13
1 PROPOSAL REFERENCE NO: IN-NPIU-191007-CS-QCBS INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR EMPLOYER SATISFACTION SURVEY Under Technical Education Quality Improvement Programme - Phase-III (TEQIP-III) (A WORLD BANK ASSISTED PROJECT) CREDIT NO. - CR. 5874-0 IN NATIONAL PROJECT IMPLEMENTATION UNIT (NPIU) Jasola Vihar, New Delhi 110025 (A unit of MHRD, Govt. of India for implementation of World Bank Assisted projects in Technical Education) Phone: +91-11-26941003/04/06/08/09/29, Fax: +91-11-26941012/14, E-mail: [email protected] Website: www.teqip.in 28 th September, 2020

EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

1

PROPOSAL REFERENCE NO: IN-NPIU-191007-CS-QCBS INVITATION FOR EXPRESSION OF INTEREST (EOI)

FOR

EMPLOYER SATISFACTION SURVEY

Under

Technical Education Quality Improvement Programme - Phase-III

(TEQIP-III)

(A WORLD BANK ASSISTED PROJECT)

CREDIT NO. - CR. 5874-0 IN

NATIONAL PROJECT IMPLEMENTATION UNIT (NPIU)

Jasola Vihar, New Delhi – 110025 (A unit of MHRD, Govt. of India for implementation of World Bank Assisted projects

in Technical Education)

Phone: +91-11-26941003/04/06/08/09/29, Fax: +91-11-26941012/14,

E-mail: [email protected]

Website: www.teqip.in

28th September, 2020

Page 2: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

2

I. EOI NOTICE

Ministry of Human Resource Development, Government of India (GoI) is implementing the Technical

Education Quality Improvement Project (TEQIP-III) with the assistance of World Bank. The project objective is to improve quality and equity in the selected public funded/aided engineering education institutions, and

augment the effectiveness of the engineering education system. The national policies and directives pertaining

to technical education of the GoI envisage that the quality of technical education should be refined while addressing the need to expand access.

Employability of engineering graduates in India remains a major concern, particularly in the focus states. A

study conducted by the World Bank and the Federation of Indian Chambers of Commerce and Industry (FICCI) in 2009 disclosed that there was substantial dissatisfaction among employers with the technical skills

of graduates, recruited from engineering institutes. An amended version of the survey was conducted in 2014

along with a series of interviews and focus group discussions with the top employers and respective institutes. While this study revealed a marked improvement in the satisfaction level of employers on the soft skills of

engineering graduates albeit, employers continued to be dissatisfied with the technical skills of engineering

graduates.

One of the key success metrics in TEQIP – III is to map the satisfaction level of employers with engineers

recruited from the institutes, supported by the project. With this pursuit, the project stands to support employer

surveys and monitor the level of employer satisfaction with TEQIP graduates and map the level of satisfaction during the course of project. Indeed, the National Project Implementation Unit (NPIU) of TEQIP-III, foresee

to hire a survey Service Provider/ organization/ agency (referred to as ‘Service Provider’ hereinafter) to

conduct this survey.

In this regard, NPIU invites Expression of Interest (EoI) from eligible Service Providers through Central

Public Procurement Portal https://eprocure.gov.in/eprocure/app to indicate/express their interest in providing the services for conducting an Employer Satisfaction Survey of participating project institutions. Request for

EoI document may be downloaded from Central Public Procurement Portal

https://eprocure.gov.in/eprocure/app. Aspiring Service Providers are advised to refer eligibility criteria as

mentioned in this document. EoI must be submitted online at CPPP https://eprocure.gov.in/eprocure/app on or before 19th Oct, 2020 up to 1400 hrs. Manual submission of EoI shall not be accepted. The opening of

EoIs will be scheduled on 19th Oct, 2020 @ 1430 hrs. A pre-bid meeting will be held on 05.10.2020 at

1200 Hrs – 1400 Hrs at NPIU Conference Hall, Jasola Vihar, New Delhi. Pre-Bid queries

/clarifications preferably be sent in writing via email at [email protected] to the NPIU prior one day

before the scheduled date of pre-bid meeting. Only one official will be allowed from each service

provider to attend pre-bid meeting at NPIU.

Interested service provider are advised to refer Bidders manual Kit available at CPPP website

https://eprocure.gov.in/eprocure/app for participating in this EoI. Intending service providers are

advised to visit TEQIP-III website www.teqip.in and CPPP website

https://eprocure.gov.in/eprocure/app regularly till closing date of submission of proposals for any

corrigendum /addendum/ amendment.

The Service Provider will be selected through Quality and Cost Based Selection (QCBS) method in accordance with the procedures set out, in the World Bank's Guidelines: Selection of Employment of

Consultant by World Bank Borrower.

Central Project Advisor National Project Implementation Unit,

3rd Floor, 301-302 Copia Corporate Suites

Jasola Vihar, New Delhi, PIN Code - 110025

Phone- 011 26941021

Page 3: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

3

II. Objective

The objective of the assignment is to conduct employer satisfaction survey to:

(a) Measure the level of employer satisfaction with students who graduated from TEQIP III institutes (list attached as Annexure-1) in academic years 2017-18 and 2018-19, and (b) evaluate any change in employer

satisfaction. The survey will also attempt to provide a comparison of how the satisfaction level of employers

varies between graduate engineers hired from TEQIP III versus non-TEQIP III institutes. Employers recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly

or through focused group discussions organized across the country. The key questions to be addressed include

1) What is the level of employer satisfaction with graduates from TEQIP III institutions recruited in 2017-18 and 2018-19?

2) Is there a change in the satisfaction level of employers with graduates from TEQIP III institutions

recruited in 2018-19 compared to graduates recruited in the past year? a. In which areas do employers note a change in satisfaction levels? (For example, technical

skills, interpersonal skills, higher-order thinking skills, and so on).

3) How does the satisfaction level of employers vary between graduates from TEQIP III versus non-TEQIP III institutes?

III. Scope of work

Under this assignment, the primary role of the Service Provider will be to conduct an employer satisfaction

survey with the following scope of work:

1. To finalize the survey design embracing critical areas such as sampling methods, sample size and

accuracy.

2. To design appropriate questionnaire/ preparation of survey tool, using as a basis, previous survey tool developed under the TEQIP-II project.

3. To conduct the survey using multiple relevant modalities appropriate for the current COVID-19

situation, ensuring high quantitative and qualitative response rate from the sample selected and avail

copies of survey tools & questionnaire including design of focused group, sampling strategy etc. to the CPA for further review and approval.

4. Compilation and tabulation of raw data from the survey. The Service Provider shall be responsible

for ensuring data consistency and validity. 5. Summarize/interpret the survey results, including the description of survey procedures and sampling

method, summary tables, data tables, discussion of the survey results, challenges, recommendations,

lessons learned, and so on.

6. Conduct presentations, as appropriate to the relevant stakeholders. 7. Furnish final report (along with all raw data) from the survey incorporating comments of relevant

stakeholders.

IV. Important mentions

1. Design of sampling strategy and sample size:

The sample will be drawn from a list of employers who participated in recruitment drives in TEQIP – III

institutes in the academic years 2017-18 and 2018-19*; including those who participated but did not recruit any students.

● A stratified sampling method should be preferred accordingly, taking into account different

parameters including size of the company, sector, state, job profile etc.

● The database of the employers will be provided to the Service Provider by the NPIU.

*There may be the scope of adding one more round of the survey (on a pro-rata basis) for the

academic year 2019-20 (in addition to the proposed round covering academic years 2017-18 and 2018-19) -.

Page 4: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

4

2. Finalizing the survey tool: ● All the survey instruments/forms/questionnaire will be prepared and finalized jointly by NPIU and

the Service Provider.

● The Service Provider will conduct a pilot, provide a brief report to NPIU and revise instruments, if

necessary

3. Collecting Data

● Rapid response survey techniques will be used for data collection given the duration of the assignment and considering constraints imposed by the COVID-19 pandemic. Data collection will require

interviews of HR managers/recruiters/reporting managers who participated in the recruitment drives

in TEQIP-III institutes for the academic years 2017-18 and 2018-19.

● Interviews will be conducted directly and or through focus group discussions (around 4-5 FGDs). The number of participants and locations will be determined in consultation with NPIU.

● All relevant data required by NPIU will be shared by service provider and kept confidential

4. Analyzing the Data

● The Service Provider will analyze the data in consultation with NPIU, write the report and present

findings.

V: Duration of the assignment

The assignment will include surveying satisfaction of employers with 2 cohorts of TEQIP III graduates:

● The survey will be conducted after signing the contract and will cover students who graduated and were placed in the academic years 2017-18 and 2018-19.

● The change in the level of employer satisfaction will be measured by comparing employer feedback

on the 2 cohorts mentioned above. ● Survey will be completed within 2.5 months for both cohorts of students.

Sub-Activities of Survey

No. Sub-Activity Deliverables Timeline Total Time

1 Signing of Contract Submission of an inception report

detailing the research design

(including data collection

methods, sampling method, survey tool and data analysis

plan)

Within 1 week of

signing of Contract.

10 weeks

from award

of contract

2 Pilot survey Brief report to NPIU Within 2 weeks of

signing the contract

3 Survey: Employer Interviews,

Focused Group Discussion

and Collecting Data for survey

Status of work Within 6 weeks of

signing the contract

4 Data Entry and Report

Writing

Within 7 weeks of

signing the contract

5 Draft Report Within 8 weeks of

signing the contract

6 Final Report Submission Within 9 weeks of

signing the contract

7 Relevant Data Sharing with

NPIU

Within 10 weeks of

signing the contract

VI. Deliverables:

● Upon signing of the said contract, submission of an inception report detailing the survey design

(including data collection methods, sampling method, and data collection tools and data analysis plan)

in close consultation with NPIU. ● A draft report on the findings from the survey in English language.

● Submission/ presentation the findings based on the draft report..

● A final report of the said survey need to be submitted in soft copy as well as hard copy.

● Submission of all relevant data of the survey in SPSS/Stata/Excel format.

Page 5: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

5

VII. Implementation

The Service Provider will report to the Central Project Advisor (CPA), NPIU for TEQIP-III. The

NPIU will provide the available employer data set to the selected service provider. However, rest

of the required data needs to be arranged by the selected service provider.

VIII. Payment Schedule (indicative)

Terms of Payment Percent (tentative)

Contract signing NIL

At the time of submission of Inception report 10%

Submission of final report of survey 60%

Relevant Data submission 30%

IX. Minimum Eligibility Criteria

A Service Provider should provide Name, Address, Telephone, Facsimile and email id etc. of the consulting firm as per the format attached in Annexure-III and should have the following Minimum Eligibility Criteria:

Sl# Criteria Document to be submitted

EC1 The Service Provider must be registered in India under

Companies Act 1956 or statutory body and must be in

operations for at least Five (5) years as on date of tender document.

Copy of Certificate of Incorporation

for firms, or certificate of recognition

for institution of higher education issued by competent authority

EC2 The Service Provider should have at least 3 similar

assignment experience and track records of conducting similar surveys with different organizations, public and

private agencies, employers’ associations etc out of which at

least two should be in government or reputed educational

organization

The documentary evidence in form

of work contract/completion letter must be enclosed.

EC3 The Service provider should have past experience in

conducting Focus Group Discussions.

The documentary evidence in form

of work contract/completion letter

must be enclosed.

EC4 A capacity statement on available IT equipment for

conducting such surveys

A declaration on the company letter

head duly signed by the Authorized

Signatory

EC5 The service provider should have sufficient number (at least

6) of professional researchers as mentioned in Annex-2 to

conduct the assignment in the enlisted institutes

Proof of availability of key

professionals (refer Annexure-2)

EC6 The Service provider should have average annual turnover of more than Rs. 05 (five) Crore in India during the last

three successive audited Financial Years.

a.

The balance sheet/audited report from

chartered accountant for the last three

financial years should be submitted.

EC7 Service Provider should have a Net Positive Worth Duly certified and signed statement

by the authorized CA should be

enclosed indicating that the firm is having positive net worth

EC8 The Service Provider must have valid GST, Service Tax

Registration and PAN number allotted by the respective

authorities.

Copies of all the relevant certificates

should be enclosed.

EC9 The Service Provider should not be involved in any

Bankruptcy filing or for protection from it.

Undertaking from the Bidder should

be enclosed

Page 6: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

6

Annexure – I

List of TEQIP-III institutions

Sr. No.

State Institute

Sub-

Compo

nent

1 Andaman &

Nicobar Islands Dr. B.R. Ambedkar Institute of Technology, Pahargaon, Port Blair 1.1

2 Andhra Pradesh A U College of Engg, Visakhapatnam, Andhra Pradesh 1.3

3 Andhra Pradesh JNTU College of Engineering, Anantpur, Andhra Pradesh 1.3

4 Andhra Pradesh JNTU College of Engineering, Kakinada, Andhra Pradesh 1.3

5 Andhra Pradesh SVU College of Engineering, Tirupati, Andhra Pradesh 1.3

6 Arunachal Pradesh

(CFTI) NIT Arunachal Pradesh 1.1

7 Assam Assam Engineering College, Kamrup 1.1

8 Assam Bineswar Brahma Engineering College, Kokrajhar 1.1

9 Assam Dibrugarh University Institute of Engineering & Technology, Dibrugarh

1.1

10 Assam Guwahati University Institute of Science & Technology, Assam 1.1

11 Assam Jorhat Engineering College, Jorhat 1.1

12 Assam Jorhat Institute of Science & Technology, Jorhat 1.1

13 Assam (CFTI) IIIT Guwahati 1.1

14 Assam (CFTI) NIT, Silchar 1.3

15 Bihar Bhagalpur College of Engineering, Bhagalpur 1.1

16 Bihar Darbhanga College of Engineering, Darbhanga 1.1

17 Bihar Gaya College of Engineering, Gaya, Sri Krishna Nagar 1.1

18 Bihar Lok Nayak Jay Prakash Institute of Technology, Chapra 1.1

19 Bihar Motihari College of Engineering, Motihari 1.1

20 Bihar Muzaffarpur Institute of Tech, Muzaffarpur 1.1

21 Bihar Nalanda College of Engineering, Chandi, Nalanda 1.1

22 Bihar (CFTI) NIT, Patna 1.3

23 Chhattisgarh Government Engineering College, Bilaspur 1.1

24 Chhattisgarh Govt Engineering College, Jagdalpur 1.1

25 Chhattisgarh Govt Engineering College, Raipur 1.1

26 Chhattisgarh Vishwavidyalaya Engineering College, Lakhanpur 1.1

27 Chhattisgarh

(CFTI) NIT Raipur 1.3

28 Delhi Delhi Technological University, NCT Delhi 1.3

29 Gujarat Birla Vishwakarma Mahavidyalaya, Vallabh Vidyanagar, Gujarat 1.3

30 Gujarat (CFTI) SVNIT, Surat 1.3

31 Haryana Faculty of Engineering & Technology, Deenbandhu Chhotu Ram

University of Science & Technology, Murthal, Haryana 1.3

Page 7: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

7

Sr.

No. State Institute

Sub-

Component

32 Haryana Faculty of Engineering & Technology, Guru Jambeshwar

University of Science & Technology, Hissar, Haryana 1.3

33 Haryana University Institute of Engineering and Technology (UIET),

Kurukshetra University, Kurukshetra, Haryana 1.3

34 Haryana YMCA Institute of Engineering, Faridabad, Haryana 1.3

35 Haryana Faculty of Science, Kurukshetra University 1.3

36 Haryana (CFTI) NIT Kurukshetra 1.3

37 Himachal Pradesh Atal Bihari Vajpai Govt Institute of Engineering & Technology,

Shimla 1.1

38 Himachal Pradesh Jawaharlal Nehru Govt. Engineering College, Sundernagar 1.1

39 Himachal Pradesh Rajiv Gandhi Government institute of Engineering & Technology,

Kangra 1.1

40 Jammu & Kashmir Faculty of Engineering, Shri Mata Vaishno Devi University, Katra 1.1

41 Jammu & Kashmir Govt. College of Engineering & Technology, Jammu 1.1

42 Jammu & Kashmir School of Engineering & Technology, Baba Ghulam Shah Badshah

University, Rajouri 1.1

43 Jammu & Kashmir School of Technology, Islamic University of Science & Technology, Pulwana

1.1

44 Jammu & Kashmir

(CFTI) NIT Srinagar 1.1

45 Jharkhand Birla Institute of Technology, Mesra Ranchi 1.1

46 Jharkhand BIT, Sindri 1.1

47 Jharkhand Chaibasa Engineering College, Chaibasa (formerly Techno India,

Chaibasa) 1.1

48 Jharkhand Dumka Engineering College, Dumka (formerly Techno India

Dumka) 1.1

49 Jharkhand Ramgarh Engineering College, Ramgarh (formerly Techno India

Ramgarh) 1.1

50 Jharkhand University College of Engineering and Technology (UCET),

Vinoba Bhabe University, Hazaribag 1.1

51 Jharkhand (CFTI) ISM Dhanbad 1.3

52 Jharkhand (CFTI) NIT Jamshedpur 1.3

53 Karnataka Basaveshwar Engineering College, Bagalkot, Karnataka 1.3

54 Karnataka BMS College of Engineering, Bangalore, Karnataka 1.3

55 Karnataka BVB College of Engineering & Technology, Hubli, Karnataka 1.3

56 Karnataka Dr. Ambedkar Institute of Technology, Bangalore, Karnataka 1.3

57 Karnataka H.K.E.S’s PDA College of Engineering, Gulbarga, Karnataka 1.3

58 Karnataka Malnad College of Engineering, Hassan, Karnataka 1.3

Page 8: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

8

Sr.

No. State Institute

Sub-

Component

59 Karnataka National Institute of Engineering, Mysore, Karnataka 1.3

60 Karnataka PES College of Engineering, Mandya, Karnataka 1.3

61 Karnataka Sri Jayachamarajendra College of Engineering, Mysore, Karnataka 1.3

62 Karnataka (CFTI) NIT Surathkal 1.3

63 Kerala School of Engineering, Cochin University of Science of

Technology, Cochin, Kerala 1.3

64 Kerala (CFTI) NIT Calicut 1.3

65 Madhya Pradesh Indira Gandhi Engineering College, Sagar 1.1

66 Madhya Pradesh Jabalpur Engineering College, Jabalpur 1.1

67 Madhya Pradesh Madhav Institute of Technology & Science, Gwalior 1.1

68 Madhya Pradesh Rewa Engineering College, Rewa 1.1

69 Madhya Pradesh Samrat Ashok Technological Institute, Engg. College, Vidisha 1.1

70 Madhya Pradesh Shri G S Institute of Technology & Science, Indore 1.1

71 Madhya Pradesh Ujjain Engineering College, Ujjain 1.1

72 Madhya Pradesh

(CFTI) MANIT Bhopal 1.3

73 Maharashtra BVB's Sardar Patel College of Engineering, Mumbai, Maharashtra 1.3

74 Maharashtra College of Engineering, Pune, Maharashtra 1.3

75 Maharashtra Department of Technology, Shivaji university, Kohlapur,

Maharashtra 1.3

76 Maharashtra Government College of Engineering, Jalgaon, Maharashtra 1.3

77 Maharashtra Government Engineering College, Aurangabad, Maharashtra 1.3

78 Maharashtra Govt College of Engineering, Karad, Maharashtra 1.3

79 Maharashtra Institute of Chemical Technology, Mumbai, Maharashtra 1.3

80 Maharashtra SGSS Nanded, Maharashtra 1.3

81 Maharashtra University Department of Chemical Technology, North Maharashtra University, Jalgaon, Maharashtra

1.3

82 Maharashtra VJTI, Matunga, Maharashtra 1.3

83 Maharashtra Walchand College of Engineering, Sangli, Maharashtra 1.3

84 Maharashtra

(CFTI) VNIT, Nagpur 1.3

85 Manipur Manipur Technical University, Imphal 1.1

86 Manipur (CFTI) IIIT Manipur 1.1

87 Manipur (CFTI) NIT Manipur 1.1

88 Meghalaya (CFTI) NIT Meghalaya 1.1

89 Mizoram (CFTI) NIT Mizoram 1.1

90 Nagaland (CFTI) NIT Nagaland 1.1

91 Odisha CET Bhubaneshwar 1.1

92 Odisha Government Engineering College, Kalahandi 1.1

93 Odisha Government Engineering College, Keonjhar 1.1

94 Odisha IGIT Sarang 1.1

95 Odisha PMEC Berhampur 1.1

96 Odisha VSSUT Burla 1.1

97 Odisha (CFTI) NIT Rourkela 1.3

Page 9: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

9

Sr.

No. State Institute

Sub-

Component

98 Punjab SLIET Longowal 1.3

99 Punjab Guru Nanak Dev Engineering College, Ludhiana 1.3

100 Punjab (CFTI) NIT Jalandhar 1.3

101 Rajasthan College of Engg & Technology, Udaipur 1.1

102 Rajasthan Govt Engg College, Ajmer 1.1

103 Rajasthan Govt Engg College, Bharatpur 1.1

104 Rajasthan Govt Engg College, Jhalawar 1.1

105 Rajasthan Govt Mahilla Engg College, Ajmer 1.1

106 Rajasthan Govt. College of Engg & Tech, Bikaner 1.1

107 Rajasthan Govt. Engineering College, Banswara 1.1

108 Rajasthan Govt. Engineering College, Bikaner 1.1

109 Rajasthan MBM Engg College, Jodhpur 1.1

110 Rajasthan MLV Textile & Engineering Colege, Bhilwara 1.1

111 Rajasthan University College of Engineering, RTU Kota 1.1

112 Rajasthan (CFTI) MNIT Jaipur 1.3

113 Sikkim (CFTI) NIT Sikkim 1.1

114 Tamil Nadu Alagappa Chettiar College of Engg & Tech, Karaikudi, Tamil

Nadu 1.3

115 Tamil Nadu CIT Coimbatore, Tamil Nadu 1.3

116 Tamil Nadu Government College of Engineering, Bargur, Tamil Nadu 1.3

117 Tamil Nadu Govt College of Engineering, Salem, Tamil Nadu 1.3

118 Tamil Nadu Govt College of Technology, Coimbatore, Tamil Nadu 1.3

119 Tamil Nadu PSG College of Technology, Coimbatore, Tamil Nadu 1.3

120 Tamil Nadu Thiagarajar College of Engineering, Madurai, Tamil Nadu 1.3

121 Tamil Nadu (CFTI) NIT Trichy 1.3

122 Telangana JNTU College of Engineering, Hyderabad, Telangana 1.3

123 Telangana JNTU Institute of Science & Technology, Hyderabad, Telangana 1.3

124 Telangana University College of Engineering, Osmania University,

Hyderabad, Telangana 1.3

125 Telangana (CFTI) NIT, Warangal 1.3

126 Tripura Tripura Institute of Technology, Narsingarh 1.1

127 Tripura (CFTI) NIT Agartala 1.1

128 UT-Chandigarh PEC University of Technology, Chandigarh 1.3

129 UT-Chandigarh University Institute of Chemical Engineering and Technology,

Punjab University, Chandigarh 1.3

130 UT-Chandigarh University Institute of Engineering and Technology, Punjab

University, Chandigarh 1.3

131 UT-Puducherry Pondicherry Engineering College, Puducherry 1.3

132 Uttar Pradesh Bundelkhand Institute of Engineering & Technology, Jhansi 1.1

133 Uttar Pradesh Dayalbagh Educational Institute (Deemed University) Dayalbagh, Agra

1.1

134 Uttar Pradesh FET MJP Rohilakhand University, Bareilly 1.1

135 Uttar Pradesh Harcourt Butler Technical University (Formerly HBTI), Kanpur 1.1

Page 10: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

10

Sr. No.

State Institute

Sub-

Compo

nent

136 Uttar Pradesh Institute of Engineering & Technology, Bundelkhand University,

Kanpur Road, Jhansi 1.1

137 Uttar Pradesh Institute of Engineering & Technology, Dr B R Ambedkar

University, Khandari Agra 1.1

138 Uttar Pradesh Institute of Engineering & Technology, Dr. RML Awadh

University, Faizabad 1.1

139 Uttar Pradesh Institute of Engineering & Technology, Lucknow 1.1

140 Uttar Pradesh KNIT Sultanpur 1.1

141 Uttar Pradesh MMM University of Technology, Gorakhpur 1.1

142 Uttar Pradesh Rajakiya Engineering College, Azamgarh 1.1

143 Uttar Pradesh Rajkiya Engg College Ambedkar Nagar 1.1

144 Uttar Pradesh Rajkiya Engineering College Bijnor 1.1

145 Uttar Pradesh Rajkiya Engineering College, Banda 1.1

146 Uttar Pradesh Uma Nath Singh Institute of Engineering & Technology, VBS

Purvanchal University, Jaunpur 1.1

147 Uttar Pradesh Uttar Pradesh Textile Technology Institute, Kanpur 1.1

148 Uttar Pradesh

(CFTI) MNIT, Allahabad 1.3

149 Uttar Pradesh

(CFTI) ZHCET-AMU, Aligarh 1.3

150 Uttarakhand BKTI Dwarahat 1.1

151 Uttarakhand College of Technology Pantnagar 1.1

152 Uttarakhand GBPEC Pauri Garhwal 1.1

153 Uttarakhand Institute of Technology, Gopeshwar 1.1

154 Uttarakhand Seemant Engineering Institute, Pithoragarh 1.1

155 Uttarakhand THDC Engineering College, Tehri Garhwal 1.1

156 Uttarakhand Women Institute of Technology, Sudhowala, Dehradun 1.1

157 Uttarakhand

(CFTI) NIT Uttarakhand 1.1

158 West Bengal Dr Maulana Abul Kalam Azad University of Technology, West

Bengal, (formerly West Bengal University of Technology, Kolkata) 1.3

15 West Bengal Faculty of Engg & Tech - Jadavpur Univ, Jadavpur, West Bengal 1.3

160 West Bengal University College of Technology-Calcutta University, West

Bengal 1.3

161 West Bengal

(CFTI) IIEST, Shibpur 1.3

162 West Bengal

(CFTI) NIT Durgapur 1.3

Page 11: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

11

Annexure – II Assignments and Required Qualification/ Experience of the key

professionals

Designation Number Main Assignment Minimum qualification and

professional

experience required

Team Leader 1 Lead, manage and supervise the

work of the consultant team,

coordinate with NPIU/World Bank; design data collection

instruments, plan and execute

focus group discussion with help

of team, train team members, conduct data analysis and write

reports, provide debriefing on the

report and be ultimately responsible for the consultants’

deliverables and quality

assurance

● Post-graduate degree in

Economics, Statistics,

Management, Social Sciences or any other

relevant discipline

● Minimum 08 years of

research experience in areas related to education,

technical education/ skills

training, labour market or any other relevant field

● Strong experience in

conceptualizing, supervising and leading

studies/ surveys

● Excellent communication

and report writing skills in English

Researcher 1 Carry out research work, train and

supervise surveyors and data

entry staff, ensure quality of data collection and assist in analysis

and interpretation of data

● Post-graduate degree in

Education, Economics,

Statistics, Social Sciences, Engineering, Management

or any relevant discipline

● Minimum 05 years of research experience in

related field.

● Experience of designing surveys, data analysis and

supervising teams on data

collection

Surveyor/ Moderator

2 Carry out data collection and processing, focus group discussion

● Master’s degree in any relevant discipline

● Minimum 03 years of

experience in conducting

surveys and data collection

Research

Assistants/

Enumerators

2 Assist in carrying out research work,

data entry, data collection and report

writing

● Bachelor’s degree in any

relevant discipline

● Minimum 02 years of relevant experience in

assisting surveys and

research projects

Page 12: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

12

Annexure – III

FORMAT FOR SERVICE PROVIDER PROFILE

(On the letterhead of the applying entity)

SN

PARTICULAR

DETAILS

1. Name of the Consultancy Firm

2. Corporate/Registered office Address

3 Company Registration No. &

Date of Registration

4. PAN No

5. GST No

6. Authorized Contact Person

and Designation

7. Address for Communication

8. Landline No.

9. Mobile No.

10. Fax No.

11. E – Mail Address

12. Website Address

We hereby certify that-

A) All the statements made and information furnished in the application and the

enclosures are true and correct.

B) We also understand any misleading or wrong information will disqualify the

application straightaway.

Signature and Seal of Authorized Contact

Date:

Page 13: EMPLOYER SATISFACTION SURVEY · recruiting graduates from TEQIP III institutes in both focus and non-focus states, will be consulted directly or through focused group discussions

13

Annexure – IV

Compliance sheet – Eligibility Criteria

Sl# Criteria Documents to be submitted Compliance Sheet

(Yes/No) and Page

No.

EC1 The Service Provider should be registered

in India under Companies Act 1956 or

statutory body and must be in operations for at least Five (5) years as on date of tender

document.

Copy of Certificate of

Incorporation for firms, or

certificate of recognition for institution of higher

education issued by

competent authority

EC2 The Service Provider should have at least 3

similar assignment experience and track

records of conducting similar surveys with

different organizations, public and private agencies, employers’ associations etc out of

which at least two should be in government

or reputed educational organization

The documentary evidence

in form of work

contract/completion letter

must be enclosed.

EC3 The Service provider should have past

experience in conducting Focus Group

Discussions.

The documentary evidence

in form of work

contract/completion letter must be enclosed.

EC4 A capacity statement on available IT

equipment for conducting such surveys

A declaration on the

company letter head duly signed by the Authorized

Signatory

EC5 The service provider should have sufficient number (at least 6) of professional

researchers as mentioned in Annex-2 to

conduct the assignment in the enlisted

institutes

Proof of availability of key professionals (refer

Annexure-2)

EC6 The Service provider should have average annual turnover of more than Rs. 05 (five)

Crore in India during the last three

successive audited Financial Years.

b.

The balance sheet/audited

report from chartered

accountant for the last three financial years should be

submitted.

EC7 Service Provider should have a Net Positive

Worth

Duly certified and signed

statement by the authorized CA should be enclosed

indicating that the firm is

having positive net worth

EC8 The Service Provider must have valid GST, Service Tax Registration and PAN number

allotted by the respective authorities.

Copies of all the relevant certificates should be

enclosed.

EC9 The Service Provider should not be involved in any Bankruptcy filing or for

protection from it.

Undertaking from the Bidder should be enclosed