Better Buildings Case Competition US Department of Energy March 14, 2014. Electri -City: Energy Management in Public Buildings. Electri-City: Energy Management in Public Buildings. The Lean Green Machines. Electri -City. Goal: - PowerPoint PPT Presentation

Citation preview

Page 1: Electri -City: Energy Management in Public  Buildings

Electri-City: Energy Management in Public Buildings

Electri-City: Energy Management in Public

Buildings

The Lean Green Machines

Better Buildings Case Competition

US Department of EnergyMarch 14, 2014

Page 2: Electri -City: Energy Management in Public  Buildings

Electri-City

Goal: • A Better Buildings Energy Plan for a mid-size US city

government

Issues:• Building structures• Data control systems • Budgeting process

Focus:• Employee Incentives to Promote Development• Data Management for Public Building Controls• Improvements to Building Infrastructure

Page 3: Electri -City: Energy Management in Public  Buildings

Better Buildings Energy Plan

Forming the Better Buildings Board

Better Buildings

Energy Plan

Better Buildings

Board

Upper-level Managemen

t

Departmental Support

Page 4: Electri -City: Energy Management in Public  Buildings

Better Buildings Energy Plan

Three Core Components

Proactive Maintenance

Culture

Open Source Software

Training and Development

Energy Savings

Incentives

Better Buildings Energy Plan

Page 5: Electri -City: Energy Management in Public  Buildings

EHSRAs EHSRAs : Environmental Health and Safety Retrofitting Audits

Purpose:• Document current building equipment and departmental ownership

• Motor specifications involved in HVAC control• Air filter locations• Ventilation pipe widths• Rooms served by air handling units (AHUs)• Location and areas affected by dampers• Model numbers for equipment & sensors• VAV box model number & box locations• Inputs & outputs of VAV (including location of device communicating info)• Areas affected by VAV • Number, model, & locations of light fixtures• Location of outlets & outlet specifications

Tasks:• Record building maintenance and operations information• Develop preventative maintenance procedures (ISO 50001)

Page 6: Electri -City: Energy Management in Public  Buildings

Energy Management Office

Relationships

Energy Management

Office

Local Utilities

Private Institutions

Facilities & Department

Managers

Local Consulting

Firms

Continuous Improvement

Team

Better Buildings

Board

Page 7: Electri -City: Energy Management in Public  Buildings

Green Funds

• Green Funds = Realized energy-savings by department

• Prioritization: Occupancy size Building square footage Projected energy savings Aggregate funding opportunities LEED certifications Award recognition

ACEEE Exemplary Programs Dsire.org

Departmental commitment

Sub-metering to track

department energy use

Normalization and approval

from Accounting

Green Fund

Page 8: Electri -City: Energy Management in Public  Buildings

Continuous Improvement Team

Relationships

Continuous Improvement

Team

Upper Level Management

Energy Management

Office

Utilities Companies

Software Developers

Data Analyst

Page 9: Electri -City: Energy Management in Public  Buildings

Continuous Improvement Team

Responsibilities

Evaluate compliance with legal requirements

Encourage ITC to activate equipment power management

Support EMO to create training module

Support Data Analyst to identify high-level priority operations

Maintain quarterly acknowledgements & prizes

Organize and maintain up-to-date building layouts

Assist facilities management in identifying priorities

Page 10: Electri -City: Energy Management in Public  Buildings

Better Buildings Board

Hierarchy

Better Buildings Board

Mayor and City Council

City Energy Manager

Five Members with Diverse Backgrounds

Department Managers

Building Engineers

Facilities Managers Data Analyst Continuous

Improvement Team

Page 11: Electri -City: Energy Management in Public  Buildings

Better Buildings Board

Guidelines

City Energy Manager is Head of Board for 1st year

Head of Board will be re-elected biannually

Bi-weekly meetings to evaluate energy savings projects

Communication with utilities account representatives

Set major energy-savings goals

Page 12: Electri -City: Energy Management in Public  Buildings

Data Analyst

Resources

Data Analyst

EHSRA’s

Layouts of Data Capture Devices and

Controls

Energy Star PortfoliosFloor Plans

Infrastructure Ownership

Page 13: Electri -City: Energy Management in Public  Buildings

Data Analyst

Responsibilities

Document Energy

Performance Indicators

Weather Normalization

Procedures

High Level Project

Prioritization

Monthly Energy Data

Reports

Page 14: Electri -City: Energy Management in Public  Buildings

HVAC System Interactions

• Responsive Control• Personalized Data• Project Haystack Vision• BACnet Compatible

http://vector-magz.com/technology/server-clip-art-item-3/

V A V Box

Raspberry Pi

City Intranet

EnPI’s

Page 15: Electri -City: Energy Management in Public  Buildings

Mock Project Timeline

Year 1

Employee Incentives to Promote Development

• Support from community leaders and departmental involvement in program are requested by Mayor & Energy Manager

• Raspberry Pi BACnet controlled training module is created with software consulting resources

Building Infrastructure Upgrades

• Gradual replacement or upgrade of ‘energy hogs’ • Implement standard practices to maintain & organize CAD

documents• Infrastructure upgrades with short simple-payback periods

are implemented

Data Management for Public Buildings

• Energy Manager and Data Analyst are trained on Energy Star Portfolio Manager

• Data Analyst is appointed and weather normalization equipment and techniques are established and purchased

• BACnet/Raspberry Pi Training for software developers• Record infrastructure/equipment ownership as

departments opt into program

Page 16: Electri -City: Energy Management in Public  Buildings

Mock Project Timeline

Year 2

Employee Incentives to Promote Development

• CIT is implemented• Better Buildings Board is implemented• Raspberry Pi/BACnet training module is created• CIT is trained on BACnet/Raspberry Pi Module

Building Infrastructure Upgrades

• Gradual replacement or upgrade of ‘energy hogs’ • EHSRAs should be adopted by facilities and maintenance staff involved in Better

Buildings Energy Plan• Infrastructure upgrades with short simple-payback periods are implemented• Preventative Maintenance programs for HVAC are developed & implemented

Data Management for Public Buildings

• Data Analyst unveils first monthly report• Department or Facilities Managers take over responsibility for Energy Star

Portfolio Manager• BACnet/Raspberry Pi Training incorporate training module development for

software developers• Implement infrastructure/equipment ownership records as departments opt in• Simple energy-monitoring sub-meters should be installed to isolate department

ownership based on FIFO and departments with major potentials for energy savings

Page 17: Electri -City: Energy Management in Public  Buildings

Mock Project Timeline

Year 3

Employee Incentives to Promote Development

• Life Cycle Costs for Procurement are implemented• Comprehensive report should review city building management

strategies and adjust budgets to meet energy reduction goals• CIT is trained on BACnet/Raspberry Pi Module

Building Infrastructure Upgrades

• Gradual replacement or upgrade of ‘energy hogs’ • Infrastructure upgrades with short simple-payback periods are

implemented

Data Management for Public Buildings

• EnPIs are approved by Continuous Improvement Team and submitted for approval to City Council to establish standard accounting practices for Green Funds

• Building and infrastructure ownership is used to track energy savings • Simple energy-monitoring sub-meters should be installed to isolate

department ownership based on FIFO and departments with major potentials for energy savings

Page 18: Electri -City: Energy Management in Public  Buildings

Mock Project Timeline

Year 4

Employee Incentives to Promote Development

• Energy-savings EnPIs are reviewed by Continuous Improvement Team

• Quarterly acknowledgements and rewards are established by City and approved by Accounting

• Hold Energy Awards ceremony to celebrate success

Building Infrastructure Upgrades

• Building employee evaluations include environmental aspects such as involvement with EHSRAs

• Gradual replacement or upgrade of ‘energy hogs’ • Infrastructure upgrades with short simple-payback periods

are implemented

Data Management for Public Buildings

• Raspberry Pi downstream development must be evaluated based on current technologies

• Infrastructure ownership are used to document Green Funds and provide supplemental funds for departments

• Simple energy-monitoring sub-meters should be installed to isolate department ownership based on FIFO and departments with major potentials for energy savings

Page 19: Electri -City: Energy Management in Public  Buildings

Better Building Energy Plan

Three Core Components

BACnet Training

Development of HVAC Controls Training Module

Software Consultation

Open Source Software

Training & Development

Energy Star Portfolio EHSRAs

Life Cycle Procurement

Practices

Simple Building

Infrastructure Upgrades

Proactive Maintenance

Culture

Local Utilities Incentives

Energy Efficiency

Award Programs

Departmental Green Funds

Employee Rewards and Recognition

Energy Savings

Incentives