Owner :
PT RYHAN RESOURCE INDUSTRI
Up : MR AGUNG
Rukan Arthagading Niaga Blok I No.2
Kelapa Gading Barat
Contractor :
PT DUTA MANDIRI PERKASA PRIMAKomplek Meditrania Blok D5 No 25 Samarinda
Phone/ Fax: (0541)-, E-Mail [email protected]
: Web:www.dutamandiriperkasa.com
PREPAIRATION
- Mob Demob Matrial and Peralatan
FABRICATION AND INSTALATION
1 SECTION CRANE LIFTING
- WF 1 = 600 x 200 x 11 x 17 MM
- WF 2 = 600 x 200 x 11 x 17 MM + Two side
- WF 3 = 500 x 200 x 10 x 16 MM
- WF 4 = 400 x 200 x 8 x 13
- WF 5 = 350 x 175 x 7 x 11
- Steel Pipe Ø 30 "
- Steel Plate 38 mm Thichnes ( 6M x 7 M)
2 SECTION CRANE & TRUCK TRAVELING 6M x 20M\
- WF 1 = 600 x 200 x 11 x 17 MM
- WF 2 = 600 x 200 x 11 x 17 MM + Two side
- WF 3 = 500 x 200 x 10 x 16 MM
- WF 4 = 400 x 200 x 8 x 13
- WF 5 = 350 x 175 x 7 x 11
- Steel Plate 38 mm Thichnes ( 6M x 20M)
3 SECTION RAILING Ø 2" Scedule 40 + ACECORIS
- Steel pipe ø 2" Scedhule 40
- Square Bare 20 x 20 x 6M
]
TOTAL IN WORD :
KETERANGAN PENAWARAN
- Harga adalah FOB Site
- Termasuk Cost Sosial
CARA PEMBAYARAN
- Untuk Pengadaan Barang 50% Saat PO Ditandatangani
- Payment II 30% Setelah Matrial siap dikirim
- Payment III 20% Setelah matrial sampai disite
Page : 1
Direktur Utama
" Dua milyar dua ratus delapan puluh enam juta rupiah"
B
275,000,000Rp
PT DUTA MANDIRI PERKASA PRIMA
Samarinda 13 February 2013
Yoga Nugroho Cp.ST
Kg
Kg
29,245,440Rp 19,218,432Rp 48,463,872Rp
232,288,000Rp
-Rp
152,646,400Rp 384,934,400Rp
-Rp -Rp
2,089
16,592
Kg
Kg
2,089
16,592
-Rp -Rp -Rp
KgTOTAL
13,689,600Rp 34,521,600Rp
329,323,200Rp 830,467,200Rp
7,920 Kg 7,920 Kg
2,688 Kg 2,688
35,796 Kg 35,796 Kg
1,488 Kg 1,488 Kg 20,832,000Rp
501,144,000Rp
110,880,000Rp
-Rp
-Rp
62,361,600Rp
72,864,000Rp 183,744,000Rp
-Rp
Kg 37,632,000Rp
595 Kg 595 Kg
1,512 Kg 1,512 Kg
8,332,800Rp
21,168,000Rp
1,590 Kg 1590 Kg
1,980 Kg 1980 Kg
22,260,000Rp
27,720,000Rp
14,628,000Rp
A
UPAH
1,908 Kg 1908 Kg 26,712,000Rp 17,553,600Rp
LOCATION :
NO QUATATION
Volume
PROJECT :
JOB DESCRIPTION:
Si DESCRIPTIONMATRIAL
SAT
QUATATIONSTEEL FABRICATION
BANGKANAI BLOK DEVELPOMENT ( CIVIL WORK)
STEEL FABRICATION
LUWE HULU - KALTENG
03/DMPP
UPAH TENAGA
VOLUME SATUAN MATRIAL
HARGA
12,529 Kg 12,529 Kg 175,400,400Rp 115,263,120Rp 290,663,520Rp
-Rp
797,518,192Rp ##############
TOTAL HARGA
36,888,000Rp
-Rp
18,216,000Rp 45,936,000Rp
5,475,840Rp 13,808,640Rp
13,910,400Rp 35,078,400Rp
44,265,600Rp
24,729,600Rp
2,286,132,832Rp 86,687