Emamat Residential Project Mashhad, Iran
PROJECT DETAILS:
Type: Residential
Location: 33 Emamat 33 Ave., Emamat Blvd., Mashhad,
Iran.
Client: Mr. Oloomi and Mr. Behnamifar
Areas:
Site area: 166.5 square meters
Typical floor area: 116.55 square meters
Ground floor area: 80 square meters
Parking area: 35 square meters
Height: 5 levels above ground level
Total area: 695.3 square meters
Program:
Five 4 ½ dwelling units (Main entrance, Master bedroom, Middle bedroom, Kitchen,
2 Bathrooms, Wardrobes, Living room, Dining area)
Parking and Storage in ground floor
Design/Build start: June 2005
Construction start: August 2005
Inauguration start: October 13, 2008
Estimated cost: 140000$
Cost at completion: 210600$
Estimated schedule: 18 months
Time at completion: 40 months and 13 days
PROJECT CREDITS:
Designers:
Project Architect: Babak Manouchehri, Eng., P. Ar.
Structural Engineer: Majid Tayyarani Toosi, Eng., P. Eng.
Mechanical/Plumbing: Alireza Fakour, Eng., P. Eng.
Electrical: Reza Moridasadi, Eng., P. Eng.
Project Manager: Babak Manouchehri, Eng., P. Ar.
Vertical Transportation: Aria Faraz Sepehr (OTIS EXPRESS representative)
General Contractor: Zare and Partners Group
Paneling Consultant: KNAUF Khorasan Consulting Group
Architectural Supervisor: Babak Manouchehri, Eng., P. Ar.
Structural Supervisor: Majid Tayyarani Toosi, Eng., P. Eng.
Mechanical/Plumbing Supervisor: Alireza Fakour, Eng., P. Eng.
Electrical Supervisor: Reza Moridasadi, Eng., P. Eng.
26
PROJECT SPECIFICATIONS:
Structural System: Steel structural frame Floor System: Reinforced composite floor system Bracing System: Shear wall Interior Partitioning: KNAUF paneling system Suspended Ceilings: KNAUF paneling system
Steel structural system
Reinforced composite floor system
Bracing system: Shear wall
Site plan
27
Ground floor plan Typical floor plan
Section
Main elevation
Measurement plans
28
Typology of openings plans and details
Cast-in-place concrete foundation
Oblique concrete foundation under
the elevator shaft
Vibrating the poured concrete
29
Joints in the steel structural system
(Column to foundation and steel beams to one another)