26
Embedded Data Centers: Designing Better Energy Efficiency Programs Robert Huang, Cadmus Silicon Valley Leadership Group Data Center Efficiency Summit November 5, 2014

Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Embedded Data Centers: Designing Better Energy Efficiency Programs Robert Huang, Cadmus

Silicon Valley Leadership Group – Data Center Efficiency Summit

November 5, 2014

Page 2: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

What are Embedded Data Centers (EDCs)?

2

Type Square Feet # Physical Servers Number in U.S.

Server Closets Less than 100 Less than 5 1.4 million

Server Rooms 100 to 999 5 to 24 1.3 million

Localized Data Center 500 to 1,999 25 to 99 66,000

Mid-Tier Data Center 2,000 to 19,999 100 to 499 10,000

Enterprise Data Center At least 20,000 At least 500 7,000

Source: IDC, 2013

Page 3: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

EDCs in Commercial Buildings

3

Typical office building’s DC is:

23%

of annual energy costs

Efficient office building’s DC is:

40-50%

of annual energy costs

Source: 2013 E Source Energy Manager’s Roundtable: presentation entitled “Who needs skeletons? We’ve got servers in the closets” by Mark Monroe, Chief Technology Officer and VP at DLB Associates.

Page 4: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

EDCs are…. • Ubiquitous

– 50% of all servers in the U.S. are installed in EDCs – Found in 50% of small and medium business customers at PG&E – CBSA found 250 EDCs in 230 commercial buildings*

• Hard-to-Reach – 50 calls per completed survey with EDC Manager

• Uninterested in EE • Limited Savings per Site

– Size – Opportunities not the same

* Preliminary results

4

Page 5: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Importance of EE to EDC Managers

5

Never 35%

Rarely 29%

Sometimes 18%

Often 12%

Always 6%

PG&E Study asked IT Vendor: How Often do Customers Ask About EE? (n=17)

Page 6: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

When Do Closets Need to Have Dedicated Cooling?

• 1.5 kW IT load limit at 77 degrees

• Technically, based on # servers includes: – Most server closets

– Some server rooms

• CBSA: 35 of 85 server closets had no dedicated cooling

6

Schneider Electric, Whitepaper

Page 7: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Airflow Management/Cooling Savings are Very Limited in Server Closets

7

Page 8: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Growing Interest in EDCs

• EPA: Updating utility guidance to include EDCs • NEEA, PG&E, & SVP: Conducting charrettes with EDC

managers/IT vendors

• NRDC: Issued papers on topic • NWPCC: Analyzing CBSA data • PG&E: Surveyed EDC managers • NYSERDA: Examining entire DC market including EDCs • MN: Requested EDC pilot • VERGE and ACEEE Conferences Red denotes Cadmus projects

8

Page 9: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

How Can This Group be Reached?

9

• PG&E:

– EDC Managers: 1 survey completed per 50 calls

– IT Vendor: 1 survey completed per 5 calls

– 45% of EDC Managers use an IT vendor

• Another survey found IT Vendor twice as likely to know about utility data center efforts

• Link program to IT Vendors that heavily influence EDC decision making (similar to HVAC programs)

Page 10: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

If HVAC Opportunity is Limited, Look to IT

• Pursue prescriptive incentives (custom too costly):

– ENERGY STAR qualified servers, data storage, and networking based on efficiency metrics

– Server virtualization

– Migration to colocation and cloud services (chiller-less cooling)

• Explore per-unit incentives: midstream for IT Vendors or upstream for IT equipment makers

10

Page 11: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Incentives Can Help Increase EE in EDCs

11

Top 5 EE Barriers in EDCs

Ranking According to SDC Managers: According to IT Vendors:

1 Resource constraints Resource constraints

2 EE not priority Focus on upfront costs

3 Focus on upfront costs Lack of understanding of in-house IT manager

4 Lack of understanding of in-house IT manager

Risk averse

5 Risk averse EE not priority

Page 12: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Server Savings

• EPA study at MSFT DC metered HP ProLiant servers – G6 (ES)

– G5 (non-ES)

• Determined over 50% savings very low loads (where most servers operate)

Page 13: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Server Virtualization of EDCs

• 2012 NRDC study: 37% (n=30)

• 2014 CBSA study: 35% (n=86)

• EDCs ripe for server virtualization incentives

13

Page 14: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

ENERGY STAR Is Gathering SERT Data For Servers

14

Page 15: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

ENERGY STAR Requires Data Storage Performance Info

15

• Three types of information collected: – Transaction (I/O per second per watt)

• Banking – Large number of random I/O operations

– Streaming (MiB per second per watt) • Netflix – Streaming large continuous chunks of data

– Capacity (GB raw capacity per watt) • Not accessed frequently but prepared to go

• Currently 60 models on qualified product list

Page 16: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

IT Vendor Perspective on EDC Migration

• Eventually, will head to a co-location facility or the cloud

• Held back mostly by security and bandwidth

• Most indicated that EDCs would migrate to a colocation facility before moving to the cloud

-PGE Study

16

Page 17: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

ComEd Closet to Colocation Program

• 5 cents/KWh incentive

• EDC with 5kW total load that saves 10% from colocation migration…… pockets $200 incentive

17

Page 18: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

EPA EDC Case Study – Preliminary Info

• Small municipal server room

• Funding for new HVAC system

• Two rack server room

• 4 kW IT load

11/10/2014 18

Page 19: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Server Room HVAC Possibilities

19

Page 20: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Panel Metering

• Metered total load and AC load at panel

– Watt nodes

– Data logger

• Also metered temperature and humidity

11/10/2014 20

Page 21: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Odd Findings

21

• 3.5 ton spot cooler oversized for 4 kW IT load

• Mysterious increase in use of AC and temp changes with no change in IT load

Page 22: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Culprit

• During the summer, the manager was leaving the door open to cool adjoining offices on hot days

• The 3.5 ton spot cooler was going full blast all day

22

Page 23: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Looking to be Efficient

• Consolidating another server room into this

• Getting rid of spot cooler

• Currently examining small cooling unit made by Daiken with air side economizer – Needs to be on outer wall

– $18K to install

– Extra $4K for economizer

– Incremental cost payback in 2 years

23

Page 24: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Single Enthalpy Control

24

Economizer Operation Parameters

ES1 80 60 28 80%

ES2 75 57 26 74%

ES3 70 54 24 68%

ES4 65 51 22 61%

ES5 60 48 20 54%

% Time

OnDB Temp

Temp

DewpointEnthalpyUnit

Page 25: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Summary of EDC Program

• Develop prescriptive rebates for IT measures (to ease administrative burden) – IT equipment – Colocation/cloud migration

• Leverage IT Vendors’ relationships and market influence (similar to HVAC programs’ use of contractors)

• Explore upstream incentives to manufacturers • Use classic HVAC measures for larger EDCs

– Possibly smaller, free cooling units – Variable speed drives to accommodate shrinking IT loads

• Run pilots

25

Page 26: Embedded Data Centers: Designing Better Energy Efficiency ...€¦ · EDCs in Commercial Buildings 3 Typical office building’s DC is: 23% of annual energy costs Efficient office

Contact Info

Robert Huang

[email protected]

Office: 617-673-7117

Allison Bard

[email protected]

Office: 617-673-7264

26