EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry Adapted Energy Management Standard Development EMSPI: Energy Management Standardization in the Printing Industry Luis Galiana – date: 07/04/2016 www.emspi.eu

EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry Adapted Energy Management

Standard Development

EMSPI: Energy Management Standardization in the Printing Industry

Luis Galiana – date: 07/04/2016

www.emspi.eu

Page 2: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION

Not ready Ready? (verify with

partners)

D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION

Not ready Ready? (verify with

partners)

D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready

D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready

D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material

Not ready Ready

D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION

Not ready Ready? (verify with

partners)

D4.1cExplanatory document on difference between Basic/Full=EMS Spec (extra deliverable)

Not ready Ready

Page 3: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

Before

One manual for both implementations.

Complete PDCA (Plan-Do-Check-Act)

After

Two versions: basic & full model.

Full model: Complete PDCA.

Basic model: PD

Page 4: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

Energy baseline diagnosis manual

6 pages document (to be delivered from FCO2 to

Dienstencentrum).

Information gathered from “PR_444_Energy baseline” and Annex

1 of Full Model Guidelines “Guideline for definition of simple

energy performance indicators”.

Page 5: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

Page 6: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION

Not ready Ready? (verify with

partners)

D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION

Not ready Ready? (verify with

partners)

Page 7: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION

Not ready Ready (verify with

partners)

D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION

Not ready Ready (verify with

partners)

D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready

D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready

Page 8: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION

Not ready Ready (verify with

partners)

D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION

Not ready Ready (verify with

partners)

D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready

D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready

D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material

Not ready Ready

D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION

Not ready Ready? (verify with

partners)

Page 9: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Coaching Materials

INDEX

1. Introduction to the EMSPI project.

2. Introduction to energy management.

a. Structure.

b. Deming Cycle.

3. Adaptation to graphic industry.

4. EnMS implementation.

a. Structure.

b. Basic Vs. Full Model.

c. Examples of registries / procedures.

d. List of measures.

5. Conclusion.

6. Discussion.

a. What have participants learnt?

b. How to start with energy management in your company?

c. Where to focus on the first place?

d. What has already been done in your company?

• 35 slides PPt document.

• To be adapted (if needed) per

Country and workshop.

Page 10: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Status of Deliverables

Del. DELIVERABLES / DESCRIPTION OF ACTIONS & RESULT(S) Madrid Prague

D4.1a Adapted standard manual’s requirements BASIC VERSION One for both versions (Manual)

Ready

D4.1b Adapted standard manual’s requirements FULL VERSION Ready

D4.2 Energy baseline diagnosis manual Not ready Ready

D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready

D4.3b EMS implementation manual (English) FULL VERSION Ready (Guidelines) Ready

D4.3a1EMS implementation manual (translation 5 languages) BASIC VERSION

Not ready Ready (verify with

partners)

D4.3b1EMS implementation manual (translation 5 languages) FULL VERSION

Not ready Ready (verify with

partners)

D4.4a EMS implementation spreadsheet BASIC VERSION Ready (registries) Ready

D4.4b EMS implementation spreadsheet FULL VERSION Ready (registries) Ready

D4.5Coaching materials for Energy Management implementation (English) BASIC & FULL VERSION - adjusted material

Not ready Ready

D4.5.1Coaching materials for Energy Management implementation (translation 5 languages) BASIC & FULL VERSION

Not ready Ready (verify with

partners)

D4.1cExplanatory document on difference between Basic/Full=EMS Spec (extra deliverable)

Not ready Ready

Page 11: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation

Basic Vs. Full Implementation

“Basic” version:

The basic implementation is specially focused in the

“PLAN” and “DO” phases of the Deming Cycle, which

include the energy planning, implementation and

operation tasks. These tasks are summarized in sections 2

and 3 of the Basic Version of the EnMS Manual

document.

The basic model do not cover the requirements of the

ISO 50001 standard, but can be used as a first step for

implementing the full model in the future.

“Full” version:

The full implementation covers all four phases of the Deming Cycle. These phases are specified in sections 2, 3, 4 and 5 of the

Full Version of the EnMS Manual document.

The full version includes procedures, which are used to describe in detail a specific and advanced task.

The full model covers the requirements of the ISO 50001 standard.

Page 12: EMSPI Meeting Prague, 7-8 April 2016 WP4 - Printing Industry … · 2016-04-11 · D4.3a EMS implementation manual (English) BASIC VERSION Ready (Guidelines) Ready D4.3b EMS implementation