30
Environmental Development Plan Gram Panchayat: Gunjoti Taluka:Omerga District: Osmanabad (MH) Gurgaon office 1 st Floor SCO-16, Sector 10- A, Gurgaon (Haryana) Mumbai office 2 nd Floor, J- 204,International Info Tech Park, Vashi station building ,Vashi- Navi Presenting J . M. Environet Pvt. Ltd.

EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

  • Upload
    amimaur

  • View
    231

  • Download
    6

Embed Size (px)

DESCRIPTION

dadadffsg

Citation preview

Page 1: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

E nv i ro n m e n t a l D eve l o p m e n t P l a nG r a m P a n c h a y a t : G u n j o t i

Ta l u k a : O m e r g aD i s t r i c t : O s m a n a b a d ( M H )

Gurgaon office 1st Floor SCO-16, Sector

10- A, Gurgaon (Haryana)

Mumbai office 2nd Floor, J-204,International Info

Tech Park, Vashi station building ,Vashi- Navi Mumbai

Presenting

J . M. Environet Pvt. Ltd.

Page 2: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

A b o u t J . M E nv i r o n et

J.M. Environet Pvt. Ltd. was established in 1993 (registered office at Jaipur (Raj.) &

corporate office at Gurgaon (HR) working as consultant since last 20 years & presently

our clientele is spread over in 22 states of INDIA.

Providing consultancy in environmental assessment, water management solid waste

management, rural sanitation, slum survey, social impacts, socio-economic survey,

survey through GPS, DGPS, Land Use, Land Cover Mapping, Rural Development, Urban

Planning, Municipal Finance.

Sucessfuly completed more than 900 projects related to environmental consultancy

services.

JM is working on externally funded projects like ADB, World Bank, DFID (U.K.) , EKF

(Denmark).

JM has in-house full-fledged environmental approved laboratory (NABL & MOEF) with

latest equipments.

Page 3: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Gunjoti GP

  Geographical Coordinates

Latitude 17°48'33"N

Longitude 76°35'46"E

A b o u t G u n j o t i G r a m P a n c h a y a t :

Before independence, Gunjoti was a district centre known as

PAYAGAH in Hyderabad State under the rule of Nizam.

Gunjoti is 4 km away from Omerga towards southwest which is

situated on National Highway No. 9 (Pune-Hyderabad).

Umarga , Nilanga , Gulbarga , Tuljapur are the nearby Cities to

Gungoti.

Total population of Gunjoti Gram Panchayat is 9352 with two

Revenue Village i.e. Gunjoti & Gunjoti Wadi.

Total Geographical area is 2823.24 Ha.

Total House hold of Gunjoti Gram Panchayat area is 1869

Geographic Location : Regional Scenario

INDIA MAHARASHTRA DIST: OSMANABAD

Page 4: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Gunjoti : Connectivity & LinkagesRoad Connectivity (Km) Hyderabad    :  231 Pune               :  334  Nasik              :  440  Mumbai         :  480

Rail Connectivity (Km) Solapur           :  65 Osmanabad   :  82 Latur               :  89

Air Connectivity (Km) Hyderabad 

International      Airport           :  234

Page 5: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Demographica l Information

Source : As Per Census Data 2011

S .NO NAME OF VILLAGE POPULATION Male Female Sex Ratio Sex Ratio (0-6)

1. Gunjoti Village 8737 4449 4288

964 8912. Gunjoti Wadi 615 326 289

Total 9352 4775 4577

51.06 %48.94 %

Population Distribution Under Total Male & Female

Total Male Total Female

52.99 %

47.01 %

Population Distribution Under Total Male & Female (0-6 Age)

Total Male (0-60) Total Female (0-6)

Page 6: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Rural India Maharashtra Osmanabad Gunjoti GP02468

101214161820 18.45

12.17

16.1

16.8478882911755

11.25

14.63

2.2 0.927091679066041

SC Population ST Population

D e m o g ra p h i c a l I n fo r m a ti o n

Rural India Maharashtra Osmanabad Gunjoti GP0

10

20

30

40

50

60

70

80

9086.39

74.16 73.8

77.5455158462576

67.3860.27

55.5

65.4850746268657

Male Female

Rural India Maharashtra Osmanabad Gunjoti GP

947 951

921

958.534031413613

919

890

866

887.070376432079

Sex Ratio Sex (0-6)Sex Ratio

Major Findings- Gunjoti

Good Literacy level

Good overall sex Ratio

Low ST population (0.9%) when compared to SC population (16.8%)

SC/ST Population

Rural Literacy

Page 7: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Population P r o j e c ti o n :

Taluka Grampanchayat

Population Projection

Year2011

Year2021

Year2031

Year2036

Omerga Gunjoti 9352 10730 12148 13610

Geometric Progression Method:

Incremental Increase Method:

Arithmetic Increase Method:

Yr:2011 Yr:2021 Yr:2031 Yr:20360

2000

4000

6000

8000

10000

12000

14000

16000

9352

10730

12148

13610

Population Growth

Year

Pop

ula

tion

Year Population Decadal Growth

2011 9352 19.77 %

2021 10730 14.73 %

2031 12148 13.21 %

2036 13610 12.03 %

Average Growth 14.93 %

Remark: Population of Gunjoti GP is increasing but Growth Rate is Slightly Decreasing in every 10 Years

Source : As Per Census Data 1991, 2001 & 2011 & Population Projection

Page 8: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Working Methodology

Preliminary Site Visit by Team of Experts

Workshop with Stakeholders

Baseline Data Collection

Scope & Identification of Study Area

Aims & Objective

Situation Analysis & Identification of Issues

Comments & Suggestions from Gram Sabha

Draft EDP

Final EDP Submission

Page 9: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Meeting & Discuss ions Preliminary Meeting was conducted on 02.12.2013 with

Gram Panchayat Sarpanch, Dy. Sarpanch, Village Development Officer to Initiate the EDP Project. This visit was made by Mr. M.N. Waingankar, Mr. Israr Y. Pathan & Mr. J.Patni as JMEPL Representatives.

Kickoff Workshop and Discussion was organized on 29.0.1.2014 in front of Mr. K.D. Bone, Dy. CEO, District Osmanabad. Village Development Office of all 8 Gram Panchayats. Were presented.

A site visit of Mr. Anuj Sharma, Mr. M.N. Waingankar, Mr. Israr Y. Pathan, Ms. Harshada Mahajan and Monitoring Staff was conducted in Gram Panchayat area for discussion and identification of the Issues and Potential of the Gram Panchayat.

Site Visit of Water Supply & Sanitation Expert along Mr. M.N. Waingankar and Monitoring team was conducted to identify the water supply gap and identify sustainable Water Supply and Sanitation proposal.

Page 10: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

B a s e l ine M o ni to r i ng & E x pe r t s V i s i t

Baseline Environmental Monitoring was conducted

in Entire Gram Panchayat area to access the

Environmental Condition of the area including

following aspects:

Ambient Air Quality Monitoring

Ambient Noise Level Monitoring

Water Sampling

Soil Sampling

GPS Survey of Infrastructure Facilities

Road Slope & Drainage Survey

Village Boundary Survey

Biodiversity Study

Hydro geological Study

Water Supply & Sanitation survey

Agriculture & Cropping Study

Land use Land Cover Study

Page 11: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

E nv i ro nm e nta l Q ua l i t yS. No. Environmental

AspectLocation Results Remark

1. Ambient Air quality 1. Gondehale Gali, Ward No. 4

2. G.P. Building3. Near Main Omerga

Road

PM-10: 72.25 – 107.45 g/m3

PM-2.5:34.60 – 50.25 g/m3

NO2: 14.65 – 22.95 g/m3

SO2: 7.28 – 12.25 µg/m3

CO: less than 0.5 mg/m3

Well Within the Standard.

2. Ambient Noise Level 1. Gondehale Gali, Ward No. 4

2. G.P. Building3. Near Main Omerga

Road

Day Time:53.82 to 58.24 dB (A)Night Time:44.24 to 49.77 (A)

3. Water 1. Ward No.1 Gunjoti2. Ward No.4 Gunjoti3. Ward No.6 Gujoti

pH: 6.90to 6.99Total hardness:336.96 to 565.76 mg/LAlkalinity:304.92 to 308.09 mg/L

4. Soil 1. Nr. Omerga Gunjoti Road

2. Nr. Omerga Gulberga, Ward No.6

pH:7.77 to 8.03 Organic Matter:0.75 % to 1.11%. Phosphorous:15.67to 34.76 kg/ha Potassium:451.43 to 828.36 kg/haNitrogen:124.96 to 84.46 kg/ha.

Page 12: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

L a nd U s e L a nd C ove r ( LU LC )S. No. LU/LC Class

Area in

hectare% Area

1. Water Bodies 84.01 2.98

2. Roads 25.35 0.90

3. Commercial / Institutional 1.07 0.04

4. Open Land 68.91 2.44

5. Open Scrub Land 154.42 5.47

6. Plantation 17.12 0.61

7. Agriculture Land 2457.31 87.04

8. Residential Area 14.98 0.53

9. Industrial Area 0.02 0.00

10. Crematorium 0.06 0.00Total 2823.24 100.00

3% 1% 0% 2%

5%1%

87%

1% 0% 0%

LULC(%)

Water Bodies

Roads

Commercial / Institutional

Open Land

Open Scrub Land

Plantation

Agriculture Land

Residential Area

Industrail Area

Crematorium

• Majority of land is dominated by 87.04 %

• Vacant Open land for Infrastructure.

• 2.98% of total area is covered by Water Bodies.

Page 13: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Major i ssues of a l l Grampanchyat :

Settlement in Grampanchayat area;

Drainage System;

Solid Waste Management & Disposal Facilities;

Transportation in internal area of Gram Panchayat;

Storage and Supply of Water;

Road Condition;

Education & Technical Education Facilities;

Health Care Facilities;

Employment Opportunities;

Lack for Small Scale Business & Awareness

Page 14: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

W a t e r S u p p l y & S a n i t a ti o nS. No. Type Number

1. Govt well 14 nos

2. Over head tanks in working condition 1nos

3. Over head tanks in Non working condition 2 nos

4. Handpump in Working Condition 7 nos

5. Handpump in non Working Condition 4 nos

Gram Panchayat Has Awarded with Nirmal Gram Purushkar for total sanitation;

2 Public Toilets are present in Ward no.1 & 3. There is no Wastewater Treatment Facilities. Improper Drainage Facility.

Years

PopulationBasis of Water

Demand for Residential

Population (LPCD)

Domestic Water Demand

(LPCD) *

Basis of Water Demand for Floating

Population(LPCD)

Water Demand of Floating Population

(LPCD)

Total Water Demand (LPCD)

Sewage Generation

(LPCD)DomesticFloating (per

day)

2011 9352 1870 70 654640 45 84150 738790 591032

202110679

2136 70 747530 45 96120 843650 674920

203112034

2407 70 842380 45 108315 950695 760556

203613420

2684 70 939400 45 120780 1060180 848144

Present & Future Water Requirement & Waste Water Generation Source : Gram Panchayat & Primary Survey

Page 15: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

S o l i d W a s t e M a n a g e m e n tSr No. Ward/Wadi Type

1 4 Open Dump2 5 Open Dump3 5 Open Dump4 Gunjoti Wadi Open Dump5 Gunjoti Wadi Open Dump6 4 Open Dump7 5 Open Dump8 5 Open Dump9 3 Open Dump

10 3 Open Dump11 Harijan Wasti Open Dump12 Harijan Wasti Open Dump13   Open Dump14 Shishak Colony Open Dump15 1 Open Dump16 1 Open Dump17 1 Open Dump18 1 Open Dump

Solid Waste Dumping Site

PROJECTED WASTE GENERATION

Year PopulationBasis of Waste

generation (gms/day)

Waste Generation (tonne/day)

Floating Population

Basis of Waste generation (gms/day)

Waste Generation (tonne/day)

Total Waste Generation (tons/day)

2011 9352 200 1.87 1870 50 0.09 1.96

2021 10679 200 2.14 2136 50 0.11 2.24

2031 12034 200 2.41 2407 50 0.12 2.53

2036 13420 200 2.68 2684 50 0.13 2.82

• Waste is being dumping in open land.• Door to door Waste Collection Facility is not available.• Waste is only collected manually by hand Cart.• Proper Waste Dumping Site is not available.• Proper Waste Management System is not available.

Page 16: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

M a n a g e m e n t P l a n : S e c t o r a l G o a lSN SECTOR GOAL

1. Economy, Trade

&Commerce

To create a vibrant village with diversified economic base using local opportunities and

potentials with special consideration to the economically weaker sections of the society

2. Water supply To ensure access to drinking and safe water supply to all

3. Sewerage To achieve access to sewerage network for all

4. Drainage To achieve comprehensive and sustainable drainage system by regarding the existing natural

drainage

5. Solid Waste

Management

To achieve and promote environmentally sustainable waste management practice

6. Transportation To achieve comfortable, sustainable, equitable and efficient transport facility system

7. Power supply To ensure access to renewable energy sources of power to all

8. Education To promote quality educational facilities in the village with special focus to the marginalized

section of the society

9. Health To provide quality health facilities with special focus towards primary health care facilities and

emergency services

10. Environment To use efficiently the potential of the village and to promote it as a environment friendly eco –

village

13. Disaster

Management

To ensure Gunjoti as a sustainable and disaster-free village

14. Rural Governance To promote the management to be efficient, equitable, accountable and transparent in nature

15 Other Social

Facilities

Area Specific Management Plan based on the Requirement/ Recommendation

Page 17: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

M a n a g e m e n t P l a n : C o s t E s ti m a ti o n S. No. Details of Acivities Total Phase-I Phase-II Phase-III Phase-IV Phase-V

1 Economy Trade & Commerce 4611 916 940 930 925 900

2 Water Supply 165.83 113.1 52.73 - - -

3 Sanitation 872.15 14.8 857.35 - - -

4 Solid Waste Management 185.305 38.82 58.06 32.295 28.065 28.065

5 Education 50 - 50 - - -

6 Medical & Health Facility 12 - 12 - - -

7 Transportation 762.51 574.51 187.99 - - -

8 Energy Management 316.72 69.00 74.00 69.82 53.9 50.00

9Pollution & Biodiversity Management 528.75 105.75 105.75 105.75 105.75 105.75

10 Tourism Development 100.0 20.00 20.00 20.00 20.00 20.00

11 Other Social Facilities 219.36 50 62 80.32 13.52 13.52

12 Disaster Management Plan 125 20 20 20 20 45

13 Village Capacity Building 80 10 10 20 20 20

14 DPR for All Proposal 50 10 10 10 10 10

15 IEC for Related to all proposal 70 10 10 15 15 20

Total 8148.63 1951.98 2469.88 1303.185 1211.235 1212.335

Page 18: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Thank You……

Page 19: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

Backup Slides……

Page 20: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

E nv i ro nm e nta l Q ua l i t y : Am b ie nt A i r

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

0

20

40

60

80

100

120

83.10

97.4

2

107.

45

72.2

5

82.6

7

84.7

5

100 100 100

PM10 Max. PM10 Min. NAAQSMONITORING STATIONS

PM10

g/

m3

AMBIENT AIR QUALITY MONITORING RESULTS : PM10

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

0

10

20

30

40

50

60

70

39.8

8

44.8

1

50.2

5

34.6 38

.02

40.6

8

60 60 60

PM2.5 Max. PM2.5 Min. NAAQSMONITORING STATIONS

PM

2.5

g/

m3

AMBIENT AIR QUALITY MONITORING RESULTS : PM2.5

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

0

10

20

30

40

50

60

70

80

90

19.0322.64 22.95

14.65 16.03 16.25

80 80 80

NO2 Max. NO2 Min. NAAQS

MONITORING STATIONS

NO

2

g/m

3

AMBIENT AIR QUALITY MONITORING RESULTS : NO2

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

0102030405060708090

10.6 12.25 11.777.28

8.35000000000001 7.91

80 80 80

SO2 Max. SO2 Min. NAAQSMonitoring Stations

SO2

g/

m3

AMBIENT AIR QUALITY MONITORING RESULTS : SO2

Page 21: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

E nv i ro nm e nta l Q ua l i t y : Am b ie nt N o i s e

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

51

52

53

54

55

56

57

58

59

53.8

2 54.3

7

58.2

4

55 55 55

Day Time (6:00 a.m. to 10:00 p.m.) CPCB NOISE STANDARDS (Residential)MONITORING STATION

Leq

dB (A

)

Ambient Noise Level Day Time (6:00 a.m. to 10:00 p.m.)

Gondehale Gali, Gunjoti G.P. Building, Gunjoti Near Main Omerga Road, Gunjoti

4142434445464748495051

44.2

4

46.1

8

49.7

7

Night Time (10:00 p.m. to 6:00 a.m.) CPCB NOISE STANDARDS (Residential)MONITORING STATIONS

Leq

dB (A

)Ambient Noise Level

Night Time (10:00 p.m. to 6:00 a.m.)

Page 22: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : E c o n o m y T r a d e & C o m m e r c e

Details of Activities Total Phase-I Phase-II Phase-III Phase-IVPhase-V SourceEconomy Trade and Commerce= Grain processing units-40.00 Lakhs (Approx), Pulses Process Unit-30.00 Lakhs (Approx), Oil Sheed Processing unit-25.00 Lakhs (Approx), Bazarpeth -16.00 kahs, Development of Sericulture unit in 50 Acre open land @ 90.00 Lakhs per unit= 90x50= 4500 Lakhs

4611 916 940 930 925 900 4611

Page 23: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : W a t e r S u p p l y

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Total cost of Water Supply Scheme is-113.10 Lakhs (Pump House- 1.75 Lakhs, Pumping machinery-3.79 Lakhs, Rising Main-92.74 Lakhs, Trenches Gallery of 25 M-5.50 Lakhs, New 6x12 M well-9.32 Lakhs), DWWT Plant-52.73 Lakhs.

165.83 113.1 52.73 - - - 165.83

D e t a i l e d C o s t : S a n i t a ti o nDetails of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Sanitation Facilities required the underground drainage. Total 46 Roads required the Drainage work and the cost of the same is-857.35 Lakhs, total 7 roads required the covering of Open Drainage and the cost of the same is-4.80 Lakhs. Total Drainage work= 862.15 Lakhs, 5 Public toilets @ 2.00 Lakhs each=2x5= 10.00 Lakhs

872.15 14.8 857.35 - - - 872.15

Page 24: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : S o l i d W a s t e M a n a g e m e n t

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V SourceWaste Collection Van-12.00 Lakhs, 2 small dust bins for each HH @ 100 Rs/bins. Total House hold is 1869. So that total Cost of Dust bins are- (2X100X1869)X2=7.47 Lakhs, 10 Waste Dumping bins ate major points of GP area @ 5000 Rs/- bins= (5000X10)X2=1.00 Lakhs, 10 Vermicomposting unit @ 1.00 Lakhs per unit= 10X1=10.00 Lakhs, Waste dumping, Segragation unit & Shed- 20.00 Lakhs, 2 workers for each Vermicomposting unit @ 150/- Day for five year= (150X2X1825)X5= 27.375 Lakhs. 1 Driver for Ghanta Gadi @ 500 Rs/ day for 5 years- (500X1825)X5-45.625 Lakhs, 2 Workers with Ghanta gadi @ 150 Rs/ Day for 5 Years-(150X2X1825)X5= 27.375, Cost of Fuel & Maintainance for Ghanta gadi- (8.00X5)=40.00 Lakhs,

185.305 38.82 58.06 32.295 28.065 28.065 185.305

Page 25: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : E d u c a ti o n

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source,Establishment of Zilla Parishad School with All Educational facilities.

50 - 50 - - - 50

D e t a i l e d C o s t : M e d i c a l & H e a l t h F a c i l i t y

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V SourceEstablishment of Primary Sub Health Centre with all basic medical facilities.

12 - 12 - - - 12

D e t a i l e d C o s t : T r a n s p o r t a ti o n

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V SourceTotal Main and Internal Road length is 30.83 Km. Total 53 Roads identified. 43 Roads required only Road Construction Work and the total cost of the same is-758.51 Lakhs, Two bus shed @ 2.00 Lakh= 4.00 Lakhs

762.51 574.51 187.99 - - - 762.51

Page 26: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : E n e r g y M a n a g e m e n t

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V SourceEnergy Management- Total 300 Solar Panel are required for road Side lightning. 22 Lamps are available so that 278 new Solar Lamps will be established @ 19000/- per lamp cost- Total cost of Road Side Solar Lamps- 52.82 Lakhs. Maintenance cost or replacement of Batery @ 5000= 5000x300=15.00 Lakhs. (Only for first maintenance after 5 years) Establishment of Solar Power Generation Unit of 400 KW Capacity= 250 Lakhs

316.72 69.00 74.00 69.82 53.9 50.00 316.72

Page 27: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : P o l l u ti o n & B i o d i v e r s i t y

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V SourceTotal 12000 plants will be planted on both side of the road. 1-Cost of Tree Samples= 12000X50= 6.00 Lakhs 2-Digging Charges=12000X150=18.00 Lakhs3-Tree Guard Cost= 2000X50=6.00 Lakhs4-Mannuar Cost= 12000X50= 6.00 Lakhs. Total cost of Plantation-36.00 Lakhs To survive 12000 Plants, 60 families will (180 Member) will work 1825 Days (5 Years) @ 150 Rs per head/ per day (as per minimum wage Act), so that total cost of Maintenance will be 180X1825X150=492.75 Lakhs

528.75 105.75 105.75 105.75 105.75 105.75 528.75

Page 28: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : T o u r i s m M a n a g e m e n t Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Development of Historical Places in Gunjoti GP area i.e Strengthen of Hutam Smarak, Garden and Sitting Facility, Strengthen of Ram Mandir, Entry gate, Plantation and electrification, Strengthen of Shinai Mandir, Community hall, Concreting of Compound anf development of compound wall, Graden and drinking water facility, Electrification, Garden, Compound wall and Kabristan area, Plantation, Sitting arrangement and electrification at Hazi Munnawar Dargah, Strengthen of compound wall, renovation of math, cleaning and boundary wall of well, compound wall and compound development, sitting arrangement Tulsi Mata Math, Strengthen and Electrification and Graden at Ghanta Math, Overall strengthen and construction of Entry gate of the Guru Satling Maharaj Samadhi Sthal, Garden, Entry gate, Compound and compound wall with sitting arrangement, electrification facility in Maruti Mandir- 100.00 Lakhs (Approx)

528.75 105.75 105.75 105.75 105.75 105.75 528.75

Page 29: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : O t h e r S o c i a l F a c i l i t y Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Development of Play Ground- 80.32 Lakhs, Establishment of Study Centre- 12.00 Lakhs, Construction of Community Hall-50.00 Lakhs, Construction of Cremation Ground-13.52 Lakhs, Construction of Grave Yard-13.52 Lakhs, Construction of Gym with all required Facility- 50.00 Lakhs

219.36 50 62 80.32 13.52 13.52 219.36

D e t a i l e d C o s t : D i s a s t e r M a n a g e m e n t P l a n Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Disaster Management Plan 12 - 12 - - - 12

D e t a i l e d C o s t : V i l l a g e C a p a c i t y B u i l d i n g Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Training of GP Members, Sarpanch and Village Development Office regarding Transparant Administration, New policies of Government and other Technical training programs. Technical trainining programs/Camps to the youth and Health and Women Health & Child Development training and awarness etc.

12 - 12 - - - 12

Page 30: EDP Osmanabad PPT Gram Sabha Gunjoti 11.07.14

D e t a i l e d C o s t : D P R f o r a l l P r o p o s a l

Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

Detailed Project Report 12 - 12 - - - 12

D e t a i l e d C o s t : I E C f o r a l l P r o p o s a l Details of Activities Total Phase-I Phase-II Phase-III Phase-IV Phase-V Source

IEC Plan 12 - 12 - - - 12