Upload
kyle-maynard
View
218
Download
0
Embed Size (px)
Citation preview
7/28/2019 Engku Ismaeil Bin Engku Indong
1/5
ENGKU ISMAEIL BIN ENGKU INDONG Resume
886 KG SURAU HJ MAT ZIN
21400 MARANG TERENGGANU
Contact No. : 013 - 4550486
Email : [email protected]
Age : 25 years old Date of Birth : 20 JULY 1988
Nationality : Malaysia Gender : Male
Marital Status : Single Maykad no. : 880720-11-5235
Race : Malay Religion : Islam
2006 - 2010 Diploma in Civil Engineering
Faculty of Civil Engineering,
MARA University of Technology, Bukit Mertajam. Pulau Pinang.
Building Design (autocad)
Costing and Estimating
Construction and Project Management
Construction Materials
Waste Water Management
Construction Management- Estimate cost and period of time to built a double storey house.
Construction Design-Design a double storey house.
Waste Water ManagementSewage Treatment Plant Process
1
PERSONAL PARTICULARS
HIGHER EDUCATION
RELEVENT SUBJECT
EDUCATION PROJECT
7/28/2019 Engku Ismaeil Bin Engku Indong
2/5
ENGKU ISMAEIL BIN ENGKU INDONG Resume
Name of Employer : Veolia Water (OM) Malaysia Sdn Bhd
Year : 6th November 2012 - Present
Position : Technician Operation/Site Safety Supervisor Project Involve : mofu
1. Operate and maintane the waste water treatment and biogas system plant.
2. Involved in EPCC (Engineering Procurement Construction and Commissioning) of waste
water treatment plant from civil prospective.
Job Description
To advise on cost and design related to civil engineering and SHE
(Safety,Health and Environment) aspect.
Members of Safety and Health Committee.
Members of ERT (Emergency Response Team) of Emery Oleochemicals.
Involved in MSOSH (Malaysian Society For Occupational Safety and Health) audit.
Familiar with IMS (ISO 9001,ISO 14001,OHSAS 18001)
Prepare Method Of Statement(MOS),Job Safety Analysis (JSA),and HIRARC for routine and
non routine work that need to be carried out on site.
Ordering Material.
Procure Construction material to be delivered on site
Site Supervision (Supervise and coordinate sub con work package)
Evaluate performance of supplier and sub contractors.
Name of Employer : Gabungan Strategik Sdn Bhd
Year : 5th November 2011 - 5th November 2012
Position : Assistant Planning Engineer.
Project involve :
1. Proposed Bukit Tengah Depot (N5-S16) Electrified Double Track Project Ipoh PadangBesar (MMC Gamuda)
Job Description
Procure Construction Material to be delivered on site (Tiles).
Order Material
Site Supervision
(Supervise and coordinate sub con work package.)(concrete,tiles,ceiling,drainage)
Forecasting Progress Claim of Sub Con.
Prepare Progress Report (weekly)
Prepare Monthly Report.
Document controller for Bukit Tengah Depot (N5-S16)
Assist Safety Officer to prepare paper work,and safety working area
(detect hazard of work place).
2
WORKING EXPERIENCES
7/28/2019 Engku Ismaeil Bin Engku Indong
3/5
ENGKU ISMAEIL BIN ENGKU INDONG Resume
Name of Employer : Bestar Sdn Bhd
Year : 3rd August 2011 - 28th October 2011.
Position : Site Supervisor
Project involve :
1. Proposed New Development of Detached Units, Semi-D and Double Storey at Avenue 6
Bandar Tun Hussein Onn for Uda Holdings Berhad.
2. Proposed 12 Storey Hotel on Lot 69685 Jln Pju 7/3, Mutiara Damansara for Boustead Hotel
& Resort.
Job Description
Procure Construction Material to be delivered on site.
Site Supervision (Supervise and coordinate sub con work package.)
Prepare Progress Claim to the maincon.
Forecasting Progress Claim of Sub Con.
Name of Employer : Xybase Sdn Bhd
Year : 1st March 2011 - 28th July 2011.
Position : Testing and Integration Engineer
Project involve : BLESS (Business License Electronic Support System)
Jabatan Perdana Menteri (Putrajaya),
Job Description
Preparing test scripts and test procedure for Internal Functionality Test (IFT) and User
Acceptance Test (UAT).
Implementing Internal Functionality Test (IFT) after development of the system and to ensurethat the system is error free and according to clients needs.
Conducting the User Acceptance Test (UAT) with the respective clients and preparing test
reports before the system is hand over to the user.
Currently I am part of the team for the Testing team in the BLESS (Business Licensing
Electronic Support System) project which is an e-government project by ICU- JPM.
(Implementation coordination Unit)
Energetic and can work under pressure.
Recommended by manager as a hardworking staff.
Good communication skill and able to lead.
Able to use microsoft office (project, power point, words, excel) and web browser.
Fast learner.
*Proficiency = Beginner,Intermediate,Advanced
NO LANGUAGE Written Proficiency Spoken Proficiency
1 Malay 10 10
2 English 7 6
3
ADDITIONAL.
7/28/2019 Engku Ismaeil Bin Engku Indong
4/5
ENGKU ISMAEIL BIN ENGKU INDONG Resume
NO COURSEDESCRIPTION CONDUCTED BY LOCATION EVALUATION
1 Sijil Kelayakan
Pegawai Yang
Menjaga Kerja
(PYMK) KTM 039
Keretapi Tanah Melayu
Berhad
KTMB/OSHEN
Stesen Keretapi Bukit
Mertajam
Good, Passes
2 Site Safety Supervisor
(SSS)
(COMPETENCY
EXAM)
MBAM
(Master Builder Association
Malaysia)
MBAM Training centre
Kuala Lumpur.
On Process
3
ICSS (Intensive
Confine Space Safety
and Emergency
Rescue Training For
Industry ERT)
Pasukan Bomba Dan
Penyelamat Malaysia
Akademi Bomba
Ipoh,Perak
Good,Passes
NO SKILL YEARS PROFICIENCY
1 Autocad 1 Beginner
2 Microsoft Project 1.5 Intermediate
3 Costing and Estimating 1.5 Intermediate
4 Supervise,coordinate and deligate work 2 Intermediate
4
COURSES ATTENDED
7/28/2019 Engku Ismaeil Bin Engku Indong
5/5
ENGKU ISMAEIL BIN ENGKU INDONG Resume
1. Mohd Faris Bin Azmi
Maintenance Engineer
Veolia Water Malaysia (OM) Sdn. Bhd.
Mobile : 017 408 4033.
2. Nashruddin Bin Hj Maridin.
Project Manager
Gabungan Strategik Sdn bhd.
Mobile : +012 - 2038955
3. Norazlinabinti Aba Rahman @ Lina, CSM
Software Development Manager
Software Development Department
XYBASE Sdn. Bhd.
Mobile: +6019-380 5242.
5
REFFERENCES