to their respective departments/functions/services;
Alignment with National eGovernance Policy Guidelines like State Data Center and SWAN
etc.
Risk Management
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 96
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
A set of standards, which have been developed with an aim to draw attention of the Project
Management Teams to risks encountered in the program environment and to present controlled
solutions to these problems. There are no universal remedies in project management; therefore the
solution presented has been developed especially with flexibility in mind, to be adapted to suit the
particular circumstances of the Program. The rationale for standardizing the method is based on the
added control afforded by all project management using the same process. This should reduce any
misunderstanding and ensure that all of the program teams operate in a uniform manner.
Any project team member can raise an issue at any point during the project lifecycle. The issue is
formally raised; in order to document and review any problems or concerns that cannot be resolved
through direct discussion between team members, or through the day-to-day management process.
Risk Monitoring
It is very important to keep monitoring risks on periodic basis. Risk Monitoring is therefore the
process that systematically tracks and evaluates the performance of risk handling actions against
established metrics throughout the project. During risk monitoring meetings, existing risks as well as
new risks are reviewed and discussed in details by the Project Team. Through Risk Monitoring, the
project team will:
Implement and direct risk mitigation actions;
Monitor the risk mitigation actions to determine their effectiveness, and
Revise the risk mitigation strategies as needed, if required.
The project team should also ensure implementing the following.
Implement the Risk Mitigation Plan - Implementing the Risk Mitigation Plan requires the
monitoring of the risk warning flags and reacting quickly to implement the risk mitigation
strategies. Effective mitigation is proactive, as problems rarely solve themselves.
Assess Mitigation Effectiveness - After implementing the Risk Mitigation Plan, the project
team needs to assess the effectiveness of the risk mitigation actions.
Reassess Exposure - Evaluating the project's current risk status on a regular basis will
address the dynamic realities of the project. Project team meetings can be venues to raise
and report project risk and risk mitigation actions and results.
The project team will also address probability of risks and impact changes, as well as any new risks
that are identified. Newly identified risks should be subjected to the same risk assessment and
management process. Risks that have been successfully mitigated should be “resolved” and that
status should be reflected in the Risk Management Matrix and on project reports.
Successful mitigation means reducing Risk Exposure to a level where the risk is no longer deemed by
the project team to be among the project’s “Top Risks.” The risk monitoring and review process will
provide assurance that there are appropriate controls in place for the eDistrict project activities and
that the procedures are understood and followed and should determine whether:
The measures adopted resulted in what was intended and
The procedures adopted and information gathered for undertaking the assessment was
appropriate.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 97
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
5 Operation and Maintenance Phase Revenue model to sustain O&M phase including revenue projection and recurring expenses estimates
5.1 Projected Revenue
The indicative projected revenue is provided below.
Total Revenue envisaged for 5 Years
SI. NO
Category of Services
Avg. Transactions/Year
Service Charge
Growth Rate/Year (%) Year 1 Year 1 Year 3 Year 4 Year 5
Remarks
1 Certificates 31,56,480 10 10
3,15,64,800
3,47,21,280
3,81,93,408
4,20,12,749
4,62,14,024
2
Certified Copies of Court Orders
23,76,000 10 10
23,76,00,000
26,13,60,000
28,74,96,000
31,62,45,600
34,78,70,160
Assuming Certified copy has a min. of 10 Pages
3 Ration Card Services
12,96,000 10 10
12,96,00,000
14,25,60,000
15,68,16,000
17,24,97,600
18,97,47,360
4 Licensing( Arms etc)
1,64,520 10 10
1,64,52,000
1,80,97,200
1,99,06,920
2,18,97,612
2,40,87,373
5 Revenue Services
5,40,000 10 10
5,40,00,000
5,94,00,000
6,53,40,000
7,18,74,000
7,90,61,400
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 98
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6
Agriculture Services(Licenses)
9,360 10 10
9,36,000
10,29,600
11,32,560
12,45,816
13,70,398
7
Excise Services(License)
4,320 10 10
4,32,000
4,75,200
5,22,720
5,74,992
6,32,491
8
Fisheries Services(Issue of ID cards)
360 10 10
36,000
39,600
43,560
47,916
52,708
9 Others(Licenses)
1,800 10 10
1,80,000
1,98,000
2,17,800
2,39,580
2,63,538
Total
47,08,00,800
51,78,80,880
56,96,68,968
62,66,35,865
68,92,99,451
5.2 Projected Operational Expenses
Operational Expenses for the next three years
SI Project Cost Item Amount (Rs. Lakhs)
1 O & M Cost for I Year @ 5% of Total Project Cost 473.18
2 O & M Cost for II Year @ 7.5% of Total Project Cost 709.77
3 O & M Cost for III Year @ 10 % of Total Project Cost 946.36
Total (in Rs. Lakhs) 2129.30
5.3 Revenue Model
There are many Revenue models, which can be adopted by different States based on the suitability and feasibility of implementation in the State. One
broad way is to go for Public Private Partnership (PPP) Model through private vendors and other way is to impose the user charge on the Citizens for
using computerized services. The principle behind the idea is to develop self-reliance within the system over a period of time instead of depending
entirely on government funding for managing operating and maintenance costs involved for running the computerized system. It has to be noted that
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 99
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
the major benefit for using PPP model is not the financing aspect, but to manage the day-to-day operations including procurement of consumables,
adherence to Service Level Agreements, and ensuring high quality of service to the citizens.
The User Charge Model gives the flexibility to the Government to operate the whole setup by its own staff and at the same time, impose some user
charge on every transaction from the computerized system, so that the operational expenses can be recovered from the same without putting any extra
load on Government exchequer. More importantly it gives flexibility to the operating officials to manage the computerized efficient services running
throughout without being dependent on the official process for procurement of consumables, repair services etc., which very often gets delayed and
defeats the very purpose of computerization.
User Departments: The main role of the user departments would be to deploy a proper backend computerization within their departments so that the
different services to citizens can be delivered to citizens through Common Service Centres/ Kiosks. In order to realize this, the departments would have
to re-engineer their internal processes and would also have to provide necessary financial support towards the work being done for them.
District Administration: The District Administration is major player in the whole process with different roles and responsibilities. On the one hand, it is
responsible as a user department and on other hand it would act as a facilitator/administrator also. The second main role and responsibility of the
District Administration is to have a vigilance control over all the departments. District Administration would also be owner of the application software as
well as data and would act as backup of service provider.
District e-Governance Society: The role of the district e-Governance Society (headed by District Collector) is to manage the entire project in respective
districts which include relationship with local service provider, financial operations, technical and logistical support and providing infrastructure for
project.
e-District Data Centre: The e-District data Centre is the technical hub of entire e-District setup at the district. The Database Server, RAS-cum-router,
leased line etc. shall all be installed at this centre. The data centre would be directly under the control of e-Governance Society. The complete data
(related with e-district application) shall reside on the Database Server installed at the State Data Centre. The Total Solution Provider would be required
to manage complete setup of this data centre. Connectivity with State Data Centre, Collectorate, Main Centre and Departments would be provided from
e-District Data Centre data centre for mutual data transfer. Citizen service Centres or Community Information Centres would act citizen interface to
provide G2C and G2B services would be interrelated with the e-District data base server.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 100
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
1 Certificates
1 Domicile 10-15 7 300
2 Nativity 10-15 7 150
3 Rural Area Certificate 10-15 7 750
4 Dependent Certificate 10-15 7 300
5 Next of Kin Certificate 10-15 7 300
6 Destitute Certificate 10-15 7 150
7 Non-Remarriage Certificate (for Compassionate Appointments) 10-15 7 150
8 No Graduate in the family certificate 10-15 7 150
9 Certificate for Destitute Children for admission in Orphanage School 10-15 7 450
10 Destitute Widow Certificate for priority in getting job opportunity 10-15 7 150
11 Non-Marriage Certificate (for Compassionate Appointments) 10-15 7 60
12 Mother Tongue Certificate (Linguistic Minorities - for Reservation in Education Inst Border Dist)
10-15 7 150
13 Certificate for Non Violation of Section 79 A & B ( Issued in AC & Taluka ) 10-15 7 600
14 NOC (Land Grant Cases) 10-15 7 450
15 NOC (Lands Granted through Land Tribunal/Land Reforms) 10-15 7 450
16 Certificate of Land not coming under PTCL(SC/ST) act 1978 10-15 7 600
17 Correction of Name(Applicant/Father/Mother) in Birth Certificate 10-15 7 900
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 101
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
18 Correction of Name(Applicant/Father/Mother) in Death Certificate 10-15 7 900
19 Non-Availability of Birth Certificate 10-15 7 900
20 Non-Availability of Death Certificate 10-15 7 900
21 Project Displacement Certificate (PDC) Ex: Land acquired for Highways, Irrigation and Housing projects ,etc ( all the three offices are involved)
20-40 7 8
2 Social Welfare (Pensions)
1 Freedom fighter honorarium 30 7 2
2 Inter-caste Marriage Assistance scheme (In some case issued by Taluka Social Welfare Officer)
30-40 7 10
3 Assistance for last rites for BPL Card Holders 30 7 300
4 Physically Handicap Pension (For Persons having more than 75% Disability are not being covered under Nemmadi)
90 7 120
5 Old Age Pension (OAP1) (Age between 60-64 Years) 90 7 250
6 Old Age Pension (OAP3) (Age between 80 Years and above ) 90 7 250
7 Aam Admi Bima Yojana 30 7 40
8 Adarsha Vivaha Yojana(Interface with WCD and SRO at Dist Level 30 7 30
3 Revenue Court Cases
1 Receipt of Disputes regarding Mutation 90 30 20
1) Issuance of notices
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 102
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
2 Receipt of Appeal in Revenue Court Cases 90 30 20
1) Issuance of notices
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
3 Water and Path Ways Disputes u/s 90A of land revenue act 90 30 20
1) Issuance of notices
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
4 Boundary Disputes u/s Section 49 E and F of KLR Act , 1964 (Rules 51 and 52) 90 30 20
1) Issuance of notices
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 103
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
2) Listing of cases
3) Adjournment of cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
5 Dues and Recovery
1) Track Default loan processes(such as Nationalized/Co-operative Banks, Financial Assistance given by Taluka and Gram Panchayats, SGSY etc)
180 90 90
2) Recovery of Government dues( Commercial Taxes, Excise, Stamp Duty, Transport, Ex-Minister's Rental Dues, other State Dues)
180 90 90
3) Court Recoveries (Judicial Magistrate First Class JMFCs), Consumer Courts, Labour Courts, Family Courts etc)
180 90 90
4) Recoveries under Karnataka State Financial Corporation , Karnataka Small Scale Industrial Development Corporation, Khadi Gram Udyog, BSNL
180 90 90
5) Issuance of Revenue Recovery Certificate 180 90 90
6 Certified Copies(Not taken up under NLRMP)
1)Closed Files of all sections such as Revenue Court Cases and Record of Rights(RRT) Cases 30-40 10 600
2) Closed Files of Land Grant Cases under Sec 94A,B and C of Land Revenue Act Files and Registers, 90 A of Land Revenue Act,
30-40 10 600
3) Closed Files of Water and Path Way Disputes Cases under 90 A of Land Revenue Act 30-40 10 600
4) Closed Files of Land Reforms Sections such as Land Tribuanal Cases of Sec 77 and 77 A of Land Reforms Act
30-40 10 600
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 104
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
5) Issue of Certified copies of Records available in Record Room of Taluka offices
30-40 10 3000
6) Issue of Certified copies from Deputy Commissioner offices 30-40 10 600
7) Issue of Certified copies from Assistant Commissioner offices 30-40 10 300
8) Survey Records not taken under NLRMP (Pakka, Tippan, Village Maps, Atlas) 30-40 1 300
4 Ration Card services
1 Issue of New Ration Card 60 10 1800
2 Issue of Duplicate Ration Card 15 10 1800
3 Addition of Name in Ration Card 15 10 2400
4 Deletion of Name in Ration Card 15 10 2400
5 Deletion of certain family members ( partial) in Ration Card and issuance of new Ration card for the remaining family members
15 10 2400
6 Correction of Name, Age and Sex in Ration Card 15 10 2400
7 Correction of incorrect card category entries like APL, BPL & AAY 15 10 2400
8 Correction of wrong photographs of family members in Ration Cards 15 10 2400
9 Correction of incorrect entries in the Ration card like Gas connections 15 10 2400
10 Application for surrender of Ration card 15 10 2400
5 RTI and Grievances
1 Filling of Applications of Grievances and Status Tracking No Defined Timelines
No Defined Timelines
Case Dependent
2 RTI applications and status tracking filed to the PIO (Taluka Office) and first appellant 15-30 7 Case Dependent
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 105
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
authority for VA, RI/DT( Nada Office)
3 RTI applications and status tracking filed to the PIO ( Assistant Commissioner's Office) and first appellant authority for Taluka Office
15-30 7 Case Dependent
4 RTI applications and status tracking filed to the PIO ( Deputy Commissioner's Office) and first appellant authority for Assistant Commissioner's Office
15-30 7 Case Dependent
5 RTI appeals before State Information Commission 15-30 7 Case Dependent
6 Licensing
Arms License
1 Issue of arms license 60 30 30
2 Renewal of arms license 20 7 15
3 Duplicate arms license 20 7 15
4 Entry of weapon 20 7 10
5 Addition of Weapon 20 7 10
6 Deletion of Weapon 20 7 10
7 NOC for sale of weapon 20 7 10
8 Permission to carry weapon 30 10 10
9 Extension of purchase period 20 7 10
10 Change of address 30 10 10
11 Cancellation of license 60 30 10
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 106
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
12 Addition/deletion of retainer 60 30 10
13 NOC for import of weapon 30 10 5
14 Licenses for Crop protection weapons 30 10 10
15 Renewal of arms license for Crop protection weapons 30 10 150
16 Duplicate arms license for Crop protection weapons 30 10 5
17 Entry of weapon for Crop protection weapons 30 10 5
18 Addition of Weapon for Crop protection weapons 30 10 2
19 Deletion of Weapon for Crop protection weapons 30 10 10
20 NOC for sale of weapon for Crop protection weapons 30 10 1
21 Permission to carry weapon for Crop protection weapons 30 10 1
22 Extension of purchase period(for Crop protection weapons 30 10 1
23 Change of address for Crop protection weapons 30 10 1
24 Cancellation of license for Crop protection weapons 30 10 1
Small Savings
1 Small Saving Agents 30 10 80
2 Stamp Vendors 30 10 3
Business
1 Arms Dealers 60 20 1
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 107
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
2 Cinemas and Dramas 120 30 2
3 Video Parlour/Entertainment Clubs - SP Issues this 120 30 1
Mining
1 Temporary permission for mining 90 45 10
2 Permanent license for mining 90 45 5
3 NOC for explosive Licenses 90 45 2
4 License to store explosives for Mining 90 45 1
5 License for the sale of crackers 90 45 10
7 Magisterial (MAG) Court Cases
1
Application for Magisterial Court Cases (under Sec 107, 109, 110, 144 & 145 of CRPC) 109 – Suspicious Offender 107 – Trouble Maker 110 – Habitual Offender
No Defined Timelines
30 100
1) Issuance of Notices
2) Listing of Cases
3) Adjournment of Cases
4) Tracking status of execution of orders
5) Stay and final orders of cases
2 Unnatural Death Cases No Defined Timelines
30 100
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 108
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
Application for case under Atrocities No Defined Timelines
100
8 Scholarships (Dept of Social Welfare, Dept of Tribal Welfare and Dept of Backward Castes
& Minorities)
1 Scholarship and admission in hostels for SC 90 30 50
2 Scholarship and admission in hostels for ST 90 30 50
3 Scholarship and admission in hostels for BC and Minorities 90 30 15
4 Govt of India (GoI) Post metric Scholarships for SC 90 30 200
5 Govt of India (GoI) Post metric Scholarships for ST 90 200
6 State specific Scholarship for Hostel Admission for Post Metric Students for BC and Minorities
90 30 100
7 State specific Scholarship for Post Metric Students for BC and Minorities 90 30 100
8 State specific Pre-Metric Scholarships for SC 90 30 100
9 State specific Pre-Metric Scholarships for Hostel Admission for SC 90 30 30
10 State specific Pre-Metric Scholarships for ST 90 30 100
11 State specific Pre-Metric Scholarships for Hostel Admission for ST 90 30 30
12 State specific Pre-Metric Scholarships for BC and Minorities 90 30 50
13 State specific Pre-Metric Scholarships for Hostel Admission BC and Minorities 90 30 30
14 Higher Education Special Scholarship Schemes for SC 90 30 50
15 Higher Education Special Scholarship Schemes for ST 90 30 50
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 109
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
16 Higher Education Special Scholarship Schemes for BC and Minorities 90 30 50
17 GOI Scholarships for Admission of Students whose parents are engaged in unclean occupation
90 30 10
18 Admission of students in reputed Institutions 90 30 10
9 Revenue Services
1 Application for Land Conversion ( In districts except undivided South Canara ) 120 30 600
2 Application for Land Conversion of Lands granted under Land Reforms Act ( In districts except undivided South Canara)
120 30 600
3 Application for Land Conversion in Taluka offices for Patta Lands as per Rule 106 A of Karnataka Land Revenue Rules, 1966
7 5 300
10 Department of Agriculture
1 Issuance of soil health card
30 7 200
2 Fertilizer dealer registration
30 7 20
3 Agriculture information Services
750
4 Insecticides licenses
30 7 2
5 Seeds license
30 7 2
6 Fertilizers license
30 7 2
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 110
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
7 Duplicate agriculture licenses
10 1 10
8
Grant/Renewal of Agriculture License - to Sell, Stock, or Exhibit for sale or distribute of insecticides / pesticides / Fertilizers; Amendment of Seed License; Issue and Renewal of F - licenses (Petrol Bunks and Gas Agencies) , Private God owns, Wholesale Food Grains, Retail Food Grains
30 7 10
11 Department of Excise
1 License for liquor shop
15 7 2
2 Renewal of retail liquor licenses ( only those licenses valid in the preceding year)
15 7 2
3 Renewal of fruit Winery licenses ( only those licenses valid in the preceding year)
15 7 2
4 Renewal of distillery/brewery/fortified winery licenses and bottling licenses ( only those licenses valid in the preceding year)
30 7 2
5 Shifting of liquor shop
30 7 1
6 License for liquor distribution
30 7 1
7 License for narcotics ( ND4) drugs for Lab purposes
30 7 1
8 Licenses for rectified spirit
30 7 1
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 111
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
12 Department of Fisheries
1 Application for Registration of Fishing Vessels
30 7 1
2 Supply of kerosene for boats at subsidized rates
30 7 5
3 ID Cards to the fisherman
15 7 10
13 Utility Services
1 Payment of Electricity Bills
1 1 10,000
2 Payment of Water Bills
1 1 7,000
3 Payment of Telephone/Mobile Bills
1 1 15,000
14 Status Update Services
1 Application for Financial Assistance under Chief Minister’s Relief Fund
No Defined timelines
20 50
15 Other Category of Services
1 License for Sale and Procurement of Toddy 60 15 5
2 Application for providing compensation to on SC/ST citizens for committed atrocities 30-40 10 5
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 112
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Category of Services(Including Sub-Services)
Existing
Service Levels
(Days)
Proposed
Service Levels
(Days)
Avg.
Transactions/Month
3 Application from citizens for inter-caste marriage 30-40 10 2
5.4 Institutional arrangement for Operations & Maintenance Phase
The state Designated Agency in co-ordination with District e-Governance Societies (DeGS) in all districts to implement and provide institutional support
to all the stakeholders during the O & M phase. The DeGS who are the owners in their respective districts would play a key role in the post
implementation phase, i.e. O & M phase.
e-District Operation and Maintenance Phase
Stakeholders Roles and Responsibilities
State Designated Agency Institutional Support
Periodic review of e-District rollout
Manage and distribute Funds
Coordinate and facilitate interactions
Implement an effective transaction-based revenue sharing mechanism for all stakeholders
District e-Governance
Societies(DeGS)
Ensure that the stakeholder departments are fully supportive in delivering the services to the citizens
Manage, Supervise and Release funds
Ensure Capacity Building and Training
Ensure the delivery services at Service Deliver Channels as per the SLA and collect user charges
Implementing Agency Provide Support, Warranty and Maintenance for Hardware, IT and Non-IT systems
Deploy adequate manpower for Support and Helpdesk activities.
Conduct regular meetings with DeGS, SDA and State Govt. and provide status of the Operations in each district.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 113
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Ensure on-time issue resolution
Provide Handholding support to DeGS and other District and State officials.
State Programme Management
Unit
Ensure Capacity Building, Change Management and Training Plans(as approved during Project Development) are
implemented.
Design the post implementation guidelines for O & M phase.
Service Centre Agency(SCA) Provide all the Services as per SLA in a hassle free manner.
Ensure adequate facilities for the citizens to avail the services.
Provide regular updates to DeGS and SDA
Escalate any issues related e-District application and ensure they get resolved on-time without affecting citizens.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 114
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6 Financial Estimates
6.1 Total Project Cost
Total Project Cost Total Project Cost for State Wide Roll out of e-District MMP in Karnataka
Year
Component Unit Cost (Rs. Lakhs)
1 2 3 Total Cost(Rs. Lakhs) for 3
Years
State
DPR Preparation 10.00
10.00
10.00
Systems at SDC 175.00
175.00
175.00
Systems Support 24.00
24.00
24.00
24.00
72.00
Application Software for Non Pilot 55.00
55.00
55.00
Third Party/ STQC Testing 35.00
35.00
35.00
Application Support 18.00
18.00
18.00
18.00
54.00
Awareness and Communication on launch of e-Services
20.00
10.00
10.00
20.00
Assessment 15.00
15.00
15.00
Others (SPMU ) for 3 years @12 lakhs per resource per annum for 3 resources
36.00
36.00
36.00
36.00
108.00
Contingency @3 % of State-level cost 16.32
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 115
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Total Cost at State Level (A) 560.32
District
Hardware 3,929.28
3,929.28
3,929.28
Data Digitization 1,500.00
750.00
750.00
1,500.00
Training 523.59
209.44
209.44
104.72
523.59
LAN Networking and Horizontal Connectivity 750.00
250.00
250.00
250.00
750.00
Site Preparation 1,071.06
535.53
535.53
1,071.06
Seed Money to eGov Society ( DeGS) 300.00
300.00
300.00
Project Manager for 3 years @ 3.60 lakhs per year 324.00
108.00
108.00
108.00
324.00
Technical Support for 3 years @ 2.4 Lakhs per year
216.00
72.00
72.00
72.00
216.00
Awareness and Communication @ 1 Lakh/District 30.00
15.00
15.00
30.00
Contingency @3 % of all District-level costs 259.32
Total Cost at District Level (B) 8,903.24
Total Project Cost (A+B) -
9,463.56
O & M
Operations and Maintenance Cost for 3 Years (C) I Year O&M expenses @ 5% Total Project Cost II Year O&M expenses @ 7.5% Total Project Cost III Year O&M expenses @ 10% Total Project Cost
473.18
709.77
946.36
2,129.30
Total Cost including O&M (A+B+C) 11,592.86
Total Project Cost (in Lakhs) is Rs. 11,592.86
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 116
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6.2 Hardware for all Offices The hardware assessment includes the hardware required at the DC office, Sub-Division Office and Taluk offices. The figures mentioned here are indicative
and is based on the users responsible for processing the application under a particular service. The hardware assessment also includes the requirement of
digital signature and number of RI offices. Operating System License, Antivirus License and MS-Office license has also been taken into consideration. As per
the guideline, the IT infrastructure created under SDC, SWAN, SERVICE DELIVER CHANNELS, State Portal, SSDG and any other MMP should be leveraged for
the Implementation of e-District Project. Bill of Material of hardware required at each office is mentioned in the below given table. (The numbers
mentioned here are indicative)
Hardware Cost for DC Office
Description Quantity Unit Price (Rs) Total Price (Rs)
Laptop 1 32,000 32,000
Desktops( Incl. of Facilitation +Training centres) 42 27,000 11,34,000
Dig. Web cam(For Facilitation Centres) 4 2,000 8,000
MFD(Network Printer and Fax) (Only for Facilitation Centres) 3 45,000 1,35,000
Dig. Signatures 1,500 -
Laser Printers 14 17,000 2,38,000
UPS( 1 KVA) Online 42 12,000 5,04,000
Scanner 1 22,000 22,000
12 Port LAN Switch 41 3,500 1,43,500
42 U Rack 1 1,00,000 1,00,000
9 U Rack 39 17,000 6,63,000
Leased Line Modem Pair 1 7,000 7,000
Total Hw Cost for 1 DC Office 29,86,500
Total Hw Cost for all 30 DC Offices 8,95,95,000
Hardware Cost for AC Office
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 117
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Description Quantity Unit Price (Rs) Total Price (Rs)
Laptop 1 32,000 32,000
Desktop 7 27,000 1,89,000
Dig. Signatures 1,500 -
Laser Printers 2 17,000 39,667
UPS( 1 KVA) Online 7 12,000 84,000
Scanner 1 22,000 22,000
Total Hw Cost for 1 AC Office 3,66,667
Total Hw Cost for all 52 AC Offices 1,90,66,667
Hardware Cost for Taluka Offices
Description Quantity Unit Price (Rs) Total Price (Rs)
Laptop 1 32,000 32,000
Desktop 31 27,000 8,37,000
Dig. Signatures 1,500 -
Laser Printers 10 17,000 1,75,667
UPS( 1 KVA) Online 31 12,000 3,72,000
Scanner 2 22,000 44,000
Total Hw Cost for 1 Taluka Office 14,60,667
Total Hw Cost for all 177 Taluka Offices 25,85,38,000
Hardware Cost for Social Welfare - DSWO [SC - 14]
Description Quantity Unit Price (Rs) Total Price (Rs)
Desktop 3 27,000 81,000
Dig. Signatures 1,500 -
Laser Printers 1 17,000 17,000
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 118
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
UPS( 1 KVA) Online 3 12,000 36,000
Total Hw Cost for 1 District Social Welfare and Tribal Welfare Offices 1,34,000
Total Hw Cost for all 14 District Social Welfare 18,76,000
Hardware Cost for Tribal Welfare - DTWO [ST - 14]
Description Quantity Unit Price (Rs) Total Price (Rs)
Desktop 3 27,000 81,000
Dig. Signatures 1,500 -
Laser Printers 1 17,000 17,000
UPS( 1 KVA) Online 3 12,000 36,000
Total Hw Cost for 1 District Social Welfare and Tribal Welfare Offices 1,34,000
Total Hw Cost for all 14 District Social Welfare 18,76,000
Hardware Cost for Social and Tribal Welfare - DSWO [SC+ST - 16]
Description Quantity Unit Price (Rs) Total Price (Rs)
Desktop 3 27,000 81,000
Dig. Signatures 1,500 -
Laser Printers 1 17,000 17,000
UPS( 1 KVA) Online 3 12,000 36,000
Total Hw Cost for 1 District Social Welfare and Tribal Welfare Offices 1,34,000
Total Hw Cost for all 16 District Social and Tribal Welfare 21,44,000
Hardware Cost for Taluka Social Welfare - TSWO [SC+ST - 177] (Common for SC and ST)
Description Quantity Unit Price (Rs) Total Price (Rs)
Desktop 2 27,000 54,000
Dig. Signatures 1,500 -
Laser Printers 1 17,000 11,333
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 119
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
UPS( 1 KVA) Online 2 12,000 24,000
Total Hw Cost for 1 District Social Welfare and Tribal Welfare Offices 89,333
Total Hw Cost for all 177 Taluka Social Welfare Offices 1,58,12,000
Hardware Cost for Backward Castes and Minorities DOBCM[at District level only - 30]
Description Quantity Unit Price (Rs) Total Price (Rs)
Desktop 3 27,000 81,000
Dig. Signatures 1,500 -
Laser Printers 1 17,000 17,000
UPS( 1 KVA) Online 3 12,000 36,000
Total Hw Cost for 1 District Social Welfare and Tribal Welfare Offices 1,34,000
Total Hw Cost for all 30 DOBCM Offices 40,20,000
Total Hardware Cost for 30 Districts
Offices Total Hardware Cost for the (In
Lakhs) all districts
District Head Quarters (A) 895.95
Subdivisions (B) 190.67
Taluka Offices (C) 2,585.38
District Social Welfare Offices (Exclusive) (D) 18.76
District Tribal Welfare Offices (Exclusive) (E) 18.76
District Social and Tribal Welfare Offices(Common) (F)
21.44
Taluka Social and Tribal Welfare Offices(Common) (G)
158.12
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 120
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
District Backward Caste and Minority Welfare Offices (H)
40.20
Total Hardware Cost (A+B+C+D+E+F+G+H) (Rs. Lakhs)
3,929.28
Total Hardware Cost for all offices = 3,929.28 Lakhs
6.3 Site Preparation Cost
Site Preparation for DHQ, AC, Taluka, Faciltation, Training Centres, Social Welfare and BCM Offices
SI. NO. Particulars Cost/Unit (Rs. Lakhs) Requirement Total Cost(Rs. Lakhs)
1 Computer Tables 0.04 7687 307
2 Steel Framed Computer custard wheel revolving chairs with Arm and cushion seat and back (Standard size) 0.03 7687 231
3 Printer Tables 0.028 2,562 72
4 Electrical Connections including complete Wiring 0.04 3,844 154
5 Copper Plate earthing 0.08 3,844 307
Total Cost 1,071
6.4 Data Digitization and Migration
Total estimated cost for Data Digitization
Data Digitization Costs
Estimated no of records /District
Unit Cost No of Districts
Total Cost (Rs)
Total Cost (In Lakhs)
Records 10,00,000 5 30 15,00,00,000 1,500
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 121
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
* Total No of Records for digitization is approximately 10 lakh for each district.
6.5 Network Connectivity (Horizontal) As per guidelines of e-District, the project would leverage from KSWAN for network connectivity. Currently KSWAN network is being extended till all
the Hobli Offices. However for the office locations where KSWAN connectivity is not present, Implementing Agency needs to provide broadband
connectivity (through a bandwidth provider) for those offices. Following is an indicative cost for the connectivity in all districts.
LAN and Horizontal Connectivity Costs
No. of Districts
Price (.Rs) Total Cost (Rs)
Total Cost (In Lakhs)
Horizontal Connectivity Costs
30 25,00,000 7,50,00,00 750.00
6.6 Training Costs
Summary of the detailed training program has been presented in the table below. SNo. Training Module GROUP-I GROUP-II GROUP-III GROUP-IV
1 E-District Orientation Y Y Y Y
2 Basic Computing Training Y Y Y Y
3 Process Training Y Y N N
4 Activity Training N N Y Y
5 Specialized Computer Training Y Y Y Y 6 e-District Application Training Y Y Y Y
Following table shows an indicative number of officials to be trained in the aforementioned training modules.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 122
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Estimated for Training and Capacity Building Cost
Offices No. of Officials
Deputy Commissioner's Offices 1,440
Assistant Commissioner's Offices 416
Taluka Offices 11,151
District Social Welfare (Exclusive) Offices 56
District Tribal Welfare (Exclusive) Offices 56
District Social and Tribal Welfare (Common) Offices 64
Taluka Social and Tribal Welfare (Common) Offices 708
District Backward Caste and Minority Offices 150
District and Taluka Agriculture Offices 1,629
District, Sub-Div. and Taluka Excise Offices 1,290
District, Regional and Taluka Fisheries Offices 493
Grand Total 17,453
Training and Capacity Building Cost/Person (Rs. Lakhs)
0.03
Total Training and Capacity Building Cost (Rs. Lakhs)
523.59
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 123
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
6.7 Awareness and Communication
Total Estimated Cost for Awareness & Communication:
Item Total Cost (In Rs. Lakhs)
Citizen Awareness on launch of e-Services at District Level 30.00
Citizen Awareness on launch of e-Services at State Level 20.00
Total 50.00
6.8 State Programme Management Unit Following the approval of the e-District DPR, the SDA needs to identify a project consulting agency from the list of consultants empanelled by DIT for providing day to day implementation support to the DeGS for undertaking the project. The empanelled project consultant is expected to undertake the following tasks:
Design an efficient and effective end to end service delivery process
Study the capacity building requirements and help create a facility for development of capacity including preparation of Change Management &
Training plans, legal changes and draft Government Orders for the identified services
Suggest the functional requirements for the application, based on the BPR and review the System Requirement Specification (SRS) and System
Design Documents (SDD) for the application development and submit their observation to the State Designated Agency.
Facilitate in conducting the User Acceptance Test (UAT). UAT is to be conducted by the Implementing Agency. Final sign off need to be given by the
Users.
Supervise and assist the STQC for acceptance testing of the application
To assist State in the selection of System Integrator (Implementation Agency) from the DIT, GOI empanelled list.
To supervise the installation, commissioning of IT infrastructure at Central Server
Location and also at each district location. After the installation of infrastructure
Consultant would submit their report to the District Nodal officer/collector. Final acceptance is to be given by the District Nodal Officer/District
Collector.
To provide one dedicated manpower at each district for project coordination for 3 years.
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 124
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
They will be in charge for entire project management and provide regular (weekly/monthly) status update and progress tracking of the project. 3
year period will start from the day the work order is issued to the Implementing Agency.
To design the post implementation guidelines including defining the role and responsibilities of Joint Entity (PPP option) and its stake holders for
Operation and Maintenance phase.
To handover the project to the above state Joint Entity.
The Manpower Estimated for Consultancy & Program Management
State Level:
Project Manager
Consultant (Program Management)
Consultant (technology Management)
Total Cost for State Program Management Unit (SPMU) for 3 Years of implementation
Designation No. of resources Man Month Rate (In Rs. Lakhs)
Duration in months Cost (in Rs. Lakhs)
Project Manager 1 1 36 36
Consultant (Program Management) 1 1 36 36
Consultant (Technology Management) 1 1 36 36
Total Estimated Cost for State PMU 108
6.9 Support Services
As per DIT guidelines to coordinate work at the District-level and below, district level consultant/project manager would also be provided by the Consultancy organization at each District. This resource will work closely with the DeGS and its office to ensure that the project is rolled out within the stipulated timelines. Brief job description of the district level consultant/project manager is given in the below table.
Sl. No.
Title Description
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 125
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
1 Job Title Project Manager/District Level Consultant
2 Roles & Responsibilities
Coordination in supply, Installation, Inspection of Infrastructure and connectivity at District, SDO & TO location pertaining to the project.
Coordination for conduction User Acceptance Test at State & District Level.
Coordination for Training and Capacity Building.
Weekly & Monthly reports as instructed by SDA
Support in any additional functional requirement study pertaining to the project.
3 Work Place Candidate will be posted at District Headquarters or any other location within the district allotted by the district authority.
5 Reporting Structure Reporting to the Collector/Nodal Officer e-District or any other authority as will be defined by the District Authority/ SDA
District level technical support as maintenance support is also proposed for 2 years after the services have been launched. This support to the administration is needed as most of the locations are in rural areas and government employees need such handheld support to run the application and systems. System Integrator (Implementing Agency) shall provide such a resource for 2 years. Monitoring tool licenses will be provided to each of the technical staffs deployed at the districts. This will help to track the complaints raised and their status.
Brief job description of the technical support staff is given in the below table.
Sl. No.
Title Description
1 Job Title Technical Support Expert
2 Roles & Responsibilities
Coordination in supply, installation and Inspection of Hardware at the District, Subdivisions, Taluk Offices and any other location pertaining to the project.
Preventive Maintenance of District IT Infrastructure supplied under e-District
Complaints handling -Hardware & Software Issues
Complaints handling through telephone or through travel to respective location & resolve issues.
Maintenance of HW & SW records and calling.
Monitoring LAN Connectivity
3 Work Place Candidate will be posted at District Headquarters or any other location within the district allotted by the district authority.
4 Reporting Structure Reporting to the Collector/Nodal Officer e-District or any other authority as will be defined by the District Authority/ SDA
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 126
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Total Estimated Cost for support services at District Level
Designation No of Resource
Cost per year in each District (In Rs. Lakhs)
Cost for 3 years in each District (In Rs. Lakhs)
Cost for 30 Districts (In Rs. Lakhs)
Project Manager 1 3.6 10.8 324
Technical Support
1 2.4 7.2 216
Total Cost for Support Service for all districts 540
6.10 Application Enhancement/Development & Support State shall prepare the state wide roll out RFP through the Project Consultant for State Wide rollout and submit to DIT for examination and approval. After the approval of the same by DIT, proposals for State Wide rollout shall be requested from only the empanelled list of System Integrators and the state can select one of them. Pilot application developed for the state shall be rollout across the state. During the rollout phase the System Integrator will be responsible for:
a. Addressing any modification/enhancement/changes to the existing application
b. Addressing any application business rule changes
c. Creation of User logins with necessary authentication
d. Integration of Digital Signature for the new users with the application
e. Providing necessary support for integration with SSDG
f. Maintaining latest copy of all the project related documents
g. Preparing a project plan, schedule and effort estimate before initiating the development activities. Before addressing an enhancement or change
request adequate impact analysis and estimates to be performed by the application developer.
Existing Implementing Agency will provide necessary support to the new System Integrator (in case the System Integrator happens to be a different one than the existing vendor) in this regard till there maintenance & support period is over
Total Estimated Cost of Application Development & Customization:
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 127
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Activity Cost (Rs. Lakhs) Development of e-District application and Integration of the existing ICT enabled /E-Governance services 55 Total Cost for Support Application Software @ Rs 18 Lakhs per year for 3 years 54 Total Cost (Rs. Lakhs) 109
6.11 Seed Money to DeGS
Formation of DeGS (District e-Governance Society) would play a very important role during the implementation and post implementation phase. This
society would primarily be responsible for monitoring the overall implementation process and making the e-District project a success. As a part of activities
relating to setting up of DeGS an initial amount would be provided to each district.
Total Estimated Cost for Seed Money to DeGS:
Item Cost for each District (in Lakhs)
Total Cost for 30 Districts(in Lakhs)
DeGS seed money
10.00 300.00
6.12 STQC Testing
As part of DIT guideline STQC/Third party will be engaged for testing of the e-District application.
Total Estimated Cost for STQC Testing
Item Total cost for STQC Testing
STQC 35.00 Lakhs
6.13 Impact Assessment
States will get post implementation assessment done through reputed organizations and academic institutions at the midterm and post
launch stages of delivery of services. DIT is in the process of empanelling Research Institutions as well as market research agencies. The
States should use the services of these organizations for undertaking Impact Assessment. Assessment of the services being delivered under e-
District project need to be got done by the States through third party through DIT -empanelled agencies at the mid-term and post launch
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 128
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
stages of the services. Framework for the same will be prepared at a later stage.
Total Estimated Cost of Impact Assessment:
Item Total cost for Assessment
Impact Assessment 15.00 Lakhs
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 129
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
7 Annexure
7.1 Details of Districts in Karnataka District No. of
Sub- Divisions
No. of Taluks
Population(2011) Area (Sq. km)
Bagalkot 2 6 18,90,826 5,308
Bangalore Rural 1 4 9,87,257 4,763
Bangalore Urban 2 5 95,88,910 3,344
Belgaum 3 10 47,78,439 15,313
Bellary 2 7 25,32,383 1,106
Bidar 2 5 17,00,018 6,812
Bijapur 2 5 21,75,102 9,507
Chamarajanagar 1 4 10,20,962 2,355
Chikkaballapur 1 6 12,54,377 8,984
Chikmagalur 2 7 11,37,753 3,433
Chitradurga 1 6 16,60,378 5,540
Dakshina Kannada 2 5 20,83,625 10,591
Davangere 2 6 19,46,905 5,924
Dharwad 1 5 18,46,993 8,919
Gadag 1 5 10,65,235 3,509
Gulbarga 2 7 25,64,892 16,234
Hassan 2 8 17,76,221 7,020
Haveri 2 7 15,98,506 365
Karwar 4 11 14,36,847 3,259
Kodagu 1 3 5,54,762 1,522
Kolar 1 5 15,40,231 5,909
Koppal 1 4 13,91,292 3,045
Mandya 2 7 18,08,680 13,374
Mysore 2 7 29,94,744 6,854
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 130
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Raichur 2 5 19,24,773 9,617
Ramnagaram 1 4 10,82,739 4,639
Shimoga 2 7 17,55,512 7,833
Tumkur 3 10 26,81,449 6,986
Udupi 1 3 11,77,908 3,953
Yadgir 1 3 11,72,985 3,874
District Sub-division Taluk
Bangalore Rural Doddaballapura Doddaballapura
Nelamangala
Devanahalli
Hoskote
Ramnagaram Ramnagaram Ramnagaram
Channapatna
Kanakapura
Magadi
Bangalore Urban Bangalore south Bangalore south
Anekal
Bangalore North Bangalore North
Yelankha
Bangalore east
Chitradurga Chitradurga hiriyur
challakere
Chitradurga
molkalmur
holalkere
hosadurga
Davangere Davanagere Davanagere
Harihar
Channagiri
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 131
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Honnali
Harapanahally Harapanahally
Jagalur
Kolar Kolar Kolar
Bangarpete
Srinivasapura
Malur
Mulbagal
Chikkaballapur Chikkaballapur Gowribidanur
Sidlaghatta
Bagepalli
Chikkaballapur
Chinthamani
Gudibande
Shimoga Shimoga Shimoga
Bhadravathi
Thirthahalli
Sagar Soraba
Sagar
Hosanagar
Shikaripura
Tumkur Tumkur Tumkur
Gubbi
Kunigal
Madhugiri Madhugiri
Pavagada
Sira
Koratagere
Tiptur Tiptur
Chicknayakana Halli
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 132
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Turuvekere
Bagalkot Bagalkot Badami
Bagalkot
Bilagi
Jamkhandi Mudhol
Jamkhandi
Hungund
Belgaum Belgaum Belgaum
Hukkeri
Khanapur
Bylahongala Savadatti
Gokak
Ramdurga
Bylahongala
Chikkodi Athani
Raibhag
Chikkodi
Bijapur Bijapur Bijapur
Bagewadi
Muddebihal
Indi Sindagi
Indi
Dharwad Dharwad Dharwad
Hubli
Kalagatagi
Navalagunda
Kundagola
Gadag Gadag Gadag
Rona
Mundaragi
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 133
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Naragund
Shirahatti
Haveri Haveri Haveri
Ranibennur
Hirekerur
Byadagi
Savanur Savanur
Shiggou
Hangal
Karwar Karwar Karwar
Joida
Haliyal
Kumta Kumta
Ankola
Bhatkal Honnawar
Bhatkal
Sirsi Sirsi
Siddapur
Mundagod
Yellapura
Bellary Bellary Bellary
Sandur
Sirguppa
Hospet Hospet
Hadgali
H.B.Halli
Kudligi
Bidar Bidar Bidar
Aurad
Basavakalyana Basavakalyana
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 134
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Balki
Humnabad
Gulbarga Gulbarga Gulbarga
Alanda
Afzalpur
Jevargi
Sedam Sedam
Chittapur
Chincholi
Yadgir Yadgir Yadgir
Shahpur
Shorapur
Koppal Koppal Koppal
Gangavathi
Kusthagi
Yelburga
Raichur Raichur Raichur
Devadurga
Manvi
Lingasagur Lingasagur
Sindanur
Chamarajanagar Kollegal Chamarajnagar
Kollegal
Yelandur
Gundalpet
Chikmagalur Chickmagalur Chickmagalur
Koppa
Sringeri
Mudigere
Tarikere Narasimharajapura
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 135
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Kadur
Tarikere
Dakshina Kannada Mangalore Mangalore
Bantwal
Puttur Puttur
Sulya
Belthangadi
Hassan Hassan Hassan
Arasikere
Chennarayapatna
Holenarasipura
Sakaleshpura Arakalgud
Alur
Belur
Sakaleshpura
Kodagu Madikeri Madikeri
Virajpet
Somwarpet
Mandya Mandya Mandya
Maddur
Malavalli
Pandavapura K.R. Pet
Pandavapura
Srirangapatna
Nagamangalal
Mysore Mysore Mysore
Nanjangud
T.Narasipura
Hunsur K..R. Nagar
Hunsur
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 136
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Piryapatna
Heggadadevana Kote
Udupi Kundapura Udupi
Kundapura
Karkala
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 137
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
7.2 Hardware Breakup for DHQ, SDO and Taluka Offices
7.2.1 Hardware Requirement at each District Head Quarter
Description Quantity
Laptop 1
Desktops( Incl. of Facilitation +Training centres) 42
Dig. Web cam(For Facilitation Centres) 4
MFD(Network Printer and Fax) (Only for Facilitation Centres) 3
Laser Printers 14
UPS( 1 KVA) Online 42
Scanner 1
7.2.2 Hardware Requirement at each Sub Divisional Office
Description Quantity
Laptop 1
Desktop 7
Laser Printers 2
UPS( 1 KVA) Online 7
Scanner 1
7.2.3 Hardware Requirement at each Taluka Office
Description Quantity
Laptop 1
Desktop 31
Laser Printers 10
UPS( 1 KVA) Online 31
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 138
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Scanner 2
7.2.4 Hardware Requirements at Social Welfare(for SC Only)
Description Quantity
Desktop 3
Laser Printers 1
UPS( 1 KVA) Online 3
7.2.5 Hardware Requirements at Tribal Welfare (for ST Only)
Description Quantity
Desktop 3
Laser Printers 1
UPS( 1 KVA) Online 3
7.2.6 Hardware Requirements at Social Welfare(common SC and ST)
Description Quantity
Desktop 3
Laser Printers 1
UPS( 1 KVA) Online 3
7.2.7 Hardware Requirements at Taluka Level Social Welfare Office
Description Quantity
Desktop 2
Laser Printers 1
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 139
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
UPS( 1 KVA) Online 2
7.2.8 Hardware Requirements at District Backward Caste and Minority Office
Description Quantity
Desktop 3
Laser Printers 1
UPS( 1 KVA) Online 3
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 140
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
7.3 Manpower Details at each office
Estimated Manpower Details at Deputy Comissioner's Office
Sections DC ADC
Office Assistant
to DC RHA/RHM
Case Worker
(CW) Tapal Case
Worker(TCW) JHM DD Food FDA SDA Others
Administration (ADM) 1 1 1 1 2 1
Revenue Court Cases Section(RRT) 1 2 1 1
Dues & Recovery 1 2 1 1
Magesterial Court Case Section (MAG) 1 2 1 1
e-District Facilitation centres Operators ( at DC offices only) 4
Pensions (Social Securities and Pension) 1 1 1
Food and Civil Supplies 1 1 1
Revenue Inspectors and Village Accountants 18
Total for 1 DC Office 1 1 1 5 9 5 3 1 1 1 22
Total for 30 DC offices 30 30 30 150 270 150 90 30 30 30 660
Total Manpower at DC Office for all 30 Districts 1440
Estimated Manpower Details at Assistant Comissioner's Office
Sections AC Manager
Case Worker
(CW) Tapal Case
Worker(TCW)
Land Reforms 1 1 1 1
PTCL 1 1
Revenue Court Case Section (RRT) 1 1
Total for 1 AC office 1 1 3 3
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 141
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Total for 52 AC Offices 52 52 156 156
Total Manpower estimated at AC Office for all 30 Districts 416
Estimated Manpower Details at Taluka Office
Sections Tahsildar Sheristadar Food
Sheristadar
Food Inspector
(FI)
Case Worker
(CW) Tapal Case
Worker(TCW) RI VA
ADM 1 1 3 1
Land 4 1
Land Reforms 1 2 1
Pensions (SSY) 1 4 1
Record of Rights( inc Revenue Court Cases) 1 6 1
MAG 2 1
RBD( Statistics) 2 1
Food and Civil Supplies 0 0 0 0
Others (Revenue Inspectors and Village Accountants) 3 25
Total for 1 Taluka Office 1 4 0 0 23 7 3 25
Total for 177 Taluka Offices 177 708 0 0 4071 1239 531 4425
Total Manpower estimated at Taluka Office for all 30 Districts 11,151
Estimated Manpower Details at District Social Welfare ( Exclusive) Office
Particulars DSWO CW CW CW
For 1 DSWO Office 1 1 1 1
For 14 DSWO offices 14 14 14 14
Total Manpower estimated at Social Welfare ( Exclusive) Offices for all 30 Districts 56
Estimated Manpower Details at District Social Welfare + Tribal Welfare ( Common) Office
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 142
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Particulars DSWO CW CW CW
For 1 SW+ TW Office ( Common) 1 1 1 1
For 16 SW+ TW Office ( Common) 16 16 16 16
Total Manpower estimated at Social Welfare + Tribal Welfare ( Common) Office sfor all 16 Districts 64
Estimated Manpower Details at District Tribal Welfare ( Exclusive) Office
Particulars DTWO CW CW CW
For 1 DTWO Office 1 1 1 1
For 14 DTWO Offices 14 14 14 14
Total Manpower estimated at Tribal Welfare ( Exclusive) Offices for all 30 Districts 56
Estimated Manpower Details at Taluka level: Dept of Social Welfare + Tribal Welfare ( Common)
Particulars DTWO CW CW CW
For 1 TSWO Office 1 1 1 1
For 177 TSWO offices 177 177 177 177
Total Manpower estimated at Tribal Welfare ( Exclusive) Offices for all 30 Districts 708
Estimated Manpower Details at Dept of Backward Castes and Minorities( District level)
Particulars DOBCM CW CW CW Taluka Exec
Officer
For 1 DOBCM Office 1 1 1 1 1
For 30 DOBCM Offices 30 30 30 30 30
Total Manpower estimated at Dept of Backward Castes and Minorities( District level) 150
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 143
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Estimated Manpower Details at District level Agriculture Offices
Particulars Joint Dir. HQA Asst. Dir Agri. Off. Adm. Asst. Suppt. FDA SDA
For 1 District Office 1 1 2 2 2 1 2 2
for 30 District Offices 30 30 60 60 60 30 60 60
Total Manpower estimated at District level Agriculture Offices 390
Estimated Manpower Details at Taluka level Agriculture Offices
Particulars Assistant Director Agr. Off. Suppt. Adm. Off. FDA SDA
For 1 Taluka Office 1 2 1 1 1 1
For 177 Taluka Offices 177 354 177 177 177 177
Total Manpower estimated at Taluka level Agriculture Offices 1239
Estimated Manpower Details at District Level Fisheries Offices
Particulars Sr Asst Dir
For 1 District office 1 1 1 1 1 1
For 30 District Offices 30 30 30 30 30 30
Total Manpower estimated at Taluka level Agriculture Offices 180
Estimated Manpower Details at Regional Level Fisheries Offices
Particulars Dy Director Dist. Off. Asst. Dir FFDA FDA SDA
For 1 Regional Office 1 1 1 1 2 3
For 7 Regional Offices 7 7 7 7 14 21
Total Manpower estimated at Taluka level Agriculture Offices 63
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 144
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Estimated Manpower Details at Regional Level Fisheries Offices
Particulars Asst Dir
Gr II Taluka
Off.
For 1 Taluka Office 1 1
For 125 Taluka Offices 125 125
Total Manpower estimated at Taluka Level Fisheries Offices 250
Estimated Manpower Details at District Level Excise Offices
Particulars Dy. Comm Dy. Suptd Office Suptd FDA SDA Inspector Steno
For 1 District Office 1 1 1 2 4 1 1
For 30 District Offices 30 30 30 60 120 30 30
Total Manpower estimated at District Level Excise Offices 330
Estimated Manpower Details at Sub-Divisional Level Excise Offices
Particulars Dy. Suptd Inspector Sub Inspector SDA
For 1 Sub Divisional Office 1 1 1 1
For 63 Sub Divisional Offices 63 63 63 63
Total Manpower estimated at Sub-Divisional Level Excise Offices 252
Estimated Manpower Details at Taluka Level Excise Offices
Dept of Excise Inspector Sub Inspectors SDA
For 1 Taluka Office 1 2 1
For 177 Taluka Offices 177 354 177
Total Manpower estimated at Taluka Level Excise Offices 708
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 145
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
7.4 Site Preparation Costs
Site Preparation for DHQ, AC, Taluka, Faciltation, Training Centres, Social Welfare and BCM Offices
SI. NO. Particulars
Cost/Unit (Rs. Lakhs) Requirement Total Cost(Rs. Lakhs)
1 Computer Table 0.04 7687 307
2
Steel Framed Computer custard wheel revolving chairs with Arm and cushion seat and back (Standard size) 0.03 7687
231
3 Printer Tables 0.028 2,562
72
4 Electrical Connections including complete Wiring 0.04 3,844
154
5 Copper Plate earthing 0.08 3,844
307
Total Cost 1,071
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 146
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
7.5 Transactions of RTC & RDS at Nemmadi Telecentres for the year 2006-07 to 2010-11 CAT SERVICE NAME 2006-07 2007-08 2008-09 2009-10 2010-11 TOTAL
A Social Security Pensions
Old Age Pension 8,893 1,48,088 27,984 2 - 1,84,967
Physically Handicapped Pens ion 2,910 29,069 65,325 1,59,089 1,20,645 3,77,038
Widow Pension 5,461 48,234 97,930 2,19,249 1,83,147 5,54,021
Sandhya Suraksha Yojane - - 1,13,119 6,54,047 4,13,723 11,80,889
National Family Benefit Scheme - - 1,752 14,566 23,531 39,849
Indira Gandhi National Old Age Pension - - 8,701 32,817 29,237 70,755
Invalidate Services - - - 1 17 18
Invalidate scheme - - - - 3 3
Sub Total 17,264 2,25,391 3,14,811 10,79,771 7,70,303 24,07,540
B Birth & Death Registration/Certificates
Birth Certificate 1,292 2,501 1,913 1,475 1,155 8,336
Birth Certificate (Previous) - - 16 113 96 225
Death Certificate 2,788 6,207 4,924 4,229 2,941 21,089
Death Certificate (Previous) - - 45 432 240 717
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 147
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Birth Registration 543 1,640 1,410 1,411 921 5,925
Death Registration 840 3,324 2,981 3,002 2,147 12,294
Sub Total 5,463 13,672 11,289 10,662 7,500 48,586
C Revenue Department Services
Population Certificate 57 119 128 83 31 418
Caste and Income Certficate 34,881 5,41,358 9,71,800 25,22,776 21,77,730 62,48,545
Caste Certificate (Cat-A) 3,179 72,281 1,26,342 3,22,409 2,68,677 7,92,888
Caste Certificate (SC/ST) 20,714 2,75,471 5,52,029 15,62,537 13,30,455 37,41,206
OBC Certificate (Central) 607 6,165 11,483 38,054 72,884 1,29,193
Residence Certificate 1,247 29,626 1,00,270 2,15,171 2,65,874 6,12,188
Income Certificate 13,451 2,27,999 4,82,434 9,41,556 14,45,385 31,10,825
Non Tenancy Certificate 1,128 6,748 14,995 20,524 19,178 62,573
Widow Certificate 44 183 554 314 138 1,233
Living Certificate 119 427 1,623 948 710 3,827
Agricultural Family member cer 713 3,863 7,989 16,142 23,004 51,711
Re-Marriage Certificate 80 362 883 1,586 2,153 5,064
Land less Certificate 156 1,915 3,566 5,471 5,515 16,623
Surviving Family Members Certi 900 7,666 27,126 53,059 67,953 1,56,704
D e p a r t m e n t o f e - G o v e r n a n c e
D r a f
Page 148
Detailed Project Report for State wide roll out of e-District MMP in Karnataka 2012
Income Certificate for compass 137 813 1,814 3,229 4,454 10,447
Unemployment Certificate 80 442 1,040 1,672 3,543 6,777
No Govt. Job Certificate 99 505 1,333 2,429 3,048 7,414
Agriculturist Certificate 421 2,138 4,569 10,360 13,794 31,282
Small / Marginal farmer Certif 2,587 21,046 26,453 35,815 48,809 1,34,710
Agricultural Labour Certficate 858 5,707 11,518 17,858 12,163 48,104
Non creamy layer Certificate 1,210 5,277 4,971 9,741 5,515 26,714
Land holding Certificate 646 6,538 18,753 23,918 30,617 80,472
Bonafide Certificate 425 3,177 6,631 12,981 17,601 40,815
Solvency Certificate 43 112 240 452 716 1,563
Sub Total 83,782 12,19,938 23,78,544 58,19,085 58,19,947 1,53,21,296
Total RDS Transactions 1,06,509 14,59,001 27,04,644 69,09,518 65,97,750 1,77,77,422
D Total RTC Transactions 4,37,184 42,93,392 53,68,276 57,42,905 60,64,807 2,19,06,564
GRAND TOTAL 5,43,693 57,52,393 80,72,920 1,26,52,423 1,26,62,557 3,96,83,986