25
Engineering Technology www.etg-eg.com

Engineering Technology - etg-eg.com · • Stores 300 m2 Maadi ... • ABB AC 31 , AC700F , ACS 550, ACS 800 • Siemens S7-300 , 200 M , ... One Marina manual scissor lift 8 m

  • Upload
    vokiet

  • View
    239

  • Download
    1

Embed Size (px)

Citation preview

Engineering Technology

www.etg-eg.com

Group CV 2 of 25

Company presentation ET

ETG Engineering Technology Group... A leading group of companies working in the field of Engineering, manufacturing and contracting of electromechanical projects and Services. The group if currently formulated of three companies: Engineering And Services Technology SAE EAST : The Heart , Engineering and Sales arm of the group

Within EAST activities we have the products sales, projects sales and studies, Engineering development, application Software development, Technical Services and support, the productions facilities, electrical panels building, Steel works manufacturing, contracting services. the company has as well the central cooperate services of the group (for Accounting, Finance, Human resources and IT)

Petroleum Services Technology Ltd. PST : The Group Arm in the field of oil, gas and petrochemical engineering related

services, the company offers diverse services in both the midstream and downstream activities.

Group CV 3 of 25

Company presentation ETFacts & Figures: EAST Joint stock company fully owned by The Abdel Malek Family EIT limited liability company 70 % own by EAST and 30 % by family private equities PST limited Liability company 50% owned by EAST 50% by other private equities issued Capital 120’000’000.00 EGP Paid capitals: 14’000’000.00 EGP Running investments: 20’000’000.00 EGP Total Sales figures as per 2012: 62’000’000.00 EGP ( Local + Agencies) approx. 10 M USD Man Power Resources:

• Number of Employees: 57 ( permanent) • Number of Engineers: 20 • Number of qualified Technician: 20 mostly are OSHA Certified • Number of support team : 17

OUR MAIN ASSET IS OUR PEOPLES EVEN WITH A SHORTAGE OF TOOLS WE ARE ABLE TO MAKE IT

Locations:

• Headquarter (offices) 500 m2 Maadi • Stores 300 m2 Maadi • Open stores 500 m2 Maadi • New factory ( under construction 2012) 4500 sqm

Address: 30 St. 276 New Maadi – Cairo 11435 Egypt Phone & Fax: Headquarter: ++ 20 2 25193383/2 - Fax ++20 2 25193381 e-mail : [email protected] Member of:

• Egyptian Trade Chamber • Swiss Business association • Engineering industries Chamber – Egyptian industrial association • Egyptian Association for construction and building • German Arab Trade Chamber • Arab Roads association

Group CV 4 of 25

Company presentation ET In office resources Automation activity Technical reference library: We have access to the complete technical reference library of:

• ABB Industrial IT • Moeller Sucosoft S40, • Intellution fix 32, • Intellution IFIX • Step7 V5.4 • WinCC • WinCC Flexible • EPLAN P8 • Intouch • Protool

Hardware resources . We develop and configure mainly on PC’s with off line tools, but we have also test unit for PLC’s

• ABB AC 31 , AC700F , ACS 550, ACS 800 • Siemens S7-300 , 200 M , S7-200, S7-400 • Moeller • VIPA interface cards • AB • Proface • ESA

SIEMENS

Group CV 5 of 25

Company presentation ET Workshop resources Plant / Machines activity Cars

Two double cabin cars ( Toyota) Two Single Cabin cars ( Toyota)

Tools

Full set of hand tools Generator / welding set Generator / power set Hydraulic filling / filtering pumps Fuel filling / filtering pumps

Software Rexroth diagnostic tools Cummins Diagnostic tools Workshop resources contracting activity Machines Two Haullotte man lifts 10 m Two Haullotte scissor lift 12 m One Toyota electric forklift 2 t 6 m One Toyota diesel forklift 2t 6 m One Marina manual scissor lift 8 m Tools

25 Grinding machine Dewalte 5 Punching machines 30 Drill 5 electric welding machines 2 gas welding machines 50 set of hand tools (electric – mechanical)

Group CV 6 of 25

Company presentation ET Activities: 1) Engineering. - SCADA or DCS software using ABB Industrial IT, WIN CC and INTELLUTION, INTOUCH - Production control system design. - Batching and weighing control system - PLC programming. - Water gates & pumping station control. - Control Systems Cement, Glass, and limestone processing, furnace control systems - Control systems for Sewage works - Temperature control systems - Low voltage Power panels design

- Motor control center - Drives and Motors integration systems - Power distribution panels, ATS, Synchronization panels 2) Assembling: - - Control panels and desks. - Power panels. 3) Maintenance & services A) Control system. - PLC - Speed control drives B) Mechanical work

- Steel structure works - Piping works - Crushers, mills - Concrete plants supply and retrofits - Asphalt plants supply and retrofits. - Road construction Machineries ( compactors , rollers , pavers) - Forklifts – backhoes - Food industries production lines - Cement production line supports - Glass production line supports C) Relocating and Packing services - Dismantling, seaworthy packing (special aluminum foil system) and container arrangements of complete production lines for different process

4) spare parts (Logistics) Supply all electric / electronic / mechanical components according to the clients’ request.

Group CV 7 of 25

Company presentation ET 5) Representation. We are currently representing: Plant and machines Activities

- AMMANN group of Switzerland for machinery

- Yanmar france for mini excavators

- Stema Pedex for Steel rebarring production lines

- GIPO for mobile Crushers and screening units

- Cukurova backhoe loaders and forklifts Electro-Automation Activities

- Muller Industrie-Elektronik of Germany for instruments

- Sartorius Germany for weighing applications

- Camille Bauer of Switzerland for power monitoring devices.

- Official System Integrator and distributor for ABB Frequency inverters, Motors, Up to 4 MW , DCS , Instrumentation and gas Analyzers

- System integrator for Siemens Automation and drives applications

- Sole Agent for Hyosung Motors Korea

Group CV 8 of 25

Company presentation ET Rankings

• AMMANN group Asphalt plants sales market shares in Egypt 65% rank 1

• Egyptian Market plant services (Asphalt) – best performer

• AMMANN Pneumatic rollers market shares in Egypt 60% rank 1

• EAST is the only ABB drives and motor application system integrator in

the MENA Region Product EAST based on its long and professional field knowledge has its own Product solution for Green energy named EAS EAS is a system solution to provide residential, commercial and industrial application with Solar energy both on grid and off grid configuration

Energy Advanced Solutions

By EAST

Group CV 9 of 25

Company presentation ET History

1954 First business approach to the Egyptian market with Roads building contracting company

1976 Starting the heavy Machineries business with CAT and AMMANN of Switzerland

1980 Joint Venture with the Swiss Geillenger for Steel fly over bridges manufacturing Several projects had been conducted in Egypt

1999 Establishing Engineering and Services technology... first time acting into the process automation business

2002 Establishing the special design instrumentation and Agency acquiring for Mueller Industrie GmbH Germany

2003 Merging the construction machineries of AMMANN group into the EAST company

2005 Establishing the new division of Mechatronics via cooperation with Sartorius Germany

2006 Establishing the Power system division via cooperation with Camille Bauer – Switzerland

2006 Splitting the contracting and manufacturing arm to formulate EIT company

2006 Forming the Engineering Technology Group

2007 The New Holding company acquires EAST and EIT main shares

2007 Receiving the License from ABB Germany and Finland to integrate ABB frequency inverters into our systems

2008 Starting the project for our new production and workshop facilities over 4000 sqm in October city

2009 First biggest Asphalt plant in Egypt 2010 First Time complete control system Of electrical Furnaces 2011 EAST switch to Joint Stock company 2012 Establishing of PST ( Petroleum Services)

Group CV 10 of 25

Company presentation ET

Group Vision

To create a company with High Engineering strength that provides customers with first Class solutions and services

“A WORLD OF SOLUTIONS”

Group CV 11 of 25

Company presentation ET

Goals, Values and Beliefs

Our goal at ETG is simple –

Extraordinary customer service as we meet our customer's needs in the targeted industries. We accomplish this by providing information and resources to them that frees them up to address the core goals of their business and production, and by partnering with organizations and companies who are as committed to quality as we are.

Our goals are accomplished by the commitment of every employee.

Our values and beliefs require that we:

• Treat each employee with respect and listen to their input on how to continually improve our service goals.

• Treat each employee fairly. ETG. does not tolerate discrimination of

any kind and encourages all supervisors to involve employees in problem solving creativity. When problems arise, the facts are analyzed to determine ways to avoid similar problems in the future.

• Provide the most effective and efficient corrective action in resolving

customer service issues to ensure our customers' satisfaction.

• Have an open door policy which encourages interaction, discussions and the exchange of ideas to improve the work environment, and increase our productivity.

• Deliver competitive, outstanding service to our customers and, where

required, partner our customers with vendors who share our vision.

• Make "Do It Right The First Time" our commitment as a team

Welcome to our company Doc. 12 of 25

Company presentation ET

Group Structure

ETG

EIT EAST

Plants Machines

Electro-Automation

Projects, Services and Development

Consultant Office

Manufacturing Electro-mechanical Contracting

Panel Building

Mechanical steel works

Services

Agencies / distributors

PST

Downstream

midstream

Consultancies

Steel structures

Weighing bridges (Steel and concrete)

Welcome to our company Doc.

References ETReferences Our staff has conducted the following projects

1- PASTA Lines control system ( Buhler AG – Switzerland) commissioning and start-up of 12 Pasta Line with S7-400 PLC system , WINCC SCADA software and WAGO I/O interface., E+H instrumentation ,

2- Ball Mill / crushing plant in Helwan- Egypt ( Nile Co roads and bridges) Design and implementation of a full control system for the Limestone Raw Ball mill 25 T/H using PLC system and OP with a total of 150 I/O and 400 KW ABB Frequency converter.

3- Ball Mill / crushing plant in Nouakshout- Mauritania ( AMMANN AG) Design and implementation of a full control system for the Silica Raw Ball mill 5 T/H using PLC system and OP with a total of 150 I/O and 400 KW ABB Frequency converter.

4- Asphalt Batch weighing system

design and implementation of 5 system of Asphalt batch weighing system using PLC system and SCADA software package a total of 250 I/0 system .

5- Rise Hammer mill control system ( Buhler AG – Switzerland) design and implementation of 3 rice hammer mill using PLC system and Danfos Frequency inverters )

6- Floor Mill Control and Power system (Buhler AG – Switzerland) Design and implementation of conventional control system for 75 motor in the milling process including mimics implementation cable supplies, cable laying, terminations, labeling,( complete plant installations)

7- slide gates control system (Suez cement company) ( 3 systems ) Design and implementation of control system for slide gates control system including panel building.

8- C5 Limestone Reclaimer 1 Upgrading (Suez cement company)

Design and implementation of control system for slide gates control system including panel building.

9- Clay Stacker Control upgrade project ( Tourah cement company)

Design and implementation of the new stacker control concept including panel building software programming and installation works.

Welcome to our company Doc.

References ET

10- Upgrade of the EB Fans DC Motor drives ( Suez Cement company )

Design and implementation of new DC Drive panels to control two EB fans motor that include new control concept using ABB DC drives / Siemens PLC’s / Camille Bauer Video graphic recorders.

11- Supervision and consultancy for Fabric Home Care (P&G Nigeria Ltd.) Acting as consultant for one year for the Project executed by Orascom for the complete electrical installation of the plant, including rewiring of all control panel to be adapted to the line modification.

12- Industrial Telephone system (Procter and Gamble Nigeria ltd.)

Design, implementation and installation a complete industrial telephone system with public addressing system for the factory complex.

13- New computer network system ( Kafr El Zayat pesticides company)

design installation and commissioning of a complete 72 node computer network in two building including cable termination , switches and network start-up

14- New Industrial computer network (Egyptian Glass Company)

Design , implement and start-up of the new Ethernet / TCP/IP network to connect the process controller and SCADA stations including Fiber optic links , Fiber optic Switches

15- Upgrade and SCADA adjustment (Egyptian Glass Company) upgrade and implementation of new configuration on the ABB Advant OCS system including , Controller and SCADA modifications )

16- New Telephone PABX system (Organic company for fertilizers)

Design , implementation , installation of a 6/16 Panasonic network including cable laying, termination , PABX programming and customization.

17- Upgrade Truck Scale 80 Tons (Menyia Cement Company)

Upgrade the truck weighing bridge including new Load cells Sartorius new truck scale controller .. installation calibration

18- New Truck Scale 120 Tons ( El pharos rice milling)

New steel weighing bridge 20 x 3 m complete with Sartorius load cells , and electronic including design .. Manufacturing, installation and calibration.

Welcome to our company Doc.

References ET

19- Power monitoring system (Suez Cement company ) monitoring of the power consumption for 123 motor each with a separate indicator ( Camille Bauer A210 ). The project includes the supply of product, engineering, panel assembly, erection and commissioning on site.

20- Kiln Drive upgrade ( Mineya Cement Company)

upgrade and conversion of the Main Kiln drive motor from DC to AC with a new AC drive using ABB products, the project includes , engineering products supply and commissioning supervision

21- Cement Bags counter( Helwan Cement Company)

Supply and install of a PLC based control system to count the produced bags from the all production line , (monitoring and counting local in at each bagging station, project includes supply of all material , installation , commissioning .

22- ID Fans Upgrade ( Tourah cement Plant – line 7) Design and implementation of new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 2500 Amp and 1200 Amp / Siemens PLC’s / Camille Bauer Video graphic recorders.

23- Power monitoring system (Helwan Cement Company ) monitoring of the power consumption for 55 motor each with a separate indicator ( Camille Bauer A210 ). The project includes the supply of product, engineering, panel assembly, erection and commissioning on site.

24- ID Fans Upgrade ( Katameya cement Plant ) Design, implementation and installation of Two new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 1900 Amp / Siemens PLC’s / Camille Bauer Video graphic recorders.

25- Cooler Fans Upgrade ( Katameya cement Plant ) Design, implementation and installation of Three new DC Drive panels to control two ID fans motors that include new control concept using ABB DC drives 640 Amp / Siemens PLC’s / Camille Bauer Video graphic recorders.

26- Kiln Drive upgrade ( Tourah Cement Company – line7)

upgrade the Main Kiln drive motor with a new DC drive using ABB products, the project includes , engineering products supply and commissioning supervision and training.

Welcome to our company Doc.

References ET27- Kiln Drive Upgrade ( Katameya Cement Plant )

Design , implementation and installation of New DC drives ( two parallel drive units) for the Main Kiln drives using new control and drive system from ABB , type DCS 800 1900 Amp each .. Including Siemens PLC.. Video graphics recorders Camille Bauer

28- New Rice Mill plant ( El pharana Rice Milling – Damitta )

The project is concerned of engineering, supplying , commissioning and installation of the complete electrical package for the Rice milling plant - Main distribution panel - Main MCC panel - IN-feeding MCC panel - Cable routing and cable laying - motors connections - dry test and on load test

29- New office building electromechanical works ( YKK- plant Egypt) all electrometrical works for the new office building includes: - New AC system - New electric network, computer networks, PABX system with IP telephony - New Power distribution system - Dismantling all old installed systems - All lighting system - Earthing system - Raised floor and selling works - Drainage system for the AC units - Supply all cables , cable ducting, cable trays for the whole project

30- New Crusher Plant (Cemex – Egypt Attaka quarry) all electric installations at the quarry supply and install: - All project cables - Cable trays, cables roots excavations - ATS Panel - Main distribution panel - Earthing system - Lighting towers - Street Lighting - Cables connections for all crushing plants motors .. terminations and labeling - complete truck scale system 120 Ton

31- Rehabilitation of the LV Distribution panels (EFACO) Complete dismantling of the ( units LV Air Circuit breaker of the 3 Transformers … Renewing the Busbar system of the panels Supply, Installation and connection of the New Air Circuit breaker ( Merlin

Welcome to our company Doc.

References ETGerin) renewing the control circuit put into operation the complete system

32- Dismantling and relocation of Pampers production line (P&G) in cooperation with TEC Germany ; we have assists for the complete dismantling , transporting rehabilitation, crating , Container storage, Containers shipping for a complete production line P&G Egypt to Morocco.

33- Upgrade of Additives stacker and reclaimer (Mineya cement plant)

Upgrade of the Additives Stacker control system from April PLC system to S7-300 Siemens PLC in addition to operator Touch screen TP270 from Siemens.

34- Dismantling and relocation of Pampers production line (P&G) in cooperation with PSP Germany ; we have assists for the complete dismantling , transporting rehabilitation, crating , Container storage, Containers shipping for a complete production line P&G Egypt to Nigeria.

35- Upgrade of Limestone circular type stacker and reclaimer ((Mineya

cement plant) Upgrade of the Additives Stacker control system from April PLC system to S7-300 Siemens PLC in addition to operator Touch screen TP270 from Siemens.

36- Remote evacuation system ( Cemex Plant - Assiut) Design and implement of a new concept remote evacuation system to guide the works during the evacuation process in case of fire … the system includes manual calling units, sounders and controllers .

37- Fault recording system for power stations ( Damanhour Power station) The project includes material supply , engineering , implementation and installation of the complete project. The supplies include 5 units of Camille Bauer Video Graphics recorders with 36 channel each for a total of 180 channel to be monitored

38- Power Monitoring System (EFACO) Complete Engineering, supplies of Power monitoring and Analysis system including the dismantling of the old system , erection and commissioning of the new 19 inch rack monitoring and Power calculation and Analysis devices from Camille Bauer that cover to melting furnace. All products supplied from Camille Bauer , Switzerland total signal of 120 signal

Welcome to our company Doc.

References ET39- Truck Scale weighing bridge (SINAI Cement)

complete design , construction of two weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3 .. with our own EAST Software package .. communication between controller and PC over Ethernet protocol

40- Truck Scale weighing bridge (RoyaI Cement) complete design , construction of One weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3 .. with our own EAST Software package .. Communication between controller and PC over Ethernet protocol

41- Installation of Oil filling machine ( Misr Petrolium) Erection and commissioning support of a packing machine .. within the scope of work was a manufacturing and installation of stainless Steel buffer tank and pumping system.

42- Truck Scale weighing bridge (PLACO Egyptian Gypsyum – Saint Goban) complete design , construction of One weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X5 ..

43- Upgrade of Cement Mills system ( Tourah Cement )

Design, implementation, erection and commissioning of a complete control and power system to upgrade the Cement Mills at Line 7 Tourah Cement The project includes: cable Trays supply, routing design and install cables Supply and install Steel Bridges manufacturing and install Power panels Design , manufacturing and install Control Panels Design , manufacturing and install Transformer supply and Install Medium voltage cables supply and install Control system ABB Industrial IT design, supply , install and start-up HMI development Project documentation connections for all projects equipments

44- Truck Scale weighing bridge (Lafarge Quaries) complete design , construction of two weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3 .. with our own EAST Software package .. communication between controller and PC over Ethernet protocol

Welcome to our company Doc.

References ET 45- Electrical works of Cold repair of the Furnace and cutting Line ( EGC –

Egypt) complete electrical repair of the plant dismantling all control panel to be replaced by Siemens Control systems Renovating all control instrumentation for the furnace, bath and lehr Supply and install necessary SO2 flow meters , special high temperature cables. Supply and install new weighing controllers

46- Truck Scale weighing bridge (Arabian Cement) complete design , construction of Five weighing bridges ( concrete type ) 120 T each dimension 20 X 3 m using Sartorius Load cells and controller X3 .. with our own EAST Software package .. communication between controller and PC over Ethernet protocol

47- Automation system for Furnace control (EFACO- Egypt) Design, implementation, erection and commissioning of a complete control and power monitoring system for Two furnaces for each line the project includes: Three control system PLC based ( S7-300) programmed via CFC Connection between the system via Ethernet using Hirshmann self diagnostic switches. Four Scada packages from Intouch each 1000 Tag license Power monitoring and analysis racks from Camille Bauer HMI development Project documentation and client training connections for all projects equipments

48- Electrical panels upgrades for three production lines ( ECC – Lafarge - Egypt) Design , manufacturing and installation of new low voltage main breakers panels including adaptation of bus bar system , connection of control circuit and integrating the new addition into the plant network. The job was done in three stage (each stage for one production line) and in a very short time frame during lines shutdowns.

49- Scada Developing and Complete factory panel labeling (Sphinx glass – Egypt) developing and connecting one Scada package ( Intouch 1000 Tag) to the current factory network to monitor parts of the batch plant The project comprise as well developing a numbering schema for all the control panels in the factoring .. re-edit all the electrical drawing to include the new numbering schema and to install the new numbers on all the panels wires.

Welcome to our company Doc.

References ET

50- Kiln Drive Upgrade ( Helwan Cement Plant ) Design , implementation and installation of New DC drives ( two parallel drive units) for the Main Kiln drives using new control and drive system from ABB , type DCS 800 1900 Amp each .. Including Siemens PLC.. Video graphics recorders Camille Bauer

51- Upgrade of Clay linear type stacker and reclaimer (kattameya cement plant) Upgrade of the Additives Stacker and reclaimer control systems from ABB CS31 PLC system to S7-300 Siemens PLC in addition to operator Touch screen MP270 from Siemens, including engineering, software development , hardware upgrade , commissioning and start-up

52- Electrical Installation for Paper production line Line 17&18 (P&G - Egypt) complete installation electrical works, installation material supplies , equipments rentals up to the stage of commissioning and start-up a complete production line P&G Egypt

53- Control system for continuous sub-base plants ( AMMANN – DE) design , material purchasing , manufacturing and assembling , commissioning and start-up of 6 fully automatic control systems for Sub-base production pant with capacity of 400 T/h

54- Complete road building Package ( Arab Contractors – Egypt) supply and support of one Asphalt plant JB240 ( 240 t/H ), Soil compactors, tandem rollers, excavator , vibratings plates , total 20 machine a complete package of construction equipments from one project from one source.

55- Complete road building Package ( Arab Contractors – Chad) supply and support of one Asphalt plant CB180( 180 t/H ), Soil compactors, tandem rollers, pneumatic rollers , total 12 machine a complete package of construction equipments from one project from one source.

56- Complete control system for water plant ( Orascom – Egypt) Engineering , procurement and construction of a complete control system managing a water pump station in northern part of Cairo, the deliveries includes , PLC control panel, pressure and flow measurements , power and motor protections. Site erection, commissioning , start-up and documentation.

57- Crane system upgrade in Gold mines ( Nestra- Ghana) complete engineering , assembling and installation of crane control system using ABB ACS 850 Inverter with Crane application modules.

58- Tank Gauging system ( Shell – Egypt ) design , material purchasing , manufacturing and assembling, Software Developing , commissioning and start-up of 21 raw material tanks monitoring system using Siemens S7-300 System , with wireless Ethernet network and WinCC V11 package to control the tank filling from the laboratory base.

Welcome to our company Doc.

References ET59- Tanks weighing system ( Ascom – Egypt )

Supply and commissioning of 6 Sartorius tank weighing system each 200 Tons complete with Load cell, mounting kits, weighing transmitters

60- Tank – belt weighing system ( Alexfert – Egypt ) Supply and commissioning of One Sartorius tank weighing system 200 Tons complete with Load cell, mounting kits, weighing transmitters and two belt weighing system including all necessary components and controllers

61- Automation system for Turbine control (NPC- Egypt) Design, implementation, erection and commissioning of a complete control and r monitoring system for One turbine the project includes: One DCS control system full redundant ABB AC800 M , and 800 XA stations Connection between the system via Ethernet using Hirshmann self diagnostic switches. 3 Video Graphics records with a total 50 loading and alarming channels HMI development Project documentation and client training connections for all projects equipments

Welcome to our company Doc.

References ETMajor Customer reference:

• Assiut Cement Company.(CEMEX) • Procter and Gamble Nigeria • Procter and Gamble - Egypt • Arab Contractors – Egypt • Arab Contractors – Mauritania • Arab Contractors – Chad • Arab contractors - Kuwait • Arab contractors – Ethiopia • Arab contractors - Nigeria • Arabian Contracting Company (MMM). • Green Valley contracting company • Egyptian Cement Company (Lafarge) • Egyptian Glass Company (EGC-Guardian) • Sphinx glass company • Nissan Egypt. • FIAT AUTO Egypt • Nile co. for Roads constructions. • Nile co. for Roads and Bridges • Nile co. for Construction & Pavement. • GAPCO. • Oriental petrochemical (OPC) • North Cairo Electrical power station • Khalda Petroleum Company. • Qaroun Petrolium Company • Andalos for food industries • Gefco for rice milling • Gafco for rice milling • Pharos for rice milling • Metal Tubes • Tony tube manufacturing • Buhler AG (Switzerland) • Noell (Germany) • Suez Cement Company (italcementi group) • Alexandria Cement company (Titan) • Ameriya Cement Company ( Cimpor) • Beni sweif cement Company ( Titan) • Egyptian Ferro – Alloy Company ( EFACO) • Misr Aluminum company – Egypt • Alexandria Fertilizers ( Uhde) • Helwan Fertilizer ( Uhde) • Misr Petroleum – Egypt • Tourah cement Company (italcementi group) • Henkel - Egypt • Alkan Pharma – Egypt • YKK Egypt • Egyptian Sugar company • Upper Egypt Milling company • North Cairo – Electricity power plant

Welcome to our company Doc.

References ET• Mineya municipality – Egypt • Assiut Municipality – Egypt • Bel Egypt • Ascom – Egypt • Royal cement • South Valley cement • Fayoum Sugar Company • Nobareya Sugar Company • Delta Sugar Company

Welcome to our company Doc.

References ETExport Countries

- Jordan - Kuwait - Nigeria - Ghana - Cameron - Chad - Ethiopia - South Sudan - North Sudan - Syria

Welcome to our company Doc.

References ET