Challenges when Producing Fire Preventions Plans Emma How and Sophie Crosswell Eunomia Research & Consulting 9 th November 2016

Emma & Sophie_Fire Prevention Plans

Embed Size (px)

Citation preview

Page 1: Emma  & Sophie_Fire Prevention Plans

Challenges when Producing Fire

Preventions Plans

Emma How and Sophie Crosswell

Eunomia Research & Consulting

9th November 2016

Page 2: Emma  & Sophie_Fire Prevention Plans

History of Eunomia

• Established in 2001 by

Chairman, Dr Dominic Hogg

• Rapid growth

• 20 staff in 2009

• 42 staff in 2013

• Now more than 70

• Largest strategic waste

consultancy team in UK/EU

Page 3: Emma  & Sophie_Fire Prevention Plans

Eunomia Offices

Auckland,

New

Zealand

Brussels,

Belgium

Manchester

Bristol London

UK

Copenhagen,

Denmark

Page 4: Emma  & Sophie_Fire Prevention Plans

Key Expertise in Waste Management

• Policy appraisal & guidance

• Strategy and planning

• Environmental and financial modelling

• Operational expertise• Collection logistics (in-house

collections modelling tool)

• Efficiency reviews, change management, business process re-engineering

• Market assessment, technology appraisal (due diligence)

• Procurement

Page 5: Emma  & Sophie_Fire Prevention Plans

Issue 1: Impact on Site Design

• Issue:

• Achieving compliant material separation whilst ensuring

sufficient storage space

FIRE WALLSOR

6M

SEPERATION

Page 6: Emma  & Sophie_Fire Prevention Plans

Issue 1: Impact on Site Design

Daily

Throughput

Volume &

tonnes of

material to be

stored

Required bay

sizes

Calculation Modules

Annual site

throughput by

material stream

Haulage method

Minimum

storage capacity

Collection

vehicles

Material

properties

Maximum pile

height

Page 7: Emma  & Sophie_Fire Prevention Plans

Issue 1: Impact on Site Design

Bale Storage

Area

Requirements:

- Adjustable bale

dimensions

- No. bales per

shipment

- Adjust stack

dimensions

- Est. no. days

storage

Compliance with

FPP Guidance:

- Compares

material

volumes,

based on bay

sizes, with FPP

guidance

- Calculates

water

requirements

for EA

compliance

High-Level

Business Case:

- Material income

- Operational

costs

- Capital

development

costs

- Financial

projections

Page 8: Emma  & Sophie_Fire Prevention Plans

Issue 1: Compliant Site Design

Sort line

Shed

entrance/

exit

Page 9: Emma  & Sophie_Fire Prevention Plans

Issue 2: Preventing Site Fires

• Developing procedures to prevent site fires

Waste Acceptance

and Identification

of Hot Loads

Procedure

Procedures for

Managing Ignition

Sources

Page 10: Emma  & Sophie_Fire Prevention Plans

Issue 3: Managing a Site Fire

• Providing sufficient water to fight a fire

Original Pile

Largest waste pile:

700m3

Pile Size:

• Height 3.5m

• Width 20m

• Depth 12m

Water Required:

840,000 litres (3 hours)

Halve Pile

Width

2 Smaller Piles

Each waste pile: 350m3

Pile Size:

• Height 3.5m

• Width 10m

• Depth 12m

Water Required: 420,000

litres (3 hours)

Page 11: Emma  & Sophie_Fire Prevention Plans

Issue 3: Managing a Site Fire

• Using your quarantine

area:

• Dedicated area

• Use during and after a

fire event

• Emissions to the

environment

External

Impermeable

Surfacing

Internal

Impermeable

Surfacing

Weighbridge

Quarantine

Area