Emergency Data Distribution Network

Proposal

to add an independent

GOES DCS Reception and Distribution System

to complement the

NESDIS Wallops Island FacilityPresented by Ernest Dreyer, USGS/WRD

June 12, 2007

Page 2: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Overview

●Review EDDN project●Provide a current status●Describe backup capabilities●Review User access

Page 3: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Review of EDDN Project

Page 4: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN Project GOALS

• Receive data from all DCPs transmitting in the GOES DCS independently of Wallops Island.

• Locate facility at a site sufficiently distant from Wallops Island to achieve event independence.

XImplement additional pilot signal at a location other than Wallops Island.

• Distribute data independently of Wallops Island.

Page 5: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

STIWG/NESDIS Proposal• Locate the emergency distribution system

at the USGS EROS Data Center in Sioux Falls, South Dakota.

• USGS and NOAA/NESDIS will share the costs for procurement of the Direct Readout Ground Station system.

• System will be primarily operated by USGS with support from NESDIS.

• Operational costs will be shared among users who agree to participate and NESDIS.

Page 6: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Limitations

●Contains no system to

• Make new assignments• Data will be acquired from any transmitting DCP and so an internal schedule will not be necessary.

Generate abnormal platform response messages

• Messages will not be checked for abnormal conditions – at least not initially.

Page 7: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Limitations (cont.)

• Distribution will initially be over the Internet using the DDS protocol.• No DOMSAT transmissions

• No direct land-lines

• Depends on the existence of a usable pilot signal.

Page 8: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Basic EDDN System

● DRGS system with 2 antennas for GOES East and West ( at least 7M )

● DOMSAT system for data from Wallops Island

● LRGS systems for acquiring and distributing data.

● Web Server for reporting system status.

Page 9: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Some Features required of theEDDN GOES Receive System

● Receive both 100 and 300 baud messages on the same channel.

● Support a backup pilot signal and be able to switch to the backup if the primary signal fails.

Page 10: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Diagram of Proposed System

Page 11: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

System Monitoring

• Use Big Brother system monitoring Write Big Brother clients for montioring

● DRGSs via the DAMS NT event socket● LRGSs via system logs● Other events significant to the operations of

system

• Big Brother can Display current status on web site Send notifications to email groups Page users

Page 12: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

System Control

• After initial setup, system should operate with a minimum of operator intervention.

• System will be remotely managed using a remote system console assisted by on-site support.

Page 13: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Recurring Costs• EROS Support

Includes● 24/7 on-call network and emergency support● General SA support during regular hours.

SA will be familiar with DRGS systems and can assist in trouble shooting, making repairs, etc.

Does not include● Routine administration.

Page 14: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Recurring Costs (cont.)• Maintenance

Optional maintenance support for the system after the warranty period. This includes

● Yearly routine maintenance and inspection● On-call service.

Page 15: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Current Status of EDDN

Page 16: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Status of DRGS Procurement

● RFP issued Early February● Site Visit at EROS February 17,2007● Proposals Received Late March● Evaluations/Review Active● Contract Awarded June, 2007● System Installed 6 months after award

Page 17: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Status of LRGS Upgrades to support EDDN

● LRGS Software Work completed and ready for testing for the

following enhancements:● DDS Security● DDS Configuration● DDS Backup Message Recovery ● DDS Data filtering

New version is 6.0 and will be the base configuration used by EDDN

Page 18: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Basic Backup Capabilities

Page 19: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Some EDDN Features

EDDN was designed with these principles● Would integrate easily into the current

data distribution system.● Would be active all the time, not needing

to be “turned on.”● Would provide a secondary source of data

that could be used for data recovery for “problem” transmissions.

Page 20: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Role of LRGS in GOES DCS

Internet

DOMSAT

GOES-DRGS

LRIT

NOAAPORT

Tempest (tm)LRGS

UniversalReceiver

DECODES

DCS Toolkit

Web DCP Monitor

Time-Series Database

Custom Applications

Message Browser

Other LRGS Systems

UnlimitedOn-LineArchive

Page 21: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and LRGS

● EDDN takes advantage of the backup capabilities developed for Version 6.0 of the LRGS system

● The LRGS is a store-and-forward system that can be configured with a primary data feed and

one or more secondary feeds.

● The LRGS can automatically use secondary feeds for backup and data recovery.

Page 22: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and LRGS

● Version 6.0 of the LRGS supports these backup/recovery/filtering scenarios:

● Failure of primary data feed. DDS DOMSAT DRGS ( DAMS-NT connection ) Other

● Missing messages.● Reception of “bad” message.

Messages with parity errors Messages with missing EOT

● Reception of duplicate messages.

Page 23: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Examples that Illustrate Backup Scenarios

Page 24: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

LRGS BackupDOMSAT Only

Primary LRGS with 1 Peer Backup

DOMSAT

Columbia, SC HQ - Reston, VA

X1. Drops 2533 ... 2539

LRGS

3. Request: 2533 ... 3539 w/approx time range.

5. Response containing all dropped data.

LRGS

2. Post DOMSATOutage(2533-2539)

6. Data archived,outage retired.

4. Find & Returnrequested msgs

Page 25: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

LRGS BackupDOMSAT Only

Primary LRGS with 2 Peer Backups

DOMSAT

Columbia, SC HQ - Reston, VA

X1. Drops 2533 ... 2539

LRGS

4. Request: 2533 ... 3539

6. Response contains2533-2535, and 2537-2539

LRGS

3. Post DOMSATOutage(2533-2539)

7. Data archived, outageretired, Construct new

outage with 2536

5. Finds & Returns allbut 2536

X2. Drops 2536

Seattle, WA

LRGS

9. Find & Return2536

11. Data archived, outageretired.

8. Request 2536

10. Response contains 2536

Page 26: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

LRGS BackupDOMSAT and DRGS

LRGS with DOMSAT feed backed up by LRGS with DRGS feed

DOMSAT

Columbia, SC

X1. Drops 2533 ... 2539

LRGS

3. Request: 2533 ... 3539 w/approx time range.

5. Response containing msgs in time range.

LRGS

2. Post DOMSATOutage(2533-2539)

6. Data archived,outage marked as

'failed'.

4. Finds 40 messages inthe time range, none

with seq #s

GOES E GOES W

Sioux Falls SD (assume no DOMSAT)

Page 27: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

LRGS BackupDRGS and DOMSAT

LRGS with DRGS feed backed up by LRGS with DOMSAT feed

DOMSAT

Columbia, SC

X1. Drops msg fromCE123456

LRGS

3. Request CE123456 w/approx time range

5. Response contains msg

LRGS

4. Find msg. Still incache

2. 1 min after windowexpires, assert 'M'issing

for CE123456

GOES E GOES W

Sioux Falls SD (assume no DOMSAT)

6. Archive msg & retireoutage.

Page 28: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Scenario for EDDN/LRGS BackupLRGS with Primary DOMSAT feed

GOES West GOES EastDOMSAT

EROS LRGS USER LRGSWallops LRGS1st Backup

(DDS Feed)

2nd Backup??

(DDS Feed)

USER

DDS Client

EROS EDDN Wallops

Page 29: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Scenario for EDDN/LRGS BackupLRGS with Primary DRGS feed

GOES West GOES EastDOMSAT

EROS LRGS USER LRGSWallops LRGS1st Backup

(DDS Feed)

2nd Backup??

(DDS Feed)

USER

DDS Client

EROS EDDN Wallops

Page 30: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Scenario for EDDN/LRGS BackupLRGS with Primary Network DDS feed

GOES West GOES EastDOMSAT

EROS LRGSUSER LRGS Wallops LRGS1st Backup

(DDS Feed)

Primary

( DDS Feed )

USER

DDS Client

EROS EDDN Wallops

Page 31: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and User Access

Page 32: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and User Access● How will users get data from EDDN

Interactively● DDS client, either a GUI message broswer of command-line

command

Real-time● Another LRGS using DDS connection● DDS command-line command in real-time script● Other DDS clients

Page 33: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

Some examples of available DDS clients

Interactive● LRGS Message Browser● DDS command-line command

(Both are included with basic LRGS packages and can also be acquired as stand-alone software)

Real-time● Another LRGS using DDS connection to another

system● DDS command-line command in real-time script● DECODES● USGS Satin ● National Interagency Fire Center “ASCADS”

Program

Page 34: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and User Access

● How will users keep their network up-to-data? LRGSs in EDDN system will synchronize user

information, including networks, from PDTS.

● How will users monitor the operational status? Big Brother Web display

Page 35: Emergency Data Distribution Network Proposal to add an independent GOES DCS Reception and Distribution System to complement the NESDIS Wallops Island Facility

EDDN and User Access

● What documentation will be available? Setup guide that explains

● Features● Hardware and software Requirements● Registration procedure● Connection options