1 Electricity Access in Lao PDR Litthanoulok LASPHO Ministry of Energy and Mines, Department of Energy Policy and Planning. Seminar on Supporting Sustainable Development Goal 7, Target 7.1 “By 2030 ensure universal access to affordable, reliable and modern energy services”, UNCC, CR-4, Bangkok, Thailand 21 - 23 June 2016.

Electricity Access in Lao PDR - ESCAP access in Lao PDR.pdfVEAC PESCOs VEM Rural Electrification Division (RED) / PMU Fund Manager Technical Service & Collecting Tariff Tariff Cluster

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • 1

    Electricity Access in Lao PDR

    Litthanoulok LASPHOMinistry of Energy and Mines,

    Department of Energy Policy and Planning.

    Seminar on Supporting Sustainable Development Goal 7, Target 7.1“By 2030 ensure universal access to affordable, reliable and modern energy services”, UNCC, CR-4, Bangkok, Thailand21 - 23 June 2016.

  • 1. Development History of Power Sector2. Electrification investment and Development3. Key Driver of success in Lao PDR on

    Electrification.

    Contents

    2

  • 1. Development History

    q By 1975

    ØOnly 3 hydropower plants with 32 MW, 240 GWh.

    ØPopulation ~3 millionØOnly 5 main cities electrifedØEstimated less than 10% of

    families have access to electricity

    3

  • 1. Development History (Cont’)

    1. Earn foreign exchange through electricity export to finance the country’s economic and social programs;

    2. Increase access to electricity by grid extensions and off-grid rural electrification;

    3. Maintain an affordable tariff to promote economic and social development;

    4. Replace dependence on imported fuels for energy generation.

    1st Power Sector Policy was formulated in 1990:

    4

  • ØProvide a source of foreign exchange to fund economicand social development and alleviate poverty;

    ØMeet the commitments under intergovernmental MOUsand Agreements with Thailand, Vietnam and others;

    ØExtend electrification to promote better socio-economicdevelopment and reach the government target of 70%and 90% by year 2010 and 2020 respectively;

    ØIntegrate power sector and maintain its economicdevelopment as a whole with international communitiestrough its power exchange programs and foreign directinvestment.

    In early 2005, the power sector played more significant and strategic role when the Govt’ laid out important targets in the NSEDP:

    1. Development History (Cont’)

    5

  • 1. Development History (Cont’)q Present day: Ø Population of 6.6 mil. or ~27 people/square kilometers;Ø GDP per capita US$ 1,903 (2015) and expected to grow

    rate of 7.6%;Ø Electrification ratio reached 89.81% of total households

    in 2015, increased 36% from 2000;Ø Per Capita Electricity Consumption of 470 kWh/a but

    has been growing at an average rate of more than10% inthe last 15 years;

    Ø Electricity export ~ 15% of total country’s exportrevenues; Power sector’s contribution to GDP isprojected to increase to ~16% in 2020;

    6

  • 7

    Households Electrification Ratio

    Source: http://www.edl.com.la/

  • 2.Electrification Investment and Development

    § Public Investment§ Private Sector Investment based on

    Build Financing and Transfer§ Community Partnership and others§ Mini Grid

    8

  • Power to the Poor (P2P) programAddressing the equity and gender dimension of rural electrification

    • A program designed to support the poorest households with a gender focus, to bring the benefits of access to electricity to the poor

    Instrument• Interest-free credit to

    qualifying households for payment of the upfront connection changes on installment plan basis

    9

    Grid Model

  • Power to the Poor (P2P) programInstrument

    Funds from

    EdL, IDA, GEF, AusAID

    EdL P2P Revolving Fund

    EdL Operational Account

    Contractors for house wiring

    Monthly billP2P RepaymentElectricity

    tariff

    Address the affordability of the upfront connection charges , with a sustainable Revolving Fund

    Poor Households

    K700k

    Kip 700,000 ~90$

    Kip20,000/month~2.5 $

    10

  • Targeting the poor Initial results and looking forward

    Pilot program results (2008-2009)§ 537 households in 20 pilot villages

    connected utilizing P2P credit§ Average connection rate increased

    from 65% to 95% in the pilot villages§ Connection rate among female-

    headed HH increased from 63% to90%

    Example: PHONSAAD Village:electrified in 2002, 63 out of the 270households not connected by 2008, andall the 63 households were connected tothe grid in Feb-Mar 2009 with the P2PProgram scale up country-widestarted March/April 2010 11

  • Provinciallevel

    Village level

    GOL

    WB/IDA/GEF

    Centrallevel

    Ministry of Energy and Mines (MEM) /Institute of Renewable Energy Promotion (IREP)

    Customers (Rural Community Households, Enterprises)

    IDA/GEF/AusAid

    Special Ac count

    Electricity from SHS / VHGS Electricity

    Contract

    Contract

    (Village Energy Advisory Committee)

    REF

    VOPS

    PDEM

    VEAC

    PESCOs

    VEM

    Rural Electrification Division (RED) / PMUFund Manager

    Technical Service & Collecting Tariff

    Tariff

    Cluster Plan Installation

    (Village Energy Manager)

    Implementation and Management Model for Off-Grid

    12

  • Institutional Structure (REF Secretariat)

    Advisory Committee

    Fund Manager

    Secretariat Office

    ConsultantIREP

    Permanent Staff

    13

  • REF Source GOL established the REF in order to support (provideGrant Aid or Soft Loan) all activities to promote ruralelectrification developments. The rural electrificationdevelopment fund could come from:§ Government budget;§ Co-finance by the Government and Villagers;§ State Enterprises;§ Villagers;§ Donations from local and international agencies.

    In supplementary, GOL also provides tax exception orreduce tax for import equipment, construction andoperation of rural electrification project.

    14

  • Solar Home System(SHS) for Off-Grid Villages

    Solar Home System is very widely use within Lao PDR and today people are well acknowledge.

    Installation: 20 – 50 Wp

    15

  • Solar photovoltaic Mini Grid

    Project is Location in Phakeo Village Phoukhoun District Luangphabang Province, installed capacity 4.8 kWp

    16

  • Reverse Running pump Turbine

    Micro Hydropower

    17

  • Utilization Pico hydropower in Lao PDR

    18

  • 3. Key Driver of success in Lao PDR on Electrification.

    1. Sustained national commitment with substantial financial support by GoL

    2. Utility-driven grid-based electrification, complemented by off-grid program

    3. Financial support from International donors

    4. Private participation and Communities

    5. Incentive for Investor and Implimentors

    19

  • • Contact:Litthanoulok LASPHO• DepartmentofEnergyPolicyand

    Planning• MinistryofEnergyandMines,LaoPDR• Email:[email protected]• Visit:www.laoenergy.la