    Sales & Distribution Process

    1. Engage in pre-sales activities2. Create quotations and send to customers3. Create sales orders

    4. Schedule & deliver5. Bill customer (by invoice)6. Receive payment from customer7. Handle sales order return

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    3/52

    Sales & DistributionProcess

    SAP Implementation

    EGN 5620 Enterprise Systems Configuration(Professional MSEM)

    Fall, 2012

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    4/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. All

    rights reserved. 4

    Business Process Integration

    Rules

    FI

    MM

    SD

    FI SDMM

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    5/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. All

    rights reserved. 5

    Pen IncorporatedProcure for Sales Order

    Pre-SalesActivity

    Sales OrderDelivery Billing

    GeneralLedger

    Accounts

    PurchaseRequisition

    PurchaseOrder

    GoodsReceipt

    InInventory

    Plant orWarehouse

    InvoiceReceipt

    AvailabilityCheck

    NO

    YES

    Goods toDelivery

    Goods fromPurchase Order

    InventoryPostings

    AccountsReceivable

    AccountsPayable

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    6/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 6

    Business Process Integration

    SD Process

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    7/52

    SalesProcess

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 7

    SAP Sales Order Process

    (Order-to-Cash)

    Integration

    Sales OrderEntry

    Post GoodsIssue

    InvoiceCustomer

    Delivery Note &Pick Materials

    Receipt ofCustomer Payment

    PackMaterials

    CheckAvailability

    Pre-SalesActivities

    Sales QuotationEntry

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    8/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 8

    SAP SD Process

    1. Engage in pre-sales activities2. Create quotations and send to customers3. Create sales orders, item proposal, or

    scheduling agreement4. Schedule delivery and create delivery

    note5. Create/send invoice to customer (billing)6.

    Receive/post payment from customer7. Handle sales order return

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    9/52

    SD3: Create Sales Order A sales order contains all of the information

    needed to process customers request. Theprocess for creating a sales order has thefollowing steps:1. Pricing

    2. Credit limit check3. Availability Check

    4. Delivering Schedule

    5. Shipping point and route determination6. Transfer of requirements to MRP

    7. foreign trade and license processing

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    10/52

    SD3-1: Pricing SAP can display pricing information at both the header and

    the line item level for sales order.

    It enables the user to program varied pricing procedures tomeet individual organizations needs.

    The pricing is extendable; it can be attached, or extended toexternal pricing programs or elements outside SAP forpricing.

    It also allows Gross to Net pricing: This allows discountsand reductions from the master price.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    11/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 11

    SD3-2: Credit Check

    SAP provides an efficient means to implementcredit management

    It is integrated with Financial Accounting (FI), via

    credit control area

    It automatically alerts when a credit check fails

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    12/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 12

    SD3-2: Credit Check A large number of outstanding receivables or bad

    debts can have a considerable impact on companyperformance.

    The user may minimize credit risk by defining a

    credit limit for customers by using CreditManagement.

    This is especially important if a company does

    business with customers in financially unstablesectors or countries, or trade with countries thatare politically unstable or that adopt a restrictiveexchange rate policy.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    13/52

    SD3-3: Availability CheckAvailability Check

    Determines the materialavailability date

    Considers all inward andoutward inventorymovements

    Allow for 3 methods of

    deliveryOne-time delivery ( on-

    time one-time delivery)

    Complete delivery(possibly delayed one-

    time delivery)Delayed proposal (allows

    partial delivery schedule)

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    14/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 14

    SD3-3: Availability Check

    In determining the material availability thefollowing elements can be included in theavailability check

    Safety stock

    Stock in transfer Quality inspection stock

    Blocked stock

    Restricted use stock All movements of stock

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    15/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 15

    SD3-3: Availability Check

    Inward/Outward movement of goods purchase orders

    purchase requisitions

    planned orders

    production orders reservations

    dependent reservations

    dependent requirements sales requirements

    delivery requirements

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    16/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 16

    SD3-3: Availability Check

    One-time delivery Deliver on the requested delivery date

    In this section, SAP checks whether the

    requested delivery date can be kept to. If stockof the material is available to make a deliveryon the requested delivery date, the stockquantity is confirmed here.

    If there is no stock available, confirmedquantity zero is displayed.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    17/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 17

    SD3-3: Availability Check

    Complete delivery

    In this section, SAP checks whether there will besufficient stock for complete delivery at a laterdate:

    If there is sufficient stock available at a later

    date to cover the required quantity in the salesdocument, the system proposes the date here.

    If the system determines that completedelivery cannot be made at a later date, no

    date is proposed in this section.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    18/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 18

    SD3-3: Availability Check

    Delayed proposal

    In this section, SAP checks whether and for whichdates partial deliveries can be made. Partialdeliveries are displayed for different dates. Thesedates are based on the planned inward and

    outward movements of stock. During an availability check which takes

    replenishment lead time into account, the dateon which replenishment lead time ends is

    displayed if insufficient stock means that nopartial deliveries can be made beforereplenishment lead time ends.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    19/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 19

    SD3-4: Delivery Scheduling

    SAP can automatically schedule essentialshipping activities, using backward andforward scheduling rules.

    It uses defined activity times to scheduledelivery activities.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    20/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 20

    SD3-4: Delivery SchedulingTerms used in scheduling are defined below.

    Transit time is the time in days that is required to deliver goodsfrom your premises to the customer location. It is defined for aroute.Loading timeis the time in days that is required for loading adelivery item. It is determined from the shipping point, the route,

    and the loading group of the material.Pick/pack time is the time in days that is required for allocatinggoods to a delivery as well as the time in days that is required forpicking and packing. It is calculated using the shipping point, theroute, and the weight group of the order item.Transportation lead-time is the time in days that is needed toorganize the shipping of the goods. This might include booking aship and reserving a truck from a forwarding agent. It is definedfor a route.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    21/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 21

    SD3-4: Delivery Scheduling

    The following 5 deadlines are of importance for deliveryscheduling:1. Material availability deadline: must start picking and

    packing activities on the material availability deadline.This deadline must be selected early enough in

    advance so that the goods are ready by the givenloading deadline.

    2. Transportation scheduling deadline: the date on

    which you must start to organize the transportation ofthe goods. This deadline must be selected early enoughto ensure that the means of transport is available bythe loading deadline.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    22/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 22

    SD3-4: Delivery Scheduling

    3. Loading deadline:the date on which the goods mustbe available for loading and on which all vehicles thatare required to ship these goods must be ready forloading. After the time required for loading the goods

    (loading time) has expired, goods issue can be carriedout.

    4. Goods issue deadline:the date on which the goods

    leave the company in order to arrive punctually at thecustomer location.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    23/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 23

    SD3-4: Delivery Scheduling

    5. Delivery deadline: the date on which the goods are toarrive at the customer location. The difference between thegoods issue deadline and the delivery deadline iscalculated from the transit time required for the route

    between the delivering plant and the customer.The delivery deadline can be the customer's requesteddelivery deadline or the confirmed delivery date (that is,the earliest date on which you can deliver goods to thecustomer).

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    24/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 24

    SD3-4: Delivery SchedulingAn item consists of one or more schedulelines. The schedule line contains all the datathat is needed for a delivery.

    For example,

    a customer orders 20 units of a particularmaterial which you enter as one item in thesales order. However, you can only deliver 10pieces now and the remaining 10 pieces nextmonth. So you need to schedule two

    deliveries.The data for these deliveries (dates, confirmedquantities) are stored in two separate schedulelines.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    25/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 25

    SD3.4: Delivery Scheduling

    Structure of sales documents

    Header

    Line Item # 1

    Line Item # 2

    Schedule Line # 1

    Schedule Line # 1

    Schedule Line # 2

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    26/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 26

    SD3-5: Shipping Point and RouteDetermination

    A shipping point is determined for each line item

    A delivery can only be processed from oneshipping point

    Routes - route to be traveled & transit time aredetermined using customized rules

    Routes can be used to simply define transit time

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    27/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 27

    Sales order is transferred to MRP as a CustomerIndependent Requirement (CIR). If a deficit isfound, SAP will propose a purchase req. orplanned order to fulfill the shortage afterrunning MRP or MPS.

    Sales and distribution requirements reduceexisting stock or inward movements of stock onthe material availability date to ensure that

    other outward movement of stock elementscannot access the quantity reserved in this way.

    SD3-6: Transfer of requirements to MRP

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    28/52

    SD3-6: Transfer of requirements to MRP

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    29/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 29

    SD3-7: Foreign Trade and LicenseProcessing

    Predefined trade areas NAFTA, EU

    Automated reporting for trade areas

    Automated controls

    License management Embargo lists

    Control by customer, country, product, point intime

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    30/52

    SD3: Create Sales OrderThe sales order document is

    made up of three primary

    areas: HeaderData relevant for the entire

    sales order: customer data,total cost of the order,number of the sold-to party,number of the ship-to partyand the payer, documentcurrency and exchange rate,

    pricing elements for theentire document, deliverydate and shipping pointorder

    Line ItemInformation about the specific

    product: Ex: material andquantity, cost of anindividual line

    Schedule LinesUniquely belongs to a Line

    Item, contains deliveryquantities and dates forpartial deliveries

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    31/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 31

    SD3: Create Sales Order

    Item DataWhereas data in the document header applies to all itemsin the document, some data applies only to specific items.This data is stored at item level and includes the: Material number

    Target quantity for outline agreements Number of the ship-to party and the payer (analternative ship-to party or payer can be defined for aparticular item)

    Plant and storage location specifications Pricing elements for the individual items Schedule line data

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    32/52

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    33/52

    January 2008 SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rightsreserved. 33

    SD4: Schedule delivery and createDelivery notes Initiates the delivery process

    Control mechanism for the process

    Changes to delivery are allowable - products,quantities

    Integrated with the Material Management (MM)

    and Finance (FI) modules

    Picking

    Packing

    Loading

    Post Goods Issue

    DeliveryNote

    Each step inthe deliveryprocessupdates thedeliverynote status

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    34/52

    Delivery/ Goods Issuing

    Reconciliation AccountSales quotation

    Sales order

    Materials Management (MM)and Financial Accounting (FI)

    Delivery/GoodsIssuing

    No impact onFinancial Accounting (FI)

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    35/52

    SD4: Shipping

    OrderCombination

    Sales Order 1

    Sales Order 2

    Sales Order 3

    Delivery 812

    PartialDelivery

    Sales Order 4

    Delivery 813

    Delivery 814

    Delivery 815

    CompleteDelivery

    Sales Order 5

    Delivery 816

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    36/52

    DS5: Billing Overview

    SAP has the functions of processingcredit/debit memos and rebates

    It automates invoicing, based on salesorders and/or deliveries

    It can create pro forma (paper) invoices It is integrated with Finance (FI) &

    Controlling (CO)

    It updates customers credit data

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2007. Allrights reserved. 36

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    37/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 37

    DS5: Billing

    Sales Invoice

    Sold To:Rushmore Group

    Sales Org: S001Dist Channel: REDivision: 01

    Conditions/Price:

    $120

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    38/52

    January 2008 SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rightsreserved. 38

    DS5: Billing Methods

    CollectiveInvoicing

    Delivery basedInvoicing

    Delivery 834

    Delivery 833

    Order 14

    Order 9

    Delivery 856

    Invoice 968

    Order 6Delivery 820

    Delivery 821

    Invoice 945

    Invoice 946

    SplitInvoicing

    Order 32 Delivery 886

    Invoice 992

    Invoice 991

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    39/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 39

    DS5: Billing Documents

    It explicitly specifies documents

    Billing due list builds a work list ofinvoices that should be generated

    Automatic posting to Financial Accounting(FI): debit to customer sub-ledger accountand credit revenue account.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    40/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 40

    DS5: Billing Plans

    Periodic total amount for a plannedbilling period

    Milestone distributing the total amount

    over multiple billing dates - typically usedwith the project system (PS)

    Installment evenly proportionedamounts and defined payment dates

    Resource related consumed resourcessuch as service or consulting

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    41/52

    SD6: Payment

    Payment is the final step in the sales orderprocess.

    SAP posts payments against invoices.

    The posting clears the liability in the A/Raccount and increases your bank account.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    42/52

    SalesProcess

    January 2008 SAP AG - University Alliances and The Rushmore Group, LLC 2008. All rightsreserved. 42

    SD7: Handle Customer Return

    Customer ReturnOrder received

    GoodsReceipt

    CreateCredit Memo

    QualityInspection

    Paymentto Customer

    DeliveryNote

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    43/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 43

    SD7: Handle Customer Return

    1

    2

    3

    Order 14 Delivery 856

    Return Order Return Delivery

    Invoice 968

    PaymentCredit Memo

    QualityInspection

    Return to Inventory

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    44/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 44

    SD7: Handle Customer Return

    Returns document Billing block can be proposed

    Use the Order reason field to identify thereason for the return

    Full access to pricing and ability to re-price

    Return delivery Issues a goods receipt to place material into

    inventory

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    45/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 45

    SD7: Handle Customer Return

    Credit memo Billing block must be cleared from Return

    Posts to Financial Accounting (FI)

    Can be processed in batch (background) Can be processed collectively (grouped)

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    46/52

    PEN, Inc.

    EGN 5620 Enterprise Systems Configuration(Professional MSEM)

    Fall, 2012

    Sales & DistributionProcesses

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    47/52

    Sales Quotation

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    48/52

    Sales Order

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    49/52

    SD Process: Billing DocumentsAt this point

    that the salesprocess ispassed overto FinancialAccounting to

    awaitpayment.

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    50/52

    January 2008

    SAP AG - University Alliances andThe Rushmore Group, LLC 2008. Allrights reserved. 50

    Document Flow

    The document flow feature allows you tofind the status of an order at any point intime. The SAP system updated the order

    status every time a change is made to anyof the documents created in the customerorder management cycle (Order to Cash).

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    51/52

    Exercises:144a. Create customer quotation

    144. Create sales order from sales quotation

    145. Check stock status

    146. Create delivery note for sales order

    147. Check stock status

    148. Picking materials on delivery note

    149. Post goods issue150. Check stock status

    151. Bill customer

    152. Post receipt of customer payment

    153. Review document flow

    154. Create Customer Material Info Record155. Create sales order using customer info record

    156. Create delivery for sales order

    157. Pick materials on delivery note

  • 8/13/2019 EGN 5620 Enterprise Sys SD Process Fall 2012

    52/52