Copyright 2005 Northrop Grumman Corporation0 11/9/2006 3:38 PM
October 23, 2006
Rob Thomson Guy EnglerProgram Manager Program ManagerAging Aircraft Programs Life Cycle OptimizationNorthrop Grumman Corporation Northrop Grumman Corporation
Enterprise Analysisand Cost Optimization
System (EACOS)
2006 Department of DefenseMaintenance Symposium & Exhibition
“Modeling for Sustainment”Technical Breakout Session
Copyright 2005 Northrop Grumman Corporation1 11/9/2006 3:38 PM
The Essence of EACOS is “Life Cycle Optimization”Achieving the Greatest Collective Benefits for the Fleet within Cost & Other Constraints
AvailabilityMission Capable Rate
ReadinessTotal Ownership Costs Combat Capability
Fleet Drivers / Problems / Issues / Roadmaps
Enterprise Analysis and Solutions
Other
Resource Analysis Decision Support System (RADSS)
Balanced Investment Portfolio
Data Analysis Scenario Analysis Sensitivity Analysis Portfolio Planning
TotalAvailable Funding
(by FY and Type)
Other Requirements&
Constraints
Weighted Decision Criteria & Standards
Copyright 2005 Northrop Grumman Corporation2 11/9/2006 3:38 PM
EACOS Background
ObjectivesIdentify drivers affecting fleet availability and system modernization / operating & support costsIdentify and model solutions, investment options, and scenarios that provide:
Optimized improvement in aircraft fleet availabilityOptimized combat capabilitiesOptimized approaches to modernization and sustainmentOptimized approaches to Fleet Viability Reductions in total ownership costBest return on investment
Bottom line is to achieve the greatest collective benefits within constraints, thus realizing optimum investment strategies and anOptimized and Balanced Budget and Execution Portfolio for the fleet
Northrop Grumman has completed EACOS implementations for the C-5, B-1B, A-10, F-16, & B-2 fleets, plus a Cross-Fleet Pilot Project
Copyright 2005 Northrop Grumman Corporation3 11/9/2006 3:38 PM
Complicating Factors
Increasing Ownership Costs
Decreasing Mission Capable RatesAvailability
Parts Supply Problems
Changing Mission &
Performance Requirements
StructuralProblems
Reliability & Maintainability
Problems
Copyright 2005 Northrop Grumman Corporation4 11/9/2006 3:38 PM
WHAT IT DOESThe EACOS Approach
What is it ?
ImprovedReadiness /Availability
ReducedTotal Cost
ofOwnership
MissionProfiles
Logistics Information Systems
Related Cost Data
Mai
n te n
anc e
Ope
rat i o
ns
Inve
n tor
y / S
uppl
ySystem Design
Rel
iabi
lity
Baselines Systema
Identifies necessaryimprovementsa
Allows modeling & prediction ofImprovements
a
Optimizes Investmentsa
Enterprise Analysis and Cost Optimization System
Copyright 2005 Northrop Grumman Corporation5 11/9/2006 3:38 PM
Examine Problem
Areas
Identify Possible Solutions A = f (x,y)
Hardware / Softwarechanges at the
component or systemlevel
X:
Baseline Availability
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 10 20 30 40 50 60 70 80 90
# Aircraft
Prob
abili
ty
Identify Drivers
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 10 20 30 40 50 60 70 80 90# of Aircraft
Prob
abili
ty
Baseline -10% NMCS -20% NMCS -30% NMCS -40% NMCS -50% NMCS
Prioritize Solutions
with RADSS
Blend with Roadmap Projects
• RTOC• AAIP• SERP• PIWG• RIC
A Repeatable Process!
Optimized Investment Portfolio
Y:Policy / processchanges to thesupport infrastructure
The EACOS Approach
Copyright 2005 Northrop Grumman Corporation6 11/9/2006 3:38 PM
The EACOS Approach
Phase I: Enterprise AnalysisBaseline Fleet and Identify “Drivers & Solutions” (Investment Candidates):
Fleet AvailabilityMission / Operations profile (Operations, Training, MC Rates, Flying Hours)Reliability (Inherent Failures, Mission Aborts, Mean Time Between Failures)Maintainability (Not Mission Capable Maintenance, Maintenance Manhours)Supportability (Not Mission Capable Supply, Flow Days)
Maintenance Concepts (Field, Depot, Phase, and Analytical Condition Inspections)Supply Concepts (Supply Chain Management, Defense Logistics Agency)
Phase II: Cost Optimization System Define Decision GoalIdentify and Weight Decision Criteria and Standards (to generate “Benefit Scores”)Evaluate Investment Candidates (Phase I Analysis, Roadmaps, etc.)
Analyze Data (Show Stoppers, Correlations, Constraints)Identify Global and Boolean Constraints (for Linear Program optimization)
Load Data into Resource Allocation Decision Support System (RADSS)Run RADSS to generate Benefit Priorities and Benefit-to-Cost ratiosConduct Sensitivity and Scenario Analysis
Select Optimum Solution Set to achieve greatest collective Benefits vs. Constraints
Copyright 2005 Northrop Grumman Corporation7 11/9/2006 3:38 PM
Fleet Availability Baseline & Required ImprovementsMathematically Modeling the Effects of Investments
0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
0 10 20 30 40 50 60 70 80 90 100 110 120
# Aircraft
Prob
abili
ty
AvgPossessed
AvgPossessed
Yr 2005PAA
Yr 2005PAA
75%Yr 2005
PAA
75%Yr 2005
PAA
AvgAvailable
AvgAvailable
Needsto shift
Future, HigherMissionCapable
Requirement
CurrentMissionCapableAircraft
CurrentAvailableAircraft
FutureLevel ofAircraft
Available
Probability thatAircraft are
Mission Capable
63 A/C Mission Capable Today
Need 83 A/C Mission Capable
Copyright 2005 Northrop Grumman Corporation8 11/9/2006 3:38 PM
Monthly Status of an “Average Aircraft”
NMC Supply 1.9
9.6 Sortiesper Month************
39.4 Hoursper Month************4.1 Hoursper Sortie
PartiallyMissionCapable
5.4
PMCB2.7
PMCM1.5
PMCS1.2
MissionCapable
15.1
FullyMissionCapable
9.7
62.4% MC Rate
NotMissionCapable
9.1
NMCMaintenance
4.8
NMCMUnscheduled
4.1
Depot5.8
NMCMS .7
NMC Supply 1.9
NMC Both2.4
NMCBS 1.7NMCBU .7
FlyingTime1.64days
EACOSidentifies “Drivers”
to Fleet Availability
andOwnership Costs
EACOS thenmodels “Solutions”
to all “Drivers”(including relatedInvestment Costs)
andPredictive Results
Copyright 2005 Northrop Grumman Corporation9 11/9/2006 3:38 PM
Sample of Hundreds of “Drivers” and “Solutions”
Copyright 2005 Northrop Grumman Corporation10 11/9/2006 3:38 PM
EACOS Phase II: Investment OptimizationResource Allocation Decision Support System
A Complete, User-Friendly, Integrated “Portfolio Planning and Management System”
Reports and Graphics
PowerfulOptimization
Program& Sensitivity
Analysis
CustomizedAHP Decision
Model (s)
Data BasesEnhanced Analysis and Decisions
Windows Database Management
RADSS
CRITERIASafetyRiskPerformanceLifetimeSupportabilitySpecial FactorsVersatility
ALTERNATIVES
Fuel Cells
Solar Cells
Nuclear Reactor
1.0
.5
0
CRITERIA PERFORMANCE ALTERNATIVES
Safety Risk Performance Lifetime Supportability Special Factors Versatility Overall
.6
.5
.4Solar Cells
.3
.2
.1
0
Fuel Cells
XX
XX
X
XX
X
GOAL: Rate NAVFAC Southwest Environmental Site Clean-UpProjects to allow Optimization of Total Benefits to Constrained Costs
GOAL: Rate NAVFAC Southwest Environmental Site Clean-UpProjects to allow Optimization of Total Benefits to Constrained Costs
LegalAgreements
LegalAgreements
EnvironmentalRisk
EnvironmentalRisk
Degree ofCertainty
Degree ofCertainty
StakeholderValues, Concerns
& Priorities
StakeholderValues, Concerns
& Priorities ResponseComplete/Close-out
ResponseComplete/Close-outUse of
InnovativeTechnologies
Use ofInnovative
Technologies
Financial
Financial
Early Award
Early Expense
Contaminant Hazard Factor (CHF)+
Migratory Pathway Factor (MPF)+
Receptor Factor (RF)
+ RRSEM CHF Total
Fed/State/LocalRegulators
Community/Political
(.500) (.100) (.050) (.100)
(.050)
(.100)
(.050)
(.025)
(.025)
(.050)
(.050)
RRSEM
MissionImpact
MissionImpact
(.050)
Current Criteria
(M/S Access)
Copyright 2005 Northrop Grumman Corporation11 11/9/2006 3:38 PM
Tailored toIndividual Customer
Requirements
Broad Range of RADSS Applications
Copyright 2005 Northrop Grumman Corporation12 11/9/2006 3:38 PM
RADSSTM Architecture“Portfolio Planning via Decision Modeling”
Acquisition / O&MLife Cycle Costs
LinearProgramming
Module
Multi-DimensionalCost and Boolean
Constraints
Decision ModelsDecision Models
Decision Models
Problem SetsProblem Sets
Problem SetsProblem Sets
Problem SetsProblem Sets
Decision ModelsDecision Models
Decision Models
RelationalData Base
• Benefits • Benefits / Cost• Prioritization• Maximization• Optimization• Analysis Tool• Scenarios• Sensitivities• Audit Trail• Reports• Graphics
ExternalDataBases
Reports &Graphics
Problem
Problem
Problem
Problem
P
Copyright 2005 Northrop Grumman Corporation13 11/9/2006 3:38 PM
Criteria, Constraints, and Rules
RADSS supports both Qualitative and Quantitative Decision Criteria and StandardsRADSS supports multiple Constraints
Global (Total or annual budgets)
Category (On classifications)
Minimum or maximum (Cost or resource levels)
Additive (The more stringent constraint takes precedence)
RADSS supports Boolean RulesInclude (Alternatives are funded regardless of their cost or benefit)
Exclude (Alternatives are not funded regardless of their cost or benefit)
Linked (Dependent alternatives are linked to independent alternatives)
One or None (Only one alternative of a group – or none – are funded)
All or None (Either all alternatives in a group – or none -- are funded)
Copyright 2005 Northrop Grumman Corporation14 11/9/2006 3:38 PM
Sample EACOS Decision Model
Copyright 2005 Northrop Grumman Corporation15 11/9/2006 3:38 PM
Sample EACOS Decision Model Decision Goal
Improve aircraft availability, combat capability, controlcost, and improve fleet viability through_____
Availability30 %
Capability28 %
Pilot Workload
20 %
C2ISR13 %
SituationalAwareness
28 %
Life Cycle Costs18 %
Return on Investment--ROI Savings Magnitude--RTOC 54 %
46 %
CapabilityImprovement
39 %
Avionics Low ObservablesWeapons
36 %41 %
23 %
Unscheduled MMH/FH Maintain with Less 35 %
65 %
Maintenance
26 %
NMC Hours Maintenance ObsolescenceMICAPS
23 %45 %
32 %
Supportability29 %
MC RateChange
27 %
PDM Days Mod Line Days 50 %
50 %
Depot Days18 %
Survivability Mission EffectivenessCapability Obsolescence
Viability24 %
30 %49 %
21 %
Generates “Benefits Score”
for each “Solution”
Copyright 2005 Northrop Grumman Corporation16 11/9/2006 3:38 PM
Sample PBL Decision Model Application Decision Goal
Improve aircraft availability, combat capability, controlcost, and improve fleet viability through____
Availability30 %
Capability28 %
Pilot Workload
20 %
C2ISR13 %
SituationalAwareness
28 %
Life Cycle Costs18 %
Return on Investment--ROI Savings Magnitude--RTOC 54 %
46 %
CapabilityImprovement
39 %
Avionics Low ObservablesWeapons
36 %41 %
23 %
Unscheduled MMH/FH Maintain with Less 35 %
65 %
Maintenance
26 %
NMC Hours Maintenance ObsolescenceMICAPS
23 %45 %
32 %
Supportability29 %
MC RateChange
27 %
PDM Days Mod Line Days 50 %
50 %
Depot Days18 %
Survivability Mission EffectivenessCapability Obsolescence
Viability24 %
30 %49 %
21 %
Investment Decision Models can also include Performance Based LogisticsCriteria tailored to each Fleet:• Operational Availability
• Mission Reliability
• LCC System Cost per Unit of Usage
• Logistics Footprint
• Logistics Response Time
Copyright 2005 Northrop Grumman Corporation17 11/9/2006 3:38 PM
EACOS Phase II: Investment Optimization Process
Define Decision Goal
Identify Decision Criteria•Weight the Criteria•Create & Weight Standards
Identify Decision Alternatives
Collect Criteria Data for each Alternative
Analyze Data & Identify •Show Stoppers•Positive Outliers•Correlations•Constraints
Show Horses
Show Stoppers
Selection Iterations
SystemPerformance
7.0%
• Performance• Computer Resources• C4I
Assess EnhancementCandidates for execution in
the xxxxxxxxx
Fleet Availability34.0%
• NMCMU• NMCS• NMCBU• Other Down Time
Total OwnershipCost
14.0%
Human SystemsIntegration
4.0%
• Maintenance Training• Aircrew Training• Manpower & Personnel
Metrics26.0%
• MC Rate• Break Rate• MRT• UR
• Fix Rate• DR• Cann Rate• MMH/FH
Other ORDRequirements
10.0%
• Service Life• Other Logistics• Mx Planning
• Syst. Charact.• Parts Obsoles.• Trans & Basing
Risk5.0%
• Schedule• Cost• Technical• Policy/Law/Political
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
$0
$2,6
78,6
69
$7,4
14,8
84
$18,
743,
490
$24,
555,
609
$67,
422,
673
$113
,629
,528
$171
,689
,019
$242
,586
,340
$285
,463
,802
$325
,357
,855
$512
,822
,480
$607
,732
,840
$725
,800
,979
$804
,549
,149
$1,0
09,2
63,0
80
$1,0
21,9
35,5
99
$1,0
36,8
35,5
37
$1,0
66,9
55,1
68
$1,1
12,1
13,8
86
$1,2
46,6
39,7
61
Cumulative Cost
Cum
ulat
ive
Ben
efit
Series1 Series2
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
$0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000
$(000)
Del
ta M
CR
(%)
112 xxxxxxxx
35 xxxxxxx
36 xxxxxxxx
HIGHEST TO LOWEST DELTA MCR %115 xxxx xxxxxSystem2 MLG xxxxx98 NLG xxxx114 Windshield12 Digital Fuel xxxxxx13 Crew xxxxxxx116 Fuel xxxxx99 MLG xxxxx67 xxxxxxS94 Outboard xxxxxx105 Wing xxxxxx
1
2
3
4
5Load & Execute RADSS
•Unconstrained•Multiple Constraints•Multiple Scenarios
Examine Results & Make Final Adjustments•Benefit Prioritizations•Benefit to Cost Ratios (ROI)•Sensitivity Analyses•Scenario Analyses
Select OptimumSolution Set
6
7
Acquisition / O&MLife Cycle Costs
LinearProgramming
Module
Multi-DimensionalCost and Boolean
Constraints
Decision ModelsDecision Models
Decision Models
Problem SetsProblem Sets
Problem SetsProblem Sets
Problem SetsProblem Sets
Decision ModelsDecision Models
Decision Models
RelationalData Base
• Benefits / Value• Benefits / Cost• Prioritization• Maximization• Optimization• Analysis Tool• Scenarios• Sensitivities• Audit Trail• Reports
ExternalDMSMS
DataBases
Reports
Problem
Problem
Problem
Problem
P
Data Export and
Iterative Analysis
Define Decision Goal
Identify Decision Criteria•Weight the Criteria•Create & Weight Standards
Identify Decision Alternatives
Collect Criteria Data for each Alternative
Analyze Data & Identify •Show Stoppers•Positive Outliers•Correlations•Constraints
Show Horses
Show Stoppers
Selection Iterations
Show Horses
Show Stoppers
Selection Iterations
SystemPerformance
7.0%
• Performance• Computer Resources• C4I
Assess EnhancementCandidates for execution in
the xxxxxxxxx
Fleet Availability34.0%
• NMCMU• NMCS• NMCBU• Other Down Time
Total OwnershipCost
14.0%
Human SystemsIntegration
4.0%
• Maintenance Training• Aircrew Training• Manpower & Personnel
Metrics26.0%
• MC Rate• Break Rate• MRT• UR
• Fix Rate• DR• Cann Rate• MMH/FH
Other ORDRequirements
10.0%
• Service Life• Other Logistics• Mx Planning
• Syst. Charact.• Parts Obsoles.• Trans & Basing
Risk5.0%
• Schedule• Cost• Technical• Policy/Law/Political
SystemPerformance
7.0%
• Performance• Computer Resources• C4I
SystemPerformance
7.0%
• Performance• Computer Resources• C4I
Assess EnhancementCandidates for execution in
the xxxxxxxxx
Fleet Availability34.0%
• NMCMU• NMCS• NMCBU• Other Down Time
• NMCMU• NMCS• NMCBU• Other Down Time
Total OwnershipCost
14.0%
Total OwnershipCost
14.0%
Human SystemsIntegration
4.0%
• Maintenance Training• Aircrew Training• Manpower & Personnel
Human SystemsIntegration
4.0%
• Maintenance Training• Aircrew Training• Manpower & Personnel
Metrics26.0%
• MC Rate• Break Rate• MRT• UR
• Fix Rate• DR• Cann Rate• MMH/FH
Other ORDRequirements
10.0%
• Service Life• Other Logistics• Mx Planning
• Syst. Charact.• Parts Obsoles.• Trans & Basing
Other ORDRequirements
10.0%
• Service Life• Other Logistics• Mx Planning
• Syst. Charact.• Parts Obsoles.• Trans & Basing
Risk5.0%
• Schedule• Cost• Technical• Policy/Law/Political
Risk5.0%
• Schedule• Cost• Technical• Policy/Law/Political
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
$0
$2,6
78,6
69
$7,4
14,8
84
$18,
743,
490
$24,
555,
609
$67,
422,
673
$113
,629
,528
$171
,689
,019
$242
,586
,340
$285
,463
,802
$325
,357
,855
$512
,822
,480
$607
,732
,840
$725
,800
,979
$804
,549
,149
$1,0
09,2
63,0
80
$1,0
21,9
35,5
99
$1,0
36,8
35,5
37
$1,0
66,9
55,1
68
$1,1
12,1
13,8
86
$1,2
46,6
39,7
61
Cumulative Cost
Cum
ulat
ive
Ben
efit
Series1 Series2
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
$0
$2,6
78,6
69
$7,4
14,8
84
$18,
743,
490
$24,
555,
609
$67,
422,
673
$113
,629
,528
$171
,689
,019
$242
,586
,340
$285
,463
,802
$325
,357
,855
$512
,822
,480
$607
,732
,840
$725
,800
,979
$804
,549
,149
$1,0
09,2
63,0
80
$1,0
21,9
35,5
99
$1,0
36,8
35,5
37
$1,0
66,9
55,1
68
$1,1
12,1
13,8
86
$1,2
46,6
39,7
61
Cumulative Cost
Cum
ulat
ive
Ben
efit
Series1 Series2
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
$0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000
$(000)
Del
ta M
CR
(%)
112 xxxxxxxx
35 xxxxxxx
36 xxxxxxxx
HIGHEST TO LOWEST DELTA MCR %115 xxxx xxxxxSystem2 MLG xxxxx98 NLG xxxx114 Windshield12 Digital Fuel xxxxxx13 Crew xxxxxxx116 Fuel xxxxx99 MLG xxxxx67 xxxxxxS94 Outboard xxxxxx105 Wing xxxxxx
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
$0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000
$(000)
Del
ta M
CR
(%)
0
0.05
0.1
0.15
0.2
0.25
0.3
0.35
0.4
0.45
0.5
$0 $50,000 $100,000 $150,000 $200,000 $250,000 $300,000
$(000)
Del
ta M
CR
(%)
112 xxxxxxxx
35 xxxxxxx
36 xxxxxxxx
35 xxxxxxx
36 xxxxxxxx
HIGHEST TO LOWEST DELTA MCR %115 xxxx xxxxxSystem2 MLG xxxxx98 NLG xxxx114 Windshield12 Digital Fuel xxxxxx13 Crew xxxxxxx116 Fuel xxxxx99 MLG xxxxx67 xxxxxxS94 Outboard xxxxxx105 Wing xxxxxx
HIGHEST TO LOWEST DELTA MCR %115 xxxx xxxxxSystem2 MLG xxxxx98 NLG xxxx114 Windshield12 Digital Fuel xxxxxx13 Crew xxxxxxx116 Fuel xxxxx99 MLG xxxxx67 xxxxxxS94 Outboard xxxxxx105 Wing xxxxxx
1
2
3
4
5Load & Execute RADSS
•Unconstrained•Multiple Constraints•Multiple Scenarios
Examine Results & Make Final Adjustments•Benefit Prioritizations•Benefit to Cost Ratios (ROI)•Sensitivity Analyses•Scenario Analyses
Select OptimumSolution Set
6
7
Load & Execute RADSS•Unconstrained•Multiple Constraints•Multiple Scenarios
Examine Results & Make Final Adjustments•Benefit Prioritizations•Benefit to Cost Ratios (ROI)•Sensitivity Analyses•Scenario Analyses
Select OptimumSolution Set
6
7
Acquisition / O&MLife Cycle Costs
LinearProgramming
Module
Multi-DimensionalCost and Boolean
Constraints
Decision ModelsDecision Models
Decision Models
Problem SetsProblem Sets
Problem SetsProblem Sets
Problem SetsProblem Sets
Decision ModelsDecision Models
Decision Models
RelationalData Base
• Benefits / Value• Benefits / Cost• Prioritization• Maximization• Optimization• Analysis Tool• Scenarios• Sensitivities• Audit Trail• Reports
ExternalDMSMS
DataBases
Reports
Problem
Problem
Problem
Problem
P
Data Export and
Iterative Analysis
Data Export and
Iterative Analysis
RADSS Decision ProcessResource Analysis Decision Support System (RADSS)
Portfolio Planning
Copyright 2005 Northrop Grumman Corporation18 11/9/2006 3:38 PM
EACOS RADSS Run – Benefit to Cost
Copyright 2005 Northrop Grumman Corporation19 11/9/2006 3:38 PM
Delta Mission Capable Rate vs. Cost
Copyright 2005 Northrop Grumman Corporation20 11/9/2006 3:38 PM
Delta RTOC versus Cost
Copyright 2005 Northrop Grumman Corporation21 11/9/2006 3:38 PM
Scenario #9 - Medium Cost Boolean Rules
Copyright 2005 Northrop Grumman Corporation22 11/9/2006 3:38 PM
Medium Cost Alternatives ($25M - $200M)
Copyright 2005 Northrop Grumman Corporation23 11/9/2006 3:38 PM
Cumulative Effects of Funding Scenario #9
Copyright 2005 Northrop Grumman Corporation24 11/9/2006 3:38 PM
Predictive Nature of Funded Scenario(s)
Funding of a single Investment Candidate will result in calculated changes to the metrics contained in the EACOS Fleet Decision Model, i.e., deltas to:
Availability / Mission Capable RateScheduled / Unscheduled Maintenance ManhoursMICAPsCapabilityLife Cycle CostDepot Flow TimeOther Metrics applicable to the customized fleet decision model
Modeling and funding of a group of Investment Candidates within a specified scenario will result in a cumulative delta change to fleet MC Rate, RTOC, etc.
Copyright 2005 Northrop Grumman Corporation25 11/9/2006 3:38 PM
Complements / Enhances Current Decision Processes
Rigorous Enterprise Analysis and RADSS Approachis highly Effective
Allows Modeling & Better Differentiation & Prioritization
Enhances Marginal Returns on Complex Decisions
Increases Total Benefits within Constrained Budgets
Collectively Achieves Greater ROI
Benefits of the EACOS Process
Optimized & BalancedOptimized & BalancedBudget andBudget and
Execution PortfolioExecution Portfolio
Copyright 2005 Northrop Grumman Corporation26 11/9/2006 3:38 PM
SummaryThe RADSS modeling tool simplifies and optimizescomplex investment decisions
Considers decision criteria of all StakeholdersConsiders a wide-variety of constraintsConsiders sensitivity and scenario analysisResults in multiple, customized Investment Portfolios
EACOS has broad applications across the ServicesAll aging systems can benefit from the baselines and EACOS predictive assessments to help support modernization & end-to-end sustainment investment decisionsAll DoD processes (supply, maintenance, depot, operations) can benefit from EACOS principles & toolsSpecial initiatives can benefit, e.g., Modeling for Performance Based Logistics (PBL) and Aircraft Availability Improvement Program (AAIP)