Encroachment of Nature, People and Livelihoods: A Case of the Abusive, Greedy and Failing

Amaravati Capital City Project (2014-2019)

Research: Tani AlexLayout: Ankit Agrawal

Published by:Centre for Financial AccountabilityNew Delhiwww.cenfa.org [email protected]

Cover Photo: Rahul Maganti/PARI

April 2019

Copyleft: Free to use any part of this document for non-commercial purpose, with acknowledgement of source.

For Private Circulation Only

3

Encroachment of Nature, People and Livelihoods:

A Case of the Abusive, Greedy and Failing Amaravati Capital City Project

(2014-2019)

4

Background of the Amaravati Project (2014-2017)

Prime Minister Narendra Modi laid the foundation of the Amaravati Capital City Project. Photo courtesy: AP Capital Region Development Authority

After bifurcation of the erstwhile Indian state of Andhra Pradesh in June 2014, both the new states of Telangana and Andhra

Pradesh are sharing the Hyderabad as capital for 10 years. In September 2014, N Chandrababu Naidu, the Chief Minister of Andhra Pradesh announced that a single capital would be built for the State.

Amaravati, the proposed capital city covers an area of 217. 23 sq. km with the seed capital in an area of 16.94 sq. km, while the entire capital region pans over a spread of 8352.69 sq.km across both Krishna and Guntur districts of the State of Andhra Pradesh. The city specifically is planned to be built in Guntur district on the banks of the Krishna River, which is hailed as the rice-bowl of the State with 120 multi-

crops irrigated on the floodplains. The area sited for the city presently has a population of 1.03 lakh while that of the entire capital region would be 5.8 million.

The following contraventions of this project are elicited, during 2014-2017, with regard to World Bank’s Operational Policies, in a concentrated effort to prevent forthcoming irreplaceable damages to peoples’ lives. World Bank’s Operational Policies framework have been employed here as AIIB has agreed that the Environmental and Social Safeguard Policies and related procedures of the World Bank will apply to this project; and that AIIB will rely on the World Bank’s determination as to whether compliance with those policies and procedures have been achieved under the project.

5

Summary of Violations

1. Violation of Bank’s OP/BP 4.01 – Environmental Assessment

2. Violation of Bank’s OP/BP 4.04 – Natural Habitats

3. Violation of OP/BP 4.11 – Physical Cultural Resources

4. Violation of OP/BP 4.12 - Involuntary Resettlement

5. Violation of OP/BP 4.36 - Forests

1. Violation of Bank’s OP/BP 4.01 – Environmental Assessment

1.1. After the introduction of the concept plan for a greenfield Capital City in June 2015, a detailed Environmental Impact Assessment (EIA) was executed by Tata Consulting Engineers Ltd (TCE) from May-August 2015 and Environment Mitigation Plan (EMP) was prepared. Construction activities of the interim Government complex were progressing at Velagapudi and a temporary secretariat is already established. The initial leveling and construction activities for the capital city had begun prior to the disclosure of EA report to the public. Without the project-affected communities comprehending the enormity of the project and their consequences, the EA report was processed and “considering that Article 19 of the Constitution entitles the citizen to know and since that right stands infringed in this case, the whole process of EIA and issuance of the EC stand vitiated.”1 Discrepancies in publishing the Environment Clearance (EC) report to the public and uploading it at APCRDA (Andhra Pradesh Capital Region Development Authority) website at the event of NGT petitions is misleading and accordingly, presenting false information for obtaining EC triggers action by way of revocation of the EC for the project.

1.2. It is claimed that both EIA and EMP underwent significant scrutiny by the State Environment Impact Assessment Authority and Amaravati Capital City project was accorded environmental clearance during October 2015.2 Yet there are reports of forgery,

1 Noted Indian environmentalist and NGT peti-tioner EAS Sharma, in a letter addressed to B. S. S. Prasad, Member Secretary (APPCB),& Ex-officio Member Secre-tary (SEIAA), Hyderabad2 World Bank (2017): Strategic Environmental and Social Assessment - Environmental and Social Management Framework (SESA-ESMF), February

and petitions have been submitted to the National Green Tribunal (NGT) stating that the EIA and EMP reports were tailored to suit the needs of the GoAP.3 Since SESA-ESMF is the “overarching framework” that regulates the environmental and social safeguards at both the project’s development and implementation stages, we are apprehensive that SESA-ESMF document prepared for Amaravati misinforms the project affected communities, consultants, civic bodies, NGOs, and allied concerned groups.

1.3. The project is rendered Category A status and it will usher in high risk adverse impacts on the natural environment of the earmarked areas of Guntur-Krishna districts, percolating to the surrounding habitats as well. It is believed that the Bank has merely assessed the extent of the nature of the risk and have not adequately provided “…for assessment of feasible investment, technical, and siting alternatives, including the “no action” alternative, potential impacts, feasibility of mitigating these impacts, their capital and recurrent costs, their suitability under local conditions, and their institutional, training and monitoring requirements associated with them”(OP/BP 4.01 A.4).4

1.4. The Shivaramakrishnan Committee, appointed by the State in 2014 for a new capital, after various consultations with numerous stakeholders across the thirteen districts of AP, came out with recommendations for least dislocation of the existing agricultural lands along Krishna-Guntur belt and also cautioned about diverting fertile farmlands with 120 multi-crops for developmental purposes (Report of the Expert Committee 2014).5 To the dismay of the agrarian communities, GoAP unnervingly rejected the propositions and sited one of the richest food-belts of India for erecting the new capital city, forfeiting national food security for infrastructure development. We also fear that once developmental activities progress, the project executing agency will not repeal the same. Subsequently, petition has been filed to the NGT for the protection of these fertile lands with a call for considering it immediately before 3 The Hindu: (2017) NGT hearings on Amara-vati over. Accessed from: http://www.thehindu.com/todays‐paper/tp‐national/tp‐andhrapradesh/ngt-hear-ings-on-amaravati-over/article18171374.ece4 World Bank (2005): Operational Policies ,The World Bank Operations Manual, March5 Report of the Expert Committee (2014): Report of the Expert Committee, Ministry of Home Affairs, Union of India to Study the Alternatives for a New Capital for the State of Andhra Pradesh.

6 7

X

X

X

X

X

X

Kolanukonda

Tulluru

Nowluru

Rayapudi

Penumaka

Nelapadu

Nekkallu

Mandadam

Ainavolu

Bethapudi

Undavalli

Tadepalli

Sakhamuru

Nidamarru

Kuragallu

Dondapadu

Borupalem

Yerrabalem

Velagapudi

Neerukonda

Malkapuram

Mangalagiri

Tallayapalem

Venkatapalem

Lingayapalem

Ananthavaram

Abbarajupalem

Pichikalapalem

Krishnayapalem

Modugalankapalem

Kondamarajupalem

Uddandarayunipalem

60 m

50 m

25 m

60 m

50 m

60 m

60 m

25 m

50 m

50 m

50 m

25 m

50 m

60 m

50 m

25 m

50 m

60 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

50 m

60 m

50 m

50 m

60 m

50 m

50 m

50 m

50 m

50 m

60 m

50 m

25 m

Naga Stupa

Undavalli Caves

Ananthavaram Temple

U2

P3

P1

P1

R1

P3

I3

P3

P2

P1

P2

P3

P3

P3

P2P1

R1

P3

P3

P1

P2

P3

P1

P3

P3

P1

P2

P2

P1

I3

S3

P3

P1

P3

I3

P1

I3

U1

P1

S3

P3

P2

P1

S3

P3

I3

P1

P3

R1

P1

I3

U1

P1

P3

S3

S2

P3

R1

S3

U1

P1

R1

I3

R1

S2

P1

P1

P2

P2

S3

I1

P3

I3

R3

R3

R3

P1

R3

P3

I2

R3

R3

P1

S3

R3

R3

P3

P1

R1

R3

R1

P2

P1

U1

R4

C2

S3

R1

R3

R3

S2

R1

R1

R3

P3

P1

P2R3

R3

S2

P1

P2

S2

R3

C2

P1

R3

R3

R3

C2

R1

S3

S3

R3

R3

S3

R3R3

U1

R3

R3

R3

R3

R3

R3

R3

R3

R3

C2

R3

P1

P1

R1

R3

R3

P2

R1

R1

I3

R1

C2

R3

R3

R3

C2

R3

R3

P1

R3

R3

R3

R3

P3

R3

C2

S3

C2

R1

R3

U1

R3

R3

R3

P1

C3

C2

R3

R4

R3

P1

S3

R3

R3

R3

R3

R3

P3

P3

P2

R3

R3

R3

R3

R3

R3

R3

R1

C5

P1

P3

R3R3

R3

R3

R3

S2

P3

P2

R3

R3

P3

S1

S3

R3

R3

R3

S1

R3

S3

C2

P3

R3

R3

R3 R3

R3

R3

R3

R3

R3

C2

R3

R3

P1

I1

R3

R3

C2

C2

C2

U1 R3

S3

P3

R3 R3

R3

R3

R3

R3

P2

R3

P1

P1

R3

C5

S2

R3

C2

R3

R3

R3

C2

R1

C4

R3

S1S1

S1S1

R3

R3

R3

R1

R1

R3

S2

R3

R3

R3 R3

S1 S1

R3

P2

R3

R3 R3

R3

S3

P3

R3

P1

C2

P3

S3

R3

R3

R3

R3

C5

P1

R3

R3

R3

R4

R3

R3

R3

C6

R3

I1

R3

P1

I1

R3

S3

P2

S2

R1

R3

R3

R3

R3

C2

S3

P1

R3

S1

P2

C1

R3

S3

S1

R3

R3

R3

R3

P3

R3

C2

R3

P3

S3

R3

C5

P2

C1

R3

I1

R3

C2

R3

S2

U1

R3

R1

R1

R3

C2

R3

C4

R3

R3

R3 R3

C2

P1

S2

R3

P1

P2

P1

R3

R3

R3

R3

R3

R3

C2

R1

C2

S3

R3

R3

R3

P3

R3

C2

R3

R3

R3

R3

R3

P1

R3

R3 R3

R3

P3

C2

R3

R3

R3

R3

R1

R3

S3

R3

C2

C2

R3

R3

R3

C1

R1

P2

R4

R3

R3

R3

R3

C2

R3

S3

R3

S1

C5

R1

R3

C2

R3

S3

R3

R3

R3

P1

R3

R3

R3

C1

S3

S3

R3

C6

P2

R4

P3

I1

P1

R3

P2

C2

R3

R3 R3

R3

C4

R3

R3

R3

P1

S2

C1

C4

P2

C2 C2

C2 C2

C2

C2

C2

P2

P2

S2

C2

I1

U1

C2

C2

C2

R3

R3

S3

R3

R3

P3

C2

R3

R3

R3

S3

R3

C1

R3

P3

P3

R3

R3

S2

S3

I1

R1

C2

R3

P1

C2

P2

C6

R3

C6

C5

S3

R3

R3R3

C4

P2

C2

P1

R1

C5R3

C1

R1

S3

S3

U1

P1

U1

S2

R3

R1

R2 R2

R3

R1

C4

C4

R3

P2

S2

R3

C2

P3

C1 C1

C2

P2

R3

R3

C2

R3

C1

P1

C1C1

R3

R1

P2

P1

C6

C2

P1

R2 R2

R3

C2

S2

R3

P2

C2

R3

S2

C4

S2

P1

P2

R3

R3

R3

C2

C1

S2

P1

R3

P1

P1

S2

S3

S2

C2

R3

S3

C2

R3

S3

P1

S3

C2

R3

C4

C4

C2C2

R3

C2

R3

R1

R1

P2

P2

P1

C2

C2

C2

P1

C5

S1

C2

R3

C2C4 C2C2 C4C4

C6

C6

R3R3

S3

R3

C2

C4

C2

P1

R3

R3

R3

R3

R3

S2

C4

P2

R3 R3

R3

U1

P2

R3

S2 C6

P1

P1R1

P1

P2

C1

R3

S2

R3

C2

S2

R3

C5

C2

C4C4

P1

S2

C4

R3C5

C6

R3

R3

R3

C4

C4

P1

S3

S2

R3

S2

R3

C2

C2

C4

R3

R3

S2

C4

C4

P1

S2

P2

S2

C1

C2

P3

R1

P2

C2

P1

P2

C4

P1

R3

C5

S2

P1

P1

P1

C4

C4

C4

C4C4

C4

C4

C2C2

C2

C2

C2

C2

R3

C2

R3

R3

R3

C4

C4

C4C4

C4

C4

C4

C5

C2

P1

C1

R3S2

P2

C2

S2

P2

R3

R3

R1

S2

C4

C2

C2

C2

C2

C2

C4

C2

C4

C4

C4

C4C4

C4

C2

C2

R3

C3

P1

S3

R3

R3

R3

P1

R3

P1

P2

R3

P1

R3

S3

C1

S1

S2

C2

S3

C4

R2 R3

S2

C2

R3

S2

S2

P1

C4

R3

S3

C5

C4

C2 S2

R3

S3

R3

C4

P2

U1

U1

S2

P1

C5

P1

C2

S3

S3

C2

S2

R1

C4

C1C1

C1

C3

S2

S2

C4 C4

P2

P1

U1

C4

P2

S2

S2

C2

R3

S2

P1

C4

C4

U1

C4C4

C4

R3R3

S2

S2

C4C2

R3

S2

S2

R1

C6

C4

C3

U1

C2

C4

S2

R3

S2

P1

C4

I2

P2

C4

S2

S2

P1

S2

P1

C1

C4

P2

S2

C4

S2

C2

P1

U1

R3

S2

S2

S2

S2

S2 S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2 S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S3

S2

R3

R3

S2

C3

C3 C3C2

S2

R3

S2

R2

P2

R3

C3

S2

S2

R3

C2C2

C3

S2

P3

S2

C6

P1

S2

C3

C3

C2

S2

C2

U1

S2

S2

S2

S2

S2

C3

P1

S2

R1

C3

P1

P3

C2

S2

C2

C4

C4

R3

C2

S2

C3

P1

C2

C3

C2

P1

C3

S2

R3

P1

C3

S2

S2

S2

S2

P1 C4

P1

S2

P1

C2

S2

C4

S2

S3C2

C3

S2

C3S2

C3

R3

C3

C3

P1

C3

C3

P1

C3C2

P1

P1

P1

P1

P1

P1

P1

P1

P1

C3

C3

C3

C2

C3

C2

C3

C2

C3

C3

C2

C2C3

C3

C3

C3

C2

C3

C3

C3

C3

C3

C3C2

C2

C3

C3C3

C2

C3

C3

C3

C3

C3

C3

P1

C3

P1

P1P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1 P1 P1

P1

P1

P1

P1

P1

P1 P1

P1

P1 P1 P1

P1

R3

C2

C3 C3

C3

C3

C3

C3

C3

C3

C3

C3

C2

C3

C3

C3

C3

C3

C3

C2

C2

C2

C2C2

C3

C3

C3

C3

C3

C3

C3C3

C3

C2

C2

C2

C3

C3

C3

C3

C3

C3

C3

C2C3

C2

C3C3

C3

C3

C3

C3

C2C2 C2C2

C2

C2

C2

C3

C2

C3 C3

C3

C3C3

C3

C3

C3

C2

C2

C3

C3

C3

C3

C3 C3

C3

C3

C3

C3

C3 C2

C3

C2

C3

C3

C2

C4 C4

C2

S3

C4

C2

P1

C3

C4

C4

P1

P3

P3

P3

R3

P1

P1

P3

P1

P1

S3

P1

P1

P1

P1

P3

U1

P1

P1

S3

P3

S3

P1

U1

P1P1

P3

S3

S3

P3

P1

P3

P1

P1

R3

P1

P1

P1

S3

P1

P3

S3

P1

S3

C3

R3

P1

P3

R3

P1

P3

P1

P1

P1

P1

P1P1

P3

P3

P3

P2

U1

C1

S3

P3

U1

P3

U1

P1

P1

P3

P1

P3

P1

P1

P1

C2

P3

P2

P3

R3

P1

P3

P3

P1P1

P1P1

S1 S1 P1

P1

P3

P1P1

P3

R3

C5

R1

P1

P1P1P1

P1

U1

S3

R3

P1

S3

P1

P1 P1

P1P1

P1

S3

S3

P1

P1

C2

P3

P1

S3

P1

C5

U1

P1

P3

S3

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P3

P1P1

P1

P1

S3

S2

S2

P1

R3

P1

R3

P2

P1

P1

P1

P1

P1

R1

P1

P1

S3

P1

P1

U1

P2

P3

P3

P3

P3

P1

R3

P1

P3

P1

P1

P1P3P3

P1P1

P1

S3

R1

R3

S2

U1

P1

C2

P1

P1

R3

P1

P1

P1

P1

R1

P3

P1

P1

U1

S3

P1

R3

P1

P1

S3

P3

P3

P3

P3

P1

P1

P3

C3

P1

R3

P1

P1

R1

P3

P1

P1

P1

P1

P1 P1

P1

P1

P1

P3

P3

P1

R3

S3

C3

C2

C1

P1

P1

R3

P1

P1

R3

P1

P1

S3

P1

C3

C4

P3

P1

P1

U1

U1

U1

P1P1

P1

P1

R3

P1

P1

P1

P1

C5

C3

C4

S3

R3

P1

P1

P1

P3

P2

P1

P1

P1

P1

P1

R3

U1

P1

P1

C4

P1

R3

P3

P1

P1

P1

C3

R4

P1

P1

R1

R1

P1

C2

P1

R3

P1

P1

R3

P1

R1

P1

R3

P1

P1P1

P1

R3

S3

S2

R3

P1

R1

P1

P1P1

P1

P1

P1

P1

R1

R1

P1

R1

P3

P1

P1

P1

P1

P1

P1

C3

P1

P1

R1

P1

P1

P1

P1

P1P1

C6

P3P2

P1

R3

C3C3

P1

P1

P1

P1

P1

P1

R1

P1

S3

P1

P1

R1

R1

P1

R1

P1

P1

P1

P3

R4

R1

P1

P1

P1

P1

C4

P1

R3

R1

P1

P1

P1P1

P1

S3

S3

R1

P1

C4

C3

C3

R1

P3

P1

R1

P1

P1

P1

P1

C2

R1

P2

P3

P1

P1

S2

P3

P1

P1

P1

P1

P1

P3

R3

P1

P1

C3

S3

C4

C3

P1

P1

P1

P1

P3

P3

P3

P3

P3

P3

P1

P1

R1

S3

C4

P1

R1

C3

C3

C4

P1

U1

C3

P1

P1

P1

P1C3

P1

C3

C3

P1

S3

S3

S3

P1

S3

S3

S3

S3 S3

S3

S3

S3

P1

P3

P3

C3

S3

S3S3

S2

S3

S3

P1

P1

C3

S3

P1

P1

S1

P1P1

P1

P1

C3

R1

C3

U1

P1

P1

P1

C3

P1

R3

P3

P1

P3

P1

P1

P1

P1

P1 P1

R1

C2

R3

R3

R1

P1

P1

C6

P1

R3

R1

U1

R1

P1

P1

P3

R1

P1

P3

P3

P3

R1

P1

P2

R3

R1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1 P1

R1

R1

P1P1

P1

P1

P1

P1

C6

P3

I2

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1 P1

P1

C3

R3

P1

P1

P1

P1

P1

P1

P1

P1 P1

R3

P1

P1

R3

P1

R3

P1

P2

R3

R1

P1

P1

R1P1

R1

P1

P1C3

R1

P1

P1

P3

P1

P1

P1

P1

P1

R1

P1

P3

R3

R1

S2

S2

S2

S2

S2

S2

S2

S2S2S2

S2

S2S2

S2 S2

S2S2

S2

S2

S2

S2

S2

S2 S2

S2S2 S2

S2

S2

S2

S2 S2

S2

S2S2

S2 S2S2S2S2

S2S2S2S2

S2S2S2S2

S2S2S2

S2S2S2

S2

S2

S2

S2

S2

S2

S2S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

R1

P1

P1

P1

S2

P3

P1

P3

P1

R1

P1

P1P1

R1

P1

R3

P1

S2

S2

S2S2

S2

S2

S2

P3

P1

R1

P1

P3

P1

P1

P1

P1

P1

P1

P1

P1

P1

R3

P1

P1P1

R3

P1

P3

S2

P1

R1

R1

R1

P3

S3

P3

R1

R3

P1

S2

R3

P1

S2

R1

P1

P1

P1 P1

P1

P1

P1

P3

S2

P1

R3

P1 P1

P1

P1

S2

P1

P1

P1 P1

P1

P3

S2

S2

S2

S2

S2

S2S2S2

S2

S2

S2

S2

S2

S2S2

S2

S2

S2

S2

S2

S2

S2S2

S2

S2

S2 S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2 S2 S2S2

S2

S2S2

S2

S2S2

S2

S2S2 S2

S2S2 S2

S2S2S2

S2S2S2S2S2S2S2S2 S2S2 S2 S2

S2 S2S2 S2S2S2 S2S2S2S2S2

S2 S2

S2

S2 S2S2S2S2

S2S2 S2S2

S2

S2

S2S2S2 S2

S2S2S2

S2 S2S2

S2S2 S2S2

S2S2S2 S2S2

S2S2

S2S2

S2

S2S2 S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2S2

S2

S2

S2

S2

S2

S2

S2

S2

S2

S2S2

S2 S2

S2

S2

S2

S2

S2S2

S2

P1

S2

S2

P3

S2

S2

R3

P1

P1

P1

S2

P1

P1

P1

P3

R1

P1

P1

P1

S2

P3

P1

S2

P1

P2

P1

P1

P1

C2

P3

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1 P1

P1

P1

P1

P1P1

P1

P1

P1

P1

P1

P1

R1

R3

P3

P1

P1

P1

P1

S2

S2

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1

P1P1

R1

R3

P1

S2

R1

P2

P1

P1

P1

P3

P1

P1

R3

P3

P1

P1

R1

P1

P3

P1

P1P1

R3

P1

R1

P1

R1

S3

P1

P1

R1

P1

P1 P1

P1

S2

P1

R3

P1

R1

P1

S2

P3

P1

P1

R1

P1

R1

R1

P1

R3

P1

R1

P1

P3

P1

R3

R1

R3

U2

R1

R3

R1

P1

R1

P3

R1

R3

R1

P1

P1

P1

R1

R1

P1

U2

P1

P1

P1

R1

P3

R3

P1

P3

R1

P1

P1

R1

R1

R1

P3

R1

R1

R1

R3

P1

P1

R1

P1

P1

R1

P1

R1

P1

R1

R1

P1 R1

R1

C6

S3

R1

P1

R1

R1

P1

P1

R1

P1

P1

P1

R3

R1

R3

P1

C1

R1

R1

R3

R1

R3

R1

R1

R1

P1

R1

R1

R1

R1

U2

R1

369

1

1

1

289

1 & 2

202/2

372

221

344

211/2

80

171

703

484

201

133

49

223

91

3

171

56

39

201

199

1/7

3

30

351

76

79

6

3

226

2

6

2

5

3

7

4

5

4

7

9

4

9

147/2

9

2

1

249

6

5

200

2

81

72

7

73

1

2

176

76

4

77

6

90

221

5

38

98

7

11

9

270

54

78

87

79

90

88

2

9

304

91

5

9

62

4

7

5

28

6

5

4

93

1/1

98

6

4

51

451

9

1/8

5

1/6

34

2

287

54

312

327

84

26

17

49

774

58

64

8

86

8

285

41

48

357

20

1/5

20

5

24

25

15

164

79

70

51

7

428

174

58

5

32

54

42

5

23

3

1/3

33

57

120

28

73

65

23

52

64

90

602

408

66

6

270

3

93

77

390

39

97

1

80

23

71

61

45

96

45

54

93

378

73

96

440

7

169

3

74

27

8

184

75

64

613

837

20

76

22

472

5

10

68

9

6

83

85

203210

77

56

52

7

73

42

8

8

243

210

99

94

22

92

25

71

433

63

77

45

4

9

59

159

4

92

22

266

7

360

59

7

39

61

223

125

91

86

260

19

24

92

85

204

19

10

90

78

36

21

71

4

10

255

90

47

75

40

9

23 65

16

30

81

59

23

43

93

95

95

74

42

133

32

35

267

104

12

37

43

86

43

703/1

431

68

465\1

5

60

136

19

58

59

31

13

95

764

24

317

21

38

11

29

8

1

93

78

3

485

189

192

140

98

14

95

54

93

185

450

66

65

38

200

69

39

77

82

63

78

8

55

105

46

106

16

84

47

123

29

97

149

74

29

7

39

53

38

611

106

21

65

353

398

83

55

81

52

58

75

97

135

9

8

461

18

298

65

9

55

2

83

121

57

309

70

44

251

97

43

48

98

14

42

26

145

160

80

224

27

152

71

80

55

61

97

420

43

17

35

67

8

85

17

62

33

66

118

81

1

2

111

456

60

350

14

33

424

58

147

441

391

14

63

60

65

279

427

44

22

120

99

274

577

336

47

71

476

28

78

70

44

256

9/2

439

53

34

15

163

68

118

449

27

576

72

804

84

112

399

4

40

437

266

118

241

253

204

8

17

59

75

22

27

99

16

264

217

147

174

76

430

40

115

147/1

390

122

92

39

87

448

63

6

92

9

16

88

496

74

35

1/3

38

82

99

783

143

83

71

69

470

237

83

287

54

153

13

7

96

74

93

65

38

5 1

33

174

61

50

77

94

141

92

164

202

20

96

58

49

102

26

23

42

324

300

313

85

115

86

30

82

10

189

58

39

85

346

40

233

36

41

249

10

177

57

1/2

9/1

37

197

65

15

42

107

34

9430

384

164

105

92

2

63

29

183

53

164

366

67

293

6

67

8

59

60

19258

19

143

242

42

415

52

68

116

80

248

89

2

91

225

74

79

145

95

140

291

257

268

11

299

69

98

66

44

134

186

285

351

329

46

64

307

3

799

452

507

12

19

56

238

18

15

38

43

27651

15

36

101

44

272

27

8

145

122

284

81

329

91

53

108

303

7

147

51

428

67

226

40

122

194

73

49

36

71

87

48

222

167

77

2583

98

11

141

598

137

78

16

15

591

71

9

570

193

157

21448

62

80

433

223114

57

136

341

119

40

48

68

12

393

53

79

345

249

118

47

49

271

2

258

286

39

2

88

190

346

75

110

87

9

163

247

28

85

171

3

51

398

27

803

49

99

234

55

48

51

10

18

380

57

32

310

82

75

61

343

37

81

80

23631

381

37

119

81

96

51

69

266

225

86

291

240

281

301

660

433

508

436

59

52

349

40

63

123

29

134

41

98

478

126

289

791

240

39

17

177

83

261

57

766

358

432

30

59

30

90

509

270

18

117

334

39

273

234

2

438

248

417

268

476

614

22

58

98

337

20

74

496

180

20

31

4

137

353

186

281

253

54

222

96

54

60

292

61

338

33

204

91

448

73

111

23

266

4 73

87

67

210

124

235

47

45

324

179

268

108

6

122

261

515

88

78

356

19

87

234

33

405

414

420

90

150

95

238

6

19

562

232

36

337

84

38

58

71

242

357

154

19

69

69

38

57

4

516

185

46

284

169

96

18

89

402

5

12

172

76

12

45

20

269

517

98

25

326

59

74

43

57

10

362

176

18

301

22

128

38

62

70

308

265/7

19

50

31

63

350

66264

518

67

60

92

55

3

64

84

138

36

66

59

17

16

21

48

91

233

722

29

158

310

45

203

104

200

9

263

1/14

77

58

24

4492

26

435449

228

103

204

23

52

34

350

146

108

131

179

76

416

213

23

169

258

99

8

48

70

9

52

253

20

459

81

278

22

183

29

84

260

59

423

220

167

250

105

33

199

187

254

120

459

75

253

25

77

46

66

150

67

333

32

57

210

93

51

152

231

13

58

311

321

136

80

22

257

269

30

386

13

172

166

18

120

252

72

116

232

447

8

143

64

76

79

179

13

331

276

19

58

74

434

41

61

142

20

180

279

50

108

89

95

265

24

26

451

77

430

308

85

259

135

51

23

81

143

24

56

150

87

64

32

811

265

6

16

39

311

124

76

16

60

14

1

25

64

125

392

38

157

109

52

48

256

364

50

83

107

467

152

158

274

8

229

81

82

125

168

28

95

85

53

7

192

37

371

1/12

455

435

196

489

36

40

65

768

408

94

297

135

72

3

31

298

363

125

384

156

62

54

50

174

17

142

267

231

193

170

34

637

74

105

17

85

29

96

342

134

66

340

22

166

33

112

242

35

59

230

67

18 552

254

477

54

457

252

254

115

157

366

17

103

69

16

264

108

86

337

88

37

138

265

178

363

3

4

122

567

451

98

130

266/5

116

38

361

110

153

99

47

512

89

416

108

91

174

313

206

276

23

29

176

69

44

98

52

592

13

84

64

55

34

32

178

68

95

222

362

9

87

119

493

42

30

116

24

248

79

285

56

76

58

62

356

101

168

258

198

269

71

181

224

231

127

425

196

34

485

101

255

355

61

39

217

108

14

214

105

551

471

27

107

17

46

6078

66

574

299

70

482

76

181

6

61

58

241

15

127

669

144

111

51

146

3 30

265/2

153

51

92

50

440

76

333

115

15

14

268

160

340

199

418

206

63

302

62

322

366

486

126

44

16

64

89

104

480

195

45

402

22

166

184

52

26

202/B

95

189

727

75

154

74

18

327

322

376

277

29

193

79

273

372

11

87

5

36

38

202

28

117

63

32

134

78

31

354

74

88

150

43

68

360

65

141

72

149

195

102

111110

790

197

78

82

72

53

219

734

60

280

113

207

45

31

97

486

62

121

13

54

133

11

60

546

209

205

348

233

157

13

193

188

333

70

1047

36

333

227

351

254

50

176

211/1

73

114

244

118

245

37

205

129

268

156

117

78

211

10123

155

265/1

57

406

126

170

97

338

26

72

282

113

265/6

19

61

164

223

59

94

106

63

413

360

309

281

294

76

147

355

642

75

364

145

96

134

145

455

453

73

128

155

165

221

329

163

22

168

96

17

193

45

502

177

167

24

63

293

29

68

61

73

403

171

6

309

280

207

320

156126

66

76

41

68

131

183

47

233

87

479

190

81

139

233

237

486

156

47

119

62

176

44

101

28

338

244

284

335

217

97

116

452

498

268

176

227

12

213

26

166

216

131

139

223

53

408

75

52

633

16

89

32

73

107

157

493

8

21

19

71

219

593

306

369

129

270

352

86

110

46

77

18

56

175

88

499

318

60

4

228

81

358

55

342

156

90

800

184

56

269

326

24

295

263

60

12

105

206

103

117

641

205

50

72

10

65

60

549

69

599

277

154

252

216

274

57

68

149

12

210

54

143

132

199

73

269

806

201

134

225

191

60

481

158

116

59

153

277

185

73

814

134

151

230

460

144

359

143

114

407

339

281

23

52

248

318

164

177

288

76

483

41

338

277

20

279

110

86

225

33

356

169

212

260

60

263

54

52

371

195

141

226

489

330

22

311

200

343

446

159

142

179

769

56

119

13

273

207

387

140

170

151

43182

403

151

202

132

5

40

323

163

189

117

80

248

6

373

251

292

431

105

288

100

181

349

132

160

107

196

278

725

383

294

7

110

69

107

10

61 6

117

437

43

332

64

781

76

70

249

52

3

24

44

79

161

59

482

597

40

36

279

210

153

331

777

320

144

265/4

226

63

16

131

199

223

218

250

70

296

111

96

32

155

79

111

107

15

325

8

568

557

99

255

279

494

271

57

37

67

188

240

295

449

212

350

81

156

186

120

66

132

172

23

148

221

250250

6517

299

363

276

25

13

344/6

45

27/A

458

89

97

124

126

329

156

89

121

159

65

24

13

169

23

365

450

13

191

128

290

234

300

262

57

326

149

23

328

151

250

220

57

319 183

87

173

191

370

89

462

25

89

72

22

100

132

35

98

255

228

441

161

406

119

91

143

137

152

23

61

26

474

247

8 9

118

58

131

94

117

105

110

271

366

179

114

43

134

260

173

369

263

488

41

95

316

101

367

379

191

180

38

361

75

787

50

42

81

39

90

228

301

457

109

415

586

219

393

280

459

100

353

69

267

77

60

136

324

250

466

539

194

99

227

10235

267

375

208

246

321

270

462

123

195

115

359

216201

91

178

230

354

181

130

86

49

62

83

34

461

35

296

81

454

422

227

419

10

126

40

258

456

250

1/11

113

46

319

341

165

42

59

312

268

18

538

317

82

75

188

18

116

30

101

46

413

247

374

295

49

352

487

98

15

261

99

94

277

116

85

348

123

71

97

51

164

148

501

277

245

72

378

131

297

62

368

243

278

167

22

90

114

131

262

100

412

307

27

182

187

76

95

243

465

154

84

87

278

24

186

430

130

572

154

21

146

8

194

229

323

190

150

56

607

82

104

25

83

292

370

168

77

566

36

70

80

447

365

75

354

109

94 164

275

145

101

143

34

152

190

44

342

139

605

150

414

222

14

131

137

90

336

408

74

198

26

175

150

145

391

21

186

100

148

200

456

59

488

158/A

678

155

67

45

29

153

310

115

127

22 25

345

475

165

187

136

316

55

506

51

12

771

48

59

177

53

55265/3

119

145

70

57

175

483

154

265

443

35

37

15

106

15

179

345

270

483

18

131

248

291

234

184

6 6

278

325

172

100

148

129

16

251

179

128

30

28

299

321

79

56

330

228

305

153

77

323

171

446

103

321

396

162

154

249

336

561

28 11

364

219

100

111

34

200

56

91

346

40

230

73

185

228

341

158

210

202/A

111

657

33

385

237

73

173

211

24

148

136

58

16

253

49

445

86

508

244

254

53272

104

269

42

118

280

117

188

482

252

135

69

49

127

108

80

289

422

252

381

38

129

199

120

284

25

14

99

84

38

20

571

106

84

108

25

20/A

68

75

233

131

61

243

503

196

314

266

176

152

210

133

207

175361

1/1

139

168

491

240

253

117

231

303

162

60

277

83

162

359

166

192

11

1 18

119

140

148

313

275

140

311

278

328

411

415

97

24

23

109

434

242

385

129

360

387

419

164

608

238

80

335

275

125

184

27

28

20

279

86

87

11

184

227

788

341

129

41

221

51

54

272

323

110

46

167

443

798

24

328

226

20

92

315

158

48

152

159

81

156

147

79

82

291

453

13

17

224

115

42

146

109

12/A

363

249

283

139

355

180

596

115

70

126

652

241

17

181

786

146

347

26

460

68

331

284

243

392

185

14

161

12

300

236

31

463

41

348

47050

157

65

269

138

100

32

258

77

265

20

124

197

135

371

105

322

255

49

173

251

201

22

82

64

541

197

88

22

362

308

10

67

47

29 2

388

40

160

51

296

78

174

65

538

33

112

302

190

113

387

224

272

380

348

38

260

232

439

263

156

100

36

21

39

56

61

309

95

40

101

120

11

231

400

478

29

84

44

294

239

145

122

102

311

53

103

206

238

35

1/4

127

644

147

246

237

266/7

159

214

462

208

805

381

50

218

18

271

489

559

170

383

79

414

102

298

244

208

111

75

108

103

69

23

643

90

234

182

327

272

253

122

270

236

49

304

69

366

55

376

424

401

342

68

368

270

359

446

63

29

442

357

469

374

18

186

113

27

182

189

775

161

13

610 185

159

293

20

256

50

354

810

106

422

138

20

166

130

188

38

202

171

3 89

69

17

67

132

423

394

16

330

137

174

427

94

80

273

50

283

100

323

466\3

21

174

11

108

129

127

18

93

328

164

335

409

119

289

784

241

205

83

61

44

457

255

69

142

228

111

578

224

72

110

481

137

76

297

116169

454

160

135

796

130

82

262

390

188

304

282

90

223

68

81

352

156

313

51

89

159

308

195

339

80

257

456

361

429

347

289

320

102

49

482

411

235

447

10

356

127

160

534

269

74

228

498

412

302

104

283/B

75

266

152

36

169

43

103

432

174

329

315

382

161

419

107

353

221

428

105

533

779

312

121

40

413

217

310

114

221

143

79

662

73

505

18

317

32

121

83

311

211

346

617

469

10931

600

271

421

259

21

85

355

64

44

35

225

645

401

89

21

152

148

147

297

625 196

423

369

615

357

121

242

152

209

180

84

191

306

50

352

54

183

64

519

88

229

18

157

121

544

176

429

801

344

114

395

464

99

155

24

346

232

347/14

25

274

227

436

11

207

242

458

352

400

44

357

258

208

283

284

1/10

99

283/A

134

181

10

236

259

93

130

41

217

92

92

623

144

628

274

487

138

162

262

13

180

331

61

126

186

22

396

604

45

24

780

193

282

282

301

374

182

161

120

112

77

82

167

500

297

466

658

181

105

35

455

57

128/A

183

62

347/6

185

407

348

258449

270

131

427

268

373

484

155

363

40

48

265/8

112

196

476

235

647

67

347/3

315

117

222

465

362

17

334

11

10

256

267

202

111

167

10

225

184

78

622

38

93

158

192

66

265

182

133

106

111

91

204

8

261

320

267

17

161

195

259

435

466\1

554

60

492

63

240

78

14

316

283

177

121

515

115

71

634

42

218

172

170

397

175

238

266/A

693

296

464

23

146

269

48

276

176

453

371

383

77

130

280

448

163

56

95

325

367

10

359

789

267

655

128

515

66

265

378

138

216

161

92

167

48

405

2

108

192

58

85

154

135

198

674

266/2

425

123

24

472

162

513

30 6

311

317

175

444

45

355

59

305

180

249

359

410

73

126

14

82

130

104

32 157

100/A

75

266

255

347/1

153

101

76

62

160

395

238

268

177

438

364

400

212

268

121

78

165/A

294

125

279

382

100

129

429

102

321

49

100

266/8

15

124

293

278

10

140

216

590

423

102

210

418

424

152

47

132

419

326

262

71

150

205

629

132

234

12

186

71

813

344/4

517

109

386

465\4

543

133

106

525

154

234

475

192

181

197

438

303

161

30772

187

247

575

104

235

35

321

226

71

389

582

26/A

116

619

167

132

74

332

73

170

130

281

18/A

20

162

319

128

85

36

190

162

97

97

198

9 0/B

56

144

472

30

91/A

98

300

563

435

47

189

313

263

101

360

145

29

168

12

57

90/A

465

302

198

366

455

191

52

243

185

45

339

122

149

15

156

391

21

303

253

381

314

229

394

32

179

144

441

265

177

262

382

176

317

32

142

217

80

9

113

151

344

488

287

318

422

96

261

295

517

89

566

676

99

184

139

84

107

428

312

442

636

197

38

79

193

94

36

109

354

268

360

103

158

826

219

182

266/6

30

50

55

316

132

243

261

282

332

334

298

830

281

424

550

728

37

521

70

52

325267

47

684

63

263

23

450

473

300

357

131/A

563

220

103

224

370

168

163

201

490

45

110

10 0

250

130

163

365

294

340

50

229

304

230

571

70

124

271

51

103

825

222

356

84

108

133

41

27

468

564

125

543

229

82

31/A

180

410

237

263

63

206

102

242

476

565

195

1/2

172

506

107

150

245

59

443

247

16

375

52

198

193

507

398

820

246

466

229

240

330

183

296

427

64

34

290

327

159

211

123

333

473

257

822

670

125475

112

347/17

151

13

60

279

160

67

184

431

118

547

250

334

316

65

227

306

558

140

549

581

102

230

469

42

313

290

347

532

18

444

283

231

251

62

281

369

469

65

153

454

108

543

264

246

45

546

16

406

463

155

95

536

265/14

274

555

12 6

378

7

260

324

189

705

470

680

380

817

566

34

14

143

124

349

103

540

49

795

122

38

337

244

61

445432

286

576

510

184

632

278

214

320

528

127

508

155

156

245

575

62

183

433

161

29

110

544

166

556

542

280

107

284

314

280

460

556

247

564

117

256

104

229

260

459

123

522

573

28

568

507

135

136/B

618

567

46

690

137

281

539

274/C

167

473

101

18

471

41

569

740

567

277

370

103

553

511

557

436

166/B

248

548

47

304

439

347/2

310

530

306

133

203

558

259

164

117

226

27

580

217

138

265/5

276

526

114

34

217

104

235

509

503

257

102

445

39

294

3 70

285

823

289

565

504

345

37

401

26

155

246

276

284

570

191

242

577

112

204

202

332

373

254

549

216

104

370

100

62

137

819

322

328

109

116

49

256

277

224

467

262

490

91/B

178

417

190

144

62

371

118

34

47

376

175

97

541

205

235

293

262

524

314

544

574

818

271

444

232

572

666

106

194

67

651

379

282

33

816

103

252

284

449

28

497

92

210

255

49

491

114

232

292

487

109

173

21

542

685

15

107

113

345

45

255

351

128

237

231

741

134

491

104

113

394

504

313

463

297

160

500

526

304

298

492

252

71

209

150

280

172

247

302

393

285

254

441

246

489

203

315

39

695

232

492/1

31

824

319

261

351

557

439

266/4

121

337

192

67

325

687

440

319

269

207

536

298

466\5

127

286/B

113

37

355

286

66

202/1

288

91

239

302

52

468

206

145

365

542

631

376

171

552

244

478

279

177

201

213

129

93

311

124

499

125

185

172

264

188

307

133

141

421

157

184

284/A

28

61

750

126

547

110

286

201

404

211

27

82

209

88

279

138

318

706

170

300

88

304

275

503

411

27

756

175

462

124

377

471

118

133

131

172

242

31

232

253

578

815

142

465\2

300

309

281

139

525

531

283/C

203

755

134

287

190

18/C

307

377

362

148

457

46

458

574

92

529

373

33

226

546

304

450

271/A

473

162

193

201

113

450\1

528

264

342

520

377324

109

155

107

112

256

497

296/A

377

280

199

720

255

19

474

571

323

140

70

190

74

84

34

174

681

118

439

265

48

198

451

171

465\3

35

286/C

319

165

141

273

48

261

434

123

409

247

36

353

96

168

437

222

261

194

26

585

219

72

318

29

438

358

268/A

310

67

171

47

43

79

93

312

315

178

235

149

215

493

21

35

295

112

107

46

530290

198

287

195

213

459

500

28

759

170

50

197

206

144

29

55

94

438

738

187

216

162

14

296/B

26

668

202

471

258

102

259

223 4

290

232

45

724

114

56

129

739

7

63

53

44

345

51

138

50

56

1

65

95

138

9

793

1

10

148

26

27

151

364

1

225

79

11

49

215

41

263

104

24

1130

188

19

481

1

229

337

25

40

336

4664

40

53

55

54

13

3

49

55

792

194

124

163

50

1/15

100

204

635

5

248

116

24

244

19

30

404

240

99

103

43

130

265/11

3

244

257

287

1

103

134

62

147

703_1A

80

285

22

296

492

460

116

338

162

558

60109

34

173

85

17

88

407

91

115

102

340

172

178

57

110

78

521

142

224

28

274

37

298

181

32

12

290

43

545

211

163

148

261

246

33151

56

131

8

160

231

48

492

25

42

166

33

367

138

162

20/A

83

161

199

29

31

137

3

16

98

122

34

79

271

1

341

15

27

30

160

59

155

96

262

84

132

53

14

5

94

224

13

44

225

564

62

32

24

16

389

99

169

729

169

146

93

149

88

61

17

195

333

67

214

92

56

332

224

292

344

403

161

42

601

20

104

321

50

200

393

410

63

9

260

87

136

7

649

323

114

229

421

112

50

64

365

52

168

679

154

129

12

28

89

198

232

36

2

7

236

80

192

422

168127

445

227

314

52

140

287

72

152

86

6

196

14

129

34

442

356

157

477

101

218

94

490

54

163

120

197

2

15

149

14

230

136

220

343

443

233

108

107

171

375

58

31

82

344/2

21

391

94/B

220

239

288

278

347/15

327

24 5

219

27

259

103

43

149

97

158

163

16

99

16

116

199

48

270

609

44 135

239

251

200/1

606

120

552

47

219

306

114

36

26

27

180

37

236

148

175

127

17

165

159

580

430

12

317

194

147

52

170

74

105

379

238

4

106

37

59

44

654

72

444

472

388

160

103

68

163

550

56

409

50

308

39

25

209

155

25

115

31

315235

588

96

279

155

89

86

41

31

63

487

266/9

183

392

84

53

335

176

827

763

299

265/10

410

90

140

551

265

22

165

284

294

121

114

90

192

28

267/A

28

293

347

150

153214

275

68

251

43

475

278

395

79

40

500

477

11

399

267

416

179

255

274

95

447

260

387

572

3 2

426

105

4

140

166

246

671

412

150

92

106178

434

562

420

1

363

33

139

102

106

266/3

520

149

115

559

347

316

110

31

172

19

603

672

320

25

233

54

330

309

675

35

718

67

25

171

530

87

402

91

551

234

560

192

343

128

213

203

235

17

335

77

18

11

208

548

102

467

258

83

23

157

272

42

165

34

86

380

527

501

656

259

159

54

87

273

194 15

140

151

181

41

426

372253

72

138

563

184

25

620

56

64

445

60

110

518

248

550

127

85

266

386

292

112

150

114

606/1

119

62

97

534

110

384

21

43

238

322

136/A

102

78

70

388

659

764

73

273

173

73

446

498

169

88

403

42

27 6

301

648

49

461

84

295

29

95

33

230

307

152

456

237

216

289

105

458

373

151

72

170

218

440

434 71

116

235

569

269

266/13

118

5

18/A

258

52

334

306

331

32

498

148

109272

163

612

118

166/A

266/10

336

373

20/C

365

280

22

347/11

51

305

767

437

385

119

62

411

310

133

112

417

38

257

39

123

665

30

85

173

185/B

15

97

429

135

477

192

96

81

465\5

697

425

435

129

90

125

53

354

626

265/12

145

165/C

199

107

126

53

141

254

248

21

202

281

91

247

307

159

8

245

347/13

109

47

225

169

290

782

39

421

175

128

30

259

167

40

193

211

59

206

374

699

200

274/A

397

156

83/B

120

41

179

251

529

696

43

188

181

19

114

214

41

195

203

259

11

281

264

12

333

109

83/A

284

119

51

309

247

409

516

154

283

425

21

242

13

48

124

173

170

290

303

409

377

143

49

9

53

366

44

290

621

285

57

117

272

220

157

256

310

171

194

112

254

6

185/A

565

4

303

496

402

161

83

180

85

378

48

64

118

388

29

630

627

249

537

474

168

220

87

88

262

365

341

46

109

83

24

122

264

327

478

172

109

158

149

194

13

72

480

111

364

14

20

468

463

250

173

324

249

146

270

142

88

111

223

426

67

291

105

447

220

110

317

541

170

468

186

386

37

21 9

6

131

256

172

412

302

22

46

667

256/A

794

49

264

221

545

89

472

283

146

31

470

269

183

145

474

342

113

352

141

7

362

134

113

653

157

351

329

208

259

57

80

302

47

379

74

11

350

66

213

45

294

65

273

53

251

127

73

218

289

556

288

123

70

469

96

185

499

62

89

136

198

146

278

125

570

32

383

47

138

180

55

39

86

166

160

197

158

208

139

158

238

82

278

514

291

69

110

139

358

48

448

168

4

103

583

253

105

301

92

363

464

828

312

219

102

528

10

266/1

129

180

124

688

209

18/B

249

121173

682

457

282

77

37

367

49

221

46

52

282

188

37

509

360

28

153

186

2 1/B

355

375

49

114

374

388

107

178

42

369

236

677

153

124

230

40

106

86

236

61

17

159

217

770

38

50

79

196

264

46

278

404

47

131

319

25

123

291

235

111

146

137

464

121

140

189

266

218

554

403

2

137

205

383

83

367

275

55

112

176

361

257

105

514

535

292

133

68

117

109

125

45

159

181

148

166

94

87

111

526

135

85

117

178

207

210

132

116

270

121

115

47

548

163

146

451

266/11

77

147

146

479

381

88

307

47

196

28

9

325

108/B

137

233

117

703/2

521

24

2

273

193

69

347/12

245

157

101

453

226

86

276

40

331

99

105

154

93

228

255

145

36

212

296

53

26 6

58

310

368

275

34

44

128

1

15

155

5

808

829

821

135

279

182

125

238

247

108/A

664

80

122

128

187

49

123

99

28

70

340

203

174

158/B

76

110

410

275

180

48

239

184

171/2

35

73

44232

31

272

276

379

127

64

299

132

202

48

89

159

202

347/4

123

274

174

587

221

116

102

135

6

258

106

241

224

322

209

132

308

137

46

12/C

143

105

159

495

286/A

42

527

51

112

194

11

169

8

141

481

291

266

354

129

134

534

342

119

378

411

120

35

305

202

141

147

146

260

276

126

313

646

150

331

418

77

175

287

164

344

134

171/1

77

12

113

418

30

347

257

222

213

124

87

18 0

269

185

178

52

43

139

88

35

220

266

118

392

21

3

223

73

126

241

218

41

212

47

127

34

237

139

193_A

147

358

241

23

341

262

69

243

154

76

32

138

51

14

203

16

230

215

531

181

15

37

61

3

130

254

142

468

227

24

8

416

466\2

569

375

128

26

71

35

98

201

126

191

74

138

221

38

579

248

431

65

115

115

168

663

802

135

215

27

240

12

182

179

1

102

164

86

406

177

260

155

553

347/16

1

214

86

48

357

640

228

207

18

29

267

67

297

256

344/1

162

314

55

12

133

45

348

124

142

347/7

128

256

692

121

581

136

139

196

347/5

79

289

344/7

276

537

244

24

240

466\4

133 15

163

237

119

260

175

316

66

89

30

276

21

420

332

81

162

122

385

538

155

261

396

244

195

133

218

136

470

151

396

167

283/A

85

356

233

177

108

122

2

7

205

239

199

307

12

149

118

271

41

201/2

234

153

31

154

107

220

745

265/13

698

291

175

510

689

222

230

197

281

39

21/A

198

199

242

178

111

523

62

142

174

493

265

120

226

57

55

38

152

57

417

298

149

17

6

125

283

119

272

93

265

372

424

237

169

223

147

68

35

20

176

573

454

128/C

414

196

50

88

138

14

204

537

183

112

358

41

785

163

296

252

471

339

64

134133

707

50

372/9

326

43

532

1

415

286

1 29

141

496

257

165

454

624

72

30

382

161

809

331

215

217

691

336

16

211

661

458

347/10

178

154

71

111

132

106

69

437

1

194

27

88

283

351

226

343

223

241

190

143

124

277

34

129

40

148

168

807

58/A

200

14

367

198

338

441

368

288

455

73

72

81

18842

341

430

436

285

367

171

46

120

10

195

80

326

349

25

132

117

305

136

26

263

20

212

36

267

188

108

243

104

1/9

289

142

91

213

78

236

116

257

334

250

139

34

292

344/3

58

208

118

92

31 133

197

260

186

584

53

82

43

512

124

263

101

130

17

31

139

70

344/8

109

376

209

54

245

39

349

60

210

50

429

205

72

2 27

423

560

207

120

88

214

328

240

432

30

80

10

158

212

201

330

53

57

325

178

190

372/1

246

198

113

46

484

206 19

536

55

324

145

171

442

60

329

359

461

299

751

1

77

170

122

2

293

187

383

322

377

272

68

215

70

318

479

74

149

64

200

494

44

372/10

702

117

187

271

76

113

212

250

136

141

291

229

5

120

56

55

48

295

31

142

708

650

15

349

81

758

114

142

264

215

748

465

10

231

91

100/B

23

280

248

140

126

279

46

98

547

398

138

395

346

232

305

157

209

79

277

372

26/C

589

66

673

76

97

231

58/B

348

479

23

344

196

148

208

425

412

193

44

686

107

192

736

251

106

156

495

700

29

27

174

121

19

522

239

131

215

372/2

128/A

397

37

32

413

292

78

119

26

167

56

230

121

533

136

92

390

177

213

143

209

106

518

540

275/C

181

144

273

12

265/15

288

772

66

243

209

443

413

100

55

80

229

208

87

78

288

182

197

77

182

125

369 281

321

75

123

206

26

69

200

374

103

778

183

344/9

64

129

555

330

717

24

58

245

22

127

166

284

49

144

37

124

82

297

334

167

329

533

361

316

252

201/1

143

216

46

137

4

639

272

82

165

252

128

147

450

347/18

216

381

30

83

524

361

104

27

285

165/B

298

225

151

237

274

18

271/C

1

293

275

299

151

10

142

139

347/9

308

433

5

51

255

257

211

35

152

55

219

294

376

26/B

101

364

191

41

694

193

232

205

21

12/B

535

123

128/B

287

300

103

747

42

421

427

254

48

211

27

280

13

285

169

69

20/B

335

82

26

339

158

510

31

93

94

100

112

135

80

40

214

186

309

399

86

111

166

182

416

288

222

189

136

126

112

160

28

401

420

275

54

187

65

233

485

466

186

111

209

319

231

288

277

103

575

43

125

189

19

190

245

75

90

31

50

309

239

78

144

142

334

207

85

130

76

326

4

164

152

193

234

399

74

182

104

343

283

240

189

375

102

301

286

350

408

511

223

130

81

54

461

407

249

53

15

215

167

96

249

83

275/A

29

65

338

302

106

211

94

135

115

284

140

165

239

67

283

30

153

187

176

28

59

58

776

212

101

188

63

323

372/4

428

272

47

274

371

465\7

132

105

286

312

263

418

35

460

56

188

32

210

333

165

467

328

321

721

191

39

243

130225

79

576

67

78

30

128

372/3

126

555

64

480

130

102

6854

75

145

81

45

185

268/C

336

54

239

716

762

286

372/7

400

362

110

68

511

483

30

39

335

405

287

191

115

123

282

217

114

213

306

417

122

704

285

174

495

484 490

95

62

98

149

19

111

812

25

405

252

268/B

145

154

94

347/8

198

208

142

228

713

38

380

40

165

41

53

45

220

10

765

65

561

121

76

120

109

115

204

63

113

90

327

11

42

165

494

221

68

125

262

11

46

60

1/13

183

60

638

126

344/10

519

94

289

63

238

175

302

94

96

81

133

141

103

273

263

545

21

182

105

327

446

95

11

350

197

179

42

109

97

135

522

266/12

287

151

386

389

173

36

35

120

142

123

20/B

51

312

205

380

308

12

353

144

372

141

318

120/1

295

200

189

212

206

203

68

66

101

187

467

314

106

347

19

773

104

156

92

326

144

66

130

339

793/1

404

45

222

37

80

270

310

107

385

358

40

282

553

110

13

123

151

48

175

372/5

311

147

525

753

313

132

577

384

218

247

97

325

275

308

173

288

115

153

760

108

159

426

177

265

106

226

141

160

253

107

131/B

173

299

831

2

137

267

6

304

732

385

9

300

143

254

494

122

84

153

320

282

76

41

90

719

70

121

305

16

714

187

44

295

48

195

162

144

95

187

75

128/E

710

191

91

61

243

84

139

157

88

150

731

754

280

131

25

140

726

188

164

58

146

14

291

114

520

313

499

71

352

12

293

100

12

301

305

161

426

93

303

465

241

239

199

112

340

282/A

19

78

146

701

55

31/B

236

146

261

554

532

113

340

241

368

497

274

265/9

1

10184

28

328

485

28 6

513

119

337

179

290

137

251

301

128/D

204

4

268/B

169

109

22

74

51

96

245

372/8

171

505

128

683

20/C

346

283/B

17

170

106

182

158

222

394

137

452

241

274/B

99

535

130

495

214

78

286

32

338

177

337

165

113

112

71

241

339

501

384

512

173

8579

151

156

36

178

62

72

372/6

502

303

25

44

506

10829

345

312

18/B

101

529

137

264

89

480

170

733

289

390

28

319

39

20

5

37

539

14

524

39

349

432

43

304

14

523

406

527

26317

318

93

282/B

179

342

523

213

513

41

252

218

308261

216

3

277

282

237

42

149

531

735

314

491

124

125

578

190

797

238

183

84

440

42

212

94/A

33

41

737

150

133

579

305

264

285

283

271

723

212

227

90

16

148

559

212

573

12

135

147

108

251

206

83

253

344

452

8515

322

11

144

297

95

4

70

162

21956

104

560

168

296

88

54

312

61

582

368

33

303

239

8587

6

128/B

320

486

27/C

144

21

66

81

93

74

128

31

46

172

176

497

50333

45

66

397

33

382

215

246

132

303

119

711

256

87

47

344/5

187

79

51

125

379

33

353

61

203

227

322

436

41

37

75

5

127

15

36

133

236

158

266

36

108/1

505

89

91

273

287

228

259

9

86/1

27/B

75

Inner Ring Road

Vijayawada Bypass

Inner Ring Road

Inner Ring Road

Vijaya

wada B

ypas

s

Raynapadu

Vijayawada

Kolanukonda

Jupudi

Kotturu

Shabada

Tarapet

Nutakki

Prathuru

Mulapadu

Damuluru

Elaprolu

Kothapet

Badepuram

Chilukuru

Tadepalle

Vemavaram

Gollapudi

Vaddamanu

Karlapudi

Mothadaka

Gundimeda

Tadikonda

Mellempudi

Kondapalle

Malkapuram

Rayanapadu

Guntupalle

Pedaparimi

Ponnekallu

Ganiatukuru

Kilesapuram

Paidurupadu

Surayapalem

Sitanagaram

Vaddeswaram

Nidumukkala

Chinakakani

Kethanakonda

Kotikalapudi

Tummalapalem

Vykuntapuram

Ibrahimpatnam

Pedda Madduru

Kunchanapalle

Pedavadlapudi

Zami Machavaram

Vijayawada City

Mangalagiri (M)

Lachannagudipudi

Harischandrapuram

NH - 16

(5)

NH - 65 (9)

NH

- 30

(221

)

NH - 65 (9)

NH

- 65 (9)

SCALE: 1:30,000

TITLE :

Detailed Master Plan of Capital city-Amaravati

DATE

0 1 2 30.5KM

Assistant Planner Zonal Assistant Director 2

Zonal Assistant Director 3

(G. Nageswara Rao)

(Dr. N .Srikant, I.A.S)

(R. Ramakrishna Rao)

Zonal Assistant Director 1

Kurnool

Chitoor

KadapaAnantapur Nellore

Prakasam

Guntur Krishna

East Godavari

Visakhapatnam

Srikakulam

West Godavari

Vizianagaram

Krishna

Guntur

Prakasam

West Godavari

KEY MAP :

22 -02-2016

Planning Officer Director - Planning

Commissioner(V. Prasanna Venkatesh, I.A.S)

Additional Commissioner

Andhra Pradesh Capital Region Development Authority

Note:

1) R1 includes all the notified water bodies and they will continue to exist.

2) The Cadastral boundaries and numbers shall be read with revenue records.

3) Draft Detailed Master Plan of Capital city-Amaravati prepared by M/s Surbana Jurong Consultants Pte Ltd, Singapore

0

R3-Medium to high density zone

C6-Central business district zone

Legend

X Existing Railway StationsCapital City Planning BoundaryVillage Administrative BoundariesSurvey Parcels

@ Land markExisting Railway lineDownTown Road AlignmentProposed Bund AlignmentExisting Bund RoadRoad Network Outside Planning Boundary

Residential

R2-Low density zone

R4-High density zone

C1 -Mixed use zone

C2- General commercial zone

C3-Neighbourhood centre zone

C4-Town centre zone

C5-Regional centre zone

I1-Business park zone

I2-Logistics zone

I3-Non polluting industry zone

P1-Passive zone

P2-Active zone

P3-Protected zone

P3-Protected zone

S1-Government zone

S2-Education zone

S3-Special zone

U1-Reserve zone

U2- Road reserve zone

Commercial

Industrial

Open Space and Recreation

Institutional Facilities

Infrastructure Reserve

R1-Village planning zone

Detailed Master Plan of Amaravati. Source: Capital Region Development Authority, Governmet of Andhra Pradesh.

8

any developmental activities are already established there with irreversible consequences.6

1.5. The final Master plan which was introduced in February 2016 revealed the plans for deviating 13 islands (These are Lanka islands inhabited by around 500 Dalit families for more than 600 years, the displacement and marginalization issues of these families without return land is explained in the Section 4.2. of this complaint) for tourism and development purposes.7 They are also recognized as wetlands and falls under the agreement of Ramsar Convention. The Bank’s OP/BP 4.01 A.3 stipulates to “assess the adequacy of the applicable legal and institutional framework, including applicable international environmental agreements”, and henceforth warrants to ensure that the Bank will not co-finance such projects which supersedes such international agreements. Communities asserted that prohibitions are to be honoured in such cases of land reclamation, industrial development, permanent construction and any actions impacting the ecosystem of these islands.

1.6. Serious climatic shifts in the proposed Amaravati area is an advancing thought from the concerned environmental-conscious residents of the State and nationwide. This has been haphazardly scanned by the Bank infringing on its own clause OP/BP 4.01 A.2. A highly ambitious concrete city with structures of glass, steel, flyovers, transport connectivity systems as speculated in the Master Plan will enhance the growing climate crisis.

1.6.1 India has been identified as a water stress zone by the International Water Management Institute and the issue of water scarcity also affects the proposed capital area, if the floodplains of Krishna River are encroached upon for construction purposes without paying caution to the proper conservation and management of water. Floodplains are the last resort for pure unpolluted water for Indian cities.

1.6.2. Installing buildings on floodplains will increase the risk of irrevocable impairments. The State with its long coastal line is most vulnerable to cyclone and sea-level change. Though alternatives are

6 Original Application No. 171 of 2015, (M. A. No. 510 of 2015), Before the National Green Tribunal, Prin-cipal Bench, New Delhi, Pandalaneni Srimannarayan & Anr. Vs.State of Andhra Pradesh & Ors.7 Deccan Chronicle: (2017) Andhra Pradesh: Island farmers on warpath. Accessed from: https://www.dec-canchronicle.com/nation/current-affairs/070417/andhra-pradesh-island-farmers-on-warpath.html

mentioned by Bank (SESA-ESMF for Amaravati)8 for flood/storm water management including the raising of construction levels higher than the local historical flood levels, it is strongly inferred that destroying the natural absorption and discharge of Krishna floodplain will tremendously increase flash flooding, which will not be rectified by developing three more reservoirs, as mentioned in SESA-ESMF. Moreover, SESA-ESMF has given inadequate emphasis on the flood risks of Krishna floodplain, given the historical records of frequent floods there. Though GoAP has given written declaration to NGT regarding protection of floodplains, the Master Plan discloses that the SEED Capital will be built on 30 metre deep floodplain. The Master Plan has also shown that construction will happen between the Krishna bund and river, which is seen as impromptu encroachment of the river. The Bank needs to ascertain whether it has followed OP/BP 4.01 A.7 in including consultations on EA which are indeed multi-dimensional here, and if they are brought into the notice of GoAP. We are, in fact, presented with more arguable reasons that the Bank and the GoAP has not given least consideration for the protection of river ecology in the State. The proposal to elevate many thousand acres land for high-rise buildings to prevent floods from Krishna river and Kondaveeti Vagu have been challenged at the NGT, and the viability of this plan is a point of contention as explained by noted environmentalists of the country.9

1.6.3 The proposal to realign Krishna River bund is stated in the Master Plan, since Amaravati is celebrated as a Blue-Green Capital City, with a river frontage. This diversion is also purportedly suggested to provide ample public facility space against the 30 km stretch of waterfront. It is also defended by the GoAP that this realignment of Krishna River would be executed without compromising the flood protection or the course of the river.10 Only private owners of lands on either sides of the river and the bund will benefit from this scheme, by reclaiming more land between old and new bunds. The natural flow of the water will be disrupted resulting in grave danger,

8 World Bank (2017): Strategic Environmental and Social Assessment - Environmental and Social Manage-ment Framework (SESA-ESMF), February, pg. 549 Deccan Chronicle: (2016) NGT raises doubts about Amaravati. Accessed from: http://www.deccan-chronicle.com/nation/current-affairs/160916/ngt-rais-es-doubts-about-amaravati.html10 APCRDA (2016): Amaravati Project Ed. No.1, March

9

as examined by environmental experts. Several studies have reported the effects of global warming on Krishna River and it has been identified as one of the nation’s most affected river as a consequence of climate change. Kondaveeti Vagu is a catchment area for the heavy rainfalls. The flood water from this area passes through many tributaries and finally joins Krishna River after more than fifteen to thirty days. When the tributaries are disturbed, flow of flood water is restricted, leading to stagnation and crop destruction every year for the farmer. The capital city has been sited at this exact location. Details of flood mitigation in the capital city are not sufficiently mentioned in the Bank’s disclosure documents.

1.6.4. The State is categorized in the seismic zone Zone II and III and particularly the land slotted for Amaravati is in Zone III. It has been reported (Geological Survey of India) from seismic micro zonation here that earthquakes could result from the neotectonic faults located within 150 kms away from Amaravati.11 Despite the NGT stay order on the construction of activities, GoAP has vehemently proceeded with the establishing of a temporary capital secretariat at the proposed area. This is in utter disregard to the law and Constitution of India. We fail to comprehend why the Bank would proceed, in inconsistence with its own environmental policy (OP/BP 4.01 A.3), to finance this project in a vulnerable area prone to natural disasters.

2. Violation of Bank’s OP/BP 4.04 – Natural Habitats

The issues of altering river basins, wetlands and islands to ‘development sites’ mentioned in Section 1 of this document are in resonance with the deviation of the bank’s policy on natural habitats as well (OP/BP 4.04 B.2, B.3 and B.5). Opportunities for environmentally sustainable development are profoundly negligible in this project. In spite of repeated appeals from project affected communities and attentive environmental groups, the sub-components of the project are proceeding to build an artificial ‘greenfield’ capital by disrupting the natural ecology of the designated area rich with diverse bio-resources. Though the Bank’s policy on Forests will be analysed against the GoAP’s current submission to Ministry of Environment, Forests and Climatic Change in Section

11 Report of the Expert Committee (2014): Report of the Expert Committee, Ministry of Home Affairs, Union of India to Study the Alternatives for a New Capital for the State of Andhra Pradesh.

5 of this document, it is imperative to mention here that uprooting natural forests to install bio parks is incongruous, and will fail to preserve the native flora and fauna. In the Master Plan, it has been outlined that 252 ha of land in Tadepalli Reserve Forest is under consideration for possible conversion to construction site, and it is awaiting clearance from MoEFFC. Recent media articles expose that in fact 12,444.89 ha of Kondapalli Reserve Forests is under similar consideration for conversion, and in May 2017 the Forest Advisory Committee (FAC) has recommended the Expert Committee to examine the Master Plan in order to proceed further with their review of the submission by GoAP.12 We want the Bank to reflect and specify if this violation of OP/BP 4.04 B.2 warrants your definitive statement regarding the mentioned devious strategy of GoAP to acquire uninhabited forest land for easy conversion. It is nonetheless daunting to find that the Bank has mentioned there are no critical natural habitats in Amaravati capital city area.13

3. Violation of OP/BP 4.11 – Physical Cultural Resources

In the Master Plan, many existing heritage sites are planned to be maintained per se “to respect and support the rich cultural and religious heritage of the city”. Amaravati Temple and Buddha statue, Ananthavaram Temple, Neerukonda Hill, Kondapalli Fort, Undavalli Caves, Mangalagiri Temple and Kanakadurga Temple are the key destinations planned within the religious tourism circuit of the city.14 It has been further mentioned that this circuit will be connected through waterfronts and eco-tourism islands, via Bhavani Island and Undavalli Caves. Though OP/BP 4.11 mentions the Bank’s stipulation to “avoid structures/natural features and landscapes having archaeological (prehistoric), paleontological, historical, religious and unique natural values”, proper ascertainment has not been provided by both the GoAP’s Master Plan and the Bank whether the ancient sites will be altered to conform to the demands of the aggressive project design, especially pertaining to the Undavalli caves and Rock-Cut Temple which falls well within Amaravati capital city.

12 EPW (2017): Amaravati Threatens to March on Kondapalli, Economic and Political Weekly, 24 June13 World Bank (2017): Strategic Environmental and Social Assessment - Environmental and Social Manage-ment Framework (SESA-ESMF), February, pg. 5414 Amaravati Master Plan, Chapter 10, pg. 155

10

4. Violation of OP/BP 4.12 - Involuntary Resettlement

It is made aware through media at large that Amaravati Capital City Area development and construction activities will span over a period of 35-40 years involving various diverse sub-projects. Deliberating on the Bank’s SESA-ESMF and Resettlement Policy Framework documents15 notified in your website, a few questions arise:

• Has the SIA been finalized through detailed field supervision?• Other than the regular guidelines and fleeting promises regarding resettlement, has the Bank given due diligence to this colossal risky project with Category A status?• What are the measures sought by the Bank to address the evident gaps in SIA, and are the hidden risks contemplated of, and if so would they be disclosed to the project-affected communities?• What is the extent of democratic consultation and participation while designing SESA-ESMF? Do they really resonate with the directives given in the Bank’s own documents?16

The grave indiscretions directed at communities are emphasized here with specific reference to land acquisition, displacement of families and communities, loss of livelihoods, lack of attention on vulnerable groups and cultural displacement.

4.1. “The Government notified an extent of 8352.69 Sq.Kms as Andhra Pradesh Capital Region (CR) vide G.O.Ms.Nos. 253 & 207, dt. 30-12-2014 & 22-09-2015 which is meant for development under the provisions of APCRDA Act, 2014. The Capital Region includes 953 villages, 12 urban local bodies (2 Corporations, 2-Town areas, 8-Municipalities) of 26 Mandals in Guntur District and 30 Mandals in Krishna District. The Government notified an extent of 217.23 Sq.Kms as Andhra Pradesh Capital City Area (CA) vide G.O.Ms. Nos. 254 & 141, dt. 30-12-2014 & 09-06-2015 which is meant for construction of Capital City Development Project under the provisions of Land Pooling Scheme. The Capital City area falls

15 World Bank Amaravati Sustainable Infra-structure and Institutional Development Project Proj-ect and Operations http://projects.worldbank.org/P159808/?lang=en&tab=documents&subTab=archivalRe-cords16 World Bank (2017): Draft Resettlement Policy Framework, APCRDA, February, pg 28

in Guntur District (on the west of Old National Highway from Prakasam barraiage to Y-Junction at Mangalagiri. It covers 24 Revenue Villages and part of Tadepalli Municipality covering Mandals of Thullur, Mangalagiri and Tadepalli.17

The State has claimed from early 2015 that land will be acquired for the reason of public purpose only, and Amaravati will be developed as a People’s Capital. The validity of the CRDA Act, 2014 itself has been challenged as unconstitutional and contrary to the AP Reorganisation Act.18

The citizens are facing the acute errors of the promises of the Government from much early in this project, disregarding our choices and decisions, even from the instance of siting. When there were plenty of alternatives available for the State, siting a fertile food-belt area wilt multi-irrigated crops, displacing 20,000 families and unidentified others is intangible to the development falsely proposed to citizens of the State. The Bank has also failed to give a close look into these insights, violating OP/BP 4.12 D.1, when the siting of the capital city location gives no alternative to avoid displacement and the site itself is in a disadvantaged location. Across AP and India, several leaders, people’s representatives, experts and concerned groups have expressed their dissent to the State’s Chief Minister regarding the elbow-wrenching strategies forcefully used on people opposing land acquisition.19

The much acclaimed ‘Land Pooling’ is not what people required, as envisioned in the Master Plan, or lauded by the external authorities like the Bank, who are not part of communities. Several false reports and allegations are available in the media regarding this breach of an existing land law of India Land Acquisition Resettlement and Rehabilitation Act 2013 (LA ACT). The Land Ordinance repeatedly promulgated by the Government of India from January 2015 onwards has immensely helped the AP government in intimidating farmers. It is alleged that the Government should be accused of land-grabbing and has become land-brokers for private interests. Land Pooling was challenged through writ petitions and cases are still pending at the High Court of Guntur-Krishna districts. Experts, academicians, activists, NGOs have 17 APCRDA (2017): Amaravati Project Edition 2, March18 Writ Petition No 99 of 2015 currently pending in the High Court at Hyderabad19 NAPM (2017): Press Release - Appeal to Chief Minister to scrap Land Pooling Act, CRDA and fully im-plement the 2013 LAA-R&R Act , February

11

also disputed the same. Recalling OP/BP 4.12 D.2, people reiterate that it has been not been in tandem with their realities. There was nil environmental or social impact assessments conducted. Though the State asserts that it held comprehensive consultations with urban development consultations and public organizations, there was only one public consultation held in January 2017 and four more such consultations were held while writing this document.20 Yet, these hasty hearings without due notice to the concerned groups, seemed like a farce especially when this point was highlighted in the previous IPN-Request No. RQ 17/04 [case with Inspection Panel of World Bank. The then released final draft of Bank’s ESF (August 2017) published in conjunction with the timing of these hearings raise abundant doubts.

4.2. Paying particular attention to displacement of Vulnerable Groups and landless families has been elucidated in OP/BP4.12 D. 4. But certain hidden revelations need to be brought to light regarding the outright caste discrimination of Dalits and other assigned land holders with respect to the compensation/rehabilitation as against the patta land holders in the process of pooling land for Andhra Pradesh Capital Region.21 They are not compensated through adequate national land compensation legislation. Given below are some stark observations by National Alliance of People’s Movements India (NAPM) during its fact finding studies:

20 Andhra Pradesh Capital Region Development Authority (2017) Public Notice on the safeguard docu-ments. August. The notice can be accessed here: http://tiny.cc/wqsd6y21 NAPM (2017): Press Release - Appeal to Chief Minister to scrap Land Pooling Act, CRDA and fully im-plement the 2013 LAA-R&R Act , February

It may be noted that according to GO MS No. 41, which was issued on 17. 02. 2015, there is a stark discrimination between the compensation promised for patta, assigned and government lands. Four different packages were announced for patta lands, assigned lands, lanka assigned lands and Government land. For every acre of patta jareebu land, 1000 sq. yards of residential space and 450 sq. yards of commercial space is promised. For every acre of assigned jareebu land, 800 sq. yards of residential space and 200 sq. yards of commercial space is promised. For every acre of assigned lanka jareebu land, 500 sq. yards of residential space and 100 sq. yards of commercial space is promised. Since some assigned lands don’t have proper records, they are being categorized as ‘Government lands’. For every acre of such land being cultivated by the farmer, just 250 sq. yards of residential space is promised.

However, all the assigned lands and lanka assigned lands are being cultivated since the time of British rule. The Government has been taking advantage of the fact that most of the people don’t have documents of the assigned lands. Since it is the poor and the Dalits who form the lion’s share of the assigned lands, the signatories alleged that this is as an outright discrimination by the State against the oppressed castes – the Dalits. The signatories demanded that the Government should uphold the letter and spirit of the Constitution instead of actively undermining the values, rights and entitlements enshrined in the Indian Constitution.

While the Dalits are economically discriminated on the basis of the size of reconstituted plots they will be compensated with, there is a whole social angle to this caste discrimination. In most villages, the Dalits were systematically given plots far away from the development area in low-lying areas while the upper castes were given costly plots at the centre of the development area. The letter feared that the rest of the villages also will face similar situation in the future, which is a re-creation of the caste structure in the villages. It is a shame and totally unacceptable and unconstitutional that the Government, which has a mandate to prevent and act against any form of discrimination is in fact actively promoting and perpetuating caste discrimination in the garb of ‘resettlement’, the letter states.

The Bank needs to amend OP/BP 4.12 D. 7, and is exhorted to hold the mentioned policy accountable.

Farmers handing over affidavits to Municipal Administration Minister P. Narayana at Nelapadu village in Thullur mandal in Guntur District on Friday. Farmers in this village became the first stakeholders by voluntarily giving consent letters to become part of the LPS to the Minister. Photo: T. Vijaya Kumar/The Hindu

12

4.3. There have been peer-reviewed articles and findings of few fact-finding groups, and we have also borrowed extracts from their works which are cited in this document, since they well articulate anxieties of Amaravati citizens.

After the capital location was announced, the land values started rising steeply making land transactions a prominent activity from early November 2014. Within a month, the property dealers are known to have taken over 3,500 acres from farmers, involving more than `4,000 crore, “almost the entire amount paid in cash” (NAPM 2014).22 The rules were not made available in the local language. Short deadlines were set to pressurise farmers for speedy surrender of lands even before their implications were understood by them. The government exhibited a “rhetoric of urgency” to “justify the speeding up of law-making, regulations and policies to enable a new city to quickly materialize.”23 Second, it is widely believed that the land ordinance with several anti-farmer provisions was promulgated to coincide with the CRDA Act. It was argued that it was brought in as a “conspiracy” to enable the AP government to intimidate the farmers. In a democracy, “you don’t re-promulgate an ordinance. This (Union) Government did it thrice” (Devasahayam’s view as cited in Subramanyam and Varma 2015). The AP government extended the land pooling deadline eight times (Deccan Chronicle 2015c) till the ordinance lapsed. Third, a petition has been filed before the National Green Tribunal (NGT), New Delhi24 raising several environmental concerns. The NGT directed the state of AP “not to carry out any operations of the clearing of the land falling in the project area” without obtaining environmental clearance. The AP government, however, violated the order by levelling land and destroying crops in some villages. Despite this, the Prime Minister of India laid the foundation for the new capital.25

4.4. In AP, the Capital Region Development Authority (CRDA) is given “absolute power to acquire, sell, transfer, grant license or alienate the land” for the

22 NAPM (2014): “NAPM Fact-finding Committee Findings on AP Capital Region Land Issue,” undated. The committee visited 16 villages on 5–6 December 2014.23 Datta, A (2015): “New Urban Utopias of Postco-lonial India: ‘Entrepreneurial Urbanization’ in Dholera Smart City, Gujarat,” Dialogues in Human Geography, 5(1): 3–22.24 Application No 171 of 2015, National Green Tri-bunal at New Delhi.25 NGT Order dated 10 October 2015

purpose of development or redevelopment (Suchitra 2015).26 The land of our State is increasingly seen with new value internationally. It is not merely a transformation from agricultural land to industrial land; we realize that our lands are seen as ‘financial resources’ by the State to attract private international corporations and investors. The proposition to acquire land or in our case “pool” land from us, a majority of us being farmers, is a subtle strategy to lease large portions of our land to corporations for their profits. Have you really identified this concern of us, as how OP/BP 4.12 D. 5, D.6, explains? Displacement of our traditional farming occupations, increasing risks of unemployability when an IT-centric capital evolves, disappearance of small holdings and further bordering marginalization are increasing areas for our anxiety.

Considerations such as right to consent, caste composition in the sited areas, sustainability of communities’ cultural practices, demographic survey, have not been given due diligence in SESA_ESMF document. The Bank has neither prepared participatory appraisal processes, project and subproject component and mitigation measures, nor called out for the consent of restoration of livelihoods in alignment with OP/BP 4.12 D. 10.

5. Violation of OP/BP 4.36 - Forests

5.1. There are no distinguishing proposals or mention in the original Master Plan for enhancing the forest cover in area designated for capital city area. Inferring from Amaravati Master Plan, GoAP has submitted request to MoEFCC to de-notify 252 ha of land at Tadepalli Reserve Forests. Meanwhile, reports have also identified identical proposal to MoEFCC in 2015 regarding diversion of 12,444.89 ha forest land at Kondapalli Reserve for infrastructure purposes. GoAP wants to proceed with deforestation for developing bio-diversity parks, cultural and industrial park, cultural theme park, adventure eco-theme park, aerospace and green mobility industrial park, integrated infrastructure park and similar parks. This transgresses OP/BP. 4.36 since the plan involves significant conversion of critical notified and protected forests, which is, yet again, in conjunction with critical habitats category (mentioned in Section 2).

5.2. People’s affirmation is further supplemented based on Government of India’s (GoI) Forest Policy

26 Suchitra, M (2015): “Capital Punishment,” Down To Earth, 15 Feb.

13

1988 to preserve our remaining natural forests. The proposals are also in direct conflict with the Indian Forest Right Act 1927 and the Scheduled Tribes and Other Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006.It has to be noted that Kondapalli Reserve Forests indeed has communities dependent on forest produce for livelihood (Kondapalli Toys).27 Though AP Reorganization Act states that the Government can divert forestlands if no alternatives are available, this has been highly regarded as a weak justification for defending the ease of altering forest lands. Afforestation declared as compensation package in controversial Polavaram area is unreasonable, as identified by irrigation experts, as the terrain is difficult to irrigate and the experiences of earlier cultivation have been difficult. MoEF gave site clearance for the Polavaram dam in AP in October 2005. But the National Environment Appellate Authority quashed the environmental clearance to the dam because the mandatory public hearings were not held. When MoEF gave forest clearance to the project in July 2010, it turned out the Andhra Pradesh government had lied to obtain the clearance for the Polavaram project. It told MoEF 27 Kondapalli Toy making is an art of hand crafting, which has been around for five centuries, primarily based on figures of mythology, animals, birds, bullock carts, rural life. Tella Poniki, the soft wood for these dancing dolls is acquired from Kondapalli forests and the wood is seasoned for years. The artisans involved have migrated from the State of Rajasthan from 16th c.

there were no forest rights to be settled under Forest Rights Act in the project affected areas.28

5.3. The State (erstwhile undivided Andhra Pradesh) has also earlier flouted the Supreme Court orders regarding stay on deforestation (Report of CAG 2013).29 It has been ironically stated by GoAP Chief Minister that precious natural forests have become highly vulnerable to exploitation and degradation, and that it is the State’s responsibility to conserve the with its natural flora and fauna for this generation and posterity.30 We recognize this stark incoherence from State’s chief functionary31 statements as well and also resolutely urge the Bank to opt out from the project component.

28 Down To Earth (2015): Polavaram fraud, Accessed from: https://www.downtoearth.org.in/coverage/polavaram-fraud-3344429 Orders of Supreme Court were flouted by the Andhra Pradesh State Electricity Board, where the diversion of forestland in Nagarjunasagar Dam was allowed without prior permission of the Supreme Court http://www.cseindia.org/userfiles/unlocking-forests-does-CAF-Bill2015.pdf30 Andhra Pradesh State of Forest Report -201431 “The Central Government shall facilitate the creation of a new capital for the successor State of Andhra Pradesh, if considered necessary, by denotifying degraded forest land”, Andhra Pradesh Reorganization Act 2014, Part X, 94 (4)

Superimposition of Capital City Master Plan on Satellite Image acquired from Google Earth. Visualisation: Debadityo Sinha/India Together

14

Other than the aforementioned infringements of the Bank on its own environmental and social safeguards, a few implications need

to be established as well as propositions put forth to the Bank for better discernment of issues regarding Amaravati communities related to this project. More than a mere recapitulation of their concerns, which indeed looms throughout this entire document, we want to voice our resistance to ill-conceived projects undertaken by the borrower states and our contentions with the Bank’s inadequacy of existing policies which claim to supposedly serve the course of development in borrowing countries.

A. Lack of Public Consultation, Consent and Democratic Oversight

“The Requesters mention that only one consultation was held in January 2017 on the draft SESA-ESMF and draft RPF, and that only 150 persons out of an estimated 127,505 potentially affected people attended this consultation; five online comments were submitted. They allege intimidation at this consultation from security forces and state that some participants were forcibly turned away.”32

B. SIA not Addressed in WB-SESA ESMF

“The master plan proposes to distribute the 4.5 million people who will inhabit Amaravati by 2050 into 18 self-sustainable townships through integration of land use and transport planning. What is envisioned appears to be a highly regulated (and controlled?) city. Can such a city accommodate the urban informal sector and the poor/low-income people who migrate to the city in search of livelihood opportunities? Will Amaravati become a private city—32 World Bank (2017): Notice of Registration - IPN REQUEST RQ 17/04 India: Proposed Amaravati Sustainable Capital City Development Project (P159808)

planned, built (and even administered) by private/ foreign companies/governments? The Concept Note on Smart Cities by the Government of India specifies that most of the infrastructure in smart cities will be taken up “either as complete private investment or through PPPs” (public–private partnerships).”33

“To assume that Amaravati as a capital will attract 4 million migrants in the next 20 years is beyond belief.34

“The master plan also talks about creating 6,35,000 jobs by 2050 without spelling out how these jobs will come about (Ang Chit Sin et al 2015). The only concrete employment option that has been spelt out in the document refers to capitalising on the key tourist attractions: on river Krishna, the scenic islands (riverbed tourism), historic Undavalli caves, Kanaka Durga temple, Amaravati Buddha statue, Kondapalli fort, and so forth. Even if the promises are delivered, these jobs are not going to be helpful for the displaced workers of Amaravati region, but will be beneficial to a small class of professional workers. The government documents say that all displaced workers will be “reskilled” in order to accommodate them in the proposed industries of the new city and the region. The AP Skill Development Corporation (APSDC) will be established to reskill the workers. 2009). The most likely scenario is that workers (small farmers, tenants, landless and non-agricultural workers) will be released into the larger world, leaving their labour up for grabs, and as targets of intense exploitation.”35

C. Violation of Constitution of India and other Laws

The following are the National/State Policies, Laws and Regulations listed in the Bank’s own SESA_ESMF document, which are found to be violated. Also listed among them are the new laws/acts with amendments as well, to accommodate and/or circumnavigate various issues in the larger project design. There are many others which do not presently fall under the scope of this document since they warrant attention at sub-project levels.

33 “Draft Concept Note on Smart City Scheme,” Revised as on 3 December 2014, Work under Progress, http://indiansmartcities.in.34 Ramachandraiah, C (2015):” Andhra Pradesh’s Master Plan for Its New Capital”, Speculation and Weak Foundations” EPW, 19 Sep35 Vakulabharanam, Vamsi (2017): “Babu’s Camelot: Amaravati and the Emerging Capitalist Dynamics in ‘New’ Andhra Pradesh”, EPW, January

Several villagers staged protest at Capital Region Development Authority (CRDA) office in Vijayawada in January 8, 2016 protesting against the draft master plan of Amaravati by raising slogans that the proposed road connectivity in the capital may damage the archaeological site of Undavalli caves and expressing doubts over the existence of several houses in the villages. Photo: The Hans India

15

Laws Status of Violation

Andhra Pradesh State Action Plan for Climate Change, 2012 Been violated

APCRDA Act, 2014 New

The Andhra Pradesh Capital City Land Pooling Scheme (Formulation And Implementation) Rules, 2015 Violating Central LARR Act 2013

Constitution of India - Article 39 (A), Article 47, Article 48 (A), Article 51 (A), Article 21 Violated

National Water Policy, 2012 Violated

Forest Policy, 1988 Violated

National Action Plan for Climate Change, 2008 Violated

Environment Protection Act, 1986 Violated

EIA Notification 2006 and Environmental Clearance Violated

Forest Conservation Act, 1980 Violated

The Water (Prevention Control of Pollution) Cess Act, 1977 Violated

Air Act 1981 Violated

National Wetland Rules, 2010 Violated

Ancient Monuments and Archaeological Sites and Remains Act, 1958 Foreseen

National Disaster Management Act, 2005 Foreseen

National Green Tribunal Act 2010 Cases pending

Right To Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act ,2013

Gravely violated; Case with Supreme Court from 2018 on the AP State Land Amendment Bill

16

D. Coercion, Intimidation

“While the LPS was supposed to be voluntary, the AP government has relied heavily on using police as an instrument of coercion and intimidation along with several tactics which have come to be locally known as the “mind game” which has, probably, few parallels in India in recent years. The large absentee landowners, who left agriculture and have been leasing out lands and belong to the upper-caste support base of the TDP in the Thullur area, were the early ones to come forward to join land pooling. The government has claimed that it has entered into MoUs with several foreign and Indian companies, worth about `5 lakh crore by offering thousands of acres of public land.”36

“To analyse the twin strategies of speculation and intimidation/ coercion, we have drawn heavily from print media reports, government orders, master plan documents, field visits, and interviews with local activists and farmers.”37

36 Times of India (2016a): “AP Land Bank Grows 3 Times in a Year, Boosts Industrialisation Plans,” Times of India, 13 January37 Ramachandraiah, C (2016):”Amaravati- A Landscape of Speculation and Intimidation”, EPW, April

“The TDP organised an interactive meeting of the farmers with the chief minister at Hyderabad on 18 November 2014. The outcome was “disappointing” and his “promise of transforming farmers into industrialists did not go down well” (Times of India 2014b). A farmer from Krishnayapalem recalled with shock and dismay that the chief minister’s attitude was highly authoritarian.”38 More reports are available on media - Chandrababu Naidu reportedly said, “Prepare a comprehensive action plan with measures which are to be initiated legally against the people working against the capital city. We shall not spare such forces.”39

This statement has come out followingthe Chief Minister’s recent remarks about him “not hesitating” to ignore villagers and farmers of Andhra Pradesh, their connectivity to roads and non-availability of pensions, if they do not vote for his (TDP) party.

38 EPW (2016): A Landscape of Speculation and Intimidation: Making of Amaravati, Economic and Political Weekly, April 2339 http://www.thenewsminute.com/article/ap-cm-threatens-action-against-those-complaining-about-amaravati-project-alleges-conspiracy

A scan of the news report published in the Times of India dated July 3, 2017.

17

Complaint registered with the Inspection Panel – Quick Look: 2017

In May 2017, few landowners and farmers registered a complaint with the Inspection Panel with a request for Inspection, as a result of the

Bank’s non-compliance with its environmental and social policies in preparation of the proposed project. The Panel registered the request on June 12, 2017, and received the Management Response to the request on July 21, 2017.

A Panel team visited India from September 12-15, 2017, and met with the requesters and other potentially affected community members, farmers who support the LPS and their representatives, representatives of the World Bank Country Office, officials from the Ministry of Finance and from the Andhra Pradesh Capital Region Development Authority, the agency responsible for developing the city, as well as civil society representatives.

On September 27, 2017, the Panel submitted its Report and Recommendation to the World Bank Board of Executive Directors that recommended “carrying out an investigation into the alleged issues of harm and related potential non-compliance with Bank policies, especially relating to involuntary resettlement.” On November 27, 2017, Bank management submitted to the Panel an addendum that offered clarifications, an update on project preparation and additional actions to “complement and clarify” the actions presented in its July 21, 2017, response in order to fully address the Requesters’ concerns. Management indicated the addendum was based on recent field missions and discussions

with the Panel. After reviewing the addendum, the Panel submitted an updated Report and Recommendation to the Board. Based on the addendum and the proposed actions, the Panel deferred its recommendation for up to six months as to whether an investigation is warranted. The Board on December 12, 2017, approved the Panel decision to defer its recommendation and to report back to the Board in the next six months.40

Since then, the Panel is yet to publish its recommendations, even after more than a year now.

40 http://ewebapps.worldbank.org/apps/ip/Pages/ViewCase.aspx?CaseId=126

Gonzalo Castro de la Mata, Chairman of World Bank’s Inspection Panel, Jan Mattsson, Member of the Panel, Dilek Barlas, Executive Secretary, and Birgit Kuba, Operations Officer listening to the grievances of the affected communities at the Amaravati. Photo: The Hans India

18

Memorandum submitted to The Inspection Panel during their visit in

September 2017Demands from Affected Communities

and Peoples’ Groups against the Impositions of the Bank

We reiterate and exact appropriate responses and actions from the Bank in lieu of the following precise abysmal risks glaring

back at us and all the fraternal groups in solidarity with deep concern for our land, livelihoods and survival.

1. We strongly hold the World Bank and AIIB accountable for the already existing and impending crucial consequences of this mammoth capital city project with its flawed project design, based on its own environmental and social safeguards.

2. Despite repeated communication, appeals, court stay order and pending cases at the NGT, the GoAP has already proceeded with construction activities and laying out infrastructure in an accelerated mechanism, involving sub-projects and components, which highly falls in the purview of the Bank’s scope - its Urban Pro-Poor Infrastructure goal for the project. This is a very disturbing trend of the Bank for proceeding with support for the government without paying heed to the resistances of the project affected communities and circumventing the prevailing legal orders against the project. Also, as understood from the Bank’s own statement, it has executed a trust fund of $ 0.17 million for financing the preparatory works of project.

3. We do not hesitate to direct our charges against the World Bank and AIIB on lending to the catastrophic project where we are witnessing now the forced Land Pooling Scheme to amass vast parcels of land for development across one of the richest fertile food belts of India.

4. We demand that the Bank revoke its support from the project, which would surely pave the way for the disruption of the natural state of a sensitive ecosystem including remodelling reserve forests by felling trees and building bio/industrial/techno/sports parks, along with your negligence towards our foresight of frequent floods triggered to an acute degree.5. Displacement and ‘resettling’ of around 20,000 families in the guise of returning ‘developed’ residential and commercial lands in the absence of a guarantee and struggling in the tentacle grip of realtors, middlemen, goondas of real estate sector are serious concerns raised. The Bank presenting multiple plans on involuntary resettlement against these issues without public consultations or consent is vehemently questionable.

6. We have mentioned that the creation of Andhra Pradesh Capital Region Development Authority Act (APRCDA Act 2014) was against the Land Acquisition Rehabilitation and Resettlement Act 2013 along with the tweaked amendments. We are aware

Left: A photo from November 2014 of the fertile fields of Uddandarayunipalem. Right: Buildings have now come up on plots given up for the Land Pooling Scheme, while farming in these fields has stopped. Photos: Rahul Maganti/PARI

19

that, as and when project components materialise, existing laws are amended at the State, or there is a complete irreverence to the nation-specific policies. We fiercely question this disregard for the Bank for our policies and laws, which were strenuously formulated by our national leaders during our times of national and regional struggles.

7. The lack of a Resettlement Policy Plan and the inadequate addressing of the Bank against the uprooting of Dalit families from 600-year-old occupied islands and not assigning them return lands will lead directly to the creation of a wide marginalised community of informal sector on the outskirts of the capital city with no regard to their dignity, efforts and labour.

8. We want to draw the attention of the Bank to the contemptuous promises made by the Government to upgrade skills of project affected people of which farmers are majority, by wrenching their agricultural lands from them and introducing new ‘industrial and technological’ skills. The statistics of increase in land value, population and employment rates are highly speculated, and studies based on other references on recent capital cities of India affirm our case. We are resolute when we ask the Bank to reconsider stop investing in this project based on highly inflated statistics that are borrowed from the development models of foreign countries (Japan, Singapore).

9. We do not wish to sell our land to foreign players with diversified investments, MoUs and interests, in the name of ‘development’. Our State Government, who should have been supporting the citizens who elected them, refrain from giving attention to our calls. We assert that we will continue exhorting the Bank for proceeding with this ill-conceived project, against the greater interests of the people in Amaravati.

Meanwhile, Social Activist Medha Patkar, Former Power Secretary Dr. EAS Sarma, Goldman Prize awardee Prafulla Samanthra, Retired Scientist from Indian Institute of Chemical Technology (IICT) Dr. Babu Rao, and 42 other representatives of various people’s movements, civil society organisations, and concerned citizens wrote to the Executive Directors of the World Bank Group to draw urgent attention to various irregularities surrounding the proposed capital city construction. They strongly expressed that the suggestions of the Panel’s report for a full investigation into the violations of the Bank’s operating policies must be followed by the Board and that the Board should not undermine the mandate of its own

accountability mechanism. They further expressed their astonishment of the Bank’s silence on Andhra Pradesh Chief Minister N Chandrababu Naidu’s instruction to the Capital Region Development Authority (CRDA) to firmly deal with the people who filed complaints with the World Bank. The signatories of the letter held the World Bank and the Asian Infrastructure Investment Bank (AIIB), a co-financier of the project, accountable for the already existing and impending crucial consequences of this mammoth capital city project and demanded that the concerns of the project affected communities be considered; faulty ‘voluntary’ Land Pooling Scheme be withdrawn; Andhra Pradesh Capital Region Development Authority Act (APRCDA Act 2014) be abolished.41

41 http://www.cenfa.org/press-releases/csos-approach-wb-on-amaravati-capital-city-project/

20

Updates from the Ground as shared by Capital Region Farmers Federation

2018-2019

1. A new document has been released for the Amaravati project with a new title, Amaravati Sustainable Infrastructure and Institutional Development Project (ASIIDP,) without a change in project number: http://tiny.cc/xkjf6y

2. In this document, unfortunately, zilch progress is seen from the Bank towards addressing BP/OP 4.12 except recycling old arguments that are totally baseless. The World Bank and Inspection Panel has not yet shared the World Bank’s independent assessment on the Land Pooling Scheme (LPS), conducted by Geoffrey Payne in early 2018. So far, documents regarding this are not seen anywhere, but communities remain confident that most of these assessments are biased/arbitrary and some are deceptive. There is a new line of information in this updated PID/ISDS – “The proposed World Bank loan of $300 million will focus on three strategic areas: (i) providing quality infrastructure to ensure that global knowledge is built into technical designs of major infrastructure investments; (ii) supporting the set-up of an institutional structure that can lead to the establishment of an empowered and effective local government; and, (iii) supporting an inclusive benefit sharing system for all residents of the region.” It is also clearly detailed that ASIIDP comprises of five

components including who brings how much to meet this total investment need of US$ 715 million apart from World Bank, AIIB, GoAP. It means, scope of the project (in terms of interventions) has been massively expanded to ruin the lives of 140,000 people.

3. It was stated that there are independent assessments, without providing any details. Further, it was stated that the Bank has confirmed completion of appraisal vide their letter dated 07 January 2019 addressed to the Chief Secretary of Andhra Pradesh State. Citizens ask - Without checking the authenticity of the assessment documents and information presented in those documents that supports this loan/PID, as well as without proper public consultations, how come World Bank appraise those documents? On one hand Project Affected People have been constantly informed that the project is in the initial stages of preparation, but how could Bank Management complete project appraisal without sharing final assessment reports? As the Bank Management has now given their appraisal for the project by jointly collaborating with GoAP, it is necessary to ascertain the correctness of those documents and assessment reports. Farmers relentlessly claim that a number of statements made in those reports are contradictory and warrants an investigation. And this has to be verified on ground by

A sign in Undavalli argues against the land pooling process. All farmers there have multi-crop, arable land. Photo: Mridula Chari/Scroll

21

the Inspection Panel through site visits. Evidences are ready to be produced to the Panel, where GoAP/World Bank/ASIIDP violated a number of Acts/rules/laws/policies including directives from National Green Tribunal (NGT). While many cases are pending in the State’s High Court and Supreme Court of India, how could World Bank management consider appraisal of the project when an investigation is necessary at this point?

4. Natural Habitats OP/BP 4.04 of World Bank is triggered, as ASIIDP project is using flood plains for infrastructure, especially for road infrastructure? Inspection Panel witnessed this on the ground during their previous visit to the site. In some sections, they are draining the water continuously to build road infrastructure - https://youtu.be/elKTaNdOPfc.

5. Similarly, Indigenous Peoples OP/BP 4.10 – groups have provided a lot of information in their communications previously, but this updated PID/ISDS blatantly refuses to acknowledge such groups exist. The Capital Region Farmers Federation [CRFF] and People’s Watch of Andhra Pradesh [PWAP] have submitted a number of comments/suggestions/concerns with regard to Environmental & Social Management Framework (ESMF); Draft Resettlement Policy Framework (RPF); Social Impact Assessment- Resettlement Action Plan for 10 sub-arterial Roads; Social Impact Assessment – Resettlement Action Plan for Flood Management Works; and Environmental Assessment and Environmental Management Plan (EAEMP) for 10 sub-arterial roads proposed under ASCCDP (now ASIIP). These submissions were from individuals and groups/sections of the people who were impacted by ASIIP/ASCCDP. But so far there were no responses received. In many instances, Inspection Panel was copied of these correspondences.

6. The Project-level Grievance Redress Mechanism (GRM) totally failed to address the concerns that were raised in various forums from the beginning of ASIIP/ASCCDP project. Groups see that none of these concerns and suggestions were taken into account. During farmers’ last meeting with the World Bank personnel and APCRDA on 23 October in Vijayawada (at Vasavya Mahila Mandal premises, which is GRM here), they were quite reluctant to consider any of these concerns, and suggestions.

7. Further, updated PID/ISDS of ASIIDP project,

#13 in Page 8 says, it will support the Government of India’s vision of empowering city governance structure in the long term, through the 74th Constitutional Amendment Act (CAA) of 1992, which positioned urban local governments to become key institutions of political representation and service delivery. ASIIDP completely violates the 74th CAA and in fact destroyed 29 local bodies of Andhra Pradesh and their representation in the project.

8. As part of LPS, returnable plots have been allocated but development around those is “zero”. No beneficiary till date has taken physical position of their returnable plots. There is no choice to 2nd party (farmer) as Government (1st party) always dictates the terms. The 2nd party is unable to approach court or for other legal assistance. Unfortunately, this is the reality of LPS in Amaravati. This clearly shows, there is no clarity on the returnable plots, and its dimensions till date. How could farmer surrender their rights for something that does not exist on ground, even after 4 years of the capital city project?

9. In the addendum to World Bank’s Management response issued on 27 November 2017 (http://tiny.cc/h2jf6y), Page 2, point #4, (a) Community engagement and monitoring to address potential coercion and other implementation issues, there are a number of gaps. The following are being completely overlooked.

i. Citizens Advisory Committee: PWAP and PAP/PAFs are constantly requesting for their representation in this committee. But so far, no action has been taken. Instead APCRDA has filled this committee with members who are some way related with current ruling party (TDP) of Andhra Pradesh Government. This committee has failed to meet its objectives listed in their Terms of Reference. What can World Bank, IFIs, PAP/PAF, and a common man expects from this Citizens Advisory Committee?

ii. Engage a local independent party to obtain additional information on any potential coercion/Engage independent local professionals to visit affected villages to monitor concerns and feedback: How can Vasavya Mahila Mandal (VMM), the GRM, be engaged t for these two purposes? Could a single NGO be likely to be expected to perform these two tasks? VMM has totally failed to engage vulnerable groups to restore livelihoods of those impacted by ASCCDP. Many incidents of coercion have been reported since January 2018. There are several

22

atrocities that were committed by the GoAP and its police force. One such gory incident on Nandigam Suresh could be seen in this video with his own explanation https://youtu.be/OdIdrrVUtbw. PWAP and PAP/PAFs see this as a complete compromise of ethics and morals of VMM who has surrendered itself to APCRDA/GoAP. They have lost their credibility and trust to continue in ASCCDP any longer. A detailed investigation on the functioning of these Institutions and Committees is essential. How could one expect these institutions provide basic justice to the people who are affected by Amaravati capital city project, more specifically ASCCDP? There is an uprise of farmers who has given their lands under LPS, but it is constantly being suppressed by GoAP using its intelligence units.

Farmers ask what specific actions have been taken by the World Bank management to protect the interest of affected people and communities. A latest incident was on 13 September 2018, wherein a main water pipeline for irrigation of agricultural lands was broken down on purpose at Road E16 near Nidamarru village. The video is available at https://youtu.be/E1cYZgPQ6gE. iii. Support creation of a Project-level Grievance Redress Mechanism (GRM): PWAP informed several times through a number of communications, GRM has totally failed to address the needs on ground and is a complete failure. It was quite rosy on paper, but absent in action. iv. Increase the frequency of preparation missions and do outreach with stakeholders to solicit feedback on issues: These missions lack complete action. People do not see any productivity from these missions of the World Bank Management in Delhi. Instead of reducing inequalities and poverty, such missions from the World Bank are widening the inequalities and increasing the poverty. World Bank is completely ignoring Sustainable Development Goals (SDGs), where we as humanity as abided to these principles, groups question.

10. Failure of livelihood support programmes and assurances made under LPS: Apart from these, under LPS, APCRDA assured the following for landless agricultural laborers and households in the Capital City area are eligible to receive a combination of livelihood restoration benefits. Almost all landless families have challenges in accessing these benefits, and their current situation is worse than

pre-Capital City status. Both APCRDA and the World Bank failed to assess the livelihood restoration for landless agricultural labourers, this video https://youtu.be/0E4HM9zAKHk further corroborates with this observation. Following is a detailed status of these till date.

(i) A pension of INR 2,500 is being given to landless labourers. But this is being distributed once every 2 to 3 months. Also, the amount is not sufficient as the costs per family increased to INR 12,000 per month after the announcement of the Capital. There is no assurance that, it would continue after the State elections in 2019.

(ii) Employment guarantee• Employment was guaranteed for one person per family in the capital region. This is irrespective of LPS farmers, non-LPS farmers, landless labors, and Dalits. But this has not been realized till date.• Government assured daily employment and fixed wage through the establishment of nurseries, but these are not functioning anymore, except the one at Venkatapalem. PWAP would like to question, how many people will be provided with an employment by each nursery.

(iii) Interest free loan of up to 25 lakhs to all the poor families for self-employment not at all implemented. There is no facility to access interest-free loans for setting up enterprises till date.

(iv) Access to skill upgrading and training opportunities: Skill development sessions were an eye wash program and it failed miserably to generate the wage employment as promised. Although data was presented on APCRDA website, self-employment cannot be considered as an “employment” as there is no constant assured revenue per month. In the self-employment, risks are high. Further, there is a question around, how this could be linked with Skill Development? In any case, APCRDA website shows, about 1,425 have been employed till date including self-employment. This needs a serious investigation.

(v) Provision of subsidized food in all the 29 villages: Only 3 canteens have been established (except the one temporary secretariat, IGC in Velagapudi) and they are not serving 100% of poor and pending to establish such canteens at the rest of capital villages.

(vi) Free access to medical and educational benefits in designated facilities: The assurance on “Fee

23

reimbursement for all the children” whoever are studying in the capital region has not been realized to date. About 6,000 students have been identified to be benefitted as part of this scheme. Only 33 have been supported till date. Similar story in the case of “fee reimbursement” scheme. Free access to medical is not happening at all. The issued health cards are not valid.

(vii) Although the LPS promises to allocate 5% of land pooled to affordable housing for the poor, only 1,680.90 acres have been allocated in the Draft Detailed Master Plan for “weaker section housing” (i.e., for those living below the poverty line) but failed to notify the location of those lands.

(viii) No initiative on setting up of an old age homes.

(ix) Livelihood improvement plan: It was assured that a livelihood improvement plan will be prepared for all those interested farmers receiving base annuity less than INR 75,000/- and the landless labourers receiving monthly pensions, by January 2018. It is important to note that majority of farmers under LPS/LA owns only 1 to 2 acres and their annuity is less than INR 75,000 per annum and there is no livelihood improvement plan as of today. Further, APCRDA shall restore livelihood improvement to pre-displacement level of project before starting of the implementation of a project. What actions has been taken by APCRDA and VMM in this regard till date. Refer to a recent article on this available at https://ruralindiaonline.org/articles/a-wasteland-of-lost-farm-work. Further, one could hear the latest feedback from the farmers on ground, available at https://youtu.be/SBPGJEMYwz0. There is another video of farm labourers and farm workers providing their feedback on the assurances given to them, which is available at https://youtu.be/0E4HM9zAKHk. These two videos are in Telugu, but these videos summarize the issues very clearly.

11. Objections on Resettlement Policy Framework (RPF):

I. The Final Draft Resettlement Policy Framework, http://tiny.cc/folf6y only covers the impacts and mitigation measures related to

lands being acquired through LARR and negotiated settlement, and not to those that are part of the LPS despite it was specifically committed in the management response to the Inspection panel in September/November 2017. As per the BP/OP 4.12, the terms of the compensation has to be “Where the borrower has offered to pay compensation to an affected person in accordance with an approved resettlement plan, but the offer has been rejected, the taking of land and related assets may only proceed if the borrower has deposited funds equal to the amount offered as compensation plus 10 percent in a secure form of escrow or other interest-bearing deposit satisfying the Bank’s fiduciary requirements. The borrower must also provide a means satisfactory to the Bank for resolving the dispute concerning the offer of compensation in a timely and equitable manner.” This means, APCRDA has to follow the legal framework covering resettlement and the policies of the government and implementing agencies.

II. In page 4, para 1 of Final Draft Resettlement Policy Framework, it was stated that “A new state administration was set up to govern the new state, and the development of a new administrative center, Amaravati Capital City, was announced”, clarifications are sought as to why APCRDA/GoAP need 217 square kilometers (53,677 acres) for the development of an administrative center? The groups ask whether the Bank could provide a definition of administrative center? When there were developed cities such as Vijayawada at a distance of 30 km, and Guntur at a distance of 18 km to the new proposed Capital City, what additionally is that Amaravati Capital City is going to serve?

III. The Article 2 and Article 3 of the Constitution of India confer exclusive and plenary powers upon the Parliament to form or establish or to completely alter and destroy the identity of the existing states. A state legislature, as per Clause (e) of Article 3 of the Constitution, cannot even change the name of the state. It is within the exclusive domain of the Parliament to form any state, set boundaries, and name a state in the Union as defined in Article 1 of the Constitution. The power to establish a capital of a state is inherent to, and inseparable from, the power conferred upon the Parliament under Articles 2, Article 3 and Article 4 of the Constitution. The subject matter of establishing a capital of a new state formed by the parliament by law is not covered by any Entry in List-II of the Schedule-VII of the Constitution - http://tiny.cc/z3lf6y. It is specifically because the

24

capital of a state shall foster to the needs of all sections/strata’s of the society/residents of the state without any political discrimination as to the development of a particular region/part of such state. Therefore, only the Parliament can, by law, establish a capital of a newly reconstituted state, which after reconstitution and reorganisation by enacting a law, under Article 3(a)(c)(d) of the Constitution, it has lost its erstwhile capital city. It is stated that neither the State Legislature nor Executive is competent, under any Entry of List-II of the State List of Schedule-VII of the Constitution, to establish a capital for such state. Therefore, clauses (1), (3) and (4) of Section 3 and Clause (6) of Section 2 of the APCRDA, Act, to the extent these provisions establish and demarcate a new capital city and/or capital region for the new state of Andhra Pradesh, are ultra vires to the provisions of Article 245 and Article 246 of the Constitution of India read with Article 3 and Article 4 of the Constitution.

IV. In naming capital cities, State Government must seek a no-objection from central government before issuing a Gazette notification. No such procedure is followed till date. State issued a Gazette on 23 April 2015 under G.O MS No. 97. Further, the new capital city name is not yet officially recognized by Indian postal services. Please be informed that there is another temple town called “Amaravati”, which was also recognized as heritage city by Govt of India, and is about 10 km away from current unofficial capital.

V. In page 4, para 3 it was stated that “At the time of the announcement of the Capital City the area predominantly consisted of agricultural fields, mainly with commercial crops.”, communities requested the World Bank Management and APCRDA to revisit this statement as the crops were predominantly for food security. Also, before making such statement, it needs to be ensured that such data is supported by statistical back up. The fertile lands that are being ruined currently is the green belt that used to produce 120 different types of crops and is multi crop irrigated land. How could all the private and public banks in this area would have given loan to the farmers erstwhile, if the lands were not fertile and if they would not have provided food security, inquire the farmers.

12. Violation of National Acts/Rules, Policies, Directives, and also Court orders:

12.1. With regard to the flood mitigation works, there is a clear directive from the National Green

Tribunal (NGT) as per its Judgement Pronounced on 17th November 2017. It emphasized that APCRDA shall conduct a comprehensive study on hydrogeomorphology of the area with a view to effectively plan water retention ponds/reservoirs, storm water drains and their interconnectivity, so as to optimize water conservation, both surface and sub-surface.

So far APCRDA failed to conduct such a study and has tried to change the water courses. As a result, because of rains, even for just 3 to 4 mm of rain fall per day, the whole capital region was flooded, and newly formed roads are being swamped under water. The power pumps that were installed at Undavalli are not going to serve the purpose because the flow is very slow because of the catchment topography. The pumps shall be stopped every two minutes once as there is not enough water to lift from the stream. It is all the more important that hydrogeomorphology of the catchment area is conducted as per the directives and is an important activity. It is unfortunate that even the World Bank is faulted on this directive of NGT. The current flood mitigation interventions being executed on ground under the proposed ASCCDP are in fact increasing the risks of flooding in the capital city area.

Farmers and affected communities emphasize that, as per the NGT Judgement Pronounced on 17th November 2017, following points were stated:

(i) The project proponent, AP CRDA, shall conduct or cause to be conducted a comprehensive study on hydrogeomorphology of the area with a view to effectively plan water retention ponds/reservoirs, storm water drains and their interconnectivity, so as to optimize water conservation, both surface and sub surface. APCRDA hasn’t conducted such a study till date.

(ii) Any alteration of the flood plains by construction of storm water drains, retention ponds and related development within the capital city should be done only after conducting a study. Without such a study, even World Bank has failed to follow.

(iii) No alteration of the river or natural storm water morphology, flow pattern and location by way of straightening shall be permitted, as such alteration may result in increase of soil erosion, sediment transport due to raised velocity and decrease in

25

ground water recharge which may reduce base flow during the dry season.

(iv) No alteration to the pre-existing embankments if any should be permitted except as may be required for its strengthening for flood protection of the proposed Capital City. Even such exercise should be undertaken after detailed study of the flood pattern and hydraulics of the river or the storm water drains. (v) All the hills and hillocks in the catchment area of KondaveetiVagu, its tributaries and other storm water drains/channels should be treated with intensive soil and water conservation measures including afforestation so as to minimize surface run off and improve ground water recharge. What are the afforestation measures proposed? Two committees have to be formed as stated by NGT, one to supervise the work and the other to implement and process. So far, these committees are fully ignored. The people consider it’s a pity that the World Bank joined this bandwagon that continued to ignore the directives of highest environmental body of a nation.

12.2. The honorable High Court of the State has clearly provided directions on land acquisition. APCRDA has continued to mislead the orders by stating “No evidence to confirm this ever occurred. No contempt of court issues, which would have arisen from such action, have been recorded by CRDA.” It is a total failure of APCRDA to acknowledge these judgements. Following are ten cases and there are another ten cases pending in the high court. You could search these WP numbers online and related judgements. WP No 15820 of 2017, WP No 25138 of 2018, WP No 22283 of 2018, WP No 24738 of 2018, WP No 22107 of 2018, WP No 23616 of 2018, WP No 21542 of 2018, WP No 23872 of 2018, WP No 23467 of 2018, WP No 23177 of 2018.12.3. Public Property cannot be allotted to Profit-Oriented Institutions for Free, says Supreme Court of India. Refer to the article http://tiny.cc/s6mf6y.

12.4. How come the World Bank has become a part of GoAP Government Order (GO) 320?

I. LPS is a GO, but not an Act till date. So, the Government cannot acquire land using LPS. Therefore, GoAP has come up with 22 of 2018

Act, which has not come into force till today. The same has been challenged in the High Court of Andhra Pradesh, where it has been dismissed. The same Act has been now challenged in the Supreme Court in New Delhi by Medha Patkar and Sheshgiri Rao garu, refer to Diary no 42134 of 2018 Medha Patkar & Ors. Vs. UOI & Ors. Further, the rules and regulations of 22 of 2018 Act have also been challenged, refer to Diary No 4085 of 2019. While these cases are pending in the court, how could World Bank be part of the Government (through GO 320) and interfere with the legal aspects of the land?

II. GoAP issued a Government Order (GO), G.O.MS.No. 275 and 320 (dated 19 September 2018) without the consent of World Bank, approved the Resettlement Policy Framework (RPF) and Environmental and Social Management Framework (ESMF) to enable the APCRDA to avail World Bank assistance for ASCCDP. There were a number of mistakes and wrong information quoted in RPF and ESMF. On 23 October 2018, World Bank personnel confirmed to PWAP and PAP/PAFs that these documents are yet to be finalized by the World Bank management. Without the consent of World Bank, how could GoAP/APCRDA pass such GOs?

III. People of Amaravati along with CRFF, PWAP and PAP/PAFs demand the World Bank to correct the flaws and accountable for the implementation of World Bank own rules and policies as well as national rules. They exhort the Bank to make sure that all the assurances are implemented by APCRDA, but not collude with them in crime against humanity and environment.

26

Finding an amicable solution in moving forward (2019): an appeal from affected

communities o Even today, people do not consider it is late. They urge to follow an inclusive approach to convince those constantly raising objections on this green field project that is ruining the life and livelihoods of the poor farmers. CRFF, PWAP, PAP/ could take an extra mile provided APCRDA comes forward to follow the rule and ensure PAP/PAFs are compensated as per market value. Provide justice to all the sections of the people i.e. 118,000 people, and not only 22,000 farmers.

o Dissolve the current Citizens Advisory Committee with immediate effect and ensure it is more inclusive. People from various political parties, NGOs, and CRFF/PWAP must be included and given a role.

o If APCRDA really wants to realise the dream of Amaravati Capital and/or ASCCDP, why do they encourage farmers and other persons affected to approach court? All the issues that the farmers and people have been fighting, could easily be addressed by APCRDA. We call upon APCRDA and the World Bank to resolve these issues.

o So far, LPS is considered as a private agreement between a farmer and the component authority, and violates many fundamental articles of Indian constitution in the form as it is being devised. Provide legal guarantees to LPS. Irrespective of the party that rules GoAP after 2019 elections, processes must continue the momentum. It cannot be assumed that the present ruling political party, Telugu Desam Party, will be in power after May 2019. It is going to be a different challenge altogether.

o World Bank is compelled to provide legal help and support to the PAP in resolving the legal matters related with various land procuring measures that were deployed. CRFF/PWAP could facilitate the process between appointed lawyer by the World Bank and PAP/PAF.

o In the current documentation, RFP, ESMP - World Bank Policy on Involuntary Resettlement BP/OP 4.12 has been conveniently watered-down in the case of LPS. There are double standards

followed in the Compensation Valuation under different policies.

o Currently 30,774 returnable plots were registered (among this, there are a number of re-registrations, so the actual number is lower) against 62,571. That means, registration rate is 49%. This is of the total 33,000 acres. Farmers demand, could World Bank confirm LPS was successful? What happens to Bank’s investment made on the roads and flood mitigation works on the remaining private lands that were not surrendered to APCRDA yet? Could World Bank provide loan to ruin the lives and livelihoods? Remaining farmers who own their agricultural lands could approach the court anytime to cancel their consent and start cultivation on those lands. There are many lapses in the entire process of APCRDA and GoAP. The risk of Bank’s investment is too high, and it cannot be assumed that farmers will not pull APCRDA and GoAP to the court, time and again.

o Please address all the concerns and objections that were raised by PAF/PAP at various forums, a number of submissions were made.

o APCRDA/GoAP continue to intimidate, apply all sorts of coercion and threat is being created in the minds of the people, not to speak openly about Amaravati. Citizens understand that GoAP could go to any extent in safeguarding the brand and image of Amaravati.

o CRFF and PWAP appeal to the World Bank to share Geoffrey Payne’s independent assessment on the Land Pooling Scheme (LPS).

27

Unexpected Political Promises and Upheaval in Progress

When the city of Hyderabad, the political and economic capital of previous Andhra Pradesh, became the capital of Telangana State in 2014, the Chief Minister from Telugu Desam Party (TDP) of newly divided Andhra Pradesh had explicitly sought out to the Central Government for ‘special status category’ to build Amaravati capital city. The ruling party which was Congress at the centre then had denied and the opposition party, the Bharatiya Janata Party, BJP had then extended their support to TDP for this status. Ironically, after BJP came to power at the centre in 2014 general elections, they rejected TDP’s request for the same and this led to a widening rift between the two political factions. The Andhra Chief Minister keeps challenging the faction for their false promises and their partnership broke.

Yet, last week in Andhra Pradesh, BJP in its election manifesto for 2019 for the State of Andhra Pradesh, has promised that they will give back the land that was allegedly taken by the State Government “through deceit” for the construction of Amaravati, to those who request for it.42 Backlashes for the capital city project and the reckless manner in which it is pursued keep increasing in the State.43

42 ht tp s : / / w w w. t heh i ndu. c om / ne w s / c i t i e s /Vijayawada/return-of-amaravati-land-tops-bjp-agenda/article26649900.ece43 https://www.news18.com/news/politics/piyush-goyal-challenges-chandrababu-naidu-for-debate-on-nda-govts-aid-for-andhra-pradesh-2078607.html

28

This brief report of Centre for Financial Accountability New Delhi is aimed to throw light on the critical lapses and breaches which have been committed during the design, pre-appraisal and Strategic Environmental and Social Assessment – Environment and Social Management Framework (SESA-ESMF) procedures for Project PI59808: India- Proposed Amaravati Sustainable Capital City Development Project, by both World Bank [for 300 mn USD] and Asian Infrastructure Investment Bank Project PD000019-PSI-IND [for 200 mn USD]. The report also shares the recent updates from the communities of the project area earmarked for building the capital city.

This project has now been renamed in 2019 as Amaravati Sustainable Infrastructure and Institutional Development Project (ASIIDP), in both the World Bank and AIIB project pages.