Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
ENI REFINING & MARKETING SANNAZZARO GASIFICATION PLANT
PROJECT UPDATE AND START UP EXPERIENCE
Dario Camozzi - Snamprogetti, ItalyRaffaella Lucarno - Eni Refining & Marketing, Italy
Joachim Wolff - Shell Global Solutions, The Netherlands
Gasification Technologies 2006Washington, DC
October 1- 4, 2006
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
SOOT WATERFILTRATION
AIRSEPARATIONUNIT (o.b.l.)
SULPHURRECOVERY(Refinery)
SHELL GASIFICATIONPROCESS
(SGP)COS/HCN
HYDROLYSISACID GASREMOVAL
MDEA
AIR
FEEDSTOCK(VISBREAKER TAR)
ACID GASOXYGEN
SULPHUR
HP STEAM
NITROGEN
BFW HYDROGENRECOVERY
COMBINEDCYCLE
UNIT(EniPower)
HYDROGEN
POWER
SOOT ASHREMOVAL UNIT
(SARU)
SOOTWATER
(SPENT CARBON)
CARBON DIOXIDE EXPORT
WATER DISCHARGE FILTER CAKE
METALCARBONYLREMOVAL
METAL ASH
FLUE GAS
SYNGAS
(NAT.GAS)
STEAM EXPORT
Process Block Diagram
WASTEWATER
STRIPPER
TAIL GAS
WATER RECYCLE
SOUR GAS
Eni R&M-SannazzaroProcess Block Diagram
2
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
IMPIANTO DI GASSIFICAZIONE TAR DA VISBREAKINGIMPIANTO DI GASSIFICAZIONE TAR DA VISBREAKINGPROJECT DESCRIPTIONPROJECT DESCRIPTION
ENI R&M2280 t/d Syngas38000 Nm3/h H2
VVR(TAR)Snamprogetti/Shell GS
- Feedstock: 1200 t/d VVR(Tar)- Shell “radiant cooler”- “High” pressure (62 barg)- AGR (MDEA-Dow)- Ni/Fe Carbonyls removal- Hydrogen (Membr.+PSA) - 2 gasif.+ 1 LTGC ?? etc.- Start Up March’06
TarData on dry basis
Design Feed
Carbon %wt 85.73
Hydrogen %wt 9.05
Sulphur %wt 3.54
HHV (* = calculated) MJ/kg 41.28
LHV (* = calculated) MJ/kg 39.30
3
EniPower250 MWe
Snamprogetti/Ansaldo
- 1 x V94-2K (Siemens/Ansaldo)- 2 x V94-3A.2 (Siemens/Ansaldo)- Start Up July 2003/2004
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
ENI Sannazzaro IGCCProject Description
Ansaldo-SiemensV94-3A.2(400 MW)
Ansaldo-SiemensV94-3A.2(400 MW)
Ansaldo-SiemensV94-2K
(250 MW)
EniPower
EniRefining & Marketing
Eni Gas & Power
Gasification plant50 t/h Tar
H2
Syngas
Natural gas (12.5 km new pipeline)
4
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
MAIN ENTRANCE
D
AIR LIQUIDE
ENIPOWER
GASIFICATIONISLAND
5
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Refinery
CCUSYNGAS
TAR
FUELG
AS
CW
HYD
RO
GEN
TAIL G
AS
AC
ID G
ASES
BD
MPS
DW BD
(FIRE WATER, IW, WATER TREAT., IA, SIGNAL EXCH., etc.)
CCU
IntegrationPPU
6
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
GASIFICATION PLANTGASIFICATION PLANTOVERALL PERFORMANCESOVERALL PERFORMANCES
TarData on dry basis
Design Feed
Carbon %wt 85.73
Hydrogen %wt 9.05
Sulphur %wt 3.54
HHV (* = calculated) MJ/kg 41.28
LHV (* = calculated) MJ/kg 39.30
Feed = 2 x 25 t/h
7
Sweet Syngas to Hydrogen Recovery – 2560 tons/dLHV – 3700 kcal/kg465 MWth
CompositionData on dry basis
CO %mol 50.19
H2 %mol 45.95
CO2 %mol 2.94
Ar %mol 0.10
N2 %mol 0.24
H2O %mol 0.32
CH4 %mol 0.26
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectMain Characteristics
Eni Refining & Marketing-EniPower
- Feedstock: VVR(Tar)- Shell “radiant cooler”- WHE with internal Superheater (high efficiency-
steam production)- “High” pressure (62 barg)- Acid gas removal (MDEA-Dow)- Carbon Dioxide production- Ni/Fe Carbonyls removal- SARU to minimize solid waste production- Hydrogen recovery (Membr.+PSA) - 1 xV94.2K(Siemens/Ansaldo)- 2 gasif.+ 1 LTGC etc.
- Start-up: March 2006- Commercial Operation: April 2006
8
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectContract Summary
Eni Refining & Marketing-EniPower
Contract type LSScope of work EPCContractor(s) SP
Licensor(s) SGS / Dow / UOP
Detailed eng. SPConstruction SP
POWER BLOCKAnsaldoEnergia
9
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification Overall Project Schedule
ContractContract DurationDuration
Basic & Basic & DetailDetail EngineeringEngineering
MaterialsMaterials ProcurementProcurement
04/20
06
ConstructionConstruction & & PrecommPrecomm..
CommissioningCommissioning & Start Up& Start Up
11/20
02
10/20
03
11/20
05
10/20
04
07/20
0302
/2005
Contract conversionto EPC LS
Test Test RunRun06/2006
10
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectCommercial Operations
Summary Duration
Commissioning 127 days From 17th November’05 to 23rd March’06 Start-up Train 1 5 days From 23rd March’06 to 27th March’06 Start-up Train 2 11 days From 19th April’06 to 29th April’06 Overall Start up 38 days From 23rd March’06 to 29th April’06
11
Cause of shutdown 1st train 2nd trainInstrumentation 6 0 Mechanical 2 2 Operational 1 2 Common part 1 1 Total 14
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectOutages Report
PLANT OUTAGES
44%
14%
21%
21%
InstrumentationMechanicalOperationalCommon Part
12
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectOutages Report
Train 1 (up to 07/31/2006)
2%10%
1%4%
83%
Instrumentation
On streamOperational
MechanicalCommon Part
Train 2 (up to 07/31/2006)
1%
25%
74%
13
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectCommercial Operations
SYNGAS SENT TO ENI POWER
0
500
1000
1500
2000
2500
3000
date
ton/
day
1° ON2° OFF
1° OFF2° ON
1° ON2° ON
1° OFF2° OFF
1° ON2° OFF
1° ON2° ON
1° OFF2° ON
1° ON2° ON
1° ON2° ON
START UPUNITA' 33
1° ON2° OFF
1° ON2° ON
1° ON2° OFF
1° OFF2° OFF
1° ON2° OFF
2560
1280
14
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectCommercial Operations
15
MONTHLY AVERAGE PRODUCTION OF SYNGAS
488
1038
1361
20001907
0
500
1000
1500
2000
2500
Mar-06 Apr-06 May-06 Jun-06 Jul-06
month
ton/
day
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
Sannazzaro Gasification ProjectCommercial Operation
MONTHLY ELECTRICAL OUTPUT MWh (GAS TURBINE & STEAM TURBINE)
0
4136255836
91672 96308
0
14750
22154
3300434675
0
20000
40000
60000
80000
100000
120000
140000
Mar-06 Apr-06 May-06 Jun-06 Jul-06
month
MW
h steam turbine
gas turbine
16
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division17
Sannazzaro Gasification Project
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
• Mechanical design (leakages) on HP BFW Air Cooler
• Design (leakage) on newly developed superheatermodules of the WHE
• Soot deposition in the slurry tank
• Solid handling transportation
18
Sannazzaro Gasification ProjectFirst Run Experience
Issues
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
ENI Sannazzaro Gasification Plant
• “Hesitant” start-up
• “Low” availability•“High”
ContractorLicensorOwner
19
•“Smooth”
Snamproget t iSnamproget t iA company of Saipem
Eni Refining & Marketing Division
GASIFICATION TECHNOLOGYTHE MATURE WAY…
Sannazzaro Gasification plant has shown a very smooth and reliable start up coming into operations in a very
short time with performances at high level of availability and with promised process performance from the very
beginning.
“This proved that gasification technology is really today a mature technology; and we look forward to be part of new
projects that can be valuable for both Owner and Contractor and also for the Environment”
20