Control System Development. Elder Matias Canadian Light Source University of Saskatchewan. Where is Saskatoon?. The CLS. 170.88 m circumference 2.9 GeV DBA lattice with 12-fold period Nominal Tune: x = 10.22 y = 3.26 E loss per turn: > 0.876 MeV - PowerPoint PPT Presentation
Citation preview
Elder MatiasCanadian Light Source
University of Saskatchewan
Control System Development
Where is Saskatoon?
The CLS
170.88 m circumference 2.9 GeV DBA lattice with 12-fold periodNominal Tune:
x = 10.22 y = 3.26
Eloss per turn: > 0.876 MeVBend magnet radiation:
c = 1.6 Å Ec = 7.6 keV
x = 18.1 nm•radDamping times:
x = 2.4 ms, y = 3.8 ms, E = 2.7 ms~10 mm bunch length
Staff LevelsArea Initial Build Project 2000-2003
(7 beamlines)Current + 2008 hires(13 beamlines + 6 more funded)
Management 1 1
Instrument Develop + FPGA 1 2
System Design 1 2
EPICS Apps/Data Acquisition 2 6 ½
Web Services - 3 ½
System Admin - 1
PLC (Safety Systems) 1 1
PLCs ½ 1
Instrument Tech 1 2
RF Techs 2 3
Electrical Techs 1 3
Electronics/PS Techs 2 3
Excludes students. Excludes conventional IT, and AC Electrical Services Engineering in ICT of ETS groups.
Collaborate and Reuse
• Internal Collaboration/Reuse– Standardize equipment where it does not impact
scientific capability to reduce development and maintenance time
– Standardize Design Approach, Toolkits and Methods across beamlines and accelerator
– Common toolkit and tools across all projects
• External Collaboration/Reuse– Based on analysis of requirements versus
available systems
e.g., EPICS, RTEMS, IRMIS, ScienceStudio
Design Package
• A Design Package Includes:– PFD Drawings used by Mechanical Engineering
to capture system layout and critical parameters, e.g., water flow rates etc.
– P&ID Drawings used by Controls to define the inputs and outputs of the system and basic relationships• Partially based on American Instrumentation Society
– Wiring diagrams– Requirements Document (Developed as required)
– PLC and EPICS Software
Drawings
• All Drawings have a unique drawing number
• AutoCAD, Inventor, Eagle, Visio
• Draft Drawings have letter numbering
• Approved Drawings Alpha Numbering
• Drawings Review and Approval Process
• Sketches have Sketch numbers
• As-built captured on master print
• Master print in control room, updated by CAD as time permits
PID Example
PID Example
Change Control (Major Changes)
• Major Changes handled through ECR/ECO Process• Minor changes handled through MKS Integrity database
Change Control (Minor Changes)
• Central Database
• MKS IntegrityMKS Source– Includes source control– Web and IDE Based
• Implements the concept of “Sandboxes” and “Change Packages”
• Exploring options for using:– MKS Requirements – MKS Deploy
Sample Problem Report
Sample Change Package
Design for Maintainability
• Design systems for the long term
• Phase out and replace older equipment whenchanging standards
• Examples– Replacing 68360 IOC
with Moxa IOCs– Linac upgrade– PS upgrade
System Engineering ProcessConceptual Design
Preliminary Design
Detailed Design
In-house Outsource Technical Specification
Request for QuoteRequest for Proposal
Design Review
Design Review
Design Review
Installation
Commissioning
Conventional Software EngineeringUsed for Web Services Projects
Con
tent
Time
Slide prepared by IBM for CLS CANARIE Project
Comparison with the Unified Process?
Inception Elaboration Construction Transition
Requirements Analysis Design Implementation Test
Unified Process
Core Workflows In Each Phase
- Establish Feasibility- Establish Business/Scientific Case- Capture Essential Requirements- Identify Critical Risks- Establish initial budget & schedule
Deliverables (as required):- Project Plan- Risk Assessment- Initial Requirements (10-20%)
Requirements: - Refine System ScopeAnalysis: - Establish what to buildDesign:- Create an ArchitectureImplementation- Build an architecture baseline- Build any prototypesTest- Test the architecture baseline- Test any prototypes
Deliverables (as required):- PID Drawings- Wiring Diagrams- Updated Requirements Document- System breakdown
Requirements: - Uncover missing requirementsAnalysis: - Finish the analyis Design:- Finish detailed designImplementation- Build and install the systemTest:- Test and ring-out the system
Deliverables (as required):- Running System
- Correct any defected- Provide support for commissioning - Prepare final documentation
Deliverables (as required):- Final documentation- Working system
CLSI System (Beamline) Engineering Process
ProposalConceptual
DesignPreliminary
DesignDetailedDesign
Build Commissioning
Safety Critical Software
• Applications:– lockup system (ACIS)– Oxygen monitoring– BMIT human studies (under development)
• IEC 61508 – SIL 3 based system• Subject to CNSC Approval• Siemens S7/400 F• Redundant Second Chain• Fail-safe design• Independent Verification• ALARP Hazard Analysis
Hazard Analysis
Risk Class I
Risk Class II
Risk Class IV
Risk Class III
Risk cannot betolerated except in extraordinary circumstances.
Tolerable only if further risk reduction is impractical or if the cost is grossly disproportionate to the improvement gain.
It is not necessary to maintain assurance the risk remains at this level.
As the risk is reduced, the less, proportionately, it is required to spend to reduce it further to satisfy ALARP. The concept of diminishing proportion is shown in the triangle. Based on IEC 61508-5 and IEC 1564
Frequency Consequence Risk Classification
Initial Risk Probable Catastrophic I Residual Risk Incredible Catastrophic II
No. Constraint/Requirement Allocation
AM 4.1.1.a A lockup (search) procedure shall be developed requiring trained personnel or users to inspect the hutch prior to beam operation.
Procedure
AM 4.1.1.b The procedure shall define a specific configuration of the hutch perimeter doors prior to, during and after the inspection and the inspector is to follow a prescribed search patch. These controls are in place to ensure that on one may enter behind the inspector un-noticed.
Procedure
1.Hutch is not Searched and Secured Prior to Beam OperationAnalysis: The level of radiation present in a beamline hutch when the safety shutters are open is of a potentially lethal level and can not be easily detected by a worker in the hutch, it is conceivable that multiple workers could be harmed. To mitigate this hazard it is necessary to introduce an E/E/PE system (called the Access Control and Interlock System (ACIS)) that requires each hutch to be search and secured prior to beam operation through a lockup sequence.
Mitigation: