11
DP WORLD YARIMCA CONTAINER TERMINAL PROJECT A 06.04.2015 ISSUED FOR INFORMATION A.G. C.K. E.D. Rev. Date Description Prepared Checked Approved No. ORIGINATOR STFA İNŞAAT A.Ş. EDOPEC ENERJİ PETROL MÜHENDİSLİK SANAYİİ VE TİCARET LİMİTED ŞİRKETİ Document Title CATHODIC PROTECTION SYSTEM ANODE, CATHODE & REFERENCE CELL CONNECTION BOXES Head Office : Palmiye Mah. Adnan menderes Bulv. Oktay Sitesi No: 9/8 PK = 33100 Yenişehir /Mersin –TURKEY P:+90 324 3260595 F:+90 324 3260596 www.edopec.com . [email protected] Document No. EDO SPC COE COR EPC 004 014 035 589 Rev A Scale Co. Org. Cod Doc Type Disc. Code Unit Code Prj. Type Prj. NO Prıj. Year Prj Seq.No DCC Seq.N o Page 11

Edo Spc Coe Cor Epc 004 014 035 589 Rev 0_anode Cathode Reference Cell Connection Box Submission

Embed Size (px)

DESCRIPTION

EDOPEC CATHODİC PROTECTİON REFERENCES

Citation preview

  • DP WORLD YARIMCA CONTAINER TERMINAL PROJECT

    A 06.04.2015 ISSUED FOR INFORMATION A.G. C.K. E.D. Rev. Date Description Prepared Checked Approved No.

    ORIGINATOR

    STFA NAAT A..

    EDOPEC ENERJ PETROL MHENDSLK SANAY VE TCARET LMTED RKET

    Document Title

    CATHODIC PROTECTION SYSTEM ANODE, CATHODE & REFERENCE CELL CONNECTION BOXES

    Head Office : Palmiye Mah. Adnan menderes Bulv. Oktay Sitesi No: 9/8 PK = 33100 Yeniehir /Mersin TURKEY P:+90 324 3260595 F:+90 324 3260596 www.edopec.com. [email protected]

    Document No.

    EDO SPC COE COR EPC 004 014 035 589 Rev A

    Scale

    Co. Org. Cod

    Doc Type Disc. Code

    Unit Code Prj. Type Prj.

    NO

    Prj.

    Year

    Prj Seq.No

    DCC Seq.N

    o Page 11

  • Page 2 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

    ProjectTit

    DPWORLDYARIMCACONTAINERTERMINALPROJECT

    Location:

    ONDECK

    MaterialSubmission: CATHODICPROTECTIONSYSTEMANODE,CATHODE&REFERENCECELLCONNECTIONBOXES

    PropertiesofMaterial:

    ANODE,CATHODE&REFERENCECELLCONNECTIONBOXESBrand:

    EDOPEC

    REVISIONHISTORY

    Revno Date Description Preparedby Approvedby00 06.04.2015 Firstissue. AG ED

    CONSTRUCTIONMANAGER TECHNICALOFFICEMANAGER DESIGNMANAGER

    QA/QCMANAGER

    NAM

    E

    SIGN

    ATUR

    E

  • Page 3 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

    Edopec company founders, 22 years in the energy sector engineering, procurement, implementation, and consulting experience in the areas of interdisciplinary engineering is a company born from. Edopec, customer-focused solutions, together with a team of international standards in projects are using. Engineering solutions organizes and recommends a code of ethics based. Projects, taking into account customer needs and implement documentary. Edopec, constantly accepts responsibility for the project. Edopec, describe a process can be monitored by a professional providing services in the following areas of Engineering, Procurement, Installation Implementation, Consulting, Project Management and maintenance company. Edopecsince1990as a professional service-producing sectoris a company founded with the knowledge of the founders. The basic philosophy ofthe company's establishment, in accordance withinternationalstandards andthe projectis to produceengineering ethics.

    Edopec;

    Allprocessesin the oil industry-(storage, transport, pre-

    productionand production) Concerning pressure vessel design, manufacturing and

    assembly Related toalternative energy(biogas process, design) Corrosion and Cathodic Protection field (engineering,

    procurement and installation) Is a company established as a result of experience? In Turkey, as in certain areas of job creation, industry personnel training have a better understanding.

  • Page 4 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

  • Page 5 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

  • Page 6 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

  • Page 7 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

  • Page 9 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

    Adobe Acrobat Document

  • Page 10 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

    Adobe Acrobat Document

  • Page 11 of 11

    Project:(Title) DP WORLD YARIMCA LMAN LETMELER A YARIMCA KONTEYNER TERMNAL

    Prj. Identification:

    Document Title: (Subject) ANODE DISTRIBITION BOX AND CATHODE CONNECTION BOX SUBMISSINON Document No.: EDO-SPC-COE-COR-EPC-004-014-035-589-REV-0_ANODE CATHODE REFERENCE CELL CONNECTION BOX SUBMISSION

    Revision: 0 Date: 06.04.2015

    Adobe Acrobat Document