31
Confidential Slide Environmental Excellence Sasan 6X660MW Ultra Mega Power Project Certified for IMS (ISO 9001:2008, ISO 14001:2004, BS OHSAS 18001:2007)

Environmental Excellence - Foundationsoxnox2017.missionenergy.org/presentations/Dr Amitosh_Reliance.pdf · Confidential Slide Sasan Power Limited - Highlights Largest Integrated Power

Embed Size (px)

Citation preview

Confidential Slide

Environmental Excellence

Sasan 6X660MW Ultra Mega Power ProjectCertified for IMS (ISO 9001:2008, ISO 14001:2004, BS OHSAS 18001:2007)

Confidential Slide

Think big, Think fast, Think ahead. Ideas are no one’s monopoly.

“Dhirubhai Ambani”Founder, Reliance Group

Confidential Slide

Sasan Power Limited - Highlights

LargestLargest IntegratedIntegrated PowerPower PlantPlant –– cumcum –– CoalCoal MineMine inin thethe WORLDWORLD ((39603960 MWMW PowerPower PlantPlant

++ 2020 MTPAMTPA CoalCoal Mine)Mine)..

LargestLargest singlesingle investmentinvestment acrossacross anyany industryindustry inin thethe COUNTRYCOUNTRY

LargestLargest andand thethe mostmost modernmodern technologytechnology usedused inin thethe projectproject

LargestLargest singlesingle flightflight (no(no transfertransfer pointspoints enen--route)route) coveredcovered conveyorconveyor systemsystem inin thethe

COUNTRYCOUNTRY (~(~1515 KmsKms)) forfor transportingtransporting coalcoal fromfrom minesmines toto thethe powerpower plantplant..

FastestFastest startstart ofof coalcoal productionproduction atat minesmines forfor thethe plantplant inin thethe COUNTRYCOUNTRY

FastestFastest startstart ofof powerpower productionproduction inin thethe COUNTRYCOUNTRY

FastestFastest commissioningcommissioning allall 66 powerpower plantplant unitsunits inin thethe COUNTRYCOUNTRY..

FirstFirst onlineonline EffluentEffluent MonitoringMonitoring SystemSystem inin thethe STATESTATE..

Providing CHEAPEST power across the COUNTRY Providing CHEAPEST power across the COUNTRY with a cost with a cost Less than the Cost of a Toffee.Less than the Cost of a Toffee.

Confidential Slide 4

Project Details

Capacity 3,960 MW (6 x 660 MW)

Type Pithead coal supercritical technology based

Location Sasan, Distt. Singrauli, Madhya Pradesh

Land/Water3500 Ha for both Power plant & Coal mine

Water from Govind Vallabh Pant Sagar

Fuel supply Captive mines with total reserves +700 MT

EPC contract Reliance Infrastructure Limited

FinancingConsortium of 17 lenders (Indian & Off-

shore)

Power off take 25 year PPA with 14 procurers from 7 states

Project Details

Fly ash bricks

Batching Plant

4

Confidential Slide 5

Project Site

Confidential Slide 6

Power Procurers

Punjab – 600 MW

Delhi – 450 MW

Haryana – 450 MW

Rajasthan – 400 MW

Madhya Pradesh (Lead) – 1500 MW

Uttarakhand – 100 MW

Uttar Pradesh – 500 MW

Procurers - 14 Distribution Companies in 7 states

Confidential Slide

Power Station

Talent

Power Off-take

Water

Coal

Largest Integrated Ultra Mega Power Project with Captive Coal mine

Adequate provisions for resources – coal, water and power

evacuation infrastructure

Forerunner , with world class state of the art technology and

equipment – both in Mines and Power Plant

Selection of equipment with focus on reducing impact on environment

and conservation of natural resources

Training Simulators developed for Power Plant

& Mining Equipment

Highly motivated and adept team

7

Sasan UMPP – built-in strengths

Confidential Slide

Sasan Project – Water

Water Resources : Govind Vallabh Pant Sagar reservoir

– The project has been allocated water 12,532 m3/hr from Govind

Vallabh Pant Sagar reservoir

– This reservoir is the largest water body in area and is a reliable

source of year-round water supply

– Water pumped through cross country pipe line of length 25 Kms.

– Reliability : We have infrastructure to meet 270 % of our daily water

requirement.

– In plant water Reservoir with total capacity of 15.6 Lacs m3, which

can meet water demand of plant for 8 days at full load operation

– Zero Discharge

8

Confidential Slide

Sasan Project - Coal Coal Source – Moher, Moher-Amlohri Extension Captive Mines

Coal Transportation - Through Over land Conveyor (14.5 Km)

First of it’s kind OLC in power plants in

India having a transportation capacity

of 4500 TPH with belt speed of 5.6 m/s.

Economical compared to road & rail

Environment-friendly – no diesel

consumption, no fugitive emissions

Low Human interface

Coal can reach from pit to coal bunker in 2 ½ Hours time, which saves

energy & time.

Achieved single day coal transportation of 95,068 MT, equivalent to 24

railway rakes which would take unloading time of 60 hrs in track hopper.9

Confidential Slide

Air Pollution Control

Single Flight Overland Covered Coal conveyor Belt.

Dust suppression system on conveyor belts.

Dust extraction systems at Coal Silo, Ash Silo, Intermediate Ash Silo, & coal Bunkers.

ESP with capacity of 99.96%.

Two (2) Tri-flue stacks of 275m height.

Rain gun type Water sprinkling system at coal storage area.

Concrete roads within plant area.

Extensive plantation and green belt development with >80% survival rate.

Continuous emission monitoring system in flue of all units

Continuous AAQ monitoring system (CAAQMS).

Fully fledged Environment lab established.

Water sprinklers in Ash dyke.

Low NOx Burners.

10

Confidential Slide

Photographs of Air Pollution Control Facility

11

ESP OLCLow NOx Burner

CAAQMS CEMS Rain gun type sprinklers in CHP

275 meter Height chimneyEnvironmental Parameter Display BoardFly ash silo with DE system

Confidential Slide 12

Conveyor Galleries and Transfer Points

Water SprinklersSystem in Ash Pond

Confidential Slide

Water Pollution Control Effluent Treatment Plant.

Effluent Neutralization system at DM plant.

Ash pond area with multiple discharge point (garlanding concept).

Ash Water Recirculation System.

HDPE / Bentonite liner at the ash pond.

Sewage treatment plant.

Central Monitoring Basin for the correction of effluent quality, before their recycling / reuse.

Dust suppression system provided at coal transfer points.

Coal settling pit with water recirculation arrangements.

Online Effluent Monitoring System installed in ETP outlet – First in MP

IP based camera

Electro-magnetic type water Flow meter installed at various location to monitor water

consumption.

13

Confidential Slide

Photographs of Pollution Control Facility

14

Piezometers Sewage Treatment Plant

Effluent Treatment Plant Coal Settling Pond

Rain Water Harvesting Pit

OEMS system

Dust Suppression system

IP based Camera at ETP outlet Flow Meter

Confidential Slide

Ash Water Recirculation System (AWRS)

15

Decantation Well

Ash Pond

Stilling ChamberPipeline

Stilling chamber to Pump House

AWRS Pump House

Ash Water Clarifier

Pipeline Clarifier to ash

sump

Ash slurry to Ash Pond

PipelinePump houses

to clarifier

Through Gravity

Confidential Slide

Environmental Audits / Inspections

The environmental performance and compliances are regularly audited by:

Office of Inspectorate General (OAG)

Ministry of Environment, Forests and Climate Chance

Madhya Pradesh Pollution Control Board

Core Team of National Green Tribunal

Central Pollution Control Board

Export and Import Bank of the United States – Against “World bank Norms”

Independent Environmental Consultants of lender banks – Against “World bank

Norms”

IMS accreditation Agency

No Non-complinace Reported till Date

Confidential Slide

Environmental Monitoring

17

AAQ Monitoring Results-Aug, 17 (µg/m3):

0

20

40

60

80

100

120

SO2 NOx PM10 PM2.5

0

100

200

300

400

500

600

700

800

PM SOx NOx

Stack Monitoring Results-Aug, 17 (mg/Nm3):

FGD

Existing Norms New Norms

0

1

2

3

4

5

FY 2016-17

Specific Water Consumption - (m3/MWh):

Confidential Slide

Online Data Transfer Portal

18

Online Effluent Data Transfer CEMS Data Transfer

CAAQMS Data Transfer Snaps of IP based camera Portal

Confidential Slide

Initiative:

2 nos. of machines for making PENS using waste papers

installed, one each in Surya Vihar and Krishna Vihar

Colonies.

Inauguration:

Prof NP Shukla; Chairman, MP Pollution Control Board

Operated by:

Separate Women Self Help Groups (SHGs)

The new initiative will certainly lead to:

• Environment friendly management of paper wastes and

their conversion into the usable product

• Source of income for the women working under Self

Help Group.

Green Initiatives

Confidential Slide 20

Objective : “Water Conservation”

Initiative: installation of “Waterless Urinals”

Locations: Academic and administrative blocks of

DAV school and in the health care centre locates at

our Surya Vihar Colony

Advantage: Conservation of water used in the urinal

flushing.

Green Initiative

Waterless Urinals

Confidential Slide

Green Initiative

21

30 Eco-friendly E-Riksha are plying inside plant premises for movement inside

the plant.

It is an efforts towards the conservation of Natural resources & for making our

Plant free from vehicular pollution.

Confidential Slide

Green Initiative

22

SPL has procured bicycles to ride in the township & nearby areas as an

efforts towards conservation of natural resources (fuel).

Reduction of vehicular pollution load & also for up-keeping health fitness.

Confidential Slide

Green InitiativesUse of Plastic Waste in Road Construction Plastic waste collected from the plant premises / nearby area and municipal

corporation Shredding in special machine Shredded plastic is used for making road.

Confidential Slide

Green InitiativesWealth from Waste Project: Bio-methanation plant is installed in plant canteen Canteen organic waste is digested in bio-methanation plant. Two type of valuable products are generated viz. cooking gas &

manure, Cooking gas is used for cooking and manure in horticulture.

Confidential Slide

Green Initiatives

Solar Water Heater in Township Solar Street Light Provided in Rural areas

Steam Based Food Cooking in Canteens-No LPG used.

Confidential Slide

Total Plantation till Aug-17 : 3.85 Lakh

Total area covered : Acres 542 target of 474 Acres by MoEF

Status Update

Mission: <Power Plant in Jungle>

Confidential Slide

Awards

27

Greentech Award

• Environment - Gold

• CSR – Gold

Rashtra Vibushan Award

• For Environment - Gold

Global Green Future Leadership Award

• Green business award - Environment

Exceed Environment AwardsSilver Category

Confidential Slide

Awards

28

16th Greentech Award

Environment – Silver

Rashtriya Vibhusan Environment Award-2015-

Environment – Gold

Best Green Business Award-2015

Environment

Confidential Slide

Awards

29

Shristi Good Green Governance Awards-2016

Environment –

FAME Excellence Environment Award-2016-

Environment – Platinum

Asia Best Green Future Award-2016

Environment

Confidential Slide

Awards

30

Global Environment Awards-2016

Environment – Platinum

FAME Excellence Environment Award-2017-

Environment – Diamond

17th Greentech Environment Award-2017

Environment – Platinum

Confidential Slide

Thank You

Sasan Power Ltd.

The world-class plant ..

Providing the joy of working

and overall satisfaction

to all stakeholders