20
SHELTER UNITS for RAPID INSTALLATION SURI SURICATTA SYSTEMS by

[en] SURI. Shelter Unit For Rapid Installation

Embed Size (px)

DESCRIPTION

SURI is a transitional shelter for emergency shelter. It is a project developed by the R&D department at Urbana de Exteriores. A company with important expertise repairing and renovating damaged buildings in Spain. It is designed to enable its transformation over time, refillable, breathable, versatile, flexible and can be easily removed, allowing reuse or processing local materials throughout its 10 years life.

Citation preview

Page 1: [en] SURI. Shelter Unit For Rapid Installation

SHELTER UNITS for RAPID INSTALLATION

S U R I

SURICATTAS Y S T E M S

by

Page 2: [en] SURI. Shelter Unit For Rapid Installation

Patent PCT pending

SURI is a supported project by CDTI Center for Technological Industrial Development. Ministery of Science and Technology. Goverment of Spain.

Page 3: [en] SURI. Shelter Unit For Rapid Installation

Suricatta Systems is a business project that emerged from

Urbana IDR company, which was created during the reconstruction of

several buildings after the earthquake in Lorca (Spain) in 2011, using

the experiences lived by our volunteer teams who were in Haiti and

the expertise of our staff in peacekeeping missions, the project has

developed and expanded.

In Lorca we had the opportunity to check, in-situ, the harsh living

conditions in which the victims found themselves, together with the

difficult working conditions that the people helping them had to face.

The initial contact with specialized UN agencies and NGOs involved,

made us realize that this was an area for great development. These and

other similar situations were being experienced every day in many parts

of the world, and millions of people are still being affected.

Our experience in the construction field as well as our corporate

philosophy to provide solutions, led us to work on the design of a product

which seeks to improve the living / working conditions of all those people

involved.

For the last three years a multidisciplinary team has been working to try

to resolve the problem and now the product is already tangible.

We offer a modulating construction system that could solve many of the

problems that are faced in conflictive areas and this has made us aware

of the range of needs that still need to be addressed.

SURICATTA SYSTEMS

Page 4: [en] SURI. Shelter Unit For Rapid Installation

TRANSITIONAL SHELTERSURI (Shelter Unit for Rapid Installation) Designed for global solutions with immediate results.

100% RECYCLABLE AND SUSTAINABLEIt is based on “Cradle to Cradle design”, all materials are recyclable, reusable or biodegradable, making the unit environmentally friendly.

LIFE EXPECTANCY10 years, 100% UV protected.

INTEGRATIONThe unit integrates into the landscape and promote social activities.

ANTI-MOSQUITOThe walls are treated with a brand new product which is harmless to humans and provides protection against mosquito and other insects. This is essential to prevent serious diseases in the camps.

LOW COSTCompetitive price.S

LOGISTICSLightweight, resistant, easy to transport and assemble.

FLEXIBILITYEach unit can be joined from both directions, allowing clusters to be formed providing shelters of different dimensions to create any type of buildings within in camps.

LIVING / WORKING CONDITIONSHigrothermal comfort enhancement improving quality of life. Facades are breathable, waterproof and thermally and acoustically insulated. SURI offers solutions for extreme climates.

FILLABLE WALLSReduced transport costs and difficulties, SURI was designed to be re-fillable once in its destination to reinforce its stability and protection. Local materials such as earth, debris, sand etc...

NATURAL LIGHTING & SOLAR PANELSThe design has taken into consideration natural light regulated for optimum temperature and light intake within the shelter as well as providing sufficient energy for light and electricity.

RAINWATER COLLECTIONA water collection system has been designed to direct the rainwater to a tank. After passing through a filter it is converted into drinking water.

ACHIEVEMENTS

Page 5: [en] SURI. Shelter Unit For Rapid Installation

TOTAL LOAD : 11.000 CONTAINERS = 82.500 SHELTERS = 330.000 UNITS 330.000 UNITS = 33.000 TONES

TOTAL LOAD : 212 SHELTERS = 850 UNITS 850 UNITS = 85 TONES TRANSPORT TIME: 1 DAY

TOTAL LOAD : 15 SHELTERS = 60 UNITS 60 UNITS = 6 TONES

TOTAL LOAD: 1 UNIT 1 UNIT = 2 PACKS = 110 Kg (220 lb)

STRUTURE + WALLS = 40 Kg (88 lb) ◦ FLOOR + ROOF = 30 Kg ( 66 lb) ◦ FAÇADES = 30 Kg ( 66 lb)

2 PEOPLE

by CONTAINER 40” HIGH-CUBE (***)

by PLANE (**)

by CONTAINERSHIP (*)

* Emma Maersk** Antonov An-225*** Shelter measures:

2.67 x 2.94 x 5.20 m

TRANSPORT LOGISTICS

Page 6: [en] SURI. Shelter Unit For Rapid Installation

Outer wall(empty)

Lighting system

Security lock

Sockets for electricity and water supply

Solar panels

Base fixtures with adjustable height

Filled with earth, sand or debris

Outer wall(filled)

A SURI SHELTER MODEL

Page 7: [en] SURI. Shelter Unit For Rapid Installation

Rainwater tank

Filling the façade

Sockets

Solar panels

WATER COLLECTION

The roof can collect

rainwater and store it in tanks

for later use.

VENTILATIOINThe house has

ventilated air chambers to regulate the temperature

inside.

INERTIAIt seeks to achieve indoor comfort by incorporating local organic materials on site providing the enclosure with thermal inertia.

ASSEMBLEIt is connected by dry joints due to reduced weight of the elements meaning it can be carried by only two people.

MATERIALSThe choice of materials is based on three points: Recycling, reuse and composting.

LIGHTWEIGHTThe light weight of the materials reduces the energy consumption in transportation.

SOLAR LIGHTEnergy for

shelter is obtained

from natural resources such

as solar light.

Ecological concepts : biobased and Cradle to

Cradle design

Page 8: [en] SURI. Shelter Unit For Rapid Installation

265 cm / 8’ 8’’

267

cm /

8’ 9

’’

244

cm /

7’ 4

’’

294 cm / 9’ 8’’

270 cm / 8’ 10’’

4’ 3’’130 cm

10 cm

3.5 m2 / 7.8 m3

width

width

Only 2 people needed to assemble

130 cm

296 cm / 9’ 9’’

12 cm / 5’’

PACK CONTENT:- 2 structural frames- 2 folding walls- 2 multi-functional skirtings- 4 insulating textile walls- 1 roof- 8 floor fixtures- 1 universal tool to assemble

- 1 floor- 2 technical façade

Handles and wheels for easy transport

1

2

3

4

5

SURI UNIT PACKS

Page 9: [en] SURI. Shelter Unit For Rapid Installation

100 litersrainwater

tanksolar

panels

sink

mirror / window

Elevated and adjustable floor

fixture

9

8 10

7

6

ASSEMBLED BY ONLY 2 PEOPLE

Page 10: [en] SURI. Shelter Unit For Rapid Installation

HDPE (High Density Polyethylene) + PU (Polyerethane) frame

Plug

Led

TECHNICAL FRAME

The Structural Design Department at the Faculty of Civil Engineering, University of Alicante, has tested the unit in order to comply with European regulations.

100 kg/m2

200 kg/m2

vien

to: 1

00 k

g/m

2

MATERIAL TESTING

Page 11: [en] SURI. Shelter Unit For Rapid Installation

Refillable folding stretching

Local available materials

Insulation

Breathable and waterproof layers

Highly resistant velcro

> UV protected roof

Adjustable floor fixings

Cross section

> Gutter to collect rainwater

Page 12: [en] SURI. Shelter Unit For Rapid Installation

Highly resistant velcro

Units connected by only one universal tool

FLEXIBILITY

Page 13: [en] SURI. Shelter Unit For Rapid Installation

UNIT 1 person

SHELTER 4 units - 4 people

SHELTER 7 units - 7 people

PAVILLION/PATIO

COMMUNITIES

With SURI you can bui ld wherever and whatever

OFFICE/NURSERY

ORGANIC STRUCTURE

FIELD HOSPITAL

Page 14: [en] SURI. Shelter Unit For Rapid Installation

USES

HUMANITARIAN ACCOMMODATION

EMERGENCY

SANITARY

MILITARY

AGRICULTURAL AND FORESTRY

LEISSURE

EVENTS

RESTAURANT

TEMPORAL MARKET

HOUSING

GREENHOUSE

STORAGE

EDUCATIONAL

TEMPORARY ACCOMMODATION

OFFICES / LABORATORIES

Page 15: [en] SURI. Shelter Unit For Rapid Installation
Page 16: [en] SURI. Shelter Unit For Rapid Installation

Our experienced team is composed of the following companies,

professionals and organizations:

URBANA IDRWith expertise knowledge in renovating damaged buildings, highly skilled staff in peacekeeping missions and emergency areas. Urbana are the innovators of SURI.

AIMPLASCentre for Innovation and Technology (CIT). They provide solutions in all sectors related to plastics.

BARBARELA STUDIOFounded by architects now they are a multidisciplinary team in charge of the design of SURI.

UNIVERSITY OF ALICANTEProf. Salvador Ivorra. Head of the Structural division. Civil Engineering Department. Structural analysis and design. Mechanical material tests. Experimental campaign for the complete structural behaviour. GRESMES: Structural analysis research team and Structural Laboratory.

FAB LAB ALICANTEInnovation lab in singular prototypes, belonging to Alicante University and to “Fab Lab” network, created by MIT (Massachusetts Institute of Technology).

OUR TEAM

Page 17: [en] SURI. Shelter Unit For Rapid Installation

Our thanks to the following companies which are collaborating in the research

and development process of the first prototype 01 SURI:

MEDENTECHWater purifier

KOLMERInsecticide painting

TYVEK DUPONTWaterproof and breathable fabric

INCOM GROUPComposites

ISIGENERE RENOVABLESSolar energy

BERBETORESThermoplastic factory

ROTOTANKRotomolding factory

SattEco architecture

FABRICATION

Page 18: [en] SURI. Shelter Unit For Rapid Installation

PriceSURI is a competitive product with a wide range of options. Although it is a new concept we have used existing materials to produce an innovative new product, ensuring a more economical solution whilst improving quality.

AvailabilityFirst units will be available by summer 2014.

DurabilityAll the materials are treated with UV resistant technology and other additions for 10 years expected life.

WeightDesigned to be assembled by only 2 people using only one small tool, never carrying more than 50 Kg. at one time.

Resistance in extreme conditions: storms, floods, earthquakes, snowSURI has been developed under the Spanish Regulations and within the European Union framework and therefore fulfills all the expected construction aspects. In addition after filling the walls it forms a solid structure able to withstand the most of extreme conditions is achieved.

After sales-supportA 24/7 department will provide a complete after-sales service to the clients.

ConsultancyOur team can quickly provide the best solution for your needs. Don’t hesitate to ask for a free consultation.

Where is SURI made? Our first factory is based in the South of Spain.

Next achievementsWe are working with new materials and additives such as graphen, kevlar to enhance benefits (stronger structure or bullet proof walls).

FAQ

Page 19: [en] SURI. Shelter Unit For Rapid Installation

OUR TEAM

Pedro Saez BlayaSales Manager- Mob. +34 636 47 76 70- [email protected]

For further information please contact:- Tel. +34 965 131 364- [email protected]

Nathalie GidronProject director- Mob. +34 669 43 46 24- [email protected]

CONTACT

Page 20: [en] SURI. Shelter Unit For Rapid Installation

ALICANTEC/. Belando 22, Bajo03004 Alicante, SpainTel. +34 965 131 364

VALENCIAC/. Abejuela 5, Bajo46010 Valencia, SpainTel. +34 965 063 307

LONDON126 Wigmore StreetLONDON W1U 3RZ+44 (0) 7889 541 328

www.suricattasystems.com