2
PROJECT DESCRIPTION: The Encore affordable housing and mixed use community is being developed through a joint partnership of the Tampa Housing Authority and Bank of America Development. The central energy plant provides chilled water for cooling all current and future buildings on 12 lots zoned for over 2.6 Million square feet of residenƟal, retail, office, hotel, grocery, and school buildings. As the prime design‐build contractor, Trane provided Design, ConstrucƟon, OperaƟon and Maintenance, Energy Monitoring, Plant OpƟmizaƟon ,and Financial Management services. OWNER: Tampa Housing Authority Terrance Brady, Energy Manager (813) 341‐9101 Terrance.brady@thafl.com CEP CAPACITY: 2500 TONS EXPANSION CAPACITY: 2500 TONS EQUIPMENT AND SPECIFICATIONS: 5,400 SF chiller plant building 7,500 feet of underground piping Trane CVHF 1,000‐ton ice making centrifugal chiller Trane CVHF 1,000‐ton centrifugal chiller (51) Calmac ice storage tanks Marley 3‐cell cooling tower Well pump for make‐up water Condensate collecƟon system Trane Tracer SC Building AutomaƟon System OPERATION PERIOD: 2012—PRESENT Tampa Bay Trane has conƟnuously operated and main‐ tained the Encore CEP since start up in 2012. Encore Central Energy Plant Tampa, Florida

Encore Central Energy Plant - Tampa Bay Trane

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

PROJECT DESCRIPTION: 

The Encore affordable housing and mixed use community is being 

developed through a joint partnership of the Tampa Housing 

Authority and Bank of America Development.  The central energy 

plant provides chilled water for cooling all current and future 

buildings on 12 lots zoned for over 2.6 Million square feet of 

residen al, retail, office, hotel, grocery, and school buildings.  As 

the prime design‐build contractor, Trane provided Design, 

Construc on, Opera on and Maintenance, Energy Monitoring, 

Plant Op miza on ,and Financial Management services. 

OWNER: 

Tampa Housing Authority Terrance Brady, Energy Manager (813) 341‐[email protected]

CEP CAPACITY:    2500 TONS 

EXPANSION CAPACITY:  2500 TONS 

EQUIPMENT AND SPECIFICATIONS:  5,400 SF chiller plant building

7,500 feet of underground piping

Trane CVHF 1,000‐ton ice making centrifugal chiller

Trane CVHF 1,000‐ton centrifugal chiller

(51) Calmac ice storage tanks

Marley 3‐cell cooling tower

Well pump for make‐up water

Condensate collec on system

Trane Tracer SC Building Automa on System

OPERATION PERIOD:  2012—PRESENT 

Tampa Bay Trane has con nuously operated and main‐tained the Encore CEP since start up in 2012. 

Encore Central Energy Plant Tampa, Florida 

Encore Central Energy Plant Tampa, Florida