4
CONFIDENTIAL IJRGRNT TIME BOUND · HIMACHAl. PRADESH STATR RI.ECTRICITY BOARD I"MITRD (A State Government Undertaking) 1 NO.HPSEBL (SECTT.)/Confd-CR-I-JE (C/M)/2013-b3 7;) o-q 0 Dated:-II Q from:- Executive Director (PersOllllel.). H.P.State Electy.Board Ltd., Vidyut Bhawan, Shimla-4. To The Chief Engineer. Project-cum -Arbitrator, HPSEBL, Shimla-4. , Subject:- Submission of APARs in respect of Junior Engineer (ClM) Degree/AMIElDiplomaINon-DiplomalloldersiCIIDM (elM). Sir. I am directed to refer to this oflice letter NO.HPSEBL (SECTT)/Confd-CR-I-JE(CIM)/2012-13-41861-912 dated 11.9.2013 on the subject 'cited above and to intimate that the APARs in respect of Junior Engineer (ClM) . Degree/AMIElDiplomaINon-Diploma Holders! CHDM (CIM) for the period shown against each as per list enclosed who are in the promotion zon) are still awaited, which may also be got arranged and sent to this office forthwith as the same are urgently required please. superi ntending ) a ----- . tml .1 . . 1 I Sectiia Officer (Confd.). H.P.State Electy. Board Ltd. Vidyut Bhawan, Shimla-4. Copy along with list is forwarded for smilar necessary action to:- 1. All other Chief Engineers in HPSEBL. 2. The Managing Director, HPPCL, Himfed Bha.wan, Panjr4 (Below Old MLA Quarters). Shimla-5. Contd ... 2/ ...

Employee Portal 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla 13. The General Manager, Sainj Hydro Electric Project HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Employee Portal 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla 13. The General Manager, Sainj Hydro Electric Project HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The

CONFIDENTIAL ~10ST IJRGRNT TIME BOUND ·

HIMACHAl. PRADESH STATR RI.ECTRICITY BOARD I"MITRD (A State Government Undertaking) 1~

NO.HPSEBL (SECTT.)/Confd-CR-I-JE (C/M)/2013-b3 7;) o-q 0 Dated:-II Q from:­

Executive Director (PersOllllel.). H.P.State Electy.Board Ltd., Vidyut Bhawan, Shimla-4.

To The Chief Engineer. Project-cum -Arbitrator, HPSEBL, Shimla-4. ,

Subject:- Submission of APARs in respect of Junior Engineer (ClM) Degree/ AMIElDiplomaINon-DiplomalloldersiCIIDM (elM).

Sir. I am directed to refer to this of lice letter NO.HPSEBL

(SECTT)/Confd-CR-I-JE(CIM)/2012-13-41861-912 dated 11.9.2013 on the

subject 'cited above and to intimate that the AP ARs in respect of Junior

Engineer (ClM) . Degree/AMIElDiplomaINon-Diploma Holders! CHDM

(CIM) for the period shown against each as per list enclosed who are in the

promotion zon)are still awaited, which may also be got arranged and sent to

this office forthwith as the same are urgently required please.

superintending Engl~bo~ )HPSEB Ltd.~~yut~~ a ~1-v/ . YOu.rs, f~1~fullY. ----- .

tml 171~)f1pf) .1 . . 1~\~ I Sectiia Officer (Confd.).

H.P.State Electy. Board Ltd. Vidyut Bhawan, Shimla-4.

Copy along with list is forwarded for smilar necessary action to:­

1. All other Chief Engineers in HPSEBL. 2. The Managing Director, HPPCL, Himfed Bha.wan, Panjr4

(Below Old MLA Quarters). Shimla-5. Contd ... 2/ ...

Page 2: Employee Portal 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla 13. The General Manager, Sainj Hydro Electric Project HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The

... 2 ... 3. The Managing Director, H.P.Power Trans.Corpn.LtcL

Shimla. 4. The Director, Town & Country Planning . Deptt. H.P.

Shimla. 5. The Director Energy to the Govt. ofH.P.Shimla-2. 6. The Managing Director, NTPC, Kol Dam Project,

Bilaspur. 7. All the Superintending Engineers in I IPSEDL. 8. The Deputy Manager (P&A) (Estt)., SJVN Ltd., Divya

Kunj Bhawan. Near Blok-9,Phase-IILNew Shimla. 9. The Deputy Manager (P&A), SJVN Ltd., TIlakri. 10. The Under Secretary (P&A), HEP, Rampur Jhakri. ll. The Special SeCretary, BB~tB, 19-BMadbyaMarg,

Chandigarh. 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla­13. The General Manager, Sainj Hydro Electric Project

HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The General Manager, Swara Kuddu, HPPCL, Robru. 15. The Managing Director, BVPC, Jogindernagar.

They are also requested to please look into the matter and

arrange to send the awaited AP ARs in: respect of concerned officials who are

working! worked under their control to this office at the earliest please.

DA-As abo~e. L~~ Section Officer (Confd.), H.P.State Electy. Board Ltd., Vidyut Bbawall, Shimla4

Page 3: Employee Portal 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla 13. The General Manager, Sainj Hydro Electric Project HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The

LIST OF AWAITED APAR.s Il''f RESPECT OF JUNIOR ENGINEER(CIiM)I DEGREE If)WT,OMAINON-DWT,OMA HOlJ)ER~CfIDM (elM)

Sr. Name ofofficials D.O.B Period of AP \.Rs Pn::senL place ~f I No. posting I 1. 2. 3. 4 5.

Ers.

I I

JUNIOR. ENGINEERs(CIM) ( I

" DEGREE HOLDERs 1. Dcvindcr Paul Soni 21.11.67 I 1.4.12 to 31.3 .13 ' BB~m

~ORENC~ER~~IM) DJPLOMA HOLDERs I

1. Satish Kumar i', 8.4.59 1.4.11 to 31.3.12 & R.E.Garoh ! 2. Ram Singh 11.6.60 1.4.12 to 31.313 . CMD,B/Nagar 3. Ravinder Kumar Dhiman I 30.3.59 -do- BBMB 4. Jagdish Chand 12.6.56 -do- CE(MM). I 5. Javed Iqbal Ansari 2.10.58 , -do­ ED,Nahan

!I 6. AnilKumar 24.3.61 1.1.09 to 31.3.09, Arb. & Mtc.Divn.

I1.4.10 to 31.3.11 & Thalout 1.4.1210 31.8.12

7. Harcharan Singh 131.5.57 1.4.]2 to 31.3.13 ED,Una 8. Vijay KWlW' (SIT) . 12.1.59 i 12.8.08 to 313.09 & ' Elect.System

1.4.09 to 31.3.13 Divn.Harnirpur. I 9. Ashok Kumar Chauhan . 10.11.57 1.4.07 to 31.3.G8, E.D,KuUu

I1.4.08 to 31.3. 09 _. . _-­ - --­ ----~. ~-

r.,.ftc.~ivn. 110. BiriSingh 28.5.56 I 1.4.07 to 31.3.13 Arb. & , Thaloul

.. 11. . MottRam 20.7.56 1.4.07 to 31.3.1)8 IBBMB

1 12. Narinde:r '1hakur 125.9.60 1.4.07 to 31.3.11 TCD,Pandoh 13. Yashodhan Kumar ' 22.9.59 1.4.07 to 31.3.l3 Where aoouts no

known. 14. , Netar Singh 6.7.60 ' 1.4.12 to 31.3.B I UCD-I,J/Nagar j

15. I JulfiRam 8.11.62 11.4.07 to 31.3,13 ' Protection &1 Testing Circle, I

Hamirpur. I 16. Parlcash Chand 6.2.62 1 1.4.07 t.o 31.3.13 HPP<..~·L

17. Ram Paul (SIC) 5.1.62 -do- I 1\f&T-tSolan "

18. I' Harbans La! 20.4.56 -do» I.EU,Harnirpur 19. Clumde:r Mohan . 15.12.59 -do- BB:MB 20. Tarun Raj(Alla!ll) 'rota Ram 25.4.04 -do­ CR(P) Shimla.

-

21. Joga Singh 13.3.62 -00­ GiriPIHD, . I Girinagar.

I ,

.JlOOOR ENGTNEER(CIM} I

NON-DIPLO~fA HOLDER · , I 1. Er.Viiay Singh Negi L15.7.56 1.4.12 to 31.3,13 (Op)Circle, Solan.

Coutd ... 2/. ..

Page 4: Employee Portal 12. The Chief Electrical Inspector, to the Govt. ofH.P.Shimla 13. The General Manager, Sainj Hydro Electric Project HPPCL, Sarabai (Shunter) Distt.Kullu . . 14. The

~.. ... 2 ... --~-

1. 2. , J. I

4 <c.~ 5. CHDMs(CIM) J

S/Sh. - - I 1. Ichha I'w"ak Singh 21.7.58 . 1.4.12 to 31.3.13 HPPCL,Shimla 2. Yogesh Kmnar 1.8.58 1.4.ui to 31.3.08 & HPPCL

r­ 1.4.08 to 31.3.09 -

3. Manohar Lal '2.1.60 1.4.08 Lo 31.3.09 & CE(Conun.),Shimla , 1.4.09 to 2.9.09

4. Gwdeep Sinidt (H/C) 14.6.57 1.4.07 to 31.3.13 SJVNL 5. Kripal Singh (SIC) 22.5.61 -do- SJVNL

16. Yash Pal 14.4.56 -do- L SJVNL" " ~

7. Bhagat Ram (SIC) 20.4.61 -do­ l, SJVNL 8. Ashwani Kumar Kapoor 14.12.56 -do- Planning Circle,

Sundemagar 9. Iv10tiRam ~.2.59 -do- SJVNL 10. Sudershan Kumar 2.7.58 I -do- SJVNL 11. Bharat Bhushan 21.3.60 . -do- Planning Circle, I

I Sundemagar 12. Partap Ch.and 2.12.58 ; -do- HPPCL

j 0'