Upload
kranthi-kiran
View
21
Download
0
Embed Size (px)
Citation preview
Chapter 3 Engine Room Plant (Motor Ship)
Original Date: 01 Mar. 2008
Version No.1 Page:
Revision Date:
Revision
No:0 4 of 7
Raghavzx / dmet meri kolkata
Fig. 3.2-1 Simplified Main Propulsion Plant Piping System
Notes:
1. This piping system was based on the actual Very Large Container Vessels piping arrangement owned by NYK Line (NYK Terra, NYK Themis, & NYK Theseus).
2. Piping colors denotes the kind of fluid flowing in the system, e.g. blue (Fresh Water), red (F.O./D.O.), yellow (L.O.), green (S.W.),etc.
3. Arrows denotes the fluid flow direction in the system.
4. The arrangement of equipment as indicated by symbols follows the manufacturer finished plan and use for instructional purposes only. It was simplified to facilitate easy understanding of the users.
5. Some instruments / equipments symbols as per actual plan were omitted. Please refer to actual piping diagrams onboard for a complete piping system.
LOW SEA
CHEST
J.C.F.W. HEATE
R
PISTON COOL. L.O. INLET
M/E T/C L.O.
COOLER
FROM AUX.
COOL. LINE
M.G.P.S.
FERROUS ION
F
F
F
F
FEED FILTER
TANK
DUMP COND/ DRAIN COOLER
3-WAY TEMP.
CTRL VALVE
MAIN L.O. PUMP
J.C.F.W. PUMP
BACKWASH
FILTER
3-WAY TEMP.
CTRL VALVE
DEARATOR
STEAM RETURN/DRAIN
FROM 6K STEAM LINE
MAIN L.O.
COOLER
LOW SUCTION
STRAINER
M/E T/C L.O.
TANK
HIGH SEA
CHEST
CENTRAL F.W. COOLER
F.W. EXPANSION
TANK
CYL.OIL MEAS. TANK
F.W. GENER-
ATOR
TO AUX. COOL. LINE
H.F.O. SERV.
TANK
L.S.H.F.O.
SERV. TANK
M.D.O. SERV.
TANK
M.E. F.O. HEATER
HOMOGENIZER
BOILER F.O.
SETT TANK
F.O. RETURN
PIPE
F.O. SUPPLY
PUMP
F.O. CIRC.
PUMP
VISCORATOR
3-WAY CHANGE-
OVER VALVE
CENTRAL COOL.
F.W. PUMP
FWG EJECTOR
PUMP
M.C. SEA WATER
PUMP
3-WAY TEMP.
CTRL VALVE
6K-STEAM
6K-STEAM
EXH. GAS
ECONOMIZER
AUX.
BOILER
TO G/E F.O.
LINE
BLR. F.O. HEATER
HIGH SUCTION
STRAINER BOILER
F.O. PUMP
F
T/C
AIR
CLR
6K-STEAM
M/E HYDRAULIC
OIL SYSTEM
M/E STARTING
AIR SYSTEM
(M/E) HYUNDAI
B&W 11K98ME-C
L.O. SUMP
TANK
Chapter 3 Engine Room Plant (Motor Ship)
Original Date: 01 Mar. 2008
Version No.1 Page:
Revision Date:
Revision
No:0 5 of 7
Raghavzx / dmet meri kolkata
Fig. 3.3.1-1Simplified Main Propulsion Plant Piping System
(Navigational Condition)
LOW SEA
CHEST
J.C.F.W. HEATE
R
PISTON COOL. L.O. INLET
M/E T/C L.O.
COOLER
FROM AUX.
COOL. LINE
M.G.P.S.
FERROUS ION
F
F
F
F
FEED FILTER
TANK
DUMP COND/ DRAIN COOLER
3-WAY TEMP.
CTRL VALVE
MAIN L.O. PUMP
J.C.F.W. PUMP
BACKWASH
FILTER
3-WAY TEMP.
CTRL VALVE
DEARATOR
STEAM RETURN/DRAIN
FROM 6K STEAM LINE
MAIN L.O.
COOLER
LOW SUCTION
STRAINER
HIGH SEA
CHEST
CENTRAL F.W.
COOLER
F.W. EXPANSION
TANK
CYL.OIL MEAS. TANK
TO AUX. COOL. LINE
H.F.O. SERV.
TANK
L.S.H.F.O.
SERV. TANK
M.D.O. SERV.
TANK
M.E. F.O. HEATER
HOMOGENIZER
BOILER F.O.
SETT TANK
F.O. RETURN
PIPE
F.O. SUPPLY
PUMP
F.O. CIRC.
PUMP
VISCORATOR
3-WAY CHANGE-
OVER VALVE
CENTRAL COOL.
F.W. PUMP
FWG EJECTOR
PUMP
M.C. SEA WATER
PUMP
3-WAY TEMP.
CTRL VALVE
6K-STEAM
6K-STEAM
EXH. GAS
ECONOMIZER
AUX.
BOILER
TO G/E F.O.
LINE
BLR. F.O. HEATER
HIGH SUCTION
STRAINER BOILER
F.O. PUMP
F
T/C
AIR
CLR
6K-STEAM
M/E HYDRAULIC
OIL SYSTEM
M/E STARTING
AIR SYSTEM
M/E T/C L.O.
TANK
Notes:
1. Lines description: Solid line means active pipings Dotted line means in-active
2. Arrows denotes flow direction.
3. Piping condition indicated in the diagram is based in Navigational Condition of the ship. Condition may vary based on ship to ship basis.
BOILER
CIRC.PUMP
T/C L.O. PUMP
FEED WATER PUMP
(M/E) HYUNDAI
B&W 11K98ME-C
L.O. SUMP
TANK
Chapter 3 Engine Room Plant (Motor Ship)
Original Date: 01 Mar. 2008
Version No.1 Page:
Revision Date:
Revision
No:0 6 of 7
Raghavzx / dmet meri kolkata
Fig. 3.3.2-1 Simplified Main Propulsion Plant Piping System
(Entering/Leaving Port Condition)
LOW SEA
CHEST
J.C.F.W.
HEATER
PISTON COOL. L.O. INLET
M/E T/C L.O.
COOLER
FROM AUX.
COOL. LINE
M.G.P.S.
FERROUS ION
F
F
F
F
FEED FILTER
TANK
DUMP COND/ DRAIN COOLER
3-WAY TEMP.
CTRL VALVE
MAIN L.O. PUMP
J.C.F.W. PUMP
BACKWASH
FILTER
3-WAY TEMP.
CTRL VALVE
DEARATOR
STEAM RETURN/DRAIN
FROM 6K STEAM LINE
MAIN L.O.
COOLER
LOW SUCTION
STRAINER
HIGH SEA
CHEST
CENTRAL F.W.
COOLER
F.W. EXPANSION
TANK
CYL.OIL MEAS. TANK
TO AUX. COOL. LINE
H.F.O. SERV.
TANK
L.S.H.F.O.
SERV. TANK
M.D.O. SERV.
TANK
M.E. F.O. HEATER
HOMOGENIZER
BOILER F.O.
SETT TANK
F.O. RETURN
PIPE
F.O. SUPPLY
PUMP
F.O. CIRC.
PUMP
VISCORATOR
3-WAY CHANGE-
OVER VALVE
CENTRAL COOL.
F.W. PUMP
FWG EJECTOR
PUMP
M.C. SEA WATER
PUMP
3-WAY TEMP.
CTRL VALVE
6K-STEAM
6K-STEAM
EXH. GAS
ECONOMIZER
AUX.
BOILER
TO G/E F.O.
LINE
BLR. F.O. HEATER
HIGH SUCTION
STRAINER BOILER
F.O. PUMP
F
T/C
AIR
CLR
6K-STEAM
M/E HYDRAULIC
OIL SYSTEM
M/E STARTING
AIR SYSTEM
M/E T/C L.O.
TANK
F.W. GENER-
ATOR
Notes:
1. Lines description: Solid line means active pipings. Dotted line means in-active.
2. Arrows denotes flow direction.
3. Piping condition indicated in the diagram is based on Entering/Leaving Port Condition of the ship. Condition may vary based on ship to ship basis.
BOILER CIRC.
PUMP
T/C L.O. PUMP
FEED WATER. PUMP
(M/E) HYUNDAI
B&W 11K98ME-C
L.O. SUMP
TANK
Chapter 3 Engine Room Plant (Motor Ship)
Original Date: 01 Mar. 2008
Version No.1 Page:
Revision Date:
Revision
No:0 7 of 7
Raghavzx / dmet meri kolkata
Fig. 3.3.3-1 Simplified Main Propulsion Plant Piping System
(In Port Condition)
LOW SEA
CHEST
J.C.F.W.
HEATER
PISTON COOL. L.O. INLET
M/E T/C L.O.
COOLER
FROM AUX.
COOL. LINE
M.G.P.S.
FERROUS ION
F
F
F
F
FEED FILTER
TANK
DUMP COND/ DRAIN COOLER
3-WAY TEMP.
CTRL VALVE
MAIN L.O. PUMP
J.C.F.W. PUMP
BACKWASH
FILTER
3-WAY TEMP.
CTRL VALVE
DEARATOR
STEAM RETURN/DRAIN
FROM 6K STEAM LINE
MAIN L.O.
COOLER
LOW SUCTION
STRAINER
HIGH SEA
CHEST
CENTRAL F.W.
COOLER
F.W. EXPANSION
TANK
CYL.OIL MEAS. TANK
TO AUX. COOL. LINE
H.F.O. SERV.
TANK
L.S.H.F.O.
SERV. TANK
M.D.O. SERV.
TANK
M.E. F.O. HEATER
HOMOGENIZER
BOILER F.O.
SETT TANK
F.O. RETURN
PIPE
F.O. SUPPLY
PUMP
F.O. CIRC.
PUMP
VISCORATOR
3-WAY CHANGE-
OVER VALVE
CENTRAL COOL.
F.W. PUMP
FWG EJECTOR
PUMP
M.C. SEA WATER
PUMP
3-WAY TEMP.
CTRL VALVE
6K-STEAM
6K-STEAM
EXH. GAS
ECONOMIZER
AUX.
BOILER
TO G/E F.O.
LINE
BLR. F.O. HEATER
HIGH SUCTION
STRAINER BOILER
F.O. PUMP
F
T/C
AIR
CLR
6K-STEAM
M/E HYDRAULIC
OIL SYSTEM
M/E STARTING
AIR SYSTEM
M/E T/C L.O.
TANK
F.W. GENER-
ATOR
Notes:
1. Lines description: Solid line means active pipings. Dotted line means in-active.
2. Arrows denotes flow direction.
3. Piping condition indicated in the diagram is based in In Port Condition of the ship. Condition may vary based on ship to ship basis.
BOILER CIRC.
PUMP
T/C L.O. PUMP
FEED WATER PUMP
(M/E) HYUNDAI
B&W 11K98ME-C
L.O. SUMP
TANK