ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

1

Energy efficient building management

Results of the „KENWO“ project&

Outlook on activities in EcoRegion

Helge Plath, IAIB e.V. Wismar

03.04.2009

Page 2: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

2

IAIB e.V.IAIB e.V.Institute of Applied Informatics in Civil Engineering

Officially recognized Research Institute

Officially recognized Academic Institute

Director of the Institute: Prof. Dr. Klaus Fehlauer

Alter Holzhafen 17c

23966 Wismar

Page 3: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

3

Development of an affordable energy management for residential and office buildings based on optimized usage concepts

entwickelt und umgesetzt durch

Funded by the Federal Ministry of Economics and Technology (BMWi) through project executing organization Jülich (PTJ)

In cooperation with: • University o.a.Sc. Wismar • HOCHTIEF Facility Management Essen • Landkreis Ludwigslust • MINOL Messtechnik GmbH Stuttgart • Public services Leipzig

Prof. Fritz Schmidt Prof. Klaus Fehlauer

Page 4: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

4

Goals and key aspects of the KENWO project

Goals of the research and development project KENWO were: • The further the introduction specific, integrated and optimized energy concepts

in applications

• The implementation of energy concepts using a sustainable cost efficient energy management system for monitoring

• Evaluation of several aspects of the concept using a number of real buildings and gaining experience for real-world applications

Datenlogger by ennovatis

Page 5: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

5

Stocktaking and energy concepts

FERNWÄRME Verbrauch in MWh

738,7

758,4

632,7

560,0

580,0

600,0

620,0

640,0

660,0

680,0

700,0

720,0

740,0

760,0

780,0

2004 2005 2006

FERNWÄRME Verbrauch in MWh

FERNWÄRME Verbrauch in MWh

738,7

758,4

632,7

560,0

580,0

600,0

620,0

640,0

660,0

680,0

700,0

720,0

740,0

760,0

780,0

2004 2005 2006

FERNWÄRME Verbrauch in MWh

• Survey on structures, installations and usage• Condition assessment • Development of orientation measures• Implementation of selected measures

3D building models for simulation

Page 6: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

6

ISDN/Analog/ GSM

EDM-Server

0101010101

ISDN/Analog/ GSM

EDM-Server

0101010101

EDM-Server

01010101010101010101

Monitoring• Measuring, documentation and analysis

of usage based data• Controlling and observing of costs for

energy consumption• Early detection of undesirable

developments and disruptions as well as identifying risks

• Taking well aimed measures

Monitoring concept

Page 7: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

7

Energy reports and online dataEnergy reports on regular basis for the following objects:

1.District Office Ludwigslust2.District Office Hagenow3.Vocational School Ludwigslust4.Vocational School Hagenow5.Secondary School Boizenburg6.Secondary School Wittenburg7.Secondary School Pampow8.Secondary School Ludwigslust9.Secondary School Hagenow10.Secondary School Dömitz11.Special School Ludwigslust12.School for individual life management Ludwigslust13.School for individual life management Hagenow14.Regional adult education center Ludwigslust

Page 8: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

8

Energy reports and online data

Page 9: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

9

Assesment and recommended measures for:

•Warm water provision•Hydraulic inefficiencies •Taking advantage of the upper heating value effect•Cycle operation of the heater•Reviewing of connected load and rating•Monitoring of generator usage•Night set back•Heating limit / summer operation•Outliers and artifacts

Energy reports and online data

Progression of the value of feed and recirculation depending on flow rate and ambient temperature at the Gymnasium Ludwigslust (17.11.2007)

gas consumption of vocational school Hagenow am 25.11.2006

Page 10: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

10

Energy reports and online data

Web portal with online data for the buildings of the project

• Consumption data for building on daily, weekly and monthly basis

• Benchmarking / review (internal and external)

• Collection of all relevant information on building(i.e. energy performance certificate, energy report, etc.)

Page 11: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

11

Results for the district Ludwigslust

• Saving of up to 19% possible with improved operation (heating interruption, system temperatures, flowrate,…)

• Savings with optimized contracts (i.e. changing connected load of long distance heating)

• Optimization of costs for investments and follow-up cost for refitting measures

• Improvement of comfort due to hydraulic adjustment and regulation of heating

• Increasing of reliability though transparency of systems (condition, maintenance, calibration of the meters, etc. )

Page 12: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

12

ECO Region in the district of Ludwigslust

Planned project:

„continuous monitoring with automated fault detection in office buildings in the district of Ludwigslust“

• Expansion of the continuous monitoring

• Implementation of automated fault detection and error report management

Page 13: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

13

ECO Region in the district of Ludwigslust

Planned project:

„continuous monitoring with automated fault detection in office buildings in the district of Ludwigslust“

• Expansion of continuous monitoring

– Expansion of the existing monitoring by adding addition system temperatures, operation values and sub meters

– Integration of recorded data into Software for automated processing for visualization, creation of statistics and preprocessing

Page 14: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

14

ECO Region in the district of Ludwigslust

Planned project:

„continuous monitoring with automated fault detection in office buildings in the district of Ludwigslust“

• Implementation of an automated fault detection and error reporting management

– Development of rule based models for automated fault detection of the monitored systems

– Implementation and testing of feasibility for other objects

Page 15: ENERGIEMANAGEMENT FACILITY MANAGEMENT prüfen - bewerten - planen reviewing – assessing - planning 1 Energy efficient building management Results of the

ENERGIEMANAGEMENTFACILITY MANAGEMENT

prüfen - bewerten - planenreviewing – assessing - planning

15

Thank you!