14
Electric Vehicles: Opportunities and Resources 2018 CERTs Conference March 29, 2018

Electric Vehicles: Opportunities and Resources

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Electric Vehicles: Opportunities and Resources

Electric Vehicles: Opportunities and Resources2018 CERTs ConferenceMarch 29, 2018

Page 2: Electric Vehicles: Opportunities and Resources

Our Mission

“Transforming the energy system to benefit the economy and environment”

Page 3: Electric Vehicles: Opportunities and Resources

Opportunities & Resources OverviewDrive Electric Minnesota

Cities Charging Ahead

Minnesota Fleet Challenge

Volkswagen Settlement

Page 4: Electric Vehicles: Opportunities and Resources
Page 5: Electric Vehicles: Opportunities and Resources

Achieving our Vision

Page 6: Electric Vehicles: Opportunities and Resources

History of Drive Electric MN

Page 7: Electric Vehicles: Opportunities and Resources

What Drive Electric MN is Doing Now

Page 8: Electric Vehicles: Opportunities and Resources

Cities Charging AheadLed by Diana McKeown, MetroCERT Director◦ Partnership between CERTs/GPI

Activities◦ Meetings: educational webinars & in-person meetings◦ Joint action: fleet analysis, adding EVs to purchasing plans, installing charging infrastructure◦ Communications: blog posts, case studies◦ Tools/resources/guides: EV decision tree, FAQ, EV calculator

Page 9: Electric Vehicles: Opportunities and Resources

Cities InvolvedAlbert Lea

Blackduck

Bloomington

Burnsville

Coon Rapids

Eagan

Edina

Elk River

Falcon Heights

Faribault

Fridley

Hastings

Inver Grove Heights

Maplewood

Marine on St. Croix

Morris

Red Wing

Richfield

Rochester

St. Louis Park

Warren

White Bear Lake

Winona

Woodbury

Page 10: Electric Vehicles: Opportunities and Resources

Minnesota Fleet Challenge (In Progress)

Page 11: Electric Vehicles: Opportunities and Resources

Volkswagen Settlement Funding Opportunity for Electrified TransportationMinnesota Pollution Control Agency draft plan ($47 million)• School bus replacements: 20%

• Settlement category: School buses

• Heavy-duty on-road vehicles: 35%• Settlement category: Transit buses, class 4-8 trucks

• Heavy-duty off-road vehicles: 15%◦ Settlement category: Switcher locomotives, ferries, tugs, forklifts, port cargo handling equipment, ocean-going vessel shore power,

Diesel Emission Reduction Act (DERA)

• Heavy-duty electric vehicles: 15%• Settlement category: School buses, transit buses, trucks, airport ground support equipment

• Electric vehicle charging stations: 15%• Settlement category: Zero-emission vehicle infrastructure

Geographic: 60%/40% Twin Cities Metro/non-Metro

Page 12: Electric Vehicles: Opportunities and Resources

Capitalizing on the VW Settlement to Build out InfrastructureFour 50 kW charging stations are installed along the Phase 1 corridor along I-35 in Duluth, Sturgeon Lake, Pine City, and Forest Lake

Additional 50 kW charging stations will be installed in St. Cloud, Fergus Falls, Moorehead, and Alexandria along I-94 by the end of 2018

The MPCA draft plan allows for 15% of the funding to be directed toward charging stations, with 90% directed toward DCFC

Page 13: Electric Vehicles: Opportunities and Resources

Resourceswww.driveelectricmn.org

Facebook and Twitter: @DriveElectricMN

Page 14: Electric Vehicles: Opportunities and Resources

Contact information

Brendan Jordan

Vice President, Great Plains Institute

(612) 278-7152

[email protected]