CASE STUDY: PLATFORM ART GALLERY KEY INFORMATION INSTALL DATE: 31 st Oct 14 TEST PERIOD: 2.5 Months REPORTED SAVINGS: Report No: ETPLATF Approved by: B McMullen (CEng. MIChemE) CASE STUDY: PLATFORM2014 1 EndoTherm TM was trialled at the Platform Gallery by Ribble Valley Borough Council 21.43% INTRODUCTION RESULTS Time Period Usage (Units) Before (18 days) 150 70.6 2.12 Aſter (74 days) 1180 706.9 1.67 Compensated Saving - 21.43% NOTE: Comparison of usage with similar time period last year (Nov 13 - Jan 14) identified a 16.91% reduction in gas usage. The performance of EndoTherm TM was trialled at Platform Gallery by Ribble Valley Borough Council. The Gallery (combined with a visitor information centre) is a converted railway station which houses a number of craſt exhibitions and activities throughout the year. The gallery is serviced bya new 29kW boiler (installed January 2014) and the system had been power flushed prior to that in November 2013. This meant a comparison with the year previous was not suitable for this trial. A total of 2 litres of EndoTherm TM was installed on the 31 st October 2014. Usage / DD Degree Days (18.5 o C)

EndoTherm CaseStudy - Platform Gallery...EndoTherm CaseStudy - Platform Gallery Created Date: 1/23/2015 2:34:32 PM

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EndoTherm CaseStudy - Platform Gallery...EndoTherm CaseStudy - Platform Gallery Created Date: 1/23/2015 2:34:32 PM

CASE STUDY: PLATFORM ART GALLERY

KEY INFORMATION

INSTALL DATE: 31st Oct 14

TEST PERIOD: 2.5 Months

REPORTED SAVINGS:

Report No: ETPLATF Approved by: B McMullen (CEng. MIChemE)

CASE STUDY: PLATFORM2014 1

EndoThermTM was trialled at the Platform Gallery by Ribble Valley Borough Council

21.43%

INTRODUCTION

RESULTS Time Period Usage (Units)

Before (18 days) 150 70.6 2.12After (74 days) 1180 706.9 1.67

Compensated Saving - 21.43%

NOTE: Comparison of usage with similar time period last year (Nov 13 - Jan 14) identified a16.91% reduction in gas usage.

The performance of EndoThermTM was trialled at Platform Gallery by Ribble Valley Borough Council. TheGallery (combined with a visitor information centre) is a converted railway station which houses a numberof cra� exhibitions and activities throughout the year.

The gallery is serviced bya new 29kW boiler (installed January 2014) and the system had been power flushedprior to that in November 2013. This meant a comparison with the year previous was not suitable for this trial.A total of 2 litres of EndoThermTM was installed on the 31st October 2014.

Usage / DD

Degree Days (18.5oC)