EIA and EMP @ Dr. A.K.M. Saiful Islam, IWFM, BUET Environmental Impact Assessment (EIA) Professor Institute of Water and Flood Management (IWFM) Bangladesh University of Engineering and Technology (BUET) Dr. A.K.M. Saiful Islam Training Course on ‘Training Course on Project appraisal, EIA and Formulation of DPP’

Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

Embed Size (px)

Citation preview

Page 1: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET Environmental Impact Assessment (EIA)

Professor Institute of Water and Flood Management (IWFM)Bangladesh University of Engineering and Technology (BUET)

Dr. A.K.M. Saiful Islam

Training Course on ‘Training Course on Project appraisal, EIA and Formulation of DPP’

Page 2: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Lecture Topicn Major Environmental Parametersn Potential Impact on infrastructure development

projects¨ Example-1: Road Projects of LGED

n National Policies, Strategies and Regulatory Framework

n Initial Environmental Examination (IEE)n Environmental Impact Assessment (EIA)

¨ Example-1: Road Project¨ Example-2: Bridge Project

Page 3: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

PHYSICAL

ECOLOGY

HUMAN

Environmental Parameters is components of environment. It can be grouped into major components.

Page 4: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Physical Parametersn Regional Hydrology / Floodingn Drainage congestion/ Water Loggingn Erosion and Siltationn Dust and Noise Pollutionn Water Pollutionn Soil characteristics/ Soil Fertilityn Groundwater Table

Floods

Drainage Congestion

River Bank Erosion

Dust Pollution

Declining Groundwater tableDhaka city

Water pollution From industries

Page 5: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Ecological Parametersn Fisheriesn Forestn Wildlife and Biodiversityn Solid Wastesn Nuisances Plant / Eutrophicationn Wetland and Wetland Habitatn Terrestrial Habitat n Tree plantation / Urban Vegetationn Wastewater

Page 6: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Human Interest (Economic Impact)n Loss of Agricultural Landsn Loss of Top soil of Agricultural landsn Employment opportunityn Industrial Activities n Irrigation Facilities n Navigation/ Boat Communicationn Road Communication / Transportationn Agricultural Development n Landscape

Agriculture

Employment

Industry

NavigationLandscapeRoad Communication

Page 7: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Quality of Life Values (Social Impact)

n Health and Well beingn Sanitation and Pure Water Supplyn Education / Literacy n Road Safetyn Slum Improvement

Primary School

Slum improvement

Community clinicDrinking water supply

Page 8: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Potential Impacts on Environment

n A change in system exerts certain influence onmany different environmental parametersresulting a net positive or negative impact onthe environment.

n Potential Impact on Environment will be demonstrated through a Infrastructural development project: Thana Road project of LGED.

Page 9: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Ecological Impactn (a) Fisheries:

¨ (-) Roads prevent longitudinal and lateral migration of fishes in the flood plain

¨ (-) Obstruct movement of fishes onto natural feeding and breeding grounds in the flood plain.

n (b) Forest:¨ (-) Roads running through forest

area and plantations may be the cause of destruction of trees in the forest and alteration of ecology of the forest.

Fisheries

Fish breeding ground

Road running through forest

Example: LGED Thana Road Project

Page 10: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Ecological Impactn (c) Plantation:

¨ (+) The roadsides may be used for plantation of trees which is favorable impact of road construction.

n (d) Wetland and Wetland Habitant: ¨ (-) The road may encroach

wetlands which may alter the ecology of wetlands and may cause destruction of wetland habitat.

n (e) Nuisance Plant/Eutrophication:¨ (-) The Roads running through

forest area and plantations may be the cause of destruction of trees in the forest and alteration of ecology of the forest.

Roadside plantation

wetland

Eutrophication

Example: LGED Thana Road Project

Page 11: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Physico-chemical Impact

n (a) Erosion and Siltation¨ (-) causes erosion during

flood and siltation in the downstream.

n (b) Drainage Congestion /Water logging¨ (-) roads interfere with cross

drainage and can cause flooding or drainage congestion in adjacent areas during periods of high precipitation.

¨ (-) May cause crop damage, water pollution and breeding of mosquitoes.

Road erosion

Road side water logging

Example: LGED Thana Road Project

Page 12: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Physical Impactn (c) Regional Hydrology/Flooding

¨ (-) Roads constructed across flood plains perpendicular to the direction of water flow cause back water effect and increase duration, frequency and extent of flooding in the up stream.

n (d) Obstruction to Waste water flow¨ (-) Roads may obstruct the

drainage of sewage and industrial waste water loading to serious pollution problem.

n (e) Dust /Noise Pollution¨ (-) Dust raised from unpaved rural

roads and blown by the vehicles can pose a health hazard and damage vegetation along the sides of the road. Dust pollution

Road obstruction to drainage

Example: LGED Thana Road Project

Page 13: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Impact on Human Interest

n (a) Loss of Agricultural Lands¨ (-) Construction of any road is

associated with the loss of agricultural lands.

n (b) Generation of Employment Opportunities ¨ (+) Construction of road generates

temporary employment during project implementation and permanent employment during maintenance phase.

n (c) Navigation and Boat Communication ¨ (-) Roads interference with navigation

and boat communication at least for certain period of the year.

Agricultural land

Road construction

Page 14: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Impact on Human Interestn (d) Transportation and Road

communication¨ (+) Transportation of people and goods from

one place to another saving time and cost.n (e) Tourism

¨ (+) Easy movement due to road improvement has a positive impact on tourism, flourishing tourism at local as well as international level.

n (f) Industrial Activities ¨ (+) Road communication promotes industrial

activities.n (g) Irrigation Facilities

¨ (+) Borrow-pits by the side of the roads provide facility for small scale irrigation.

n (h) Landscape¨ (-) Scattered borrow pits, unauthorized

growth around road , erosion result in marred landscape.

communication

Borrow-pit Irrigation

Scattered borrow-pit

Page 15: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Quality of Life Values

n (a) Health and Well-being of Users ¨ (+) Improvement of road communication

facilitates to prompt access to health centers.

n (b) Road Safety¨ (-) Increase number and speed of motor

vehicles can lead increased accident cause death and injury.

n (c) Culture and Landscape¨ (-) Disturbances in natural landscape

would occur miss-managed borrow pit.n (d) Education /Literacy

¨ (+) Improve facilities easy movement of people and created favorable environment and spreading education.

Health and well being

Road Safety

Literacy

Page 16: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

National Policies, Plan and Regulatory Framework

Page 17: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

National Policies and Plans

n National Environmental Policy (1992)n National Forest Policy (1994)n National Environmental Management Action Plan

NEMAP (1995)n Sustainable Environment Management Program (SEMP,

1998)n National Water Management Plan (NWMP, 2001)n National Adaptation Program of Action for Climate

change (NAPA, 2005)n Coastal Zone policy (2005)n Coastal Development Strategy (2006)

Page 18: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

National Environmental Policy 1992n Sets the policy framework for environmental

action, in combination with a set of broad sectoral guidelines. It emphasize the following:¨ Maintenance of the ecological balance and overall

development of the country through conservation and improvement of the environment.

¨ Protection of the country against natural disasters¨ Identification and control of activities related to

pollution and degradation of the environment ¨ Environmentally sound development¨ Environmentally sustainable use of all natural

resources ¨ Active association with all environmental related

international initiatives to the maximum possible level

Page 19: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Regulatory Framework

n Environmental Conservation Act (1995)n Environmental Conservation Rule (1997)n Environmental Court Act (2000)

Page 20: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Conservation Act (1995)

n The environmental conservation act was passed in the parliament in 1995. The salient features of the Act are:¨ Power and function of the DOE and that of the DG ¨ Declaration of Ecologically Critical Area¨ Regulation in respect of driving vehicles emitting smokes¨ Environmental Clearance¨ Formulation of Environmental Guidelines¨ Regulation of development activities from env. point of view.¨ Promulgation of standards of quality of air, water, noise, soils¨ Promulgation of acceptable limits of discharging and emitting waste.

Page 21: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Conservation Rule (1997)In order to enforce the ECA 1995, rules and regulations were required. MOEF published in a gazette notification of ECR in 1997. Relevant rules are:

¨ Considerations for declaration of ecologically critical area¨ Procedure for granting environmental clearance¨ Requirements for IEE/EIA according to the appropriate

category of the projects (Green, Orange A, Orange B and Red)

¨ Environmental Clearance validity¨ Renewal of the clearance certificate¨ Provision of Appeal to the authority ¨ Procedure of hearing Appeal¨ Determination of Environmental Standards¨ Determination of waste discharge and emission standards

Page 22: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Court Act (2000)

n The aim and objective of the Act is to materialize the ECA 1995, through judicial activities. The main features of this Act are:¨ The Govt. will establish Environmental Courts, one or

more in every Division.¨ Jurisdiction of the Courts¨ Procedure of activities and power of the Courts¨ Right of Entry for judicial inspection, and¨ Appeal and constitution of Appeal Court

Page 23: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Clearance for Projects

n Green Project – not required¨ Book binding, Musical instrument, Assemble telephone,

photography, assemble bicycle, manufacture TV, Candle, etc.

n Orange A Project – not requiredn Poultry, Grinding, Cartoon, Dry cleaning, Comb, Pin, sports goods,

restaurant, press, weaving, cinema hall, wood, etc.

n Orange B Project - IEE and EMP requiredn PVC, Jute mill, glass factory, animal feed, ice-creme, carbon rod,

water purification plant, bricks, cold storage, rice mill, Garments etc.

n Red Project – IEE, EIA and EMP requiredn Tannery, Urea, Bridge length> 100m, Sugar, Cement, Oil refinery,

Battery, Detergent, Nuclear plant, Fiberglass, explosive, power plant, hospital, ship manufacture, tobacco, metal boat, carpets, water treatment plant, air conditioner manufacture, tyre factory etc.

Page 24: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Green Category Orange-A Category

Page 25: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Orange-BCategory

Page 26: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

RedCategory

Page 27: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Clearance Procedure

Renewal Process: q The period of validity of an Environmental Clearance Certificate shall be, in case of Green Category,

3 years from the date of its issuance and in all other cases 1 year. q Each Environmental Clearance Certificate has to be applied for renewal at least thirty (30) days

before expiry

Page 28: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Steps involved in the environmental clearance in BangladeshSource: DOE (1997) EIA Guidelines for Industries, Dhaka, Bangladesh

Page 29: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Greenn 1. Application through prescribed form-3 under Environment

Conservation Rules 1997 n 2. Prescribed fees under schedule-13 under Environment

Conservation Rules 1997 (Amended 2002) n 3. General information about the industrial unit or project; n 4. Exact description of the raw materials and the manufactured

product; and n 5. No objection certificate (Prescribed Form) from the local authority;

If an application for an Environmental Clearance Certificate for an industrial unit or project of Green Category is made under article 7(5) along with the relevant documents specified in Article7(6), then, within 15 days of the receipt of the application, the certificate shall be issued or the application shall be rejected mentioning appropriate reason for such rejection.

Page 30: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Orange-An 1. Application through prescribed form-3 under Environment

Conservation Rules 1997n 2. Prescribed fees under schedule-13 under Environment

Conservation Rules 1997 (Amended2002)n 3. General information about the industrial unit or project;4. Exact

description of the raw materials and the manufactured product;n 5. No objection certificate (Prescribed Form) from the local authority;n 6. Process flow diagram;n 7. Layout Plan (showing location of Effluent Treatment Plant);n 8. Effluent discharge arrangement;n 9. Outlines of the plan for relocation, rehabilitation (if applicable);n 10. Other necessary information (if applicable);If an application is made under Article 7(5) along with the relevant documents specified in Article7(6), then in the case of an Orange- A Category industrial unit or project, within 30 days of the receipt of the application.

Page 31: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Orange-Bn 1. Application through prescribed form-3 under Environment Conservation Rules 1997n 2. Prescribed fees under schedule-13 under Environment Conservation Rules 1997

(Amended 2002)n 3. Report on the feasibility of the industrial unit or project (applicable only for proposed

industrial unit or project);n 4. Report on the Initial Environmental Examination of the industrial unit or project, and

also the process flow diagram, Layout Plan (showing location of Effluent TreatmentPlant), design of the Effluent Treatment Plant (ETP) of the unit or project (these areapplicable only for a proposed industrial unit or project);

n 5. Report on the Environmental Management Plan (EMP) for the industrial unit orproject, and also the Process Flow Diagram, Layout Plan (showing location of EffluentTreatment Plant), design of the Effluent Treatment Plant and information about theeffectiveness of the ETP of the unit or project, (these are applicable only for an existingindustrial unit or project);

n 6. No objection certificate (Prescribed Form) from the local authority;n 7. Emergency plan relating adverse environmental impact and plan for mitigation of the

effect of pollution;n 8. Outline of the relocation, rehabilitation plan (where applicable);n 9. Other necessary information (where applicable).If an application is made under Article 7(5) along with the relevant documents specified inArticle 7(6), then Orange-B Category industrial unit or project, within 60 days of the receiptof the application, a Location Clearance Certificate shall be issued or the application shall berejected mentioning appropriate reasons for such rejection.

Page 32: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Redn 1. Application through prescribed form-3 under Environment Conservation Rules 1997n 2. Prescribed fees under schedule-13 under Environment Conservation Rules 1997

(Amended2002)n 3. Report on the feasibility of the industrial unit or project (applicable only for proposed industrial

unit or project);n 4. Report on the Initial Environmental Examination (IEE) relating to the industrial unit or project,

and also the terms of reference (ToR) for the Environmental Impact Assessment(EIA) of the unit or the project and its Process Flow Diagram; or Environmental Impact Assessment (EIA) report prepared on the basis of terms of reference previously approved by the Department of Environment, along with the Layout Plan (showing location of Effluent Treatment Plant), Process Flow Diagram, design and time schedule of the Effluent Treatment Plant of the unit or project, (these are applicable only for a proposed industrial unit or project);

n 5. Report on the Environmental Management Plan (EMP) for the industrial unit or project, and also the Process Flow Diagram, Layout Plan (showing location of Effluent Treatment Plant),design and information about the effectiveness of the Effluent Treatment Plan of the unit or project (these are applicable only for an existing industrial unit or project);

n 6. No objection certificate (Prescribed Form) of the local authority:n 7. Emergency plan relating adverse environmental impact and plan for mitigation of the effect of

pollution;n 8. Outline of relocation, rehabilitation plan (where applicable); n 9. Other necessary information (where applicable);If an application is made under Article 7(5) along with the relevant documents specified in Article 7(6), then Red Category industrial unit or project, within 60 days of the receipt of the application, a Location Clearance Certificate shall be issued or the application shall be rejected mentioning appropriate reasons for such rejection.

Page 33: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Assessment Procedures

n Initial screening and categorizing

n Initial Environmental Examination (IEE)

n Environmental Impact Assessment (EIA)

Page 34: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Flowchart of EIA Process Source: DOE (1997) EIA Guidelines for Industries, Dhaka, Bangladesh

Page 35: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Impact Assessment (EIA)

Page 36: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Environmental Impact Assessment (EIA)

n Assessment of the beneficial and adverse changes in environment resources or values resulting from a proposed project.

n Essential Elements

v Identification of possible positive or negative impacts of the project.

v Quantifying impacts with respect to common base.v Preparation of mitigation plan to offset the negative

impacts.

Page 37: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Methods of Assessment

n Environmental Impact Value

n Vi = Relative change of the environmental quality of parameters

n Wi= Relative importance or weight or parameter n N = total number of environmental parameters

å=

=n

iii )W(VEIV

1

Page 38: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Quantification of Environmental Impact n Changes of environmental

parameters¨ Severe (+5 or -5)¨ Higher (+4 or -4)¨ Moderate (+3 or -3)¨ Low (+2 or -2)¨ Very Low (+1 or -1)¨ No change (0)

0 1 2 3 4 5

No change

Very low

Low

Moderate

Higher

Severe

Page 39: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Relative importance of Environmental Parametersn All parameters are not equal importance or

weight.n It varies from country to countryn In Bangladesh flood, employment, agriculture,

fisheries carry more importance.n In next slide, a summary of relative importance

of parameters for Road project of LGED is presented.

Page 40: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

EIA Procedure

1. Preparatory Works – study report, maps2. Data collection – from all sources, survey,

satellite images, questionaire3. Data Analysis – convert to change scale4. Impact Evaluation – relative weight 5. Mitigation and Monitoring Plan –

Environmental Management Plan (EMP)6. Preparation of Report – help decision makers

Page 41: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

ENVIRONMENTAL PARAMETERS Relative Importance Value

Degree of Impact

EIV

I. ECOLOGICALFisheriesForestTree PlantationWetland/Wetland HabitantNuisance Plant/Eutrophication

II. PHYSICALRegional Hydrology/FloodingDrainage Congestion/Water loggingErosion and SiltationDust Pollution/Noise Pollution

84241

4422

-20+10-1

-1-1-10

-15

-10

Example 1: Impact Evaluation of Road Projects

Page 42: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

ENVIRONMENTAL PARAMETERS Relative Importance Value

Degree of Impact

EIV

III. HUMAN INTERESTLoss of Agricultural LandsEmployment OpportunitiesNavigation/Boat CommunicationIndustrial ActivitiesIrrigation FacilitiesLandscape

III. QUALITY OF LIFE VALUESHealth and NutritionSanitation and Water Supply Education/LiteracyRoad SafetySlum Improvement

Total Environmental Impact Value

662332

33333

-3+3-3+2+3-1

+20+2-1+2

+7

+15

-6

Page 43: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n Example-2: EIA of a Bridge

Component Value

Length 588.0 m

Spans 14 equal spans of 42.0 m

Design Water Level 5.07 m PWD

Vertical clearance 7.83 m

Elevation of the bottom ofBridge at crest

12.90 m PWD

Height of deck at midsection

15.70 m PWD

Longitudinal profile ofbridge

Type: ParabolicSlope: 3%Starting: Along bridgecenterline from mid-section orcrest section

Approach Roads Formation Level: 8.58 m abovethe datum

A Bridge in Gopalganj Sadar Upzaila on the Madhumati River

Page 44: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Physical Impact

n Regional hydrology and floodingThe construction of the proposed bridge will create 1 cmafflux, which will cause insignificant impact on flood level.

n ErosionPlanform analyses through Landsat TM images haveshown that between 1989 and 2010, the erosion rate wasless than 1.0 m/year at the proposed bridge section of theriver. The degree of impact has been assessed to be ‘verylow’ (-1).

Page 45: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n Water pollutionConstruction activities such as piling, cutting and filling with material forfoundation of bridge, may generate loose mud and soil which mayincrease turbidity of the river water. However, the effect due toconstruction activities will be temporary and will not contaminate theriver water. Therefore, the degree of impact has been assessed to be‘very low’ (-1).

n Air qualityDusts will be generated during construction activities which needmanagement especially due to the fact that the bridge site is very nearto habitats at both the eastern and western banks. Therefore, thedegree of impact has been assessed to be ‘low’ (-2).

n Noise pollutionThe bridge site is located at a rural setting. There are some shops(Gopalganj end) and a mosque and some homesteads (Narail end)near the bridge site. The noise generated during construction activitiesand the traffic activities after bridge construction may cause someproblem. The degree of impact has been assessed to be ‘low’ (-2).

Page 46: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Ecological Impactn Fish and fisheriesThe region is known for its fisheries resources andModhumita River is considered to be an important fishmigration route. The proposed bridge may create adverseimpact on the fisheries of Modhumita River, especiallyduring the construction phase. The degree of impact hasbeen assessed to be ‘low’ (-2).

n Trees and vegetationSome trees and few bamboo groves may need to be felledduring construction especially for approach road on theNarail end. However, the damage will be minimal given thecommonality of the species. The degree of impact hasbeen assessed to be ‘low’ (-2).

Page 47: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Impact on Human Interest

n Loss of landsTo facilitate the smooth traffic communication on thewestern side of the river, new approach road will berequired at the Narail end which will cause loss ofagricultural land. The degree of impact has been assessedto be ‘moderate’ (-3).

n Industrial activitiesIt is expected that the proposed bridge will expand theindustrial activities at the locality as well as in the region.The degree of impact has been assessed to be ‘low’ (+2).

Page 48: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n Employment opportunityPresently a large number of service holders face the difficulty of crossing the Madhumoti River everyday for their employment purposes. It is expected that the proposed bridge will generate as well as enhance employment opportunity other than short term labor during the construction phase. The degree of impact has been assessed to be ‘low’ (+2).

n Transportation and communicationThe proposed bridge will significantly enhance the road communication between Gopalganj and Khulna through Terokhada. In future, it will also facilitate the regional road network up to Kolkata, after the construction of Kalia Bridge under RHD. The degree of impact has been assessed to be ‘high positive impact’ (+4).

Page 49: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n NavigationMadhumoti River is an important local as well as regional navigational route. Therefore, the proposed bridge will have some impact on the navigability of the river, especially during the construction phase. The degree of impact has been assessed to be ‘low’ (-2).

n Travel safetyTravel safety will improve for a large number of people who now have to cross the river with only one available ferry boat. The degree of impact has been assessed to be ‘very low’ (+1).

Page 50: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n Service accessibility to healthThe Madhumati River imposes a huge risk for theemergency patients to reach Sadar Hospital at theGopalganj end. The risk will be significantly minimized andtravel time will be considerably reduced after theconstruction of the proposed bridge. The degree of impacthas been assessed to be ‘moderate positive impact’ (+3).

Page 51: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

n Education and literacyThere are well-established schools, on the east side (Gopalganj

end) of the river. For the students from the Narail end, thebridge will offer easier and convenient communication. Thus itis expected that the bridge will improve existing literacy in theregion. Female education will be especially benefited. Thedegree of impact has been assessed to be ‘moderate positiveimpact’ (+3).

n Cultural and Heritage ValuesOne important feature of the proposed bridge is that at one end

there is Bangabandhu Mausoleum, located at Tungipara ofGopalganj District and at the other end there is Shat GombujMasjid, located at Bagerhat District. So the bridge willfacilitate an easy communication between these two importantnational monuments . Considering the importance of theproposed bridge from the cultural and heritage point of view,the degree of impact has been assessed as ‘+2’.

Page 52: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Parameters Relative importance

value

Degree of impact

Relative impact EIVPositive Negative

1. Physical -16Regional Hydrology andFlooding

4 -1 -4

Erosion 2 -1 -2Water Pollution 2 -1 -2Air Quality 2 -2 -4Noise pollution 2 -2 -42. Ecological -20Fish 8 -2 -16Trees and vegetation 2 -2 -43. Human interest +47Loss of lands 6 -3 -18

Industrial activities 3 +2 +6Employment opportunities 6 +2 +12

Transportation andcommunication

6 +4 +24

Navigation 2 -2 -4Travel safety 3 +1 +3Health 3 +3 +9Education and literacy 3 +3 +9Cultural and Heritage Values 3 +2 +6

Total EIV +69 -58 +11

Page 53: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

DOE Published Documentsn DoE has developed a generic EIA Guidelines for

Industries in 1997.

Sector Specific Guidelines developed are as follows: n EIA Guideline for Cement Industry n EIA Guideline for Project in the Natural Gas Sector

(Upstream and Downstream) n EIA Guideline for Textile Industry n EIA Guideline for Pharmaceutical Industry n EIA Guideline for Coal Mining n Guideline for Gender Responsive Environmental

Management n EIA Guideline for Roads & Bridges

Page 54: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Other Useful References¨ Environmental Assessment Guidelines for LGED

Projects, LGED, 2008¨ Guidelines on environmental issues related to

physical planning, LGED, 1992.¨ Environmental Impact Assessment, CERM, BUET,

2003.¨ Manual for Environmental Impact Assessment,

Bangladesh Flood Action Plan, MWR, 1995¨ Hydrological & Morphological Study and EIA of

Proposed Eighteen Road Bridges over different rivers Under Construction of Large Bridge on Upazila and Union Road Project, LGED, 2011.

Page 55: Environmental Impact Assessment (EIA)teacher.buet.ac.bd/akmsaifulislam/presentations/EIA_DR_Saiful_May... · T Environmental Impact Assessment (EIA) ... (BUET) Dr. A.K.M. Saiful Islam

EIA

and

EMP

@ D

r. A.

K.M

. Sai

ful I

slam

, IW

FM, B

UET

Other Useful Referencesn JMBA, Jamuna Multipurpose Bridge Authority (1994), General

Environmental Guidelines for Construction of Jamuna Multipurpose Bridge (Government of the People’s Republic of Bangladesh, Dhaka, Bangladesh).

n FAP, Flood Action Plan (1992), Bangladesh Flood Action Plan —Guidelines for Environmental Impact Assessment, Irrigation Support Project for Asia and the Near East (USAID, Dhaka, Bangladesh).