1
Energy Performance of gyGreen Buildings
ผชวยศาสตราจารย ดร.อรรจน เศรษฐบตร
Assistant Prof. Dr. Atch Sreshthaputra
Chulalongkorn University
The Association of Siamese Architects under Royal Patronage
1
2
Assessment category “L” as negative impact
Assessment category “Q” as positive impact
(Neighboring building) (Neighboring building)
g poutside the boundary
p pinside the boundary
Emission of Air-pollutants,Noise, Heatetc.
ResourceConsumption,Embodied CO2
Emission, etc.
(Neighboring building) (Neighboring building)
Hypothetical EnclosedSpace Site BoundarySoil, Water-pollutants etc.
BEE = Q / L
BEE: Building Environmental EfficiencyQ B ildi E i t l Q lit & P fQ : Building Environmental Quality & Performance
L : Building Environmental Loadings
3
100
A B +
Office
S
50
Q(Q
u alit
y ) B -
C
SchoolRetail shopRestaurantHallHospitalHotelApartment
Submission mandatory for buildings with floor areas of more than 2000m2
0
0 50 100
C Factory
L (Load)
100 BEE=1.5BEE=3.0 BEE=1.0(Very sustainable)
50
CC
B+B+AASS
BEE=0.5
QualityBB--
( y )
(U t i bl )
60 BEE=2.0 BB--
0 50 100Loading
(Unsustainable)
30
10
19
ลง
ขน
หองนา 10 ป9
ป8
บนได 1
โถงบนได 1
โถงลฟท 1
หองนา 8หองนา 9
โถงทางเชอมCH-1 CH-1 CH-1 CH-1
ทางสญจร
ระหวางชน
หองนา
แปลนสวนสานกงาน ชน 4-19NN
SHAFTFA
SHAFTEA
FHC.
หองประชม 1
หองนา 10 ป9
หองเตรยมอาหาร
หองถายเอกสาร
หอง AHU. 1หองอปกรณไฟฟา 1
หองซกลางป10'
FHC.
หองผบรหาร
หองผบรหาร
INFORMATION BOARD
หองทางาน หองทางาน หองทางาน หองทางาน หองทางาน หองทางาน
หองผชวยผอานวยการฝาย
หองผอานวยการฝาย
20
EASHAFT
FASHAFT
FHC.
FHC.
ลฟท 2หอง AHU. 2ลง
ขน
บนได 2
โถงบนได 2
งานระบบ
วศวกรรม
13
ENERGY
SEnvelope SystemLighting/Equipment
HVAC systemRenewable Energy
Building Energy ManagementMeasurement & Verification
25
16
MATERIALS
/Building Reuse / RenovationMaterial Reuse: PREFABRICATED CONSTRUCTIONRecycled MaterialsRegional MaterialsFast-growing plant materials: Bamboo, CottonCertified Wood
32
20
AEROGEL GLAZING
พนทสเขยว
ประหยดนา
ตนไมใหญ
บาบดนาเสย
Urban Heat Island
สภาวะนาสบาย
ประหยดพลงงานวสด Recycle
กงหนลม
ญ
CSR
Solar Cell
Indoor Air Quality
แสงธรรมชาต
ถงผา
21
3MAdidas
General ElectricHerman-Miller
SamsungSiam Cement PLCSiemensAir France – KLM
Barclays PlcBayer AGBMWBP (just removed)CarrefourCoca-Cola
Hewlett-PackardHitachiHSBCIntel Corp.Johnson ControlsMcDonald’sMitsubishi
SiemensStarbucksSymantecTescoToshibaToyota MotorUnileverVodafoneColgate Palmolive
DaikinDaimler AGDellGenzyme
MotorolaNikeNokiaPanasonicPepsiPuma
VodafoneVolkswagenWalt Disneys
Green Buildings Movement in Thailand
Building Energy Code (1995)Environmental Impact Assessment (EIA)Environmental Impact Assessment (EIA)Green Label Program (TEI)Green Leaf Hotel“Number 5” electrical appliances (EGAT)Energy Labeling Program (DEDE)AFD/GHB soft loan projectThailand Energy AwardsNew Building Energy Code (2009)Thai Green Building Institute (ASA/EIT)Pollution Control Department (Green Government Building)
22
Building Energy Code
Overall Thermal Transfer Value (OTTV)
Roof Thermal Transfer Value (RTTV)
Lighting Power Density (LPD)
Cooling Efficiency (kW/ton)
Whole Building Approaches (kWh/m2.yr)
(Soon) will be compulsory when applying for building permit.
EIA
Ministry of Natural Resource & Envir.
Large residential project (4,000 m2)
Large commercial complex (10,000 m2)
Wastewater
Garbage
Traffic
Green area
(SOON) building energy-related assessment
23
Green Label
Thai Environment Institute
Not many Building materials
Paint
Water closet
Water FaucetWater Faucet
Etc.
Green Leaf
Thai Tourism Authority
Hotel & Resort
Checklist scheme
“5 leaves” is the highest
24
Thailand Energy Award
Ministry of Energy
Large buildings & non-residential
New Bldg.& Retrofitted Bldg.
New Category: Green Building
Number 5 appliances
“EnergyStar” Scheme.
A/C, portable fan, light bulb, refrigerators
Best known for A/C
Insulation and glass
25
TEEAM
Thailand Energy & Environmental Assessment Method
Maintained by the Ministry of Energy
LEED-style
Checklist scheme
Gold, Silver, Bronze
AFD/GHB Soft loan
Low-income housing/condo project
High-rise, low-rise, not for single house
Government Housing Bank
Roof Insulation (6-inch), high-efficient A/C (11.5 EER), Lighting (60 lumen/watt), glass windows (Tinted glass g g ( ), g ( gSC < 0.40)
26
Assessment Tools of Building Environmental Performances around the World
51
GREEN BUILDING ASSESSMENT TOOLS
LEED & Energy Star (U.S.A.) LOTUS (Vietnam)
BREEAM (U.K.)
DGNB (Germany)
CASBEE (Japan)
Green Star (Australia)
GBCC (Korea)
HKBEAM (Hong Kong)
Green Mark (Singapore)
Green Index (Malaysia)( )
ESCALE (France)
Green Building Tool (Canada)
GOBAS (China)
( y )
TEEAM (Thailand)
PCD (Thailand)
TGBI (Thailand)52
27
GREEN BUILDING STANDARDS
Site & Landscape
Water
Energy
Materials
Indoor Environmental Quality
Community & Culture
PREREQUISITES
28
LEED Prerequisites
ควบคมมลภาวะขณะกอสรางตามมาตรฐาน USEPA-CGPป 20% B liประหยดนาอยางนอย 20% จาก Baselineมแผนการ Commissioning ดานการใชพลงงานมประสทธภาพพลงงานขนตาตาม ASHRAE 90.1 2007ทาจาลองการใชพลงงานดวยคอมพวเตอร ใหเหนวาประหยดกวา Baseline ไมตากวา 14 %ไมม CFC ในสารทาความเยนเตรยมสถานท และแผนการเกบวสดทสามารถ recycle ไดมาตรฐานคณภาพอากาศภายใน ตาม ASHRAE 62.1 2007มการจดการควบคมควนบหร
55
TEEAM PrerequisitesRTTV ตากวา 12 watt/m2 (เทยบจากกฎหมายเกา 2538)OTTV ตากวา 45 watt/m2 (เทยบจากกฎหมายเกา 2538)ป ป ประสทธภาพเครองปรบอากาศตามกฎหมายเกาไมม CFC ในเครองปรบอากาศปรมาณ Fresh Air ตามกฎหมายระดบความสองสวางผานเกณฑมระบบบาบดนาเสย บอดกขยะ บอดกไขมนมแ ผนควบคมมลภาวะขณะกอสรางมแ ผนควบคมมลภาวะขณะกอสรางเลอกใชสและหรอสารเคลอบผวทสงผลกระทบเชงลบตอสงแวดลอมนอย
56
29
TREES Prerequisitesเตรยมความพรอมสความเปนอาคารเขยวหลกเลยงทตงทไมเหมาะแกการสรางอาคาร พนททมความสมบรณทางธรรมชาต
มแผนการ Commissioning ดานการใชพลงงาน (3rd Party)มประสทธภาพพลงงานขนตา (4 คะแนน EA1) ASHRAE 90.1 2007อตราการระบายอากาศผานเกณฑมาตรฐาน ASHRAE/วสทระดบความสวางผานเกณฑมาตรฐานควบคมมลภาวะขณะกอสรางตามมาตรฐาน ควบคมมลภาวะขณะกอสรางตามมาตรฐาน เตรยมสถานท และแผนการเกบวสดทสามารถ recycle ได
57
PCD PrerequisitesสรางอาคารบนพนททมคณคาทางระบบนเวศตาประสทธภาพเครองปรบอากาศตามกฎหมายLighting power density 14 watt/m2 (Office)OTTV ไมเกน 50 watt/m2, RTTV ไมเกน 15 watt/m2ระดบความสวางผานเกณฑมาตรฐานอตราการระบายอากาศผานเกณฑมาตรฐานเครองสงลมเยนม Filter ระดบ MERV 7 ตาม ASHRAEมการตรวจสอบอาคารตามกฎหมายมการตรวจสอบอาคารตามกฎหมายมแผนควบคมมลภาวะขณะกอสรางตามมาตรฐานออกแบบกอสราง cooling tower ตามประกาศกรมอนามย ผลการวเคราะหนาทงผานเกณฑคา reflectance ของเปลอกอาคารไมเกน 30% 58
30
Energy LabelingTh il d E & E i t l
The Ministry of Energy. Chulalongkorn University
Thailand Energy & Environmental Assessment Method
59
Transportation & Location (5 points)
TEEAM: CHECKLISTTEEAM: CHECKLIST
Site planning & Landscape (7 points)Building Envelope (40 points)A/C system (10 points)Lighting System (13 points)Natural system & Renewable energy (12 points)Sanitary system (4 points)Building Materials & Construction (0, 18 environment points)Innovation (9 points)
60
31
Total 100 points
TEEAM RATINGTEEAM RATING
นอยกวา 40 “FAILED”
มากกวา 40 “GOOD”: Bronze
มากกวา 55 “VERY GOOD”: Silver
มากกวา 70 “EXCELLENT”: Gold
61
BUILDING ENVELOPE (40 points)Wall/Roof Insulation (OTTV/RTTV)
TEEAM: KEY FACTORSTEEAM: KEY FACTORS
High-Efficiency Glass (Double Glazing Low-E)
HIGH-EFFICIENCY COOLING SYSTEM (15 points)High-COP Chillers (COP > 6.24)VAV, Thermal Wheel,
HIGH-EFFICIENCY LIGHTING (15 points)9 Watt/m2 (T5 + Electronic Ballasts)Daylight Sensors/Dimmers
RENEWEABLE ENERGY + CONTROL SYSTEM (12 points)Solar/Wind Energy > 1.5% of Total Energy UseBuilding Automation System 62
32
หมวดท 4 การใชพลงงาน (Edit) Point
มแผน Commissioning จดทาโดย 3rd Party 1
มแผน Measurement & Verification 1
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 5% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 10% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 15% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 20% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 25% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 30% 2
63
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 35% 2
* ประหยดพลงงานกวา Whole Bldg. Baseline อยางนอย 40% 2
ไมใชสาร Halon หรอ CFC HCFC ในระบบดบเพลง 1
* ใชพลงงานทดแทน 0.5% ของปรมาณการใชพลงงานในอาคาร 1
* ใชพลงงานทดแทน 1% ของปรมาณการใชพลงงานในอาคาร 1
Point 21
64
33
Leadership in Energy and Environmental Design (LEED)
The US. Green Building Council (USGBC)
65
CURRENT LEED PROJECTS80,000 buildings are registered from 100 countries
40 buildings registered in Thailand
10,000 buildings are certified.
More than 300,000 LEED AP (Accredited Professionals)
More than 70 LEED APs are in Thailand
Building owner pays at least millions for certification
Additional construction cost is 10-20%
66
34
LEED
LEEDLEED--NC: New NC: New commercialcommercial construction & renovationconstruction & renovation
LEEDLEED--EX: Existing building operationEX: Existing building operation
LEEDLEED--CI: Commercial interiors projectsCI: Commercial interiors projects
LEEDLEED--CS: Core & Shell projectCS: Core & Shell project
LEEDLEED--H: HomesH: Homes
LEED School, Retail, Healthcare, HotelLEED School, Retail, Healthcare, Hotel
LEEDLEED--ND: Neighborhood developmentND: Neighborhood development
67
LEED PROJECTS
Energy Complex: LEED CS (Platinum) (A49) 68
35
LEED PROJECTS
Kasikorn Bank: LEED NC (Platinum) (D103) 69
LEED PROJECTS
Park Venture Hotel: LEED CS (Platinum) (Palmers & Turners) 70
36
LEED PROJECTS
Thai Health Promotion Office: LEED NC (Platinum) (Plan Studio)71
LEED PROJECTS
STAR PETROLIUM OFFICE: LEED NC (SILVER) (A49)72
37
หองสมด HSBC & กรงเทพมหานครLEED NC 2009 (Platinum) (DWP)
ทตลาดหลกทรพยแหงใหม: LEED NC 2009 (Gold) (A&A)
38
75
LEED NC 2009: CREDITS
Sustainable Site 26 points
Water Efficiency 10 points
Energy & Atmosphere 35 points
Material & Resources 14 points
Indoor Environmental Quality 15 pointsy p
Innovation in Design 6 points
Regional Priority 4 points
76
39
Yes ? No
12 2 Sustainable Sites 14 Points
Y Prereq 1 Construction Activity Pollution Prevention Required1 Credit 1 Site Selection 11 Credit 2 Development Density & Community Connectivity 1
1 Credit 3 Brownfield Redevelopment 11 Credit 4.1 Alternative Transportation, Public Transportation Access 11 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 11 Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles 1
1 Credit 4.4 Alternative Transportation, Parking Capacity 11 Credit 5.1 Site Development, Protect or Restore Habitat 11 Credit 5.2 Site Development, Maximize Open Space 11 Credit 6.1 Stormwater Design, Quantity Control 11 Credit 6.2 Stormwater Design, Quality Control 1
3 10 Materials & Resources 13 Points
Y Prereq 1 Storage & Collection of Recyclables Required1 Credit 1.1 Building Reuse, Maintain 75% of Existing Walls, Floors & Roof 1
1 Credit 1.2 Building Reuse, Maintain 95% of Existing Walls, Floors & Roof 11 Credit 1.3 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1
1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 11 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3.1 Materials Reuse, 5% 11 Credit 3.2 Materials Reuse,10% 11 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 11 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 11 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Region 11 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Region 1
LEED SCORE CARD
1 Credit 6.2 Stormwater Design, Quality Control 11 Credit 7.1 Heat Island Effect, Non-Roof 11 Credit 7.2 Heat Island Effect, Roof 11 Credit 8 Light Pollution Reduction 1
5 Water Efficiency 5 Points
1 Credit 1.1 Water Efficient Landscaping, Reduce by 50% 11 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 11 Credit 2 Innovative Wastewater Technologies 11 Credit 3.1 Water Use Reduction, 20% Reduction 11 Credit 3.2 Water Use Reduction, 30% Reduction 1
9 2 Energy & Atmosphere 17 Points
Y Prereq 1 Fundamental Commissioning of the Building Energy Systems RequiredY Prereq 2 Minimum Energy Performance RequiredY Prereq 3 Fundamental Refrigerant Management Required
1 Credit 6 Rapidly Renewable Materials 11 Credit 7 Certified Wood 1
11 4 Indoor Environmental Quality 15 Points
Y Prereq 1 Minimum IAQ Performance RequiredY Prereq 2 Environmental Tobacco Smoke (ETS) Control Required1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 11 Credit 3.1 Construction IAQ Management Plan, During Construction 11 Credit 3.2 Construction IAQ Management Plan, Before Occupancy 11 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 11 Credit 4.2 Low-Emitting Materials, Paints & Coatings 11 Credit 4.3 Low-Emitting Materials, Carpet Systems 11 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 11 Credit 5 Indoor Chemical & Pollutant Source Control 11 Credit 6.1 Controllability of Systems, Lighting 1
1 Credit 6.2 Controllability of Systems, Thermal Comfort 11 C dit 7 1 Th l C f t D i 1
77
6 Credit 1 Optimize Energy Performance 1 to 10 10.5% New Buildings or 3.5% Existing Building Renovations 1 14% New Buildings or 7% Existing Building Renovations 2 17.5% New Buildings or 10.5% Existing Building Renovations 3 21% New Buildings or 14% Existing Building Renovations 4 24.5% New Buildings or 17.5% Existing Building Renovations 56 28% New Buildings or 21% Existing Building Renovations 6 31.5% New Buildings or 24.5% Existing Building Renovations 7 35% New Buildings or 28% Existing Building Renovations 8 38.5% New Buildings or 31.5% Existing Building Renovations 9 42% New Buildings or 35% Existing Building Renovations 10
1 Credit 2 On-Site Renewable Energy 1 to 3 2.5% Renewable Energy 1 7.5% Renewable Energy 2 12.5% Renewable Energy 3
1 Credit 3 Enhanced Commissioning 11 Credit 4 Enhanced Refrigerant Management 11 Credit 5 Measurement & Verification 1
1 Credit 6 Green Power 1
*Note for EAc1: All LEED for New Construction projects registered after June 26th, 2007 are required to achieve at least two (2) points under EAc1. 1 Credit 7.1 Thermal Comfort, Design 11 Credit 7.2 Thermal Comfort, Verification 1
1 Credit 8.1 Daylight & Views, Daylight 75% of Spaces 11 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
TOTAL SCORE = 110
Less than 40 FAILED
40 – 49 Certified
50 – 59 Silver
60 79 Gold60 – 79 Gold
80 – 110 Platinum
78
40
LEED Prerequisites
ควบคมมลภาวะขณะกอสรางตามมาตรฐาน USEPA-CGPป 20% B liประหยดนาอยางนอย 20% จาก Baselineมแผนการ Commissioning ดานการใชพลงงานมประสทธภาพพลงงานขนตาตาม ASHRAE 90.1 2007ทาจาลองการใชพลงงานดวยคอมพวเตอร ใหเหนวาประหยดกวา
Baseline ไมตากวา 12 %ไมม CFC ในสารทาความเยนเตรยมสถานท และแผนการเกบวสดทสามารถ recycle ไดมาตรฐานคณภาพอากาศภายใน ตาม ASHRAE 62.1 2007มการจดการควบคมควนบหร
Energy & Atmosphere 35 คะแนน
ทาการจาลองการใชพลงงานเพอแสดงใหเหนการลดใชพลงงานลง 12 – 48% เพอไดคะแนน 1-19 คะแนน (เทยบกบมาตรฐาน ASHRAE 90 1 2007)เพอไดคะแนน 1 19 คะแนน (เทยบกบมาตรฐาน ASHRAE 90.1 2007)ใชพลงงานทดแทน 1 – 13% ไดคะแนน 1-7 คะแนน
มแผนการทา Commissioning ตงแตการออกแบบใชสารทาความเยนทไมมผลตอทง Ozone Depletion และ Global Warmingไมใชสาร Halon หรอ CFC HCFC ในระบบดบเพลงทา Measurement & Verification (M&V) ดวยการจาลองการใชพลงงานแลวเปรยบเทยบผลกบผลการวดจรง (Calibrated Simulation)เปรยบเทยบผลกบผลการวดจรง (Calibrated Simulation)35% ของการใชไฟฟา ตองซอมาจากโรงไฟฟาสะอาด หรอโรงไฟฟาพลงงาน
ทดแทน
43
85
Use Profile
40%
50%
60%
Diversity Factor (Electrical Appliances): Weekdays
40%
50%
60%
Diversity Factor (Electrical Appliances): Saturday
0%
10%
20%
30%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 240%
10%
20%
30%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
50%
60%
Diversity Factor (Electrical Appliances): Sunday
50%
60%
Diversity Factor (Electrical Appliances): Holidays
0%
10%
20%
30%
40%
50%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
0%
10%
20%
30%
40%
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
44
87
มาตรฐานเปลอกอาคาร LEED (Baseline)
Building Envelope (ASHRAE 90.1 2007) (Prerequisites) ไ ใ Opaque roof: U-Value หลงคาไมเกน 0.36 Watt/m2.C (ใยแกว 3 นว)
Skylight: พนทไมเกน 5% ของหลงคา. คา U-value ไมเกน 10.76 Watt/m2.C. คา SHGC ของ Skylight 0.19 – 0.36.
Vertical wall: “WWR นอยกวา 40% !!!!
Opaque wall: U-Value ผนงเบาไมเกน 0.642 Watt/m2.C (ใยแกว 2 นว), ถาเปนผนง Mass ใหไมเกน 3.29 Watt/m2.C (ผนงกออฐมอญฉาบปน)
Vertical glazing: U-value กระจก ไมเกน 6.81 Watt/m2.C. คา SHGC ของกระจก ไม
เกน 0.25 (Low-e หรอ Reflective)
88
45
Baseline Lighting Power Density (LPD)
Maximum Lighting Power Density (LPD) ตาม ASHRAE 90.1
Open office: 12 Watt/m2
Enclosed office: 12 Watt/m2
Meeting room: 14 Watt/m2
Atrium (first 3 floors): 6 Watt/m2Atrium (first 3 floors): 6 Watt/m2
Retail area: 18 Watt/m2
Parking garage: 2 Watt/m2
89
Baseline HVAC
90
46
Baseline HVAC
91
Monthly Electricity
Base Case
1500
2000
Lightweight ConcreteWall
Single Green Glass
6" Fiberglass Ceiling
kWh 1000
1500
g g
Combined
0
500
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec92
47
Energy Saving (%)
18%
16%
18%
20%
4%3%
7%
4%
6%
8%
10%
12%
14%
16%
0%
3%
0%
2%
Base Case LightweightConcrete
Single GreenGlass
6" CeilingInsulation
Combinationof All
93
Design OptionsInvestment
(Baht)OTTV
(Watt/m2)
Case Study: A Green Office
(Baht) (Watt/m2)
Typical Buildings (Audit data) ‐ 60‐100
Best Practice (Award winning) ‐ 20‐30
Original Design (As of August 6, 2008) ‐ 60.75
1). Insulating Low‐E 12,544,500 42.69
2). 4" Insulation in spandrel 320,000 60.44) p ,
3). Reduced Vision Glass (3,800,000) 53.96
4). Overhang shading device 11,900,000 53.36
5). Combined all 20,964,500 33.11
45 Watt/m2 คอคาสงสดตามกฎหมาย 2538
48
60.75
42.69
60.4453.96 53.36
33.11
20
40
60
80
OTTV (Watt/m2)
0
Original Design (As of Aug 6, 2008)
1). Insulating Low-E 2). 4" Insulation in spandrel
3). Reduced Vision Glass
4). Overhang shading device
5). Combined all
151.5 151.4149.3
147.0150
154
Energy Use Index (kWh/m2.yr)
143.3140.0
134
138
142
146
Original Design (As of Aug 6, 2008)
1). Insulating Low-E 2). 4" Insulation in spandrel
3). Reduced Vision Glass
4). Overhang shading device
5). Combined all
2,686,320
727,272
1,477,476
3,773,952
1,000,000
2,000,000
3,000,000
4,000,000
Energy Saving (Baht/Yr)
0.0 36,036 0
Original Design (As of Aug 6, 2008)
1). Insulating Low-E 2). 4" Insulation in spandrel
3). Reduced Vision Glass
4). Overhang shading device
5). Combined all
8.98.1
8
10
Payback (Years)
0
4.7
0.0
5.6
0
2
4
6
Original Design (As of Aug 6, 2008)
1). Insulating Low-E 2). 4" Insulation in spandrel
3). Reduced Vision Glass
4). Overhang shading device
5). Combined all
49
SUMMARY
131Investment
(Baht)OTTV
(Watt/m2)Energy Use (kWh/m2.Yr)
Energy Saving (Baht/Yr)
Energy Saving (%)
Payback (Years)
Typical Buildings (Audit data) ‐ 60‐100 150‐200 ‐ ‐ ‐Typical Buildings (Audit data) 60 100 150 200
Best Practice (Award winning) ‐ 20‐30 100‐120 ‐ ‐ ‐
Original Design (As of Aug 6, 2008) ‐ 60.75 151.5 ‐ ‐ ‐
1). Insulating Low‐E 12,544,500 42.69 143.3 2,686,320 5.4% 4.7
2). 4" Insulation in spandrel 320,000 60.44 151.4 36,036 0.1% 8.9
3). Reduced Vision Glass (3,800,000) 53.96 149.3 727,272 1.5% 0.0
4). Overhang shading device 11,900,000 53.36 147.0 1,477,476 3.0% 8.1
5). Combined all 20,964,500 33.11 140.0 3,773,952 7.6% 5.6
6). Combined all + Light sensor 27,964,500 33.11 131.0 6,705,972 13.5% 4.2
คา Investment สามารถหกลบสวนของคาเครองปรบอากาศทจะมขนาดเลกลงไดอก
6). Combined all + Light sensor 27,964,500 33.11 131.0 6,705,972 13.5% 4.2
เมอคาไฟขนราคา saving รายปกจะสงขน
50
เมอคาไฟขนราคา Saving กจะมากขนตาม จากปละ 6 ลาน ไปสป
ละ 21.6 ลานในปท 25
เมอรวม saving ตลอด 25 ป จะมมลคาถง 320 ลานบาท
51
การจดการพลงงาน
LEED Requirement
Fundamental Commissioning (บงคบ)
Enhanced Commissioning
Measurement & Verification (M&V)
Commissioning
The process of verifying and documenting that the facility and all of its systems and assemblies are planned, designed, installed,
tested, operated, and maintained to meet Owner’s Project Requirements.
52
Measurement & Verification (M&V)
เพอตรวจสอบปรมาณการใชพลงงานของอาคารตลอดชวงเวลาใชงาน
พฒนา M&V Plan โดยใชวธดงน อยางใดอยางหนงWhole-building calibrated simulation
Energy Conservation Measure (ECM Isolation) ตามขนตอนของ International Performance Meas rement & Verification Protocol (IPMVP) International Performance Measurement & Verification Protocol (IPMVP) Volume III: Concepts and Options for Determining Energy Savings in New Construction, April 2003.
M&V Period อยางนอย 1 ป หลงอาคารเปดใชงาน
BEFORE RENOVATION (kWh/Year)
MODEL BUILDING (kWh/Year)
MEASURED DATA (kWh/Year)
AREA LIGHTS 2,190,372 1,478,507 1,262,361
PUMP + MISC 1,172,429 1,141,019 2,018,314
Measurement & Verification (M&V)
CHILLER ELECTRIC 5,590,126 3,199,569 2,938,221
COOLING TOWERS 565,634 302,045 347,884
FANS ENERGY 4,964,932 1,818,887 1,451,550
EXT LIGHTS 93,222 93,222 92,418
TOTAL KWH 14,576,715 8,033,249 8,110,748
UPS Data Center 4,917,645 4,917,645 4,917,645
104
, , , , , ,
Water Treatment 88,607 88,607 88,607
GRAND TOTAL (kWh) 19,582,967 13,039,501 13,117,000
ENERGY SAVING (kWh/year) = 6,543,466
ENERGY SAVING (%) = 45% (ไมรวม WWT, UPS)
ENERGY SAVING (%) = 33% ( รวม WWT, UPS)
54
107Source: New Building Institute 2010
108Source: New Building Institute 2010
การออกแบบอาคารเพอใหผใชพลงงาน ลดใช เปนสงสาคญทสด
55
คน และนสยของคนเปนตวแปรทสาคญมาก
109Source: New Building Institute 2010
110Source: New Buildings Institute 2010
อาคาร LEED มากกวา 50% ใชพลงงานเกนทคาดการณไว
57
Certified Silver Gold/Platinum
LEED Energy Credits 2.8 4.9 6.9
Energy Saving ทคาดการณไว 21% 26% 34%
Energy Saving ทวดไดจรง 22% 25% 20%
113
ผลการประเมนพลงงานของอาคาร LEED
โดยเฉลย อาคารทไดรบรอง LEED ใชพลงงานนอยกวาอาคารทวไป ประมาณ 18 – 39%
แตอยางไรกด มอาคารทได LEED ถง 35% ทใชพลงงานมากกวาอาคารทวไปทไมได LEEDแตอยางไรกด มอาคารทได LEED ถง 35% ทใชพลงงานมากกวาอาคารทวไปทไมได LEED
ประสทธภาพการใชพลงงานของอาคารเมอวดจรงไมมความสมพนธกบระดบความเขยวของ
LEED ไมวาจะเปน Certified, Silver, Gold, หรอ Platinum ตางไมมขอแตกตางกนเลย
ประสทธภาพการใชพลงงานของอาคารเมอวดจรงไมมความสมพนธกบระดบคะแนนดาน
พลงงาน (Optimized Energy Performance credits)
การทา Enhanced Commissioning และ Measurement & Verification (M&V) ตามไ ป ใ มาตรฐาน LEED ไมมความสมพนธตอประสทธภาพการใชพลงงานของอาคารเมอวดจรง
อาคาร LEED ในระดบ Gold และ Platinum เปนกลมอาคารทพบวามความคลาดเคลอนของการประหยดพลงงานทตงเปาไว (34%) และการประหยดพลงงานจากการวดจรง(20%) สงมาก
114
58
115
สรป: พลงงาน กบอาคารเขยว
Energy Performance StandardgyEnergy Simulation Services (DOE-2, EnergyPlus, eQuest)Building Automation System (BAS)Measurement & Verification (M&V)
Non-CFC RefrigerantBuilding Commissioning / ESCO servicesRenewable Energy (grid-connected system)
116
60
0 0 0 Possible Points: 26Y ? N
Credit 1 4Credit 2 1C dit 3 1
LEED Certified Design and ConstructionBuilding Exterior and Hardscape Management PlanIntegrated Pest Management Erosion Control and Landscape Management Plan
Sustainable Sites
LEED EBOM: Sustainable Site
Credit 3 1Credit 4 3 to 15
Reduce by 10% 3Reduce by 13.75% 4Reduce by 17.5% 5Reduce by 21.25% 6Reduce by 25% 7Reduce by 31.25% 8Reduce by 37.5% 9Reduce by 43.75% 10Reduce by 50% 11
Integrated Pest Management, Erosion Control, and Landscape Management PlanAlternative Commuting Transportation
119
Reduce by 56.25% 12Reduce by 62.5% 13Reduce by 68.75% 14Reduce by 75% 15
Credit 5 1Credit 6 1Credit 7.1 1Credit 7.2 1Credit 8 1Light Pollution Reduction
Heat Island Reduction—Non-Roof
Site Development—Protect or Restore Open HabitatStormwater Quantity Control
Heat Island Reduction—Roof
LEED EBOM: Water Efficiency0 0 0 Possible Points: 14Y ? N
Y Prereq 1
Credit 1 1 to 2Wh l b ildi t i 1
Minimum Indoor Plumbing Fixture and Fitting EfficiencyWater Performance Measurement
Water Efficiency
Whole building metering 1Submetering 2
Credit 2 1 to 5Reduce by 10% 1Reduce by 15% 2Reduce by 20% 3Reduce by 25% 4Reduce by 30% 5
Credit 3 1 to 5Reduce by 50% 1Reduce by 62 5% 2
Additional Indoor Plumbing Fixture and Fitting Efficiency
Water Efficient Landscaping
120
Reduce by 62.5% 2Reduce by 75% 3Reduce by 87.5% 4Reduce by 100% 5
Credit 4 1 to 2Chemical Management 1Non-Potable Water Source Use 2
Cooling Tower Water Management
61
LEED EBOM: Energy & Atmosphere
121
LEED EBOM: Materials & Resources0 0 0 Possible Points: 10
Y ? N
Y Prereq 1 Sustainable Purchasing Policy
Materials and Resources
l d lY Prereq 2
Credit 1 1
Credit 2 1 to 2
40% of Electric 1
40% of Furniture 1
Credit 3 1
Credit 4 1
Credit 5 1
Credit 6 1Solid Waste Management—Waste Stream Audit
Sustainable Purchasing—Ongoing Consumables
Sustainable Purchasing—Durable Goods
Solid Waste Management Policy
Sustainable Purchasing—Reduced Mercury in Lamps
Sustainable Purchasing—Food
Sustainable Purchasing—Facility Alterations and Additions
122
Credit 7 1
Credit 8 Solid Waste Management—Durable Goods 1
Credit 9 Solid Waste Management—Facility Alterations and Additions 1
Solid Waste Management—Ongoing Consumables
62
LEED EBOM: Indoor Envir. Quality0 0 0 Possible Points: 15
Y ? N
Y Prereq 1
Y Prereq 2 Environmental Tobacco Smoke (ETS) Control
Minimum IAQ Performance
Indoor Environmental Quality
Y Prereq 2
Y Prereq 3
Credit 1.1 Indoor Air Quality Best Management Practices—Indoor Air Quality Management P1
Credit 1.2 1
Credit 1.3 Indoor Air Quality Best Management Practices—Increased Ventilation 1
Credit 1.4 Indoor Air Quality Best Management Practices—Reduce Particulates in Air Distrib1
Credit 1.5 Indoor Air Quality Best Management Practices—Facility Alterations and Additions1
Credit 2.1 Occupant Comfort—Occupant Survey 1
Credit 2.2 Controllability of Systems—Lighting 1
Credit 2.3 Occupant Comfort—Thermal Comfort Monitoring 1
( )
Green Cleaning Policy
Indoor Air Quality Best Management Practices—Outdoor Air Delivery Monitoring
123
p g
Credit 2.4 Daylight and Views 1
Credit 3.1 Green Cleaning—High Performance Cleaning Program 1
Credit 3.2 Green Cleaning—Custodial Effectiveness Assessment 1
Credit 3.3 Green Cleaning—Purchase of Sustainable Cleaning Products and Materials 1
Credit 3.4 Green Cleaning—Sustainable Cleaning Equipment 1
Credit 3.5 Green Cleaning—Indoor Chemical and Pollutant Source Control 1
Credit 3.6 Green Cleaning—Indoor Integrated Pest Management 1
LEED EBOM: Innovation, Regional Priority0 0 0 Possible Points: 6
Y ? N
Credit 1.1 1
Credit 12 1
Innovation in Operations: Specific Title
Innovation in Operations
Innovation in Operations: Specific TitleCredit 1.2 1
Credit 1.3 1
Credit 1.4 1
Credit 2 1
Credit 3 1
0 0 0 Possible Points: 4
Y ? N
Credit 1.1 1
Documenting Sustainable Building Cost Impacts
Regional Priority: Specific Credit
LEED Accredited Professional
Regional Priority Credits
Innovation in Operations: Specific Title
Innovation in Operations: Specific Title
Innovation in Operations: Specific Title
124
Credit 1.2 1
Credit 1.3 1
Credit 1.4 1
0 0 0 Possible Points: 110C ert if ied 4 0 t o 4 9 p o int s Silver 50 t o 59 p o int s Go ld 6 0 t o 79 p o int s Plat inum 8 0 t o 110
Regional Priority: Specific Credit
Total
Regional Priority: Specific Credit
Regional Priority: Specific Credit
63
LEED 2012 DRAFT
125
1. INTEGRATIVE PROCESS 3 2%
LEED 2012 Draft
2. LOCATION AND TRANSPORTATION 34 27%
3. SUSTAINABLE SITES 12 9%
4. WATER EFFICIENCY 11 9%
5. ENERGY AND PERFORMANCE 26 20%
6. MATERIALS AND RESOURCES 10 8%
7 INDOOR ENVIRONMENTALQUALITY 15 12%
126
7. INDOOR ENVIRONMENTAL QUALITY 15 12%
8. PERFORMANCE 7 5%
9. INNOVATION 6 5%
10. REGIONAL PRIORITY 4 3%
TOTAL 128 100%
64
LEED 2012 Draft1. INTEGRATIVE PROCESS 3IPc1 DISCOVERY – ANALYSES TO SUPPORT INTEGRATIVE PROCESS 1IPc2 IMPLEMENTING SYNERGIES 1IPc3 LEED ACCREDITED PROFESSIONAL 1
2. LOCATION AND TRANSPORTATION 34LTp1 SENSITIVE LAND PROTECTIONLTc1 LEED FOR NEIGHBORHOOD DEVELOPMENT LOCATION 17LTc2 DEVELOPMENT DENSITY AND DIVERSE USES 8
127
LTc3 QUALITY TRANSIT AND REDUCED VMT 4LTc4 BICYCLE NETWORK, STORAGE AND SHOWER ROOMS 1LTc5 WALKABLE PROJECT SITE 1LTc6 REDUCED PARKING FOOTPRINT 2LTc7 LOW‐EMITTING AND FUEL‐EFFICIENT VEHICLES 1
LEED 2012 Draft3. SUSTAINABLE SITES 12SSp1 CONSTRUCTION ACTIVITY POLLUTION PREVENTIONSSp1 CONSTRUCTION ACTIVITY POLLUTION PREVENTIONSSp2 ENVIRONMENTAL SITE ASSESSMENTSSc1 SITE ASSESSMENT 1SSc2 BROWNFIELD REMEDIATION 2SSc3 SITE DEVELOPMENT—PROTECT OR RESTORE HABITAT 2SSc4 SITE DEVELOPMENT— OPEN SPACE 1SSc5 RAINWATER MANAGEMENT 3SSc6 HEAT ISLAND REDUCTION 2SSc7 LIGHT POLLUTION REDUCTION 1
128
SSc7 LIGHT POLLUTION REDUCTION 1
65
LEED 2012 Draft4. WATER EFFICIENCY 11WEp1 LANDSCAPE WATER USE REDUCTIONWEp2 MINIMUM FIXTURE AND FITTING WATER USE REDUCTIONWEp3 APPLIANCE AND PROCESS WATER USE REDUCTIONWEc1 ADDITIONAL LANDSCAPE WATER USE REDUCTION 2WEc2 ADDITIONAL FIXTURE AND FITTING WATER USE REDUCTION 4WEc3 SUSTAINABLE WASTEWATER MANAGEMENT 2WEc4 COOLING TOWER MAKEUP WATER 2WEc5 ADDITIONAL APPLIANCE AND PROCESS WATER USE REDUCTION 1
129
LEED 2012 Draft5. ENERGY AND PERFORMANCE 26EAp1 MINIMUMENERGY PERFORMANCEEAp1 MINIMUM ENERGY PERFORMANCEEAp2 FUNDAMENTAL REFRIGRANT EAc1 OPTIMIZE ENERGY PERFORMANCE 18EAc2 DEMAND RESPONSE 2EAc3 RENEWABLE ENERGY PRODUCTION 3EAc4 ENHANCED REFRIGERANT MANAGEMENT 1EAc5 GREEN POWER AND CARBON OFFSETS 2
130
66
LEED 2012 Draft6. MATERIALS AND RESOURCES 10MRp1 STORAGE AND COLLECTION OF RECYCLABLESMRp2 CONSTRUCTION AND DEMOLITION DEBRIS MANAGEMENTMRc1 ENVIRONMENTALLY PREFERABLE STRUCTURE AND ENCLOSURE 3MRc2 CONSTRUCTION AND DEMOLITION DEBRIS MANAGEMENT 2MRc3 NON‐STRUCTURAL MATERIALS TRANSPARENCY 2MRc4 ENVIRONMENTALLY PREFERABLE NON‐STRUCTURAL PRODUCTS AND M 1MRc5 RESPONSIBLE SOURCING OF RAW MATERIALS 1MRc6 AVOIDANCE OF CHEMICALS OF CONCERN IN BUILDING MATERIALS 1
131
LEED 2012 Draft7. INDOOR ENVIRONMENTAL QUALITY 15EQp1 MINIMUM INDOOR AIR QUALITY PERFORMANCEEQp2 ENVIRONMENTAL TOBACCO SMOKE CONTROLEQp3 CONSTRUCTION INDOOR AIR QUALITY MANAGEMENT PLANEQc1 ENHANCED INDOOR AIR QUALITY STRATEGIES 2EQc2 LOW‐EMITTING INTERIORS 3EQc3 INDOOR AIR QUALITY ASSESSMENT 2EQc4 THERMAL COMFORT 1EQc5 INTERIOR LIGHTING 2
132
EQc6 DAYLIGHT 3EQc7 QUALITY VIEWS 1EQc8 ACOUSTIC PERFORMANCE 1
67
LEED 2012 Draft8. PERFORMANCE 7PFp1 WATER METERINGpPFp2 BUILDING‐LEVEL ENERGY METERINGPFp3 FUNDAMENTAL COMMISSIONING AND VERIFICATIONPFc1 ENHANCED COMMISSIONING 3PFc2 MONITORING BASED COMMISSIONING 1PFc3 ADVANCED WATER METERING 1PFc4 ADVANCED ENERGY METERING 1PFc5 RECONCILE PROJECTED AND ACTUAL ENERGY PERFORMANCE 1
133
9. INNOVATION 6
10. REGIONAL PRIORITY 4
LEED 2009 & LEED 2012
Points % Points %
LEED 2012 LEED 2009
1. INTEGRATIVE PROCESS 3 2% ‐ ‐
2. LOCATION AND TRANSPORTATION 34 27% ‐ ‐
3. SUSTAINABLE SITES 12 9% 26 24%
4. WATER EFFICIENCY 11 9% 10 9%
5. ENERGY AND PERFORMANCE 26 20% 35 32%
6. MATERIALS AND RESOURCES 10 8% 14 13%
134
7. INDOOR ENVIRONMENTAL QUALITY 15 12% 15 14%
8. PERFORMANCE 7 5% ‐ ‐
9. INNOVATION 6 5% 6 5%
10. REGIONAL PRIORITY 4 3% 4 4%
TOTAL = 128 100% 110 100%
68
LEED ND 2012 (prerequisite)
ทตงโครงการทเหมาะสม (Smart Location)
การอนรกษระบบนเวศน พนธพชและสตวทใกลสญพนธ
การอนรกษพนทชมนาและแหลงนา (Wetland & Waterbody)
การอนรกษพนทเกษตรกรรม (Agricultural Land)
การหลกเลยงพนทนาทวมถง (Floodplain)
135
LEED ND 2012 (Credits)Preferred Location (10 credits)
Brownfield Remediation (2 credits) Brownfield Remediation (2 credits)
Reduce Automobile Dependency (7 credits)
Bicycle Network & Storage (2 credits)
Housing & Job Proximity (3 credits)
Steep Slope Protection (1 credit)
Site Design for Habitat or Wetland (1 credit)
Restoration of Habitat or Wetland (1 credit)
Long-term Conservation Management of Habitat & Wetland (1 credit)
136
69
Conclusion: LEED 2012
CO2 footprint reduction (end results)
Sustainable Land development สาคญมาก ๆ
Biodiversity
More green products with certifications
Professional Practices – INTEGRATIVE PROCESS
Building Information Modeling -- BIM !!!
137
รางผงเมองใหม วาดวย F.A.R. BONUS 20%
Affordable Housing
Urban Public Space
Mass Transit Park & Ride
Storm water Runoff
Energy Conservation
การโอนสทธ138
74
กฎกระทรวงฉบบใหม ป พกฎกระทรวงฉบบใหม ป พ..ศศ. . 25522552
อาคารทกชนด ทกประเภท (ยกเวนอาคารทางศาสนา อาคาร
โบราณสถาน พระราชวง และองคกรระหวางประเทศ)
อาคารขนาดพนทมากกวา 2,000 ตารางเมตร
ยนรายการคานวณพรอมลงนามโดยสถาปนก วศวกร
ผออกแบบ แนบไปกบเอกสารขออนญาตกอสราง (แตปจจบนไ โ ใ
147
คณะกรรมการควบคมอาคารยงไมรบเรอง แตบางโครงการตองใชยนเสนอ
EIA)
ไมมผลบงคบใด ๆ กบอาคารเกา
กฎกระทรวงฉบบกฎกระทรวงฉบบใหม ใหม OTTV/RTTV (OTTV/RTTV (25522552))
อาคารสานกงาน สถานศกษา OTTV ไมเกน 50 วตตตอตรม อาคารสานกงาน สถานศกษา OTTV ไมเกน 50 วตตตอตรม.
RTTV ไมเกน 15 วตตตอตรม.
หางสรรพสนคา รานคายอย OTTV ไมเกน 40 วตตตอตรม.
RTTV ไมเกน 12 วตตตอตรม.
โรงแรม โรงพยาบาล สถานพกพน OTTV ไมเกน 30 วตตตอ
148
ตรม. RTTV ไมเกน 10 วตตตอตรม.
75
ขอกาหนดฉบบขอกาหนดฉบบใหมใหม ((25522552))((แสงสวางแสงสวาง))
อาคารสานกงาน สถานศกษา ไมเกน อาคารสานกงาน สถานศกษา ไมเกน 1414 วตตตอตรมวตตตอตรม. .
หางสรรพสนคา รานคายอย ไมเกน หางสรรพสนคา รานคายอย ไมเกน 1818 วตตตอตรมวตตตอตรม. .
โรงแรม โรงพยาบาล สถานพกพน ไมเกน โรงแรม โรงพยาบาล สถานพกพน ไมเกน 1212 วตตตอตรมวตตตอตรม. .
149
ประสทธภาพเครองปรบอากาศขนาดเลกประสทธภาพเครองปรบอากาศขนาดเลก
ประเภทประเภท คา คา COP (EER)COP (EER)
Air Cooled < Air Cooled < 00..995995 ตนตน 22..82 82 ((99..6262))
Air Cooled Air Cooled 11--55 ตนตน 22..82 82 ((99..6262))
Air Cooled > Air Cooled > 55 ตนตน 22 56 56 ((88 7474))
150
Air Cooled > Air Cooled > 55 ตนตน 22..56 56 ((88..7474))
Water Cooled Water Cooled ทกขนาดทกขนาด 33..99 99 ((1313..6262))
76
ประสทธภาพเครอง ประสทธภาพเครอง ChillerChiller
ประเภทประเภท คา คา COP (kW/Ton)COP (kW/Ton)
Air Cooled <= Air Cooled <= 100100 ตนตน 22..70 70 ((11..3030))
Air Cooled > Air Cooled > 110000 ตนตน 22..93 93 ((11..2020))
Water Cooled < Water Cooled < 150150 ตนตน 33..91 91 ((00..9090))
Water Cooled Water Cooled 150150--200200 ตนตน 44..69 69 ((00..7575))
151
Water Cooled Water Cooled 200200--250250 ตนตน 55..25 25 ((00..6767))
Water Cooled Water Cooled 250250--500500 ตนตน 55..40 40 ((00..6565))
Water Cooled > Water Cooled > 500500 ตนตน 55..67 67 ((00..6262))
WholeWhole--Building Consumption ApproachBuilding Consumption Approach
ใ ใเกณฑการพจารณาการใชพลงงานรวมของทงอาคาร: เมอสวนใดสวนหนงของอาคารไมผานเกณฑตามกฎหมายดงกลาว อาคารควบคม
สามารถนาเขาสการพจารณาการใชพลงงานรวมของทงอาคาร
โดยจะมการจาลองอาคารอางองทมลกษณะเหมอนอาคารทจะกอสราง
ทกอยาง แตใชคาตางๆ ตามขอกาหนดกฎหมาย (รวมทงคา WWR)
152
อาคารทจะกอสรางจะผานเกณฑไดหากมคาการใชพลงงานโดยรวมทง
ปตากวาผลการจาลองคาการใชพลงงานของอาคารอางอง
78
คาสมประสทธสดสวนความรอนทเปนภาระแกระบบปรบอากาศ และจานวนชวโมงใชงานสาหรบอาคารแตละประเภท
ประเภทอาคาร Cl Ce Co Cv nh
สถานศกษา สานกงาน 0.84 0.85 0.90 0.90 2340
โรงมหรสพ ศนยการคา สถานบรการ
หางสรรพสนคา อาคารชมนมคน0.84 0.85 0.90 0.90 4380
โรงแรม สถานพยาบาล อาคารชด 1.00 1.00 1.00 1.00 8760Cl = สมประสทธสดสวนความรอนทเปนภาระแกระบบปรบอากาศ จากไฟฟาแสงสวาง
Ce = สมประสทธสดสวนความรอนทเปนภาระแกระบบปรบอากาศ จากอปกรณและเครองใชไฟฟาตางๆ
Co = สมประสทธสดสวนความรอนทเปนภาระแกระบบปรบอากาศ จากผใชอาคาร
Cv = สมประสทธสดสวนความรอนทเปนภาระแกระบบปรบอากาศ จากการระบายอากาศ
nh = จานวนชวโมงใชงานสาหรบอาคารแตละประเภท
155
PARAMETER CODE พ.ศ. 2535 CODE พ.ศ. 2551 AS BUILT
Building Area (sq.m.) 160,000 160,000 160,000 OTTV (Watt/sq.m.) 45 40 33.84Wall Area (sq.m.) 41,217 41,217 41,217 RTTV (Watt/sq.m.) 25 12 9.83Roof Area (sq.m.) 20,000 20,000 20,000 COP 2.93 5.53 6.25
LPD (Watt/sq.m.) 23 18 16.03EPD (Watt/sq.m.) 20 20 20Occupancy (person/sq.m.) 0.10 0.10 0.10Ventilation Rate (Liter/sec.sq.m.) 0.25 0.25 0.25
Coefficient lighting 0.84 0.84 0.84Coefficient equipment 0.85 0.85 0.85Coefficient occupant 0.90 0.90 0.90Coefficient ventilation 0.90 0.90 0.90
Hours of operation 4,380 4,380 4,380
Cooling Energy (external) (kWh/yr) = 3,520,092 1,495,917 1,115,241 Cooling Energy (internal) kWh/yr = 12,777,043 6,237,500 5,333,391
Light & Plug Energy (kWh/yr) = 30,134,400 26,630,400 25,249,824 TOTAL E C ti (kWh/ ) 46 431 535 34 363 817 31 698 456TOTAL Energy Consumption (kWh/yr) = 46,431,535 34,363,817 31,698,456
EUI (kWh/sq.m. yr) = 290.20 214.77 198.12 ENERGY SAVING (kWh/sq.m. yr) = - 75.42 92.08
64%32%8%
ENERGY SAVING (%) เทยบกบพรบ. 2535 =
ENERGY SAVING (%) เทยบกบพรบ. 2551 =
ENERGY SAVING (%) เทยบกบขอมล Baseline ของ พ.พ.=