Mechanical project (1/2)• Major technical objectives of the project:
– To improve the integration and the virtual design/testing– To develop innovative technologiesOn two mechanical systems :– Variable vane system (VSV and VBV)– Power off take/Gearbox system
• General content : – Innovative design and new technologies using composite– Advanced modelling (kinematics using flexibility and friction, CFD code,
etc.) – Demonstrators– Validation through testing ("power off take", VSV, VBV)– Updated design rules – Updated best practises for simulation
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 3
Mechanical project (2/2)
• Objectives In line with the FP7 Targets :– GREEN through SFC improvement, Reduced weight, Increased life time– COST EFFICIENCY through Reduced development times, Reduction of
maintenance costs by dynamics improvement & gear noise prediction
• SME partners already identified :– Samtech (BE), Arttic (FR)
• Contact point : Christian Paleczny - Snecma Mail : [email protected] Phone : 33 1 60 59 99 79
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 4
Aerothermal project (1/2)
• Major technical objectives of the project: – Build-in a database of test cases representative of HP turbine inlet
conditions :• To validate 3D CFD and thermal codes
• to improve the numerical methodologies
• General content : – Upgrade one existing test rig with combustor simulator to provide
representative HPT inlet flow conditions ( RTDF/OTDF profile, flow unsteadiness, flow structure)
– Design and manufacturing of the test rig modification and of the turbine to be tested
– Realize tests, with the highly instrumented test rig
– Realize CFD validation using the available experimental data
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 5
Aerothermal project (2/2)
• Objectives In line with the FP7 Targets :– GREEN through SFC improvement, Increased life time
– COST EFFICIENCY through Reduced development times
• SME partners already identified :– ?
• Contact point : Remi Olive- Snecma
Mail : [email protected]
Phone : 33 1 60 59 91 76
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 6
Engine distributed control system project ( ½)
• Major technical objectives of the project: – To increase maturity (SRL) of distributed control systems used in a aero-engine– To investigate software modules running on distributed microprocessors linked by
a bus network– To assess usage and provide knowledge and recommendations for further
development
• General content :– Capture of functional requirements– Architecture and evaluation methods– Advanced control laws– SW top level design & tools evaluation– Communication sub system design– SW design & tools evaluation– Communication evaluation by simulation and test (test in specific rig)– Integrate components to demonstrate local control concepts– Smarts sensors or components requirements– Smarts sensors or components evaluation
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 7
Engine distributed control system project ( 2/2)
• Objectives In line with the FP7 Targets :– GREEN through SFC improvement, Reduced weight, Reduced nacelle
lines
– COST EFFICIENCY through Reduced development times, Reduced possession costs
• SME partners already identified :– TT Tech (Austria)
• Contact point : Marc Missout - Snecma
Mail : [email protected]
Phone : 33 1 60 59 66 24
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 8
Reality
Volvo Aero lead
Contact: [email protected]
Topics studied;– Real geometry effects
• Effect of geometrical deviations caused by the manufacturing process or wear.
• Effects on aerodynamic performance and mechanical integrity of components• Different engine components will be studied
FP7 Call 3
July 2009
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 9
Weldmat
FP7 Call 3
July 2009
Volvo Aero lead
Contact: [email protected]
Topics studied:
The focus is welding simulation and metallurgy of superalloys, to achieve predictable welding. Specific outcome of the project is:
1. Improved lifing of welds → reduced cost and weight
2. Joining dissimilar material → reduced cost and weight
3. Control of tolerances and deformation in welding → improved engine efficiency
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 10
RISE Lead: MTU Aero EnginesContact: [email protected]
• Major technical objectives of the project: – Develop a validated and predictive design tool for compressor and turbine sealing. – Improve the modelling of micro and macro cutting in seals for better engine and
fuel efficiency.– Develop an integrated model for seal abradability as an enabling technology to
increase the use of un-shrouded blades, which leads to increased engine and fuel efficiency.
• General content : – Advanced modelling, Innovative materials processing, Validation through testing,
Updated best practises
• Objectives In line with the FP7 Targets :– GREEN through SFC improvement, reduced tip clearance, increased life time– COST EFFICIENCY through reduced development times, reduction of
maintenance costs by increased life time
• SME partners already identified :• Ramiro Y Rilla S.A. ES• Ustav fyziky plazmatu AV CR, v.v.i. CZ
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 11
INTELLECT D.M. 2• Major Technical Objectives of the Project:
Support low emissions combustor technologies for aero-engines, through
– Innovative design methodologies for clean combustion. Detailed non-intrusive measurements inside low NOx combustion chambers to gain knowledge e.g. on improved fuel-air mixing
– Low emission combustors designs with improved operability– Advanced combustor cooling technologies, design and validation– Improved knowledge on combustor interfaces, compressor-combustor-
turbine modeling and experiments
• Objectives In-line with FP7 Targets:– GREEN through Lowest Emissions, Clean Combustors with Improved
Operability (Ignition, Efficiency, Lean-Blow Out)– COST EFFICIENCY through Significant Reduced Development Times, Smart
Knowledge Based Engineering Systems to allow Full Combustor Optimisation and enhanced Combustor Cooling Technologies
SME’s: Dziomba Aeronautical Consulting (DAC), Cambridge Flow Solution (CFL)
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 12
Fuel Injector Research for Sustainable Transport
WP1. Fuel Spray Preparation
WP2. Soot Prediction in Complex Systems
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 13
CoNoMaC formerly CORENOISE (1/2)
• Major technical objectives of the project: Improvement of the understanding of
– the generating mechanism of direct and indirect combustion noise– the transmission process of combustion noise through the turbine
Development and enhancement of core noise prediction methods for industrial design tools
Validation of the prediction methods on the basis of acoustic data of industrial aero-engines
• General content : Experiments involving carefully designed test cases
– A generic set up with controlled excitation– A combustor experiment on noise generation– A turbine experiment on noise propagationValidated improved prediction tools and models (high fidelity and low
fidelity) with increased accuracy, less variability requiring less computational effort
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 14
CoNoMaC formerly CORENOISE (2/2)
• Objectives In line with the FP7 Targets :– Reduce aircraft noise by 10dB
• SME partners already identified :– SMCPFA
• Contact point: Friedrich Bake - DLR
Mail : [email protected] Phone : +49-30-310006-24
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 15
Composites Project (1/2)• Major technical objectives of the project:
– Development of design methods, and advanced manufacturing simulation capability for 3D reinforced composites, including NDE capability acquisition.
• General content : – A process map for FEM supported validation and capability to optimise 3D reinforced
engine components with regard to weight and cost– Verification of the manufacture process capability and improved accuracy in analytical
verification activities– Known capabilities of NDT methods, and use of NDT to validate structural models– Known cost/benefit of using state-of -the art NDT technologies, manufacturing process
simulation and appropriate FEM methods to improve competitiveness.– Significant training benefits (100% funded), and potential for End-User employment of
researchers at the end of the project
• Benefits for SMEs: – Opportunity to work directly with end users who could utilise your capabilities in the
longer term– Opportunity to validate your capabilities through the development and testing of a
substantial test article– Access to networks of contacts in industry and academia, with potential for involvement
in other projects
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 16
Composites Project (2/2)
• Objectives In line with the FP7 Targets :– Green Aircraft – developing improved composites manufacture and design
validation capability would lead to reduced CO2 emission– Aircraft development costs – composites manufacture capability
development would enable efficient design, cheaper manufacture and utilisation of cheaper raw materials
• SME partners already identified :– Currently in negotiation– SME partners with specialist composites manufacturing, NDE, test
metrology or engineering software development capability are particularly encouraged to enquire.
• Contact point : Alison McMillan – Rolls-Royce Mail : [email protected] Phone : +44 1332 244951
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 17
MERLIN - Possible partners and activities. • ITP
– On-Line NDT– Boss Creation– Salvage (production)– Prototypes for Rigs/Blades for aerodynamics
only– No modelling
• AVIO– Boss creation on case L.P.T (min dia 300mm,
max 1800mm)– Restoration of errors during production of
cases– Build-up carrier for geared turbo fan– Build-up input shaft (corrugated shaft)– Note: Protocast (Italy SME) to be involved
• MTU– Ti Al repair fo blade– 247 static part– Part of turbine centre frame
• Rolls-Royce– On-Line NDT
– Deposition of bosses on to aeroengine cases
• TWI– Blown Powder stsrem Deposition Studies
– Powder bed Deposition system studies
• Turbomeca– Static parts
– Diffusers
– HP nozzle guide vanes
– Blade Sheilding case
• Volvo (VAC)– Manufacture and repair of structural components
– NDT
– LMD of powder and wire
– Deposit different material to substrate
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 18
Proposed Work packages – July 2009
• WP1– Project definition– Design optimisation
• WP2– Process development– High spec material– More complex– Geometry validation– Process monitoring and
control– Analysis– FE Modelling
• WP3– NDT– On-line NDT
• WP4– Testing and OEM evaluation
• WP5– Demonstrators
• WP6– Management– Inc dissemination and
exploitation
Engine Industry Management GroupEngine Industry Management Group
July 2009 Page 19
MERLIN - Innovation
• Online NDT• High Spec Materials• New Design development for performance• More Complex Geometries• Powder Recycling• Generic Demonstrator• Faster Laser Metal Deposition
• Contact point : Jeff Allen – Rolls-Royce Mail : [email protected]