Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Embed Size (px)

Citation preview

Page 1: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Eleanor EwrySRWG Study Program Subgroup Chair

Annual Study Program Subgroup Update

March 2015

WECC HQ

Page 2: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

2

• 2016 Annual Study Programo Annual Surveyo Base Case Compilation Scheduleo Annual Study Program Scope of Work

• Purpose of WECC Basecases

Agenda

Page 3: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Annual Survey

• Annual survey was sent to TSS members on 12/22/14

• Current study area in the rotation is Southern Nevada/Arizona/New Mexico

• Received three responses

• 2016 Light Spring in Desert Southwest

• 2018-19 Heavy Winter & 19 Heavy Summer (Year 2 peak case for TPL studies)

• 2020 Heavy Summer in Arizona

• Received a request from a representative of the four planning regions (ColumbiaGrid, CAISO, NTTG and WestConnect)

• 10-year Light Load case to be implemented immediately.

Page 4: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Basecase Compilation Schedule

• Changes proposed since the last SRWG meeting were presented to TSS for implementation in the current 2015 compilation schedule• TSS approved moving the TEPPC case later in

the year to move up the summer operating cases• TSS approved replacing the TEPPC case with the

regional request• Implemented interchange schedules proposed by

BPA

Page 5: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Basecase Compilation Schedule

• Drafted three Compilation Schedules for 2016• One mirrors our current process (move for

approval)• One includes a potential schedule for BCCS• One includes a proposed two-year cycle for

developing basecases

Page 6: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Basecase Compilation Schedule

• 2016 schedule that mirrors the current process

• Schedule will need to be modified to reflect MOD-032 and PC Responsibilities• Remove due date to Area Coordinator• Data Representatives will be responsible for

specifying their own schedule for data submission. Otherwise, PCs will follow the submission schedule to WECC.

• Spring OP case moved later in the schedule

Page 7: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Basecase Compilation Schedule

• 2016 schedule for BCCS

• Includes all four seasons with both heavy and light load for 1-year, 5-year and 10-year cases

• Total of 24 cases• Profiles will need to be submitted about

every 2 weeks• Potential to accept scenario case suggestions

for the 5- and 10-year cases• Will not seek approval for this schedule until

BCCS is viable

Page 8: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Basecase Compilation Schedule

• 2016 schedule with 2-year cycle

• Operating cases would be created every year• 5-year and 10-year cases would be created

every other year• This would allow for the creation of more

scenario cases• Would require the use of older cases to

complete TPL studies

Page 9: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Interchange Schedules

• BPA has submitted revisions to the Interchange Schedules in the 2015 schedule• These changes have been carried forward to the

2016 schedule

• Request that each entity responsible for the interchange schedules propose revisions to the schedule

Page 10: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Scope of Work

• Annual Study Program Scope of Work has been modified to incorporate parts of the MOD-11 & 13-WECC-CRT-1criterion• WR5, WR6 and WR11 have been included• Move for approval of the new SOW effective

immediately

Page 11: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Purpose of WECC Basecases

• White paper currently being drafted to identify the purpose of the WECC basecases and how they should be used

• Seeking feedback/participation from members on drafting this paper

• Had a request for clarification of what year summer loading should be based off of

• Is this the appropriate place to identify that?

Page 12: Eleanor Ewry SRWG Study Program Subgroup Chair Annual Study Program Subgroup Update March 2015 WECC HQ

Questions?