48
EGM calling – May 7 th 2012 Christer & Elizabeth Pe;erson MYP 1B Hans Arne KrisBanson MYP 4A & B Ciara Wharton PYP5A, MYP1B, MYP3A, MYP4A Pia Strum MYP 4A & B Karin Williams PYP 4A LarsVngve Larsson PYP 4A Ulric & Corinna Aspegrén MYP 3A, MYP 3A, PYP 3B Philip & Juliene Munts PYP 4 Neil Wilson PYP 5A & MYP 4A Colle;e Logan MYP 1A Niels Wagner PYP 5A SPSC1 Peter & Julie Brave MYP 3A

EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

EGM  calling  –  May  7th  2012  Christer  &  Elizabeth  Pe;erson      MYP  1B  

Hans  Arne  KrisBanson        MYP  4A  &  B  

Ciara  Wharton            PYP5A,  MYP1B,  MYP3A,  MYP4A  

Pia  Strum              MYP  4A  &  B  

Karin  Williams                PYP  4A  

Lars-­‐Vngve  Larsson          PYP  4A  

Ulric  &  Corinna  Aspegrén        MYP  3A,  MYP  3A,    PYP  3B  

Philip  &  Juliene  Munts        PYP  4    

Neil  Wilson              PYP  5A  &  MYP  4A  

Colle;e  Logan              MYP  1A  

Niels  Wagner              PYP  5A  SPSC1  

Peter  &  Julie  Brave          MYP  3A  

 

Page 2: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Analysis  of  the  material  presented  to  parents  by  Bladins  Founda6on’s  Board  

on  March  16th  2012.  

2  

Page 3: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

3  

Page 4: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

27/4/2012

36 34 38 37 35 37 31 39 41 31 35 4

393

18

     

       2009    2010    2011    2012    2013  

IS  Students          338        354        374  -­‐>  393  

Target          297      337        377          417          457  4  

Page 5: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Target  is  Key  Board  says:  “con6nued  strong  growth”  is  key  Strategic  plan  2015  says:  Reaching  targets  is  key    IS  Target  -­‐  starBng  2008/09:    2  parallel  classes  with  22  students/class  40  students/year  over  5  years…NOT  conBnuous  strong  growth    Start  2011/12  Target  status:    117    of  120  

 To  meet  target:  64  students  over  next  2  years.  

   

 

  5  

Conclusion  :  No  panic  concerning  intake  of  IS  students  

Page 6: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

6  

Page 7: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

IS  Target  Strongly  Above  Budget  

 Year      2009    2010    2011    2012    2013  

Students          338        354      374  -­‐>  393  

Projected  Target    297    337      377        417        457  

Board’s  budget    275      293        332        349      359  

Target  vs  budget        +45      +68    +98  

7  

•  Founda6on  Board’s  budget  is  conserva6ve:    •  only  10-­‐15  students  increase  per  year.  •  More  is  realis6c  

 •  IS  generates  healthy  earnings  even  with  fewer  students  

budgeted  (see  previous  slide)  

Page 8: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  1        

False  Alarm  concerning  

IS  students  intake  

presented  by  Board  

 to  parents  and  teachers  

8  

Page 9: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

9  

Page 10: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Key  Indicators  Öresund  region  2012-­‐20  Board’s  use  of  Danes  as  indicator  (proxy)    

for  decline  in  expats  is  misleading  

But  if  it  was  to  be  used  as  an  indicator  then  data  from  March  2012  says  :  

 

More  Danes  prone  to  move  to  Sweden    l  1  of  8    considers  job  in  Sweden  before  2014      Highest  number  since  2008,  first  increase  since  2007.  Employment  data  stronger  on  the  Swedish  side  

l  8000  jobs  available  in  Swedish  Öresund  region  l  Only  5000  jobs  available  in  Danish  Öresund  region  Source  :  next  slide  

10  

Page 11: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Source  of  Key  Indicators  Öresund  region  2012-­‐20:    Job  og  uddannelse  I  Öresundsregionen  

Danish partners are:

City of Copenhagen (lead partner) The Capital Region of Denmark

Region Zealand Employment Region Copenhagen & Zealand

Copenhagen Technical College Basic Social & Health Education Programs

(Sosu C) Metropolitan University College

Swedish partners are:

City of Malmö Region Skåne

Swedish Public Employment Service Malmö Swedish Public Employment Centre’s

Department for Analysis Malmö University

Københavns Kommune, Beskæftigelses - og Integrationsforvaltningen Bernstorffsgade 21, 5. sal 1592 København V Tlf. (+45) 4049 3195

11  

Page 12: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Employment  data  and  immigraBon  indicators  within        the  Öresund  region  2012  

Flere  danskere  overvejer  job  i  Sverige;  d.  2  marts,  2012  

En  undersøgelse  fra  Øresundsbroen  viser  at  hver  8.  dansker  overvejer  at  søge  job  i  Sverige  indenfor  de  næste  to  år.    Det  er  det  højeste  antal  siden  2008  og  første  gang  

kurven  s6ger  siden  2007.  Krisen  på  det  danske  arbejdsmarked  og  de  lidt  bedre  jobmuligheder  i  bl.a.  Skåne  er  en  af  forklaringerne.  

De  seneste  tal  viser  at  der  i  januar  var  markant  flere  ledige  job  i  Skåne  end  i  Østdanmark.  På  Platsbanken  der  er  den  svenske  arbejdsformidlings  jobnet  var  der  ca.  8.000  nye,  ledige  job  i  Skåne,  mens  der  i  hele  Østdanmark  blot  var  ca.  5.000  nye  ledige  

job  i  januar.  

Source: Job og uddannelse I Öresundsregionen Öresundsregionens näringslivs-conscortium (inkl. Malmö stad och Köpenhamns stad)

Page 13: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  2          

Board  used  misleading  indicator  

Board  used  out-­‐of-­‐date  data  

Board  failed  to  consult  authority  source    

13  

Page 14: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Employment  Data  in  Öresund  Region  

Source:  Öresundsregionens  näringslivs-­‐conscorBum  (bestående  av  bl.a.  Malmö  stad  och  Köpenhamns  stad)    

14  

Page 15: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Employment  Data  in  Öresund  Region  

Source: Öresundsregionens näringslivs-conscortium (bestående av bl.a. Malmö stad och Köpenhamns stad)

No forward looking. Why stop at 2010?

15  

Page 16: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

16  

Page 17: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Board  not  taking  into  account:   ESS - European Spallation Source A World-Leading Centre for Materials Research

ESS will be a European

research facility, built for

international scientists,

in Lund

17  

Page 18: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Future  Needs  of  Key  Employer  -­‐  ESS  •  Today 116 employees •  Plan to be 300 in 2013 •  400-500 in 2014/2015

“ESS employees will most likely reside in Malmö as there is a family

housing problem in Lund.”

“Forecast of children for international school (conservative)” Today: 4 2013-2014: 10-20 2014-2015 : 20-25 2015-2016 : 25 2016-2017 : 30 2017-2018 : 35…

Source: Matti Tiirakari, Head of Administration, Tel: +46 722 440 009

18  

Page 19: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Tetra  Pak  

“We will definitely need places for children of parents that are on expatriate contract in Sweden över a period of 1-5

years. (We have right now at least 6 children that will start at Bladins in fall and I expect that this number will rise during

spring/summer).

We have also got an increased need for children with parents that get employed with local contract in Sweden.

School with IB teaching is an absolute requirement from

our employees, at first hand from our expatriates, as the children must have a continuity in their education.“

Source:  Eva  Åkesson,  HR  Director,  AB  Tetra  Pak,  Lund,  Tel:  +46  46  36  33  73   19  

Page 20: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Board  not  taking  into  account:  IKEA  

Employee transfer to Malmö of 500 (decided) and 200 (under discussion).

A possible total of 700 employees.

10% are international transferees (foreigners and Swedish

included)

Expected need for international school places: 50 !!! Start 2013/2014

Source: Roland Idemyr, MD of IKEA Services AB, Tel: +46 42 444 78 69

20  

Page 21: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  3      

 

Board  failed  to  contact  key  Employers,  a  vital  input  to  a  robust  strategic  plan  

   

 

21  

Page 22: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

22  

4 out of 7 companies has very few expats – not relevant Power company has very

few expats – not relevant

Page 23: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

IKEA  OperaBons  moving  to  Malmö  

Summary  2011  Sales  Growth  6.9%  Stores  Growth  2.7%  

Despite  weaker  global  economy:  25.2  B  EUR  tot  rev/2.97  B  EUR  net  inc  131  000  employees  from  48  naBons  

85%  Of  the  IKEA  Country  managers  work  somewhere  other  than  their  home  country  

Source: IKEA Yearly Summary 2011; “Welcome inside”

Why  is  IKEA  omi;ed  from  the  data?  

23  

Page 24: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Corporate  Finance  Corporate finance does not say how the company is investing regionally.

Example: Sandvik (from  Board’s  list  of  previous slide) Annual Report 2010 decided to expand its production of crushers in Svedala by investing SEK 300 M in a new production facility. Corporate finance does not say much about expat movement.

24  

Example : Sony Mobile Communications (from Board’s list of previous slide) •  Currently 20 students in 2011/2012 •  Forecast is 30 students over 2 years •  Source: Alf Johansson, Human Resources, Sony Mobile Communications, Tel: +46 10 801 66 50

The expat concept is changing: Expat yesterday is on local contract tomorrow but still needs international schooling.

Page 25: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  4  

 Board  used  selec6ve  corpora6ons  where  several  have  very  low  impact  on  IS;  failed  

to  use  several  key  Employers    

Board  used  corporate  financial  result  which  is  a  misleading  indicator  for  expats  

   

 25  

Page 26: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Compe66on  

Board  referring  to  the  whole  region.  

26  

Page 27: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

CompeBBon  –  No  surprises  !   Malmö Hyllie: NO decision yet

27  

For the record: Bladins Foundation Board has since 2007 known that there is going to be an international school

in Malmö. This is documented in minutes.

Contacted: Mat Mac Shane: Former Hyllie school project leader, Tel: +46 70 885 64 50 Jörgen Neldestam: Ordförande i Hyllie Stadsdelsfullmäktige, Tel: +46 709 79 93 99 Matz Nilsson: Utbildningsdirektör Malmö Kommun, Tel: +46 70 256 85 90 Amela Hodzit: Politisk Sekreterare till Catherine Sjärnfelt Jammeh, Kommunalråd

inom skola, Tel: +46 40 34 11 19

Page 28: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

CompeBBon  :  what  is  the  fear?    

Bladins International School is the category leader in this segment with 25+ years expertise. •  Why should we fear increased competition? •  We should build on our brand and not retreat •  As a growing area, the region might just need the capacity “Bladins international school is valuable brand and vital in the region’s plans.” - Matz Nilsson, utbildningsdirekör Malmö Kommun, Tel: +46 40 34 10 00

28  

IS  on  track  :    Year        2009    2010    2011    2012    2013  Students          338        354                        374  -­‐>  393  Projected  Target          297                      337                        377                        417                          457  Board’s  budget    275      293        332        349                        359  

x

Page 29: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Why fear competition? Why not build on Bladins’ strong brand? No - the Board wants to massively downsize IS.

Page 30: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  5  

Board has know since 2007 about a new international school in Malmö

The competitive environment is not alarming as

has been presented by the board to parents / teachers.

IS is the category leader with a strong brand that

can stand up against competition.

 

   

 

30  

Page 31: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

31  

Page 32: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

How  can  the  plan  only  depend  on  IS  and  pre-­‐school?  What  is  the  contribu6on  of  GS  (Grundskolan)?    

32  

Page 33: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management
Page 34: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

GS  with  severe  cost  challenge  

Here  is  where  the  alarming  situa6on  comes  from  :  

GS  cost  structure  has  not  been  addressed.  

 

 

34  

•  Capping  of  no.  of  students  per  class  

•  GS  half  class  system  is  very  costly  and  not  the  norm.  

•  The  separaBon  of  the  common  investment  fund  (means  GS  has  to  fully  carry  it's  own  costs).  

Page 35: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  6  

GS  has  severe  cost  challenges  which  must  be  addressed.    

 

GS  cost  structure  is  vital  for  it’s  survival  but  should  not  be  at  the  detriment  of  IS.  

 

What  has  the  Board  done?  This  must  be  a  key  ac6on.  

 

 

 

 

 

   

 

35  

Page 36: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

36  

IS  is  on  track  according  to    set  targets  

Only  2011  was  nega6ve,  otherwise  earnings  for  IS  are  posi6ve  !  

Page 37: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Quality  of  a  downsized  IS?  Shiying  the  financial  problem  of  GS  

to  IS  -­‐  not  a  holisBc  soluBon    

Less  criBcal  mass  with  Reduced  student  populaBon  

•  Increased  overhead  costs  per  student    •  Loss  of  support  staff,  special  needs,  councilor,  librarian,  

classroom  assistants.      

37  

Page 38: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

IS  Future  Quality?  Shiying  the  financial  problem  of  GS  to  IS  

 More  vulnerable  to  risks  l  Less  flexibility  -­‐  Hiring  people  and  use  them  in  an  effecBve  

way  

l  Lose:  High  calibre  teachers  recruited  in  an  internaBonal  field.  

l  Stagnant  work  force,  less  opportuniBes  for  the  teachers  as  fewer  posiBons.  

l  Teacher  sickness  

   –  difficulty  in  finding  temp  replacement  resulBng  in          less  quality  

   –  SubsBtutes:  reverBng  back  to  unqualified  parents    covering  staff  sickness.  

 

38  

Page 39: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

IS  Future  Quality?  Shiying  the  financial  problem  of  GS  to  IS  

   High  risk  of  losing  skilled  high  

calibre  teachers  which  will  make  the  downsizing  a  self  fulfilling  prophecy  as  parents  will  then  take  their  children  out  of  the  school  

  39  

Page 40: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  7  

Less  IS  students  do  

not  bring  higher  quality  educa6on    

 

 

 

 

   

 

40  

Page 41: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

FoundaBon  Board  misrepresen6ng  of  facts  and  denying  informaBon  to  key  

stakeholders      The Board (did not as they stated) inform / anchor strategy with:

•  the IS management (confirmed March 15th 2012 by Sandra Nilsson, Head of IS)

•  the ISPA management or parents (confirmed March 15th 2012 by Abenaa Uttentha and Alexandra Bürmeister, IS PA Board)

On the above information, two Foundation Board members expressed concerns as the Board Chairperson had specifically said that key stake holders had been involved in the process. Staff asked for sources of data on presentation and wanted meetings. There was no process with parents nor with staff on how to create a well built robust strategy.

41  X

Page 42: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Conclusion  8  

 

The  Board  failed  to  inform  and  anchor  strategy  with  IS  management,  ISPA  management  and  IS  parents.    

 

 

42  

Page 43: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

What  we  believe  is  Vital    

Grundskola  thrives  and  has  a  healthy  financial  structure.  

 

InternaBonal  school  is  not  jeopardised  and  can  achieve  its  targets  (stay  with  double  class  system).  

 

It’s  not  a  zero  sum  game  between  GS  and  IS.  

 

The  Bladins  InternaBonal  School  in  Malmö  has  a  KEY  role  to  play  in  the  Öresund  region.  

 

 

 

43  

Page 44: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Summary  Conclusion  1:      False  Alarm  concerning  IS  students  intake  

Conclusion  2:      Misleading  indicator,  out-­‐of-­‐date  data,  failed  to  consult  authority        source  (trend  indicators  of  Öresund  region).    

Conclusion  3:      Board  failed  to  contact  key  Employers  such  as  IKEA  !  

Conclusion  4:        Selec6ve  corpora6ons;  used  corporate  financial  result  a            misleading  indicator  for  expats  

 Conclusion  5:      CompeBBon,  no  new  surprises  and  not  alarming  

Conclusion  6:      GS  cost  structure  is  vital  for  it’s  survival  but  should  not  be  at  the        detriment  of  IS.  

Conclusion  7:      Less  IS  students  do  not  bring  higher  quality  educa6on  

Conclusion  8:      Board  failed  to  inform  and  anchor  strategy  with  IS  school          management,  ISPA  management  and  IS  parents.  

  44  

Page 45: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Final  Conclusion:  The  FoundaBon  Board  has  failed    

IS  parents  and  teachers    

With  inadequate  fact  gathering,  you  cannot  make  correct  strategic  conclusions  !    

IS  is  doing  well,  reaching  set  targets.    

The  real  problem  is  that  GS  has  too  high  a  cost  which  needs  to  be  addressed  in  itself  instead  of  just  shiling  the  problem  to  a  “downsized”  IS.    

45  

Page 46: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Final  Conclusion:  The  FoundaBon  Board  has  failed    

IS  parents  and  teachers  The  board  is  either  incompetent  or  is  deliberately  selecBng  erroneous  data  to  make  their  case.  Why?    

•  Trust  has  been  breached.  We  hereby  request  a  vote  of  non-­‐confidence  for  the  current  board.  

•  We  need  to  relook  at  the  strategy  with  an  independent  expert  to  review  data.  Build  a  strong  strategy  for  both  GS  and  IS  on  valid  data.   46  

Page 47: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

The  Board  of  Bladins  FoundaBon  

Eva Edenhammar Chairperson John Humaloja Vice Chair Carl Holmquist Full Member Mats Rydberg Full Member Anders Risberg Full Member Bjorn Mullaart Full Member Erik Pineiro Deputy Member

Page 48: EGMcalling$–May$7 th2012files.enjin.com/199003/BladinsEGM/EGM May 7th 2012... · 2012. 5. 22. · (confirmed March 15th 2012 by Sandra Nilsson, Head of IS) • the ISPA management

Thank  You  

48