AAC Review , May 10 -12, 2005 Jay Theilacker
HPTFHPTF
CRYOGENICSCRYOGENICS
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
HPTF CRYOGENICSHPTF CRYOGENICS
Design scopeDesign scope Heat load and capacity requirementsHeat load and capacity requirements Cryogenics at Meson Detector Building Cryogenics at Meson Detector Building
(MDB)(MDB) Cryogenics at New Muon Lab (NML)Cryogenics at New Muon Lab (NML) ScheduleSchedule ConclusionsConclusions
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
DESIGN SCOPEDESIGN SCOPE
Source of refrigerationSource of refrigeration
Distribution systemDistribution system
Cryogenics controlsCryogenics controls
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
HEAT LOAD & CAPACITYHEAT LOAD & CAPACITY2K 4K 80K
[watts] [watts] [watts]
MDB
NML
CW Test Facility In process of being defined TBD TBD TBD
Capture Cavity 2 Test
Proton Driverfront end to 110 MeV
1.3GHz ILC Module
Initial PI plus 2 ILC CM
PI plus 4 ILC CM
29 58 430
Two 9-cells CavitiesTwo 3.9GHz CavitiesTwo ILC CM Q=5e9, E=35 [MV/m], Rep Rate = 1 [Hz]
One ILC CMSingle 3.9GHz Four Cavity CMFour ILC CMQ=5e9, E=35 [MV/m], Rep Rate = 5 [Hz]
257 261
Capacity Required*
793
Single ILC Cryo Module (CM) Q = 5e9, E = 35 [MV/m], Rep rate = 5 [Hz]
39 42
3937
Test Area
Single 9-cells High Gradient CavityQ=5e9, E=35 [MV/m]Rep Rate = 5 [Hz]
25 NbTi Solenoids1 SSR, 16 SSR Solenoids2 DSR, 14 DSR Solenoids
190
1747
Components
9 24
- 1088
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
DESIGN SOLUTIONSDESIGN SOLUTIONS
MDB
NML
CW Test Facility New Cryogenic System
Capture Cavity 2 Test
Proton Driverfront end to 110 MeV
1.3GHz ILC Module
Initial PI plus 2 ILC CM
PI plus 4 ILC CM
Temporary Cryogenic System3.5 g/sec LHe
CTF - Three Tevatron Satellite Refrigerators60 Watts at 2K
CTF - Three Tevatron Satellite Refrigerators1500 Watts at 4K
CTF - Three Tevatron Satellite Refrigerators60 Watts at 2K
New Cryogenic System
Test Area Cryogenic System and Capacity
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
CRYOGENICS AT MDBCRYOGENICS AT MDB
Meson Cryogenic Test Facility (CTF) Meson Cryogenic Test Facility (CTF) cryogenic plant cryogenic plant ↔
Meson tunnel transfer line Meson tunnel transfer line ↔
Vacuum pump Vacuum pump ↔↔
Helium recovery and purification Helium recovery and purification system system ↔↔
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
CRYOGENICS AT NMLCRYOGENICS AT NML
Temporary Cryogenic SystemTemporary Cryogenic System Option 1 Option 1 -- Dewar Based System Dewar Based System ↔ Option 2 Option 2 -- TeV Satellite TeV Satellite ↔↔
New Cryogenic SystemNew Cryogenic System Option 1 Option 1 -- Modified SSC plant Modified SSC plant Option 2 Option 2 -- New Hybrid Type Plant New Hybrid Type Plant
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
SCHEDULESCHEDULE
MDBMDB Cap Cav II 4K Operation Cap Cav II 4K Operation -- October '05 October '05 Cap Cav II 2K Operation - December '05Cap Cav II 2K Operation - December '05 8 cavity 1.3 GHz ILC CM - Spring '078 cavity 1.3 GHz ILC CM - Spring '07 PD Test Area - Fall '07PD Test Area - Fall '07
NMLNML Decision on Phase I option - June '05Decision on Phase I option - June '05 Decision on Phase II option - August '05 Decision on Phase II option - August '05
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
CONCLUSIONSCONCLUSIONS
Phased approach is taken to construct Phased approach is taken to construct HPTF cryogenic systems HPTF cryogenic systems
Test area cryogenic distribution systems Test area cryogenic distribution systems are user specificare user specific
New cryogenic plant is the critical pathNew cryogenic plant is the critical path
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
DEWARS BASED SYSTEMDEWARS BASED SYSTEM
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
TeV SATELLITE TeV SATELLITE
SATELLITE REFRIGERATOR
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
CTFCTF
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
CTF UPGRADECTF UPGRADE
Refurbish gas storageRefurbish gas storage Move oil removal vessels outside CTFMove oil removal vessels outside CTF Add PSAdd PS--1 Mycom compressor and its 1 Mycom compressor and its
controlscontrols Upgrade refrigerator controlsUpgrade refrigerator controls Modify compressor pipingModify compressor piping Install tunnel side bayonet can w/ LNInstall tunnel side bayonet can w/ LN22
subcoolersubcooler
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
TUNNEL TRANSFER LINETUNNEL TRANSFER LINE
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
TUNNEL TRANSFER LINETUNNEL TRANSFER LINE
Isolate unused header and transfer Isolate unused header and transfer line (TL) branchesline (TL) branches
Fix existing expansion box @ 1000' Fix existing expansion box @ 1000' WestWest
Transition to Pbar/Muon style TLTransition to Pbar/Muon style TL Reuse muon expansion boxReuse muon expansion box Install 350' TL and headersInstall 350' TL and headers Refurbish existing instrumentationRefurbish existing instrumentation New bayonet can with He and NNew bayonet can with He and N22
subcoolerssubcoolers
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
TUNNEL TRANSFER LINETUNNEL TRANSFER LINE
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
TUNNEL TRANSFER LINETUNNEL TRANSFER LINE
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
VACUUM PUMPVACUUM PUMP
Manufactured by Tuthill Kinney Manufactured by Tuthill Kinney
Roots Blower Roots Blower -- Model KMBD 10000 Model KMBD 10000
Liquid Ring Liquid Ring -- Model KLRC 2100 Model KLRC 2100
Skid was assembled by JLabSkid was assembled by JLab
Capacity is ~ 10 g/sec at 12 torrCapacity is ~ 10 g/sec at 12 torr
Being modified at PAB for He serviceBeing modified at PAB for He service
Engineering and Engineering and Design GroupDesign Group
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Fer
mi N
atio
nal
Acc
eler
ator
Lab
orat
ory
Cry
ogen
ic D
epar
tmen
tC
ryog
enic
Dep
artm
ent
AAC Review , May 10 -12, 2005 Jay Theilacker
HELIUM RECOVERY HELIUM RECOVERY
PSPS--1 compressor is used to recover 1 compressor is used to recover helium from the MDBhelium from the MDB
Full flow inline purifierFull flow inline purifier
Connections to mobile purifierConnections to mobile purifier