Elevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13 th , 2014 10:00am –11:30am Panelists: Jeff Schnitzer, GE Critical Power, General Manager Mark Acton, CBRE Norland, Critical Product Director Joe Higgins, Fidelity Investments, VP Engineering & Corporate Sustainability Officer Adam Early, P.E., Goldman Sachs, Vice President, Critical Systems & Engineering Paul G. Hines, Sentinel Data Centers, Vice President Data Center Operations & Engineering Robert E. McFarlane, Shen Milsom & Wilke LLC, Principal (Moderator) @AGRION

Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

  • Upload
    others

  • View
    4

  • Download
    1

Embed Size (px)

Citation preview

Page 1: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Elevating Data Center & Mission Critical Energy Efficiency

8/14/2014 AGRION.ORG 1

August 13th , 2014 10:00am –11:30am

Panelists:

Jeff Schnitzer, GE Critical Power, General Manager

Mark Acton, CBRE Norland, Critical Product Director

Joe Higgins, Fidelity Investments, VP Engineering & Corporate Sustainability Officer

Adam Early, P.E., Goldman Sachs, Vice President, Critical Systems & Engineering

Paul G. Hines, Sentinel Data Centers, Vice President Data Center Operations & Engineering

Robert E. McFarlane, Shen Milsom & Wilke LLC, Principal (Moderator)

@AGRION

Page 2: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Robert E. McFarlane

Data Center Design Principal

Shen Milsom & Wilke

Page 3: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Background & Achievements

• International Integrated Technologies Consultants • Practices in Acoustics, Telecommunications, Multi-Media, Security, Medical

Equipment Planning and Data Center Design • Member of ASHRAE, BICSI, The Green Grid and Uptime Institute • Serve on ASHRAE TC 9.9 • Chairman of ASHRAE Handbook Committee – Chapter 19 – “Data Centers” • Voting Member of ASHRAE SPCC 90.4 Data Center Efficiency Standards Committee • Adjunct Professor – Marist College: Data Center Facilities Course • Lead the effort to construct and commission a Remote NOC and contingency

trading floors for the NYSE and AMEX immediately following 9/11 • Executive responsible for the design and construction of the NYSE data center in

Mahwah • Executive responsible for the design and construction of Sentinel data centers in

NJ and NC.

Page 4: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

University of Hawaii

Manoa Campus – Honolulu

New Computer Sciences Building

Page 5: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Mark Acton

Critical Product Director

CBRE Norland

Page 6: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

6

Eur Ing Mark Acton

Critical Product Director -

CBRE Data Centre Solutions

Formerly:

• Director of the Uptime Institute in

EMEA.

• Data Centre Consultant at Intel

Solution Services

• UK Operations Director, Global Switch

• VP, Microsoft Service Delivery, Cable

& Wireless / Exodus Inc.

• Director, Global Data Centre

Operations, Digital Island Inc.

MARK ACTON - INTRODUCTION

Page 7: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

7

• Chairman of European Union Code of Conduct for Data Centres Best

Practice Committee

• Member of BSI Technical Committee TCT/7/3 (EN 50600 - CENELEC

TC 215 WG3)

• Member of BSI Technical Committee IST/46 (ISO/IEC 30134 series of

standards for data centre resource efficiency KPIs - ISO/IEC JCT1

SC39 WG1)

• Committee member of BCS Data Centre Specialist Group

MARK ACTON – INTRODUCTION

Page 8: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Paul G. Hines

Vice President

Data Center Operations and Engineering

Sentinel Data Centers

Page 9: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Notable Achievements

• Maintained full operation of the NYSE data center(s) during the Perfect Storm of 1991

• Lead the effort to construct and commission a Remote NOC and contingency trading floors for the NYSE and AMEX immediately following 9/11

• Executive responsible for the design and construction of the NYSE data center in Mahwah

• Executive responsible for the design and construction of Sentinel data centers in NJ and NC.

Page 10: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Jeff Schnitzer

General Manager

GE Critical Power

Page 11: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Jeff Schnitzer General Manager Mechanical Engineer 20 years with GE

End-to-End Power Solutions for the Building, Box and Board

www.gecriticalpower.com

Page 12: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Innovative solutions

CoreSpace

Powering New Quality

and Efficiency

HP

Meeting the Demand for 2.7 Zettabytes

of New Data

Distributed Power

Power direct to the rack

Telecom

DC Power for Central Office and

Cell Sites

Page 13: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Adam Early

Vice President, Critical Systems & Engineering - Americas

Goldman Sachs

Page 14: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Goldman Sachs LEUP Participation Summary:

Year Eligible Maximum

Incentive

Incentive Received,

Actual(A), Estimate(E)

Project Cost, Actual(A),

Estimate(E)

Measured

Performance

Estimated Cost Avoidance,

Measured(M), Estimate(E)

Payback Actual(A),

Estimate(E)

2011 $419,080 $419,080(A) $1,246,293(A) 2,028,300

kWh***

$754,500 (A) 1.3 (A) vs 1.86 (E)

2012* $423,750 $357,608(A) $637,000(E) 754,005 kWh

****(E)

10%(M) vs 8%(E) 3.13 (E)

2014** $595,913 TBD TBD TBD TBD TBD

The Large Energy Users Pilot Program (LEUP) is an energy efficiency incentive program sponsored by New Jersey’s

Clean Energy Program (NJCEP)

* This project is currently underway ** The 2013 program was incorporated into the 2014 Program *** Includes 170 kW of increased Tech load **** Chiller hours vary and a full year is needed to calculate actuals LEUP 2011 Project – 96 VFD’s on CRAC units & Cold Aisle Containment in 2 Fileds at CDC. Project was implemented in stages from 8/13 – 12/13. Measured Performance – Actual Electrical consumption was reduced ~ 1,538,700 kWh with an increased Tech Load of 170 kW (~489,600 kWh).

Page 15: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Site Implementation

Cost

Energy

Savings

(kWh)

Energy

Cost

Avoidance

Simple

Payback Incentive

Final

Payback ECM's Included

CDC $743,950 2327721 $283,982 2.62

Warehouse lighting LED retrofit

CRAC VFD's

Chilled Water Pumps VFD's

Partial free cooling Plant 1

Chiller plant optimization

BDC $1,309,410 1305405 $164,481 7.96

Warehouse lighting LED retrofit

Cold Aisle containment

Partial free cooling

30H $88,740 932296 $141,709 0.63 CRAC VFD retrofit

Total $2,142,100 4565422 $590,172 3.63 $595,913 2.62

The above has been submitted for review and the total incentive values will be provided following evaluation.

• LEUP 2012 • Project – 6 VFD’s on chillers at the CDC. Project started 5/14 and is underway with 3 of the 6 VFD’s

completed.

• Savings results of a single chiller was measured at commissioning (before and after VFD installation) to have 26 kW less consumption at identical loads. This represents approximately a 10% reduction in power and exceeded the estimated 8% reduction in power during original analysis.

• ROI calculated for project indicates pre-tax nominal payback of 3.15 years. Initial measurements indicate project is on track to exceed expected payback.

• LEUP 2014

Page 16: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Carteret Data Center

1.66

1.68

1.70

1.72

1.74

1.76

1.78

1.80

1.82

1.84

1.86

Nov

-11

Dec

-11

Jan-

12

Feb-

12

Mar

-12

Apr

-12

May

-12

Jun-

12

Jul-1

2

Aug

-12

Sep-

12

Oct

-12

Nov

-12

Dec

-12

Jan-

13

Feb-

13

Mar

-13

Apr

-13

May

-13

Jun-

13

Jul-1

3

Aug

-13

Sep-

13

Oct

-13

Nov

-13

Dec

-13

Jan-

14

Feb-

14

Mar

-14

Apr

-14

PUE (12 Month)

PUE (12 Month)

PUE Linear Trendline

Bridgewater Data Center

1.341.361.381.401.421.441.461.481.501.521.541.56

No

v-1

1

De

c-11

Jan

-12

Feb

-12

Ma

r-12

Ap

r-1

2

Ma

y-1

2

Jun

-12

Jul-

12

Au

g-1

2

Sep

-12

Oct

-12

No

v-1

2

De

c-12

Jan

-13

Feb

-13

Ma

r-13

Ap

r-1

3

Ma

y-1

3

Jun

-13

Jul-

13

Au

g-1

3

Sep

-13

Oct

-13

No

v-1

3

De

c-13

Jan

-14

Feb

-14

Ma

r-14

Ap

r-1

4

Ma

y-1

4

PUE (12 Month)

PUE (12 Month)

PUE Linear Trendline

Page 17: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Joe Higgins

VP of Engineering & Chief Sustainability Officer

Fidelity Investments

Page 18: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Responsive Data Center Capacity – A New Way

Page 19: Elevating Data Center & Mission Critical Energy Efficiency Center Slide 8_13_14.pdfElevating Data Center & Mission Critical Energy Efficiency 8/14/2014 AGRION.ORG 1 August 13th, 2014

Digital Infrastructure - Breaking the Power Curve

2000 2014

Data Center

Power (KW)

50% Power Cost

Reduction from

Business as

Usual

2 Megawatts of IT Load

reduction since 2008

2008