7/31/2019 ENGLISH - General Presentation
1/155
February 2010 1
THE COFFOR SYSTEM
Description
Applications
Tests performed - Certifications
Advantages over other Systems
Cost effective
7/31/2019 ENGLISH - General Presentation
2/155
February 2010 2
DESCRIPTION (1)
Integrated formwork System
Two grids (riblathe)
Vertical stiffeners every 20 cmstrengthen the panel
With or without thermal insulation
Horizontal links connect the twosides together
Hot dip galvanized steel
7/31/2019 ENGLISH - General Presentation
3/155
February 2010 3
DESCRIPTION (2)
Concrete is poured between the two
grids
Excess water is eliminated by gravity
Air is also eliminated
Concrete pressure is greatly reduced
COFFOR remains in the wall after
pouring
7/31/2019 ENGLISH - General Presentation
4/155
February 2010 4
Less than 1-2% of concrete go through the grids
CONCRETING
7/31/2019 ENGLISH - General Presentation
5/155
February 2010 5
Concrete can be poured from the slab formwork of the upper floor
CONCRETING
7/31/2019 ENGLISH - General Presentation
6/155
February 2010 6
Even when concrete is poured horizontally and vibrated,
less than 1-2% of concrete pass throuh the grids
CONCRETING
7/31/2019 ENGLISH - General Presentation
7/155
February 2010 7
COFFOR
A CONSTRUCTION
SYSTEM THAT IS
FAST
EASY TO USE
COST EFFECTIVE
7/31/2019 ENGLISH - General Presentation
8/155
7/31/2019 ENGLISH - General Presentation
9/155
February 2010 9
House
China
7/31/2019 ENGLISH - General Presentation
10/155
February 2010 10
House
China
7/31/2019 ENGLISH - General Presentation
11/155
February 2010 11
House - Russia
Russia
7/31/2019 ENGLISH - General Presentation
12/155
February 2010 12
The same house completed
Russia
7/31/2019 ENGLISH - General Presentation
13/155
February 2010 13
Villa - Russia
Radius wall - Russia
7/31/2019 ENGLISH - General Presentation
14/155
February 2010 14
Villa - Russia
Murs courbes
7/31/2019 ENGLISH - General Presentation
15/155
February 2010 15
Extension of a medical center
France
7/31/2019 ENGLISH - General Presentation
16/155
February 2010 16
Villa
France
7/31/2019 ENGLISH - General Presentation
17/155
February 2010 17
Villa
Bahrain
7/31/2019 ENGLISH - General Presentation
18/155
February 2010 18
Social house
Egypt
7/31/2019 ENGLISH - General Presentation
19/155
February 2010 19
Same house completed
Egypt
7/31/2019 ENGLISH - General Presentation
20/155
February 2010 20
House
Kurdistan
7/31/2019 ENGLISH - General Presentation
21/155
February 2010 21
Villa
Thailand
7/31/2019 ENGLISH - General Presentation
22/155
February 2010 22
Villa
China
7/31/2019 ENGLISH - General Presentation
23/155
7/31/2019 ENGLISH - General Presentation
24/155
February 2010 24
Development (52 villas)
China
7/31/2019 ENGLISH - General Presentation
25/155
February 2010 25
Development - 56 villas
France
R id
7/31/2019 ENGLISH - General Presentation
26/155
February 2010 26
Residence
China
Cl b h
7/31/2019 ENGLISH - General Presentation
27/155
February 2010 27
Club house
Morocco
Cl b h
7/31/2019 ENGLISH - General Presentation
28/155
February 2010 28
Club house
Morocco
7/31/2019 ENGLISH - General Presentation
29/155
February 2010 29
High standing condominium
France
7/31/2019 ENGLISH - General Presentation
30/155
February 2010 30India
Administrative building
7/31/2019 ENGLISH - General Presentation
31/155
February 2010 31
Administrative building
India
7/31/2019 ENGLISH - General Presentation
32/155
February 2010 32
Five story building with exterior
insulation - China
The concrete shell
is done in 28 days(350 m2 per floor)
With only 25
workers
Th b ildi l d
7/31/2019 ENGLISH - General Presentation
33/155
February 2010 33
The same building completed
7 story building
7/31/2019 ENGLISH - General Presentation
34/155
February 2010 34
7-story building
China
7/31/2019 ENGLISH - General Presentation
35/155
February 2010 35
Residential building
France
7/31/2019 ENGLISH - General Presentation
36/155
February 2010 36
High standing Residential Building
Four story building with exterior insulation
France (under construction)
The same building completed
7/31/2019 ENGLISH - General Presentation
37/155
February 2010 37
The same building completed
Four story building with exterior insulation(completed)
S i l h i ( d i )
7/31/2019 ENGLISH - General Presentation
38/155
February 2010 38
Social housing (under construction)
Five story social building with exterior insulation -
under construction - China
7/31/2019 ENGLISH - General Presentation
39/155
Residential development
7/31/2019 ENGLISH - General Presentation
40/155
February 2010 40
p
Five 10-story buildings- ChinaThe concrete shell (30.000 m2 floor space) was done in 58 days
Residential development
7/31/2019 ENGLISH - General Presentation
41/155
February 2010 41
Residential development
Five 10-story buildings
The concrete shell (30.000 m2 floor space) was done in 58 days
C i l/R id i l D l
7/31/2019 ENGLISH - General Presentation
42/155
February 2010 42
Commercial/Residential Development
12-story building under construction - China
The concrete shell was completed in 3 months
7/31/2019 ENGLISH - General Presentation
43/155
February 2010 43
Commercial/Residential Development
The same building after a mortar coating
7/31/2019 ENGLISH - General Presentation
44/155
February 2010 44
Commercial/Residential Development
The same building completed
7/31/2019 ENGLISH - General Presentation
45/155
February 2010 45
Commercial/Residential DevelopmentFour 9-story buildings plus one 12-story building. In
total, more than 40.000 m2 of floor space
The development was
completed in 8 months 3 months for the concrete shel
5 months for the second work
C i l b ildi
7/31/2019 ENGLISH - General Presentation
46/155
February 2010 46
Commercial building
Ground floor (walls are 5 meter high) - China
Residential building
7/31/2019 ENGLISH - General Presentation
47/155
February 2010 47
Residential building
6-story building - China
7/31/2019 ENGLISH - General Presentation
48/155
University dormitory China
7/31/2019 ENGLISH - General Presentation
49/155
February 2010 49
University dormitory - China
The walls are 3.50 m highThe concrete structure (8400 m2 over 7 levels)
was done in 7 weeks
University dormitory
7/31/2019 ENGLISH - General Presentation
50/155
February 2010 50
y y
Building completed
R id ti l d l t Chi
7/31/2019 ENGLISH - General Presentation
51/155
February 2010 51
Residential development - China
Development of 35 buildings 5-story and 10-story
R id ti l d l t Chi
7/31/2019 ENGLISH - General Presentation
52/155
February 2010 52
Residential development - China
12-story buildings
Residential development
7/31/2019 ENGLISH - General Presentation
53/155
February 2010 53
p
Housing for the Military Hospital - Algeria
Residential development
7/31/2019 ENGLISH - General Presentation
54/155
February 2010 54
Housing for the Military Hospital - Algeria
Residential development
7/31/2019 ENGLISH - General Presentation
55/155
February 2010 55
Residential development of 47 buildings - Algeria
Residential development
7/31/2019 ENGLISH - General Presentation
56/155
February 2010 56
Residential development of 47 buildings
Warehouse 12 meter high walls
7/31/2019 ENGLISH - General Presentation
57/155
February 2010 57
Warehouse12-meter high walls
China
W h 12 t hi h ll
7/31/2019 ENGLISH - General Presentation
58/155
February 2010 58
Warehouse12-meter high walls
China - Completed
7/31/2019 ENGLISH - General Presentation
59/155
7/31/2019 ENGLISH - General Presentation
60/155
High Rise Building
7/31/2019 ENGLISH - General Presentation
61/155
February 2010 61
High Rise Building
Hotel extension (34 stories) - China
7/31/2019 ENGLISH - General Presentation
62/155
CERTIFICATION
7/31/2019 ENGLISH - General Presentation
63/155
February 2010 63
CERTIFICATIONThe first construction was done in 1996 (first
generation of COFFOR)
for the piles of theHospital George Pompidou in Paris, France
Over 5.000.000 m2 of constructions have been built
COFFOR is certified: CSTB (France), CNERIB(Algeria), ITB (Poland), Switzerland, China, Russia,
Thaland, Turkey, Saudi Arabia, UAE, Egypt, etc.)
7/31/2019 ENGLISH - General Presentation
64/155
Deflexion test
7/31/2019 ENGLISH - General Presentation
65/155
February 2010 65
The COFFOR panel 200 cm x 122 cm x 15 cm has no rebar reinforcement
Under centered deflexion, the panel broke under a weight of 48 KN (4,8 T)
In addition, the panel demonstrated high ductility
7/31/2019 ENGLISH - General Presentation
66/155
COFFOR is a construction System
7/31/2019 ENGLISH - General Presentation
67/155
February 2010 67
COFFOR is a construction System
easy to useCOFFOR offers advantages:
For the contractor
For the controlling organization
For the developer
For the user
7/31/2019 ENGLISH - General Presentation
68/155
ADVANTAGES (2)
7/31/2019 ENGLISH - General Presentation
69/155
February 2010 69
Easy to useNo qualifiedpersonnel is necessary contrary toother Systems
No need for accessories (wires
tubes are sufficient) contrary toshutters
acile
ADVANTAGES (3)
7/31/2019 ENGLISH - General Presentation
70/155
February 2010 70
ADVANTAGES (3)
Easy insertion of rebar(if necessary)
No need to add rebarin current portion ofwalls
Elimination of anti-
crack welded wireacile
ADVANTAGES (4)
7/31/2019 ENGLISH - General Presentation
71/155
February 2010 71
ADVANTAGES (4)
Visual control of the pour(no segregation)
Increased securityno needfor crane
Easy insertion of conduitsfor plumbing and electricity
Cost effective compared toother Systems
acile
7/31/2019 ENGLISH - General Presentation
72/155
ADVANTAGES (6)
7/31/2019 ENGLISH - General Presentation
73/155
February 2010 73
Easy use of all type of
finishing. Stucco bondsvery well on the riblathe
7/31/2019 ENGLISH - General Presentation
74/155
ADVANTAGES (8)
7/31/2019 ENGLISH - General Presentation
75/155
February 2010 75
INSULATED COFFOR
offers an exterior insulation
that eliminates thermalbridges
COFFOR can build all
parts of constructions
7/31/2019 ENGLISH - General Presentation
76/155
February 2010 76
parts of constructions
Walls
Slabs, roof
Columns, beams
Foundations
Walls
7/31/2019 ENGLISH - General Presentation
77/155
February 2010 77
Facade wall
Walls
7/31/2019 ENGLISH - General Presentation
78/155
February 2010 78
Facade wall
7/31/2019 ENGLISH - General Presentation
79/155
Walls
7/31/2019 ENGLISH - General Presentation
80/155
February 2010 80
Mur de faade
Bahrain
7/31/2019 ENGLISH - General Presentation
81/155
7/31/2019 ENGLISH - General Presentation
82/155
Walls
7/31/2019 ENGLISH - General Presentation
83/155
February 2010 83
China
7/31/2019 ENGLISH - General Presentation
84/155
Walls
7/31/2019 ENGLISH - General Presentation
85/155
February 2010 85
Facade wall before concreting
7/31/2019 ENGLISH - General Presentation
86/155
7/31/2019 ENGLISH - General Presentation
87/155
7/31/2019 ENGLISH - General Presentation
88/155
7/31/2019 ENGLISH - General Presentation
89/155
Walls
7/31/2019 ENGLISH - General Presentation
90/155
February 2010 90
Interior wall after concreting - France
7/31/2019 ENGLISH - General Presentation
91/155
7/31/2019 ENGLISH - General Presentation
92/155
Radius walls
7/31/2019 ENGLISH - General Presentation
93/155
February 2010 93
Rebar is used to align COFFOR
Rebar
7/31/2019 ENGLISH - General Presentation
94/155
Walls
7/31/2019 ENGLISH - General Presentation
95/155
February 2010 95
Radius wall (staircase) - France
7/31/2019 ENGLISH - General Presentation
96/155
Walls
7/31/2019 ENGLISH - General Presentation
97/155
February 2010 97
Facade wall with exterior insulation - China
7/31/2019 ENGLISH - General Presentation
98/155
Slabs
7/31/2019 ENGLISH - General Presentation
99/155
February 2010 99
Slab before rebar placement - Egypt
7/31/2019 ENGLISH - General Presentation
100/155
7/31/2019 ENGLISH - General Presentation
101/155
7/31/2019 ENGLISH - General Presentation
102/155
Slabs
7/31/2019 ENGLISH - General Presentation
103/155
February 2010 103
Slab and lintel with COFFOR - China
Roofs
7/31/2019 ENGLISH - General Presentation
104/155
February 2010 104
COFFOR panel before concreting - France
Roofs
7/31/2019 ENGLISH - General Presentation
105/155
February 2010 105
Inclined roof after concreting
China
Roofs
7/31/2019 ENGLISH - General Presentation
106/155
February 2010 106
Inclined roof after concreting - China
Roofs
7/31/2019 ENGLISH - General Presentation
107/155
February 2010 107
Inclined roofExterior view - China
7/31/2019 ENGLISH - General Presentation
108/155
Lintels
7/31/2019 ENGLISH - General Presentation
109/155
February 2010 109
Lintel over a door - China
Roofs
7/31/2019 ENGLISH - General Presentation
110/155
February 2010 110
Inclined roof - France
Roofs
7/31/2019 ENGLISH - General Presentation
111/155
February 2010 111
Inclined roof - France
COFFOR can build
7/31/2019 ENGLISH - General Presentation
112/155
February 2010 112
Rectangular columns
Round columns
7/31/2019 ENGLISH - General Presentation
113/155
Columns
7/31/2019 ENGLISH - General Presentation
114/155
February 2010 114
Rectangular column
Columns
7/31/2019 ENGLISH - General Presentation
115/155
February 2010 115
Round column
Columns
7/31/2019 ENGLISH - General Presentation
116/155
February 2010 116
Round column
7/31/2019 ENGLISH - General Presentation
117/155
Tunnel
7/31/2019 ENGLISH - General Presentation
118/155
February 2010 118France
COFFOR can build
7/31/2019 ENGLISH - General Presentation
119/155
February 2010 119
Sustaining walls
Sustaining walls
7/31/2019 ENGLISH - General Presentation
120/155
February 2010 120
Sustaining wall along motorway
before concretingFrance
Sustaining wall
7/31/2019 ENGLISH - General Presentation
121/155
February 2010 121
Sustaining wall along a motorway
after concretingFrance
Sustaining wall
7/31/2019 ENGLISH - General Presentation
122/155
February 2010 122
Reinforcement of road - France
Surrounding wall
7/31/2019 ENGLISH - General Presentation
123/155
February 2010 123
New Caledonia
Walls for fitness center
7/31/2019 ENGLISH - General Presentation
124/155
February 2010 124
Walls for 2 SPAS and slab around poolsFrance
Walls for fitness center
7/31/2019 ENGLISH - General Presentation
125/155
February 2010 125
Walls for 2 SPAS and slab around pools
Surrounding wall
7/31/2019 ENGLISH - General Presentation
126/155
February 2010 126
27 km long - Russia
COFFOR can build
7/31/2019 ENGLISH - General Presentation
127/155
February 2010 127
Swimming pools
Tanks
Various piping projects
7/31/2019 ENGLISH - General Presentation
128/155
Swimming pool
7/31/2019 ENGLISH - General Presentation
129/155
February 2010 129
COFFOR pool delivered in KIT
Swimming pools
7/31/2019 ENGLISH - General Presentation
130/155
February 2010 130
Insertion of reserves is easy
Tank - China
7/31/2019 ENGLISH - General Presentation
131/155
February 2010 131
Water purification tank
COFFOR can be used for
7/31/2019 ENGLISH - General Presentation
132/155
February 2010 132
Foundation
Crawl space
Foundations
7/31/2019 ENGLISH - General Presentation
133/155
February 2010 133
With single COFFOR panels (one side)
Foundations
7/31/2019 ENGLISH - General Presentation
134/155
February 2010 134
With single COFFOR panels (one side)
Foundations
7/31/2019 ENGLISH - General Presentation
135/155
February 2010 135
With single COFFOR panels (one side)
Foundations
7/31/2019 ENGLISH - General Presentation
136/155
February 2010 136
With single COFFOR panels (one side)
Crawl space
7/31/2019 ENGLISH - General Presentation
137/155
February 2010 137
COFFOR panels placed horizontally - France
Crawl space
7/31/2019 ENGLISH - General Presentation
138/155
February 2010 138
The exterior side is higher than the interior sideElimination of edge formwork for the slab - France
COFFOR can also build
7/31/2019 ENGLISH - General Presentation
139/155
February 2010 139
Dikes
Dikes
7/31/2019 ENGLISH - General Presentation
140/155
February 2010 140
Without drying the area - France
COFFOR can reinforce
7/31/2019 ENGLISH - General Presentation
141/155
February 2010 141
Weak walls that need
reinforcement
Commercial building- France
7/31/2019 ENGLISH - General Presentation
142/155
February 2010 142
Rehabilitation of an existing building
Reinforcement of facade wallsExterior view
Commercial building
7/31/2019 ENGLISH - General Presentation
143/155
February 2010 143
Rehabilitation of an existing building
Reinforcement of facade walls Interior view
Historical wall
7/31/2019 ENGLISH - General Presentation
144/155
February 2010 144
Before reinforcement - France
Historical wall
7/31/2019 ENGLISH - General Presentation
145/155
February 2010 145
Reinforcement with COFFOR
ADVANTAGES/DISADVANTAGES OF
COFFOR VS. SHUTTERS
7/31/2019 ENGLISH - General Presentation
146/155
February 2010 146
DISADVANTAGES OF COFFOR VS.
SHUTTERS
A finishing is necessary
7/31/2019 ENGLISH - General Presentation
147/155
February 2010 147
A finishing is necessary
COFFOR cannot be used again
Necessity to wear gloves
ADVANTAGES OF COFFOR VS.
SHUTTERS (1)
No dismantling necessary
7/31/2019 ENGLISH - General Presentation
148/155
February 2010 148
No dismantling necessaryElimination of all problems related to shutters
(investment, availability, transport, cleaning,
maintenance, rotation, storing)
No need for qualified workers
No accessories
ADVANTAGES OF COFFOR VS.
SHUTTERS (2)
No crane necessary
7/31/2019 ENGLISH - General Presentation
149/155
February 2010 149
No crane necessary Increased security on the site
Easy control of the rebar presence
Easy control of the pour
Possibility to pour one story including walls
and upper slab in one pass
Easy integration of second work reserves
(piping for electricity and plumbing)
COFFOR IS COST EFFECTIVE
Compared with traditional column and beams structure,
7/31/2019 ENGLISH - General Presentation
150/155
February 2010 150
COFFOR uses much less steel
COFFOR uses a little more concrete but eliminates
most of the bricks
COFFOR saves on labor and on construction time
COFFOR USES LESS STEEL
For a 5 story-building for example,
50 percent less steel with COFFOR compared
7/31/2019 ENGLISH - General Presentation
151/155
February 2010 151
50 percent less steel with COFFOR comparedwith a column and beams structure
No rebar in the current portion of the walls(compliance with EUROCODE)
With COFFOR, only rebar in corners andaround the opening
Steel quantity in COFFOR panels correspondsto 60 kg/m3 (1 sqm weighs 11 kg)
COFFOR USES A LITTLE
MORE CONCRETE
With COFFOR most column and beams are
7/31/2019 ENGLISH - General Presentation
152/155
February 2010 152
With COFFOR most column and beams are
eliminated
Quantity of concrete with COFFOR is about 20-30
% greater than concrete in frame structure
Approximately 60-70% of bricks are eliminated
with COFFOR
COFFOR SAVES ON LABOR AND ON
CONSTRUCTION TIME
Man-hour with COFFOR is reduced by 70%d l d b
7/31/2019 ENGLISH - General Presentation
153/155
February 2010 153
Man hour with COFFOR is reduced by 70%compared to column and beams
Less qualification of workers with COFFOR
Construction time with COFFOR is 3 to 4 times
faster:one floor per week with COFFOR
One floor per month with traditional column and beams
Savings in management and overhead isimportant for the contractor
CONCLUSION
COFFOR builds shear wall ---> safer construction
7/31/2019 ENGLISH - General Presentation
154/155
February 2010 154
COFFOR builds shear wall > safer construction
COFFOR is faster
COFFOR is simpler
COFFOR is cheaper
7/31/2019 ENGLISH - General Presentation
155/155
February 2010 155
THANK YOU FOR YOUR ATTENTION!