Emergency Response & Disaster Management Plan PETRONET LNG LIMITED PETRONET LNG LIMITED Dahej Dahej S.VENUGOPAL, Manager(HSE) S.VENUGOPAL, Manager(HSE)

Emergency Response & Disaster Management Plan

  • Upload
    adolfo

  • View
    77

  • Download
    10

Embed Size (px)

DESCRIPTION

Emergency Response & Disaster Management Plan. PETRONET LNG LIMITED Dahej. S.VENUGOPAL, Manager(HSE). Petronet LNG is India's first LNG Terminal at Dahej. LOCATION OF DAHEJ. FACTORY LAYOUT. N. ECC2. ECC 1. Petronet North Gate (Main Gate). T 104. T 101. T 102. T 103. TLF. - PowerPoint PPT Presentation

Citation preview

Page 1: Emergency Response & Disaster Management Plan

Emergency Response &

Disaster Management Plan

PETRONET LNG PETRONET LNG LIMITEDLIMITED

DahejDahejS.VENUGOPAL, Manager(HSE)S.VENUGOPAL, Manager(HSE)

Page 2: Emergency Response & Disaster Management Plan

Petronet LNG is India's first LNG Terminal at Dahej

Page 3: Emergency Response & Disaster Management Plan

LOCATION OF DAHEJ

Page 4: Emergency Response & Disaster Management Plan

JETTY

FACTORY BOUNDARY

N

Petronet North Gate(Main Gate)

Petronet South Gate

T 101 T 102 T 103 T 104

TLF

ECC 1

ECC2

FACTORY LAYOUT

Page 5: Emergency Response & Disaster Management Plan

Emergency Control Centre (ECC-1)

Page 6: Emergency Response & Disaster Management Plan

Emergency Control Centre (ECC-2)

Page 7: Emergency Response & Disaster Management Plan

EMERGENCY RESPONSE TEAM (ERT)

3.5.1 Control Room panel operator 3.5.1.1 Plant operator

3.5.2 Chief Incident Controller (CIC)3.5.3 Site Incident Controller (SIC)3.5.4 Fire & Rescue Coordinator3.5.5 Medical Coordinator 3.5.6 Security Coordinator (Evacuation and Traffic control)3.5.7 HSE Coordinator3.5.8 Gas Monitoring Coordinator3.5.9 Communication Coordinator3.5.10 Transport & Logistics Coordinator3.5.11 Demolition & Reconstruction Coordinator3.5.12 HR & Welfare Services Coordinator (Relief & Rehabilitation)3.5.13 Public Relation and Mass Media Coordinator3.5.14 Technical Coordinator

3.5.14.1 Operations Coordinator 3.5.14.2 Port Operations Coordinator (In Case of Port operation emergency)3.5.14.3 Maintenance (Electrical, Mechanical & Instrument) Coordinator

3.5.15 Recorder 3.5.16 Messenger

Page 8: Emergency Response & Disaster Management Plan

COMMUNICATION SYSTEM

• Automatic Fire Gas Spill Detection System• Automatic Smoke and Heat Detection

System• Manual Call Points (MCP)• Portable Radio sets (Walkie Talkie) • Public Address System• Paging System• Telephones • Emergency Sirens• Messengers

Page 9: Emergency Response & Disaster Management Plan

Mutual Aid Support

• Petronet LNG Ltd.

• Reliance Industries Ltd.

• Gujarat Alkalies & Chemicals Ltd.

• Hindalco (Aditya Birla Copper)

• Gujarat Chemical Port Terminal Company Ltd.

• ONGC (C2-C3 extraction plant)

Page 10: Emergency Response & Disaster Management Plan

Approach Route to Plant

RIL

Birla Copper

GCPTCL

Welspun

Sarasawati Township DMC C/R

Route MAP to Petronet LNG

Adani Petronet

ONGC

C2C3

GACL

GFL

PetronetLNG

Page 11: Emergency Response & Disaster Management Plan

ONGC

C2-C3 Plant

Rehabilitation Camp Route

Luwara

School

Assembly point PLL south gate

Rehabilitation

from Adani

Petronet &

Lakhibaba temple

Rehabilitation Center

Lakhigaon

School

Adani Petronet

RIL

Rehabilitation Center

GCPTCL Plant

Page 12: Emergency Response & Disaster Management Plan

ONGC

C2-C3 Plant

Fire Tender & Ambulance Route

Luwara

School

Emergency

Vehicle

From Bharuch

& near by factoryEmergency

Vehicle From GCPTCL

Route to PHC Dahej

Adani Petronet

GCPTCL Plant Lakhigaon

School

Page 13: Emergency Response & Disaster Management Plan

Emergency Coordinator Team Approach route & Car Parking

ONGC

C2-C3 Plant

Emergency Vehicle

Form GCPTCL

Car

Parking

Adani Petronet

Luwara

School

Emergency

Vehicle

From Bharuch

& near by factory

Lakhigaon

SchoolGCPTCL Plant

Page 14: Emergency Response & Disaster Management Plan

OFF SITE EMERGENCY DRILL

19.02.2010

Page 15: Emergency Response & Disaster Management Plan

OFF SITE EMERGENCY DRILL

Scenario: Leakage of LNG at TLF Skid from 4” LNG tanker feed pipeline at the upstream side of MOVP 13001.

Location: Truck Loading Facility (TLF)

Date & Time: 19.02.2010

Page 16: Emergency Response & Disaster Management Plan

Location of LNG Leak in TLF area

TLF Area

FACTORY BOUNDARY

N

Petronet Main Gate

Petronet South Gate

T 101

Page 17: Emergency Response & Disaster Management Plan

Main Control Room (ECC-1)

Page 18: Emergency Response & Disaster Management Plan

Main Control Room (ECC-1) in action

Page 19: Emergency Response & Disaster Management Plan

Emergency Control Centre (ECC-2) in action

Page 20: Emergency Response & Disaster Management Plan

Regular Updation of Situation in ECC-2

Page 21: Emergency Response & Disaster Management Plan

Assembly Point

Page 22: Emergency Response & Disaster Management Plan

Fire fighters in action at site

Page 23: Emergency Response & Disaster Management Plan

Fire Fighters in action

Page 24: Emergency Response & Disaster Management Plan

Rescuers in action

Page 25: Emergency Response & Disaster Management Plan

Observers at site

Page 26: Emergency Response & Disaster Management Plan

External Observers outside the plant

Page 27: Emergency Response & Disaster Management Plan

Medical Team in action

Page 28: Emergency Response & Disaster Management Plan

Medical Team in action

Page 29: Emergency Response & Disaster Management Plan

Mutual Aid Fire Tender Arrival

Page 30: Emergency Response & Disaster Management Plan

Mutual Aid Ambulance Arrival

Page 31: Emergency Response & Disaster Management Plan

Mutual Aid Support Team arrival

Page 32: Emergency Response & Disaster Management Plan

District Level Mutual Aid Support

Page 33: Emergency Response & Disaster Management Plan

Gas Monitoring Team in action

Page 34: Emergency Response & Disaster Management Plan

Gas Monitoring

Page 35: Emergency Response & Disaster Management Plan

Evacuation

Page 36: Emergency Response & Disaster Management Plan

Evacuation

Page 37: Emergency Response & Disaster Management Plan

Evacuation completed

Page 38: Emergency Response & Disaster Management Plan

Evacuation

Page 39: Emergency Response & Disaster Management Plan

Transportation to rehabilitation camp

Page 40: Emergency Response & Disaster Management Plan

Transportation of persons to camp

Page 41: Emergency Response & Disaster Management Plan

Vehicle Entering Rehabilitation Camp

Page 42: Emergency Response & Disaster Management Plan

Rehabilitation Camp - Luwara

Page 43: Emergency Response & Disaster Management Plan

Rehabilitation Camp - Luwara

Page 44: Emergency Response & Disaster Management Plan

Rehabilitation Camp - Luwara

Page 45: Emergency Response & Disaster Management Plan

Rehabilitation Camp - Luwara

Page 46: Emergency Response & Disaster Management Plan

Ambulance in Rehabilitation Camp

Page 47: Emergency Response & Disaster Management Plan

First Aid Centre in the camp

Page 48: Emergency Response & Disaster Management Plan

Final Debriefing Meeting