“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ” Presented by Eng. Elias Abou Chedid Head of Technical Department Elements Sun & Wind

“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”

  • Upload
    tea

  • View
    38

  • Download
    0

Embed Size (px)

DESCRIPTION

“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”. Presented by Eng. Elias Abou Chedid Head of Technical Department Elements Sun & Wind. The Company | Concept | Case Study | Economical Study | Conclusion. About the Company:. Name: . Elements Sun & Wind. - PowerPoint PPT Presentation

Citation preview

Page 1: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

“Engineering Custom Made Photovoltaic Solutions for the Lebanese Industry ”

Presented by Eng. Elias Abou ChedidHead of Technical Department

Elements Sun & Wind

Page 2: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Engineering, Consultancy, Economic Analysis, Equipment supply…

The Company | Concept | Case Study | Economical Study | Conclusion

Name:

Elements Sun & Wind ECOrient 2014 2

About the Company:

Slogan: Establishment: Address: Field of Work:

Size: PV Built Capacity: Scope of Work:

Elements Sun & WindClean Power Providers

Feb 2011

Horch Tabet- LebanonEngineering and Procurement Contracting

25 Employees (3 Engineers)

400+ kWp

Page 3: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

We deliver quality solutions and services

Elements Sun & Wind ECOrient 2014 3

About the Company:

Vision:

Values:

Mission:

To reinforce our presence in the Lebanese market and further extend abroad and become a regional player in the MENA region .

◦ Credibility◦ Safety◦ Customized Solutions

◦ Excellence◦ Team Work

The Company | Concept | Case Study | Economical Study | Conclusion

Page 4: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

The Way we See the PV Market in Lebanon:

Elements Sun & Wind ECOrient 2014 4

Photovoltaic

Systems

Grid Connected

Stand Alone

Public Grid(Net

metering)

Private Grid

(PV/Diesel)

With Batteries (Remote areas, Backup,

Street lighting,..)

Without Batteries

(Special Applications)

Find the Most Adapted Type

for Each Application ?!!!

-Grid Quality-Low Prices

- High lifecycle cost- Short lifetime- Pollution

The Company | Concept | Case Study | Economical Study | Conclusion

Page 5: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Concept of a PV Diesel system:

Elements Sun & Wind ECOrient 2014 5

LoadPublic Grid

Diesel Genset

PV PanelsInverter

10 ¢/kWh

28 ¢/kWh

5 ¢/kWh

The Company | Concept | Case Study | Economical Study | Conclusion

Page 6: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

The PV system injects power to:

Elements Sun & Wind ECOrient 2014 6

The Public Grid The Diesel Genset Grid

2000MW 1MW>>>∞ ?Is this Solution Technically Feasible?

The Company | Concept | Case Study | Economical Study | Conclusion

Page 7: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Elements Sun & Wind ECOrient 2014 7

The PV power is synchronized with the Generators Power:

P PPLoad Gen PV

For a determined load, any variation of the PV power will Directly affect the Power produced by the Generators (indirect

relation)

The Company | Concept | Case Study | Economical Study | Conclusion

Page 8: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Elements Sun & Wind ECOrient 2014 8

If the power taken from the PV system is too big:• The generator may work below its minimum acceptable load

• Reverse current will be injected to the Stator of the Generator causing it to act as a load

- Poor Combustion- Deposit forming on turbo and exhaust- Oil and lubricant consumptionReduce Service life

- Stator Will heat and burnDamage the Generator

If the variation of the PV power is big and relatively fast:- Unstable Frequency

- Over/Under Voltage- High Distortion LevelsPoor Grid Quality

• Low spinning reserve: Generators incapable of taking full power of the PV systemComplete Shut Down of the Grid

The Company | Concept | Case Study | Economical Study | Conclusion

Page 9: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Elements Sun & Wind ECOrient 2014 9

LoadDiesel Genset

PV PanelsInverter

Controller

Lower PV PowerIncrease PV Power

The Company | Concept | Case Study | Economical Study | Conclusion

Page 10: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

Elements Sun & Wind ECOrient 2014 10

The System Is Implemented,

Tested and Already in Service

5th in the World

1st in the Middle

East

The Company | Concept | Case Study | Economical Study | Conclusion

Page 11: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

ECOrient 2014 11Elements Sun & Wind

• Case Study:- Location:- Average Daily Load:

- Available Genset Power:

- Installed PV Power:

- Inverters:

API- Zouk Mosbeh450-600kW

- Power Sources: Only Gensets3 X 635 KVA

- Yearly Diesel Consumption:900 Tons

- Occupied Roof Surface:

192 kWp

1200m²

8 X 20KW

The Company | Concept | Case Study | Economical Study | Conclusion

Page 12: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

ECOrient 2014 12Elements Sun & Wind

What can this PV System technically achieve?

• 245,000 kWh annual energy yield• 70,000 litters/year of fuel consumption reduction

• 170 tons/year of CO2 emission reduction• 4.6 tons/year of SO2 emission reduction

1 2 3 4 5 6 7 8 9 10 11 120

5,000

10,000

15,000

20,000

25,000

30,000

Monthly Energy Yield (kWh)

The Company | Concept | Case Study | Economical Study | Conclusion

Page 13: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

PV

EDL

Diesel G

enera

tor05

1015202530

0 5 10 15 20 25 30$0

$200,000$400,000$600,000$800,000

$1,000,000$1,200,000$1,400,000$1,600,000

Cumulative Cash Flow Simu-lation

• Granted By the EU by 5%

• Very Attrative Cash Flow

- 1.075% Interest rate

Elements Sun & Wind ECOrient 2014 13

What about the Economical study of the project?

• The system’s Implementation cost was covered by a NEEREA Loan

- 2 Years Grace Period- 8 Years Loan Period

• The PV Electricity is very cheap: 5¢/kWh Cost (¢/kWh)

- No Down Payment

• Simple Payback 5.9 Years

- Real PBP = 0 Years- NPV= 525,000$- IRR= ∞ %

- Always Positive

The Company | Concept | Case Study | Economical Study | Conclusion

- Always Ascending

- 10 Years Total Loan Period

Page 14: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

“I now own a half million dollar power plant on the roof of my factory which produces clean and cheap energy… And I did not pay a single penny”

Elements Sun & Wind ECOrient 2014 14

Attractive Performance Very Appealing Economical Results

Technically Safe System

The Tailored Fit PV/Diesel Hybrid Solution Opens New Horizons for Solar Power to Revolutionize the

Lebanese Energy Sector.

Conclusion:

Mr. Gaby Abou Chedid, CEO,API.

The Company | Concept | Case Study | Economical Study | Conclusion

Page 15: “Engineering Custom Made  Photovoltaic Solutions for the Lebanese Industry ”

ECOrient 2014 15Elements Sun & Wind

 Visit Us At Booth K12