Energy Database - Collect information from designated factories/buildings o Fit at least one of the criteria Collective electric meter or transformer of 1,000 kW or 1,175 kVA or higher Consume more than 20 TJ - Designated factories/buildings are divided into 2 categories based on their energy consumption o Type I Collective electric meter or transformer of 1,000 kW or 1,175 kVA or higher Consume more than 20 TJ o Type II Collective electric meter or transformer of 3,000 kW or 3,375 kVA or higher Consume more than 60 TJ - Designated factories and buildings are divided into many types based on their production o Factories – such as Paper/Pulp Chemicals Textiles Food/Drinks/Tobacco -> Frozen food and Palm Oil o Buildings – such as Hotel Hospital Department Store Academic Institution - Designated factories and buildings are responsible for 2 activities o Appoint PREs (Person Responsible for Energy) o Submit Annual Energy Management Report (Source of info for database)

Energy Database Overview

Embed Size (px)

DESCRIPTION

Overview of energy database

Citation preview

Page 1: Energy Database Overview

Energy Database

- Collect information from designated factories/buildingso Fit at least one of the criteria

Collective electric meter or transformer of 1,000 kW or 1,175 kVA or higher Consume more than 20 TJ

- Designated factories/buildings are divided into 2 categories based on their energy consumptiono Type I

Collective electric meter or transformer of 1,000 kW or 1,175 kVA or higher Consume more than 20 TJ

o Type II Collective electric meter or transformer of 3,000 kW or 3,375 kVA or higher Consume more than 60 TJ

- Designated factories and buildings are divided into many types based on their productiono Factories – such as

Paper/Pulp Chemicals Textiles Food/Drinks/Tobacco -> Frozen food and Palm Oil

o Buildings – such as Hotel Hospital Department Store Academic Institution

- Designated factories and buildings are responsible for 2 activitieso Appoint PREs (Person Responsible for Energy)o Submit Annual Energy Management Report (Source of info for database)

Page 2: Energy Database Overview

Energy Management Report – 8 steps

Types of Information

1. General info – TSIC ID, Locations, PREs, Energy Management Steering committee2. Awareness of energy management, Energy Management Matrix (EMM)3. Energy conservation policy – express intention to conserve energy4. Production – Process, Total production, SEC

a. Machineries – significantly energy-consuming machineries/equipmentsb. Energy Types – Electricity, LPG, Alternative energyc. Energy –consuming system i.e. lighting, HVAC

5. Energy conservation measures implementation6. Verification – energy measurement, detailed calculations7. Internal Audit – what can be improved? Success of the energy conservation measures8. Further improvement to be made

Sample report

http://www.dede.go.th/download/energysaving58/6formfact_2557.xls