Emissivity and other infrared-optical properties (WP6) ---------------------------------------------------------------------------- Objectives of the technical Work Packages To create the technical information content of the web-site (WP4 to WP9) Information would be provided by a blend of sources, by links to existing sites, by e-mail to expert or resources, by texts and articles, EVITherM The European Virtual Institute for Thermal Metrology _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

Embed Size (px)

Citation preview

Page 1: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

Emissivity and other

infrared-optical properties (WP6)-------------------------------------------------------------------------------------------------------------------

Objectives of the technical Work Packages

To create the technical information content of the web-site (WP4 to WP9)

•Information would be provided•by a blend of sources, by links to existing sites, •by e-mail to expert or resources,•by texts and articles,

EVITherM

The European Virtual Institute for Thermal Metrology

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 2: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

Objectives of WP6

WP 6 defines the technical content for emissivity and other infrared-optical properties.

Information related to the following categories will be collected and made available:

Facilities for measurements

Sources of technical data

Best practice guides

Reference material

Standardisation

Topics of interest

EVITherM

The European Virtual Institute for Thermal Metrology

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 3: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal Metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

WP6: Description of Work Tasks

Task 6.0 (CNR-IMGC)•Define the content of the Work Package•Provide a review of all data entries•Evaluate the material from other WPs pertinent to this field.

Task 6.1 (NPL)•Content of a database that includes all facilities for measurements in this field in Europe.•The database will include: measurement providers, measurement devices, calibration and testing laboratories in Europe.

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 4: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal Metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

continue WP6: Description of Work Tasks

Task 6.2 (LNE)•Identify qualified sources of technical data in this field..•Review the best sources of data for various applications (radiation thermometry, remote sensing, solar energy applications, heat exchange calculations, data for characterisation of optical materials)

Task 6.3 (ZAE)•Collect existing material related to best practice guides, measurement procedures and use of measurement devices.•Provide a review of existing material and identify additional needs.

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 5: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal Metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

continue WP6: Description of Work Tasks

Task 6.4 (RISOE)•Identification of available certified reference materials and their sources of supply. Additional reference materials (not certified) will also be identified.•Needs for additional reference materials.

Task 6.5 (2 new members)•Review of topics of interest and overview of technology and research outputs in the field plus an overview of where future work is required.•Database for industrial requests of norms, accreditation rules and legal metrology requirements •Links with organisations for standardisation and with accreditation bodies.

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 6: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal Metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

YearProject Month 3 6 9 12 3 6 9 12 3 6 9 12

WP6 To Create VI content for EmissivityTask 6.0 Define the content of the WPTask 6.1 Create content of database for resourcesTask 6.2 Identify sources of technical dataTask 6.3 Create and collect the content for best practice guides

Task 6.4 Compile list of standard reference materials Task 6.5 Compile list of standards, norms and accreditation

2003 2004 2005Project Plan EVITherM

Proposal for an updated WP6 plan

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 7: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

DeliverablesD6.0 Report defining the form and content of this area of the VI - month 9D6.1 to D6.5 Sets of data compiled in tasks 6.1 to 6.5 for review on pre-release EVITherMweb site – months* 12 - 30D6.6 Approved compiled data reviewed for phased insertion into the live EVITherM web site– months* 12 - 30

Milestones and criteriaM6.0 Formulation of final content – month 9M6.1 Sets of data compiled in tasks 6.1 to 6.5 for review on pre-release EVITherM web site -months* 12 - 30M6.2 Phased completion of approved inputs to EVITherM live website - months* 12 - 30

* Note. A plan defining the target dates for phasing information generated within this WP intothe EVITherM website will be developed by the steering committee in WP1 during the first 6months of the project

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003

Page 8: Emissivity and other infrared-optical properties (WP6) -------------------------------------------------------------------------------------------------------------------

EVITherM

The European Virtual Institute for Thermal Metrology

Emissivity and otherinfrared-optical properties (WP6)

-------------------------------------------------------------------------------------------------------------------

ACTION D.4: WPLs to arrange meetings with their members to discuss technical aims of WP. A key output of each of these meetings should be list of the planned WP outputs prioritised for phasing onto the EVITherM website. ….

EVITherM Steering Group MeetingEVITherM Steering Group Meeting28 January 2003

_____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003